9.4 Stacks, Branch Intervals, and Offsets in Tall Buildings

Colorado Journeyworker Plumber Journeyman Plumber

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Passing the Colorado Journeyworker Plumber Exam

1.1 Exam Blueprint, Format, and the 2024 Code Changeover 1.2 Colorado Licenses, Experience Hours, and Apprentice Supervision 1.3 Permits, Inspections, Blue Tags, and Board Enforcement

2 Chapter 2: General Regulations (IPC Chapter 3)

2.1 Approved Materials, Certification, and General Installation Rules 2.2 Protection of Pipes: Contact, Notching, Shield Plates, and Freezing 2.3 Piping Support, Trenching, Bedding, and Backfill 2.4 Required Tests: Water, Air, and Backflow Assembly Testing

3 Chapter 3: Fixtures and Equipment (IPC Chapter 4)

3.1 Minimum Fixture Counts, Separate Facilities, and Toilet Room Location 3.2 Fixture Clearances, Compartments, and Setting Requirements 3.3 Water Closets, Urinals, Lavatories, Sinks, and Flush Devices 3.4 Showers, Bathtubs, Fixture Fittings, and Scald Protection

4 Chapter 4: Water Heaters (IPC Chapter 5)

4.1 Water Heater Installation, Location, Access, and Clearances 4.2 Relief Valves and Discharge Piping 4.3 Water Heater Pans, Pan Drains, and Storage Tank Requirements 4.4 Thermal Expansion Control and Hot Water Temperature Limits

5 Chapter 5: Water Supply Materials and Installation (IPC Chapter 6)

5.1 Water Service and Distribution Materials, and Sewer Separation 5.2 Joints, Connections, and Dissimilar Materials in Water Piping 5.3 Valves, Shutoffs, and Required Valve Locations

6 Chapter 6: Water Supply Sizing and Pressure (IPC Chapter 6 and Appendix E)

6.1 Pressure Limits, Pressure Reducing Valves, and Water Hammer 6.2 Water Supply Fixture Units and Estimating Demand 6.3 Sizing Water Piping with Appendix E and Table E104.1

7 Chapter 7: Cross-Connection Control and Backflow Prevention (IPC Sections 608-610, Chapter 13)

7.1 Cross-Connection Principles, Backsiphonage, and Backpressure 7.2 Air Gaps and the Backflow Preventer Family 7.3 Applying Backflow Protection to Specific Connections 7.4 Nonpotable Water Systems, Identification, and Reclaimed Water

8 Chapter 8: Sanitary Drainage Materials and Fittings (IPC Chapter 7)

8.1 Sanitary Drainage Materials and Where Each May Be Used 8.2 Drainage Joints, Transitions, and Prohibited Connections 8.3 Fittings for Change of Direction and Drainage Flow Patterns

9 Chapter 9: Sanitary Drainage Sizing (IPC Sections 704, 709-711)

9.1 Drainage Fixture Units and Load Estimation 9.2 Slope of Horizontal Drainage and Installation Rules 9.3 Sizing Building Drains, Building Sewers, and Horizontal Branches 9.4 Stacks, Branch Intervals, and Offsets in Tall Buildings

10 Chapter 10: Cleanouts, Sumps and Below-Sewer Drainage (IPC Sections 708, 712-716)

10.1 Cleanouts, Manholes, and Access Requirements 10.2 Backwater Valves and Fixtures Below the Sewer Level 10.3 Sumps, Sewage Ejectors, and Macerating Toilet Systems 10.4 Building Sewers, Private Disposal, and Special Drainage Conditions

11 Chapter 11: Vent Fundamentals and Terminals (IPC Sections 901-905, 908)

11.1 How Vents Work, Trap Seal Loss, and the One-Inch Rule 11.2 Vent Terminals, Roof Penetrations, and Sidewall Terminations 11.3 Vent Connections, Grade, and the Six-Inch Rules

12 Chapter 12: Vent Types and Sizing (IPC Sections 906-911, 917)

12.1 Individual Vents, Common Vents, and Vents for Stack Offsets 12.2 Trap-to-Vent Distance, Trap Arms, and Fixture Drains 12.3 Sizing Stack Vents, Vent Stacks, Branch Vents, and Headers 12.4 Putting a Vent System Together: A Worked Building

13 Chapter 13: Engineered and Special Venting (IPC Sections 912-916, 918-920)

13.1 Horizontal and Vertical Wet Venting 13.2 Waste Stack Vents, Circuit Vents, and Combination Waste and Vent 13.3 Island Fixture Venting and Air Admittance Valves

14 Chapter 14: Traps, Interceptors and Separators (IPC Chapter 10)

14.1 Fixture Traps, Trap Seals, and Prohibited Trap Types 14.2 Trap Seal Protection, Primers, and Barrier Devices 14.3 Grease Interceptors, Oil Separators, and Solids Interceptors

15 Chapter 15: Indirect and Special Waste (IPC Chapter 8)

15.1 Where Indirect Waste Is Required, and Air Gap Versus Air Break 15.2 Waste Receptors, Hub Drains, and Standpipes 15.3 Special Wastes, Chemical Neutralization, and Health Care Drainage

16 Chapter 16: Storm Drainage (IPC Chapter 11 and Appendix B)

16.1 Storm Drainage Scope, Disposal, and Prohibited Connections 16.2 Storm Drainage Materials, Roof Drains, and Conductors 16.3 Secondary Roof Drains, Scuppers, and Controlled Flow Systems 16.4 Rainfall Rates, Roof Area, and the Flow-Rate Conversion 16.5 Sizing Vertical Conductors, Leaders, and Storm Drains 16.6 Gutters, Subsoil Drains, Building Subdrains, and Storm Sumps

17 Chapter 17: Residential Fire Sprinklers (IRC Section P2904)

17.1 Residential Fire Sprinkler Systems (IRC Section P2904)

18 Chapter 18: Isometric Analysis and Plumbing Calculations

18.1 Reading Plumbing Isometrics and Riser Diagrams 18.2 Analyzing a DWV Isometric for Code Compliance 18.3 Offsets, Travel, and the Plumbing Math the Exam Assumes

9.4 Stacks, Branch Intervals, and Offsets in Tall Buildings

Key Takeaways Explain This Topic AI

A branch interval is a vertical distance of 8 feet or more in developed length between the connections of horizontal branches to a drainage stack, measured down the stack from the highest horizontal branch connection.

IPC Table 710.1(2) footnote b permits a stack to be reduced in size as accumulated load decreases, but never to less than one-half the diameter of the largest stack size required.

IPC 711.1 requires an offset to be vented per Section 907 where a horizontal branch connects within 2 feet above or below a vertical stack offset located more than four branch intervals below the top of the stack.

IPC 711.2 requires a stack with a horizontal offset located more than four branch intervals below