7.3 Applying Backflow Protection to Specific Connections
Colorado Journeyworker Plumber Journeyman Plumber
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Passing the Colorado Journeyworker Plumber Exam
1.1 Exam Blueprint, Format, and the 2024 Code Changeover 1.2 Colorado Licenses, Experience Hours, and Apprentice Supervision 1.3 Permits, Inspections, Blue Tags, and Board Enforcement
2 Chapter 2: General Regulations (IPC Chapter 3)
2.1 Approved Materials, Certification, and General Installation Rules 2.2 Protection of Pipes: Contact, Notching, Shield Plates, and Freezing 2.3 Piping Support, Trenching, Bedding, and Backfill 2.4 Required Tests: Water, Air, and Backflow Assembly Testing
3 Chapter 3: Fixtures and Equipment (IPC Chapter 4)
3.1 Minimum Fixture Counts, Separate Facilities, and Toilet Room Location 3.2 Fixture Clearances, Compartments, and Setting Requirements 3.3 Water Closets, Urinals, Lavatories, Sinks, and Flush Devices 3.4 Showers, Bathtubs, Fixture Fittings, and Scald Protection
4 Chapter 4: Water Heaters (IPC Chapter 5)
4.1 Water Heater Installation, Location, Access, and Clearances 4.2 Relief Valves and Discharge Piping 4.3 Water Heater Pans, Pan Drains, and Storage Tank Requirements 4.4 Thermal Expansion Control and Hot Water Temperature Limits
5 Chapter 5: Water Supply Materials and Installation (IPC Chapter 6)
5.1 Water Service and Distribution Materials, and Sewer Separation 5.2 Joints, Connections, and Dissimilar Materials in Water Piping 5.3 Valves, Shutoffs, and Required Valve Locations
6 Chapter 6: Water Supply Sizing and Pressure (IPC Chapter 6 and Appendix E)
6.1 Pressure Limits, Pressure Reducing Valves, and Water Hammer 6.2 Water Supply Fixture Units and Estimating Demand 6.3 Sizing Water Piping with Appendix E and Table E104.1
7 Chapter 7: Cross-Connection Control and Backflow Prevention (IPC Sections 608-610, Chapter 13)
7.1 Cross-Connection Principles, Backsiphonage, and Backpressure 7.2 Air Gaps and the Backflow Preventer Family 7.3 Applying Backflow Protection to Specific Connections 7.4 Nonpotable Water Systems, Identification, and Reclaimed Water
8 Chapter 8: Sanitary Drainage Materials and Fittings (IPC Chapter 7)
8.1 Sanitary Drainage Materials and Where Each May Be Used 8.2 Drainage Joints, Transitions, and Prohibited Connections 8.3 Fittings for Change of Direction and Drainage Flow Patterns
9 Chapter 9: Sanitary Drainage Sizing (IPC Sections 704, 709-711)
9.1 Drainage Fixture Units and Load Estimation 9.2 Slope of Horizontal Drainage and Installation Rules 9.3 Sizing Building Drains, Building Sewers, and Horizontal Branches 9.4 Stacks, Branch Intervals, and Offsets in Tall Buildings
10 Chapter 10: Cleanouts, Sumps and Below-Sewer Drainage (IPC Sections 708, 712-716)
10.1 Cleanouts, Manholes, and Access Requirements 10.2 Backwater Valves and Fixtures Below the Sewer Level 10.3 Sumps, Sewage Ejectors, and Macerating Toilet Systems 10.4 Building Sewers, Private Disposal, and Special Drainage Conditions
11 Chapter 11: Vent Fundamentals and Terminals (IPC Sections 901-905, 908)
11.1 How Vents Work, Trap Seal Loss, and the One-Inch Rule 11.2 Vent Terminals, Roof Penetrations, and Sidewall Terminations 11.3 Vent Connections, Grade, and the Six-Inch Rules
12 Chapter 12: Vent Types and Sizing (IPC Sections 906-911, 917)
12.1 Individual Vents, Common Vents, and Vents for Stack Offsets 12.2 Trap-to-Vent Distance, Trap Arms, and Fixture Drains 12.3 Sizing Stack Vents, Vent Stacks, Branch Vents, and Headers 12.4 Putting a Vent System Together: A Worked Building
13 Chapter 13: Engineered and Special Venting (IPC Sections 912-916, 918-920)
13.1 Horizontal and Vertical Wet Venting 13.2 Waste Stack Vents, Circuit Vents, and Combination Waste and Vent 13.3 Island Fixture Venting and Air Admittance Valves
14 Chapter 14: Traps, Interceptors and Separators (IPC Chapter 10)
14.1 Fixture Traps, Trap Seals, and Prohibited Trap Types 14.2 Trap Seal Protection, Primers, and Barrier Devices 14.3 Grease Interceptors, Oil Separators, and Solids Interceptors
15 Chapter 15: Indirect and Special Waste (IPC Chapter 8)
15.1 Where Indirect Waste Is Required, and Air Gap Versus Air Break 15.2 Waste Receptors, Hub Drains, and Standpipes 15.3 Special Wastes, Chemical Neutralization, and Health Care Drainage
16 Chapter 16: Storm Drainage (IPC Chapter 11 and Appendix B)
