Study guide

2.1 Approved Materials, Certification, and General Installation Rules

Colorado Journeyworker Plumber Journeyman Plumber

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Passing the Colorado Journeyworker Plumber Exam

1.1 Exam Blueprint, Format, and the 2024 Code Changeover 1.2 Colorado Licenses, Experience Hours, and Apprentice Supervision 1.3 Permits, Inspections, Blue Tags, and Board Enforcement

2 Chapter 2: General Regulations (IPC Chapter 3)

2.1 Approved Materials, Certification, and General Installation Rules 2.2 Protection of Pipes: Contact, Notching, Shield Plates, and Freezing 2.3 Piping Support, Trenching, Bedding, and Backfill 2.4 Required Tests: Water, Air, and Backflow Assembly Testing

3 Chapter 3: Fixtures and Equipment (IPC Chapter 4)

3.1 Minimum Fixture Counts, Separate Facilities, and Toilet Room Location 3.2 Fixture Clearances, Compartments, and Setting Requirements 3.3 Water Closets, Urinals, Lavatories, Sinks, and Flush Devices 3.4 Showers, Bathtubs, Fixture Fittings, and Scald Protection

4 Chapter 4: Water Heaters (IPC Chapter 5)

4.1 Water Heater Installation, Location, Access, and Clearances 4.2 Relief Valves and Discharge Piping 4.3 Water Heater Pans, Pan Drains, and Storage Tank Requirements 4.4 Thermal Expansion Control and Hot Water Temperature Limits

5 Chapter 5: Water Supply Materials and Installation (IPC Chapter 6)

5.1 Water Service and Distribution Materials, and Sewer Separation 5.2 Joints, Connections, and Dissimilar Materials in Water Piping 5.3 Valves, Shutoffs, and Required Valve Locations

6 Chapter 6: Water Supply Sizing and Pressure (IPC Chapter 6 and Appendix E)

6.1 Pressure Limits, Pressure Reducing Valves, and Water Hammer 6.2 Water Supply Fixture Units and Estimating Demand 6.3 Sizing Water Piping with Appendix E and Table E104.1

7 Chapter 7: Cross-Connection Control and Backflow Prevention (IPC Sections 608-610, Chapter 13)

7.1 Cross-Connection Principles, Backsiphonage, and Backpressure 7.2 Air Gaps and the Backflow Preventer Family 7.3 Applying Backflow Protection to Specific Connections 7.4 Nonpotable Water Systems, Identification, and Reclaimed Water

8 Chapter 8: Sanitary Drainage Materials and Fittings (IPC Chapter 7)

8.1 Sanitary Drainage Materials and Where Each May Be Used 8.2 Drainage Joints, Transitions, and Prohibited Connections 8.3 Fittings for Change of Direction and Drainage Flow Patterns

9 Chapter 9: Sanitary Drainage Sizing (IPC Sections 704, 709-711)

9.1 Drainage Fixture Units and Load Estimation 9.2 Slope of Horizontal Drainage and Installation Rules 9.3 Sizing Building Drains, Building Sewers, and Horizontal Branches 9.4 Stacks, Branch Intervals, and Offsets in Tall Buildings

10 Chapter 10: Cleanouts, Sumps and Below-Sewer Drainage (IPC Sections 708, 712-716)

10.1 Cleanouts, Manholes, and Access Requirements 10.2 Backwater Valves and Fixtures Below the Sewer Level 10.3 Sumps, Sewage Ejectors, and Macerating Toilet Systems 10.4 Building Sewers, Private Disposal, and Special Drainage Conditions

11 Chapter 11: Vent Fundamentals and Terminals (IPC Sections 901-905, 908)

11.1 How Vents Work, Trap Seal Loss, and the One-Inch Rule 11.2 Vent Terminals, Roof Penetrations, and Sidewall Terminations 11.3 Vent Connections, Grade, and the Six-Inch Rules

12 Chapter 12: Vent Types and Sizing (IPC Sections 906-911, 917)

12.1 Individual Vents, Common Vents, and Vents for Stack Offsets 12.2 Trap-to-Vent Distance, Trap Arms, and Fixture Drains 12.3 Sizing Stack Vents, Vent Stacks, Branch Vents, and Headers 12.4 Putting a Vent System Together: A Worked Building

13 Chapter 13: Engineered and Special Venting (IPC Sections 912-916, 918-920)

13.1 Horizontal and Vertical Wet Venting 13.2 Waste Stack Vents, Circuit Vents, and Combination Waste and Vent 13.3 Island Fixture Venting and Air Admittance Valves

