Study guide
2.3 Piping Support, Trenching, Bedding, and Backfill
Colorado Journeyworker Plumber Journeyman Plumber
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Passing the Colorado Journeyworker Plumber Exam
1.1 Exam Blueprint, Format, and the 2024 Code Changeover 1.2 Colorado Licenses, Experience Hours, and Apprentice Supervision 1.3 Permits, Inspections, Blue Tags, and Board Enforcement
2 Chapter 2: General Regulations (IPC Chapter 3)
2.1 Approved Materials, Certification, and General Installation Rules 2.2 Protection of Pipes: Contact, Notching, Shield Plates, and Freezing 2.3 Piping Support, Trenching, Bedding, and Backfill 2.4 Required Tests: Water, Air, and Backflow Assembly Testing
3 Chapter 3: Fixtures and Equipment (IPC Chapter 4)
3.1 Minimum Fixture Counts, Separate Facilities, and Toilet Room Location 3.2 Fixture Clearances, Compartments, and Setting Requirements 3.3 Water Closets, Urinals, Lavatories, Sinks, and Flush Devices 3.4 Showers, Bathtubs, Fixture Fittings, and Scald Protection
4 Chapter 4: Water Heaters (IPC Chapter 5)
4.1 Water Heater Installation, Location, Access, and Clearances 4.2 Relief Valves and Discharge Piping 4.3 Water Heater Pans, Pan Drains, and Storage Tank Requirements 4.4 Thermal Expansion Control and Hot Water Temperature Limits
5 Chapter 5: Water Supply Materials and Installation (IPC Chapter 6)
5.1 Water Service and Distribution Materials, and Sewer Separation 5.2 Joints, Connections, and Dissimilar Materials in Water Piping 5.3 Valves, Shutoffs, and Required Valve Locations
6 Chapter 6: Water Supply Sizing and Pressure (IPC Chapter 6 and Appendix E)
6.1 Pressure Limits, Pressure Reducing Valves, and Water Hammer 6.2 Water Supply Fixture Units and Estimating Demand 6.3 Sizing Water Piping with Appendix E and Table E104.1
7 Chapter 7: Cross-Connection Control and Backflow Prevention (IPC Sections 608-610, Chapter 13)
7.1 Cross-Connection Principles, Backsiphonage, and Backpressure 7.2 Air Gaps and the Backflow Preventer Family 7.3 Applying Backflow Protection to Specific Connections 7.4 Nonpotable Water Systems, Identification, and Reclaimed Water
8 Chapter 8: Sanitary Drainage Materials and Fittings (IPC Chapter 7)
8.1 Sanitary Drainage Materials and Where Each May Be Used 8.2 Drainage Joints, Transitions, and Prohibited Connections 8.3 Fittings for Change of Direction and Drainage Flow Patterns
9 Chapter 9: Sanitary Drainage Sizing (IPC Sections 704, 709-711)
9.1 Drainage Fixture Units and Load Estimation 9.2 Slope of Horizontal Drainage and Installation Rules 9.3 Sizing Building Drains, Building Sewers, and Horizontal Branches 9.4 Stacks, Branch Intervals, and Offsets in Tall Buildings
10 Chapter 10: Cleanouts, Sumps and Below-Sewer Drainage (IPC Sections 708, 712-716)
10.1 Cleanouts, Manholes, and Access Requirements 10.2 Backwater Valves and Fixtures Below the Sewer Level 10.3 Sumps, Sewage Ejectors, and Macerating Toilet Systems 10.4 Building Sewers, Private Disposal, and Special Drainage Conditions
11 Chapter 11: Vent Fundamentals and Terminals (IPC Sections 901-905, 908)
11.1 How Vents Work, Trap Seal Loss, and the One-Inch Rule 11.2 Vent Terminals, Roof Penetrations, and Sidewall Terminations 11.3 Vent Connections, Grade, and the Six-Inch Rules
12 Chapter 12: Vent Types and Sizing (IPC Sections 906-911, 917)
12.1 Individual Vents, Common Vents, and Vents for Stack Offsets 12.2 Trap-to-Vent Distance, Trap Arms, and Fixture Drains 12.3 Sizing Stack Vents, Vent Stacks, Branch Vents, and Headers 12.4 Putting a Vent System Together: A Worked Building
13 Chapter 13: Engineered and Special Venting (IPC Sections 912-916, 918-920)
13.1 Horizontal and Vertical Wet Venting 13.2 Waste Stack Vents, Circuit Vents, and Combination Waste and Vent 13.3 Island Fixture Venting and Air Admittance Valves
14 Chapter 14: Traps, Interceptors and Separators (IPC Chapter 10)
14.1 Fixture Traps, Trap Seals, and Prohibited Trap Types 14.2 Trap Seal Protection, Primers, and Barrier Devices 14.3 Grease Interceptors, Oil Separators, and Solids Interceptors