16.1 Storm Drainage Scope, Disposal, and Prohibited Connections 16.2 Storm Drainage Materials, Roof Drains, and Conductors 16.3 Secondary Roof Drains, Scuppers, and Controlled Flow Systems 16.4 Rainfall Rates, Roof Area, and the Flow-Rate Conversion 16.5 Sizing Vertical Conductors, Leaders, and Storm Drains 16.6 Gutters, Subsoil Drains, Building Subdrains, and Storm Sumps
17 Chapter 17: Residential Fire Sprinklers (IRC Section P2904)
17.1 Residential Fire Sprinkler Systems (IRC Section P2904)
18 Chapter 18: Isometric Analysis and Plumbing Calculations
18.1 Reading Plumbing Isometrics and Riser Diagrams 18.2 Analyzing a DWV Isometric for Code Compliance 18.3 Offsets, Travel, and the Plumbing Math the Exam Assumes
7.3 Applying Backflow Protection to Specific Connections
Key Takeaways Explain This Topic AI
IPC 608.17.2 requires a backflow preventer with an intermediate atmospheric vent on the potable supply to a boiler, escalating to an air gap or reduced pressure principle assembly where conditioning chemicals are introduced.
IPC 608.17.3 requires double-wall construction with an air gap open to the atmosphere between the walls where a heat exchanger uses an essentially toxic transfer fluid.
IPC 608.17.4 requires a double check, double check fire protection or reduced pressure principle fire protection assembly on the potable supply to automatic sprinkler and standpipe systems.
IPC 608.17.4.1 requires a reduced pressure principle assembly where sprinkler systems under continuous pressure contain chemical additives or antifreeze, or connect to a nonpotable secondary supply.
IPC 608.16.4.2 requires sillcocks, hose bibbs, wall hydrants and other hose-connection openings to be protected by an atmospheric or pressure-type vacuum breaker or a permanently attached hose connection vacuum breaker.
Last updated: September 2026
Connections to the potable water system — IPC 608.17
This section is essentially a lookup table in prose. Exam items pick a connection and ask which device is required.
Connection Required protection Section
Carbonated beverage dispenser Backflow preventer conforming to ASSE 1022 or an air gap ; the portion downstream of the second check and the piping beyond must not be affected by carbon dioxide gas 608.17.1.1
Coffee machines and noncarbonated drink dispensers ASSE 1022 or ASSE 1024 preventer, or an air gap 608.17.1.2
Boilers Backflow preventer with intermediate atmospheric vent (ASSE 1012, ASSE 1081, CSA B64.3). Where conditioning chemicals are introduced: air gap or reduced pressure principle assembly (ASSE 1013, AWWA C511, CSA B64.4) 608.17.2
Heat exchangers, essentially toxic transfer fluid Double-wall construction with an air gap open to the atmosphere between the two walls 608.17.3
Heat exchangers, essentially nontoxic transfer fluid Single-wall construction permitted 608.17.3
Automatic sprinkler and standpipe systems Double check , double check fire protection, or reduced pressure principle fire protection assembly 608.17.4
Sprinkler systems with additives, antifreeze, or a nonpotable secondary supply, under continuous pressure Reduced pressure principle assembly (or RP fire protection assembly) 608.17.4.1
Sprinkler systems not under continuous pressure Air gap or atmospheric vacuum breaker (ASSE 1001, CSA B64.1.1) 608.17.4.1
Lawn irrigation Atmospheric vacuum breaker, pressure vacuum breaker assembly, or reduced pressure principle assembly . No valves downstream of an AVB. Where chemicals are introduced: RPZ 608.17.5
Connections subject to high-hazard backpressure Reduced pressure principle assembly 608.17.6
Chemical dispensers Air gap (608.14.1), RPZ (608.14.2), PVB/SVB (608.14.5), AVB (608.14.6) or ASSE 1055 chemical dispenser device (608.14.8) 608.17.7
Portable cleaning equipment Air gap, RPZ, ASSE 1012 preventer, double check, or chemical dispenser device 608.17.8
- Dental pumping equipment Air gap, RPZ, PVB/SVB, AVB or chemical dispenser device 608.17.9
- Humidifiers without internal backflow protection ASSE 1012 preventer or an air gap 608.17.10
- Hospital fixtures RPZ, atmospheric or spill-resistant vacuum breaker assembly, or air gap 608.3.1
Specialty fixtures — baptisteries, ornamental and lily pools, aquariums, fountain basins, swimming pools Protected per Section 608 423.1
Two sprinkler exceptions worth knowing
IPC 608.17.4 exceptions:
Where systems are installed as a portion of the water distribution system in accordance with the code and are not provided with a fire department connection , isolation of the water supply system is not required . This is the multipurpose residential sprinkler case covered in Chapter 17 of this guide.