14 Chapter 14: Traps, Interceptors and Separators (IPC Chapter 10)

14.1 Fixture Traps, Trap Seals, and Prohibited Trap Types 14.2 Trap Seal Protection, Primers, and Barrier Devices 14.3 Grease Interceptors, Oil Separators, and Solids Interceptors

15 Chapter 15: Indirect and Special Waste (IPC Chapter 8)

15.1 Where Indirect Waste Is Required, and Air Gap Versus Air Break 15.2 Waste Receptors, Hub Drains, and Standpipes 15.3 Special Wastes, Chemical Neutralization, and Health Care Drainage

16 Chapter 16: Storm Drainage (IPC Chapter 11 and Appendix B)

16.1 Storm Drainage Scope, Disposal, and Prohibited Connections 16.2 Storm Drainage Materials, Roof Drains, and Conductors 16.3 Secondary Roof Drains, Scuppers, and Controlled Flow Systems 16.4 Rainfall Rates, Roof Area, and the Flow-Rate Conversion 16.5 Sizing Vertical Conductors, Leaders, and Storm Drains 16.6 Gutters, Subsoil Drains, Building Subdrains, and Storm Sumps

17 Chapter 17: Residential Fire Sprinklers (IRC Section P2904)

17.1 Residential Fire Sprinkler Systems (IRC Section P2904)

18 Chapter 18: Isometric Analysis and Plumbing Calculations

18.1 Reading Plumbing Isometrics and Riser Diagrams 18.2 Analyzing a DWV Isometric for Code Compliance 18.3 Offsets, Travel, and the Plumbing Math the Exam Assumes

2.1 Approved Materials, Certification, and General Installation Rules

Key Takeaways Explain This Topic AI

IPC 303.4 requires plumbing products and materials to be listed by a third-party certification agency as complying with the referenced standard.

IPC 303.3 requires plastic pipe, fittings and components to be third-party certified as conforming to NSF 14.

IPC 301.7 resolves conflicts between the code and manufacturer's installation instructions in favor of the more restrictive provision.

IPC 301.6 prohibits plumbing systems in an elevator shaft or elevator equipment room, excepting only indirectly connected floor drains, sumps and sump pumps at the base of the shaft.

IPC 302.1 bars ashes, cinders, rags, flammable or explosive liquids, oil and grease from being deposited into a building drainage or sewer system.

Last updated: September 2026

What Chapter 3 is for

IPC Chapter 3 holds the rules that do not belong to any single system. It is the home for materials approval, pipe protection, trenching, support, testing, penetrations and engineered design. On the Colorado Journeyworker exam, General Regulations is worth 5 scored items , but the chapter's reach is much larger than that number suggests: a sizeable share of the drainage, vent and water-supply items ultimately trace back to a Chapter 3 rule about support spacing, shield plates or test pressure.

IPC 301.1 frames it exactly that way — Chapter 3 governs "the general regulations regarding the installation of plumbing not specific to other chapters."

Direct connection, and the two exceptions

IPC 301.3 is the baseline of sanitary design: fixtures, drains, appurtenances and appliances that receive or discharge liquid waste or sewage must be directly connected to the sanitary drainage system. Two carve-outs:

The section does not override the indirect waste systems required by Chapter 8 (covered in Chapter 15 of this guide).

Exception : bathtubs, showers, lavatories, clothes washers and laundry trays need not discharge to the sanitary drainage system where they discharge to an approved graywater system under IPC Chapters 13 and 14.

IPC 301.4 is the mirror image on the supply side: every fixture, device or appliance that requires water to operate must be directly or indirectly connected to the water supply system.

Materials: identified, certified, installed to standard

Four short sections do the work, and exam items usually hinge on which one applies.

Section Requirement

303.1 Identification Each length of pipe and each fitting, trap, fixture, material and device must bear the manufacturer's identification and any markings the referenced standard requires

303.2 Installation of materials Materials must be installed in strict accordance with the standards under which they were approved; absent that, the manufacturer's instructions. Where a standard or instruction falls below the code, the code applies

303.3 Plastic pipe Plastic pipe, fittings and components must be third-party certified as conforming to NSF 14

303.4 Third-party certification Any product the code requires to comply with a referenced standard must be listed by a third-party certification agency

303.5 Cast iron Cast-iron soil pipe, fittings and the couplings used to join them must be third-party listed and labeled, with certifiers meeting Annex A or A1 of the ASTM and CISPI standards

Note the direction of 303.2. It is a one-way ratchet: a standard or a manufacturer instruction can be more demanding than the code and you must follow it, but it can never be less demanding than the code.

IPC 301.7 states the companion rule explicitly for conflicts: "the more restrictive provisions shall apply." When an exam item pits a manufacturer instruction against a code minimum, the answer is always whichever is tighter.

Sizes are nominal

IPC 301.5 : unless otherwise indicated, pipe, tube and fitting sizes in the code are nominal or standard sizes as designated in the referenced material standards. A "2-inch" trap is a nominal 2-inch trap; you are not being asked for an actual measured inside diameter.

Prohibited locations

IPC 301.6 prohibits plumbing systems in an elevator shaft or elevator equipment room . The only exception is floor drains, sumps and sump pumps at the base of the shaft , provided they are indirectly connected to the plumbing system and comply with IPC 1003.4 (oil separators). That last cross-reference is the tell: elevator pit water routinely carries hydraulic oil.

Exclusion of materials detrimental to the sewer

IPC 302.1 bars from the building drainage or sewer system:

  • ashes, cinders or rags;
  • flammable, poisonous or explosive liquids or gases;

oil, grease or any other insoluble material capable of obstructing, damaging or overloading the drainage or sewer system, or of interfering with sewage treatment processes.

IPC 302.2 requires the code official or other authority having jurisdiction to determine that industrial waste products will not damage the public sewer or interfere with the treatment plant before they are introduced. In Colorado this routinely means the local wastewater or sanitation district gets the final word, and Board Rule 1.2(E)(1)(vv) formally lets those district regulations supersede the IPC's interceptor requirements.

Rodentproofing

A small section that appears on exams precisely because candidates skip it. IPC 304 requires:

304.2 Strainer plates — openings on drain inlets not greater than 1/2 inch in least dimension .

304.3 Meter boxes — constructed so rodents cannot enter the structure by way of the water service pipes connecting the meter box and the structure.

304.4 Openings for pipes — the annular space between a pipe and the sides of a wall, floor or ceiling opening must be sealed with compatible caulking or closed with a gasketing system.

IPC 315.1 repeats and extends the annular-space rule for penetrations generally: the space between a pipe and a sleeve, or between a pipe and a building-envelope opening, must be sealed with caulking, foam sealant or a gasketing system designed for the conditions and compatible with the pipe, sleeve and building materials . Where the pipe penetrates a fire-resistance-rated assembly or its membrane, sealing follows Section 714 of the International Building Code , not this section.

Flood hazard areas

IPC 309 points at Section 1612 of the IBC for structures in flood hazard areas and lists what must be located and installed accordingly: water service pipes, pump seals below the design flood elevation, potable well covers (sealed unless the casing or sleeve is elevated not less than 1 foot above the design flood elevation), sanitary drainage piping, storm drainage piping, manhole covers, fixtures and fittings, water heaters, and vents. The exception permits components below that elevation if they are designed to keep water out and to resist hydrostatic and hydrodynamic loads including buoyancy. In coastal high-hazard areas and coastal A zones , plumbing must additionally not be mounted on or penetrate through breakaway walls .

Toilet facilities for workers, washrooms and structural care

IPC 311.1 requires toilet facilities for construction workers, maintained in a sanitary condition; non-sewer types must conform to PSAI Z4.3 .

IPC 310 sends washroom and toilet room lighting, ventilation and interior finish to the IBC and IMC, and fixture location and compartments to IPC 405.3 .

IPC 301.2 sets the overall standard of care: plumbing must be installed "with due regard to preservation of the strength of structural members and prevention of damage to walls and other surfaces through fixture usage."

Alternative engineered design

IPC 316.1 provides the path for a system the prescriptive code does not cover. A registered design professional must indicate on the permit application that the system is an alternative engineered design, submit sufficient technical data to substantiate it, and submit two complete sets of signed and sealed construction documents including floor plans and a riser diagram , showing direction of flow, pipe sizes, grade of horizontal piping, and loading and location of fixtures and appliances. The design must provide an equivalent level of quality, strength, effectiveness, fire resistance, durability and safety. Approval is recorded on the permit and permanent permit records; denial must be in writing with reasons. Testing and inspection follow the ordinary rules.

Controlled-flow roof drain systems (IPC 1110) are the storm-drainage application of this section, so remember the cross-reference when you reach Chapter 16.

Colorado in practice

Colorado amends IPC 303 very little, but it does amend 305.1 (see the next section) and it adds the hanger rod sizing table 308.5.1 . Remember the exam rule from Chapter 1: answer from the model IPC. The Colorado amendments below are flagged so you can keep the field version and the exam version separate.

Loading diagram... IPC Chapter 3 map of general regulations