15 Chapter 15: Indirect and Special Waste (IPC Chapter 8)
15.1 Where Indirect Waste Is Required, and Air Gap Versus Air Break 15.2 Waste Receptors, Hub Drains, and Standpipes 15.3 Special Wastes, Chemical Neutralization, and Health Care Drainage
16 Chapter 16: Storm Drainage (IPC Chapter 11 and Appendix B)
16.1 Storm Drainage Scope, Disposal, and Prohibited Connections 16.2 Storm Drainage Materials, Roof Drains, and Conductors 16.3 Secondary Roof Drains, Scuppers, and Controlled Flow Systems 16.4 Rainfall Rates, Roof Area, and the Flow-Rate Conversion 16.5 Sizing Vertical Conductors, Leaders, and Storm Drains 16.6 Gutters, Subsoil Drains, Building Subdrains, and Storm Sumps
17 Chapter 17: Residential Fire Sprinklers (IRC Section P2904)
17.1 Residential Fire Sprinkler Systems (IRC Section P2904)
18 Chapter 18: Isometric Analysis and Plumbing Calculations
18.1 Reading Plumbing Isometrics and Riser Diagrams 18.2 Analyzing a DWV Isometric for Code Compliance 18.3 Offsets, Travel, and the Plumbing Math the Exam Assumes
2.3 Piping Support, Trenching, Bedding, and Backfill
Key Takeaways Explain This Topic AI
IPC Table 308.5 sets maximum horizontal hanger spacing at 4 feet for PVC and ABS, 5 feet for cast iron, 6 feet for copper tubing 1-1/4 inch and smaller, 10 feet for copper tubing 1-1/2 inch and larger, and 12 feet for steel pipe.
IPC Table 308.5 sets maximum vertical support at 10 feet for most plastics and copper, and 15 feet for cast iron, steel and aluminum.
IPC 306.2.2 requires rock encountered in a trench to be removed to not less than 3 inches below the bottom of the pipe and replaced with tamped sand.
IPC 306.3 requires backfill in 6-inch layers tamped in place until the crown of the pipe is covered by 12 inches of tamped earth.
IPC 308.6 requires rigid bracing where horizontal drainage or waste pipes 4 inches and larger change flow direction more than 45 degrees, except into a vertical pipe.
Last updated: September 2026
Hanger spacing: IPC Table 308.5
IPC 308.5 requires pipe to be supported in accordance with Table 308.5 . This table is worth memorizing, not merely looking up, because it appears in both General Regulations items and in drainage and water-supply items.
- Piping material Max horizontal (ft) Max vertical (ft)
- ABS pipe 4 10
- PVC pipe 4 10
- CPVC, 1 inch and smaller 3 10
- CPVC, 1-1/4 inches and larger 4 10
- PEX, 1 inch and smaller 2.67 (32 in) 10
- PEX, 1-1/4 inches and larger 4 10
- PE-RT, 1 inch and smaller 2.67 (32 in) 10
- PE-RT, 1-1/4 inches and larger 4 10
- PEX-AL-PEX and PE-AL-PE 2.67 (32 in) 4
- Polypropylene, 1 inch and smaller 2.67 (32 in) 10
- Polypropylene, 1-1/4 inches and larger 4 10
- Cast-iron pipe 5 15
- Copper or copper-alloy tubing , 1-1/4 in and smaller 6 10
- Copper or copper-alloy tubing , 1-1/2 in and larger 10 10
- Copper or copper-alloy pipe 12 10
- Brass pipe 10 10
- Steel pipe 12 15
- Aluminum tubing 10 15
- Stainless steel drainage systems 10 10
- Lead pipe Continuous 4
Two footnotes carry real weight:
Footnote a: cast-iron horizontal spacing increases to 10 feet where 10-foot lengths of pipe are installed . This is why a 10-foot no-hub run is supported at each joint rather than every 5 feet.
Footnote b: for the plastics and stainless systems flagged with it, sizes 2 inches and smaller require a guide midway between required vertical supports , preventing movement perpendicular to the pipe axis.
Three traps: copper tubing and copper pipe are different rows (6 or 10 feet versus 12 feet); CPVC drops to 3 feet at 1 inch and smaller while PVC stays at 4; and lead pipe must be supported continuously .
IPC 308.3 requires hangers, anchors and supports to carry the piping and its contents , of approved material that will not promote galvanic action — the reason you do not hang copper in a bare steel strap. IPC 308.4 requires attachment to the building construction in an approved manner, and 308.2 sends seismic support, anchorage and bracing to IBC Chapter 16 where earthquake loads apply.