Isolation is not required for deluge, preaction or dry pipe systems .
Hose connections — IPC 608.16.4.2
Sillcocks, hose bibbs, wall hydrants and other openings with a hose connection shall be protected by an atmospheric-type or pressure-type vacuum breaker or a permanently attached hose connection vacuum breaker .
Two exceptions:
Water heater and boiler drain valves provided with hose connection threads and intended only for tank or vessel draining .
Water supply valves intended for connection of clothes washing machines where backflow prevention is otherwise provided or is integral with the machine .
The reason hose connections get their own rule is that IPC 608.16.1 expressly bars protecting hose-connection outlets by air gap. You cannot maintain a gap at the end of a hose.
Health care applications — IPC 608.3.1 and Section 609
Health care creates the highest-hazard connections in ordinary plumbing:
608.3.1 : hospital fixture water supplies protected by an RPZ, an atmospheric or spill-resistant vacuum breaker assembly, or an air gap . Vacuum breakers for bedpan washer hoses shall not be located less than 5 feet above the floor. Vacuum breakers for hose connections in health care or laboratory areas shall be not less than 6 feet above the floor.
609.4 Vacuum breaker installation : vacuum breakers in health care serving bedpan washers, aspirators, sterilizers and similar equipment must be installed at the required heights with access.
609.5 : jet- or water-supplied orifices, except those supplied by the flush connections, shall not be located in or connected with a water closet bowl or clinical sink. The section does not prohibit an approved bidet installation.
609.6 : clinical, hydrotherapeutic and radiological equipment supplies must be protected against backflow.
609.7 Condensate drain trap seal : condensate drains serving health care equipment must maintain a trap seal.
609.8 Valve leakage diverter : required where a leaking valve could contaminate a sterile field.
Colorado field note (not exam-scored): Board Rule 1.2(E)(1)(dd) restates 608.3.1 with the same 5-foot and 6-foot vacuum breaker heights and adds dental chairs alongside hospital fixtures.
Disinfection — IPC Section 610
New potable water systems shall be purged of deleterious matter and disinfected prior to utilization. The method is the one prescribed by the health authority or water purveyor having jurisdiction, or in the absence of a prescribed method, AWWA C651 or AWWA C652 , or the procedure in Section 610 itself:
Flush the system with clean, potable water until dirty water does not appear at outlets.
Apply the approved disinfection method — either:
fill with a solution of 50 parts per million (ppm) of chlorine and hold for 24 hours , or
fill with a solution of 200 ppm chlorine and hold for 3 hours .
Flush with clean potable water until the chlorine is purged from the system.
Repeat the procedure where a bacteriological examination shows contamination remains.
Learn the pair as a trade-off: lower concentration, longer contact (50 ppm / 24 hours) or higher concentration, shorter contact (200 ppm / 3 hours) .
IPC 602.3.4 requires the same disinfection for a newly constructed individual water supply system.
Testing and inspection, restated
From Chapter 2 of this guide, because it belongs to this topic as well:
IPC 312.10.1 : annual inspections of all backflow prevention assemblies and air gaps to determine whether assemblies are operable and air gaps exist.
IPC 312.10.2 : RP, DC, PVB, RP detector fire protection, DC detector fire protection and SVB assemblies , plus hose connection backflow preventers , are tested at installation, immediately after repairs or relocation, and at least annually , per ASSE 5013, 5015, 5020, 5047, 5048, 5052, 5056, CSA B64.10 or B64.10.1, with test gauges complying with ASSE 1064 .
The inspection duty is broader than the testing duty. Air gaps cannot be "tested," but they must be inspected annually to confirm they still exist — the single most common finding being a hose or extension added below a gap that was correct at installation.