Colorado field note: Board Rule 1.2(E)(1)(i) and (j) add a hanger rod size table 308.5.1 that the model IPC does not have: 3/8 inch rod for 1/2-inch through 4-inch pipe, 1/2 inch for 5-inch through 8-inch, and 5/8 inch for 10-inch through 12-inch.
Sway bracing and anchorage
IPC 308.6 Sway bracing: where horizontal pipes 4 inches and larger convey drainage or waste and a fitting changes flow direction more than 45 degrees , rigid bracing or other rigid support must resist movement of the upstream pipe in the direction of flow. A change of direction into a vertical pipe does not require the upstream pipe to be braced.
IPC 308.7 Anchorage: anchorage must restrain drainage piping from axial movement.
IPC 308.7.1 Location: for pipe larger than 4 inches , restraints are required at all changes in direction and at all changes in diameter greater than two pipe sizes , using braces, blocks, rodding or other methods specified by the coupling manufacturer.
Together these sections explain why large no-hub cast iron under a slab or in a chase must be blocked at every bend: shielded couplings have no inherent resistance to the axial thrust a moving column of water creates.
IPC 308.8 limits expansion joint fittings to locations where expansion and contraction genuinely require them.
IPC 308.9 addresses parallel water distribution systems; 308.10 addresses thermal expansion tanks and their support.
Trenching, excavation and backfill
IPC 306.1 states the governing principle in seven words: buried piping shall be supported throughout its entire length. Every rule that follows serves that principle.
306.2 Trenching and bedding
Where the trench bottom forms the bed for the pipe, solid and continuous load-bearing support must be provided between joints , with bell holes, hub holes and coupling holes provided where the pipe is joined. The reason is mechanical: a bell resting on undisturbed trench bottom becomes a fulcrum, and the barrel between bells hangs unsupported.
Pipe shall not be supported on blocks to grade. Where the manufacturer's instructions are more restrictive than the code, the manufacturer's instructions govern.
306.2.1 Overexcavation
Where the trench is dug below the pipe's installation level, backfill to the bottom of the pipe with sand or fine gravel placed in layers not greater than 6 inches deep, compacted after each placement .
306.2.2 Rock removal
Where rock is encountered, remove it to not less than 3 inches below the bottom of the pipe and backfill to the pipe's bottom with sand tamped in place for uniform load-bearing support between joints. The pipe, including its joints, shall not rest on rock at any point.
306.2.3 Soft load-bearing materials
Where soft, poor load-bearing material is found at the trench bottom, overexcavate not less than two pipe diameters and backfill to the bottom of the pipe with fine gravel, crushed stone or a concrete foundation ; a concrete foundation must be bedded with tamped sand.
306.3 Backfilling
Backfill must be free from discarded construction material and debris . Loose earth free from rocks, broken concrete and frozen chunks is placed in 6-inch layers and tamped until the crown of the pipe is covered by 12 inches of tamped earth . Backfill under and beside the pipe must be compacted for pipe support, and must be brought up evenly on both sides so the pipe stays aligned.
306.4 Tunneling
Where pipe is installed by tunneling or jacking, it must be protected from damage during installation and from subsequent uneven loading . Earth tunnels require supporting structures to prevent settling or caving.
The four trench-bottom conditions, side by side
- Condition found IPC section Required remedy
- Sound native soil at grade 306.2 Bed on trench bottom; cut bell holes at joints
- Overexcavated below pipe grade 306.2.1 Sand or fine gravel in 6-inch compacted layers
- Rock 306.2.2 Remove to 3 inches below pipe; tamped sand
- Soft, poor bearing material 306.2.3 Overexcavate 2 pipe diameters; fine gravel, crushed stone or concrete
- Worked example: supporting a mixed riser
A three-story building has a 4-inch cast-iron soil stack in 10-foot lengths, a 2-inch PVC vent and a 1-inch copper tube hot water riser in the same chase. Floor-to-floor is 10 feet.
Cast iron vertical: 15 feet maximum, so a support at every floor line (10 feet) satisfies it easily.
PVC vertical: 10 feet maximum — a support at every floor line, and because the pipe is 2 inches, footnote b requires a guide midway between supports.
Copper tubing vertical: 10 feet maximum — a support at every floor line.
Where the copper turns horizontal at the branch, the 1-inch tubing needs support every 6 feet ; the 2-inch PVC branch needs support every 4 feet ; the horizontal 4-inch cast iron in 10-foot lengths may go 10 feet under footnote a.
The copper must not be strapped in bare steel (308.3, galvanic action), and where it crosses a steel stud it must be sheathed (305.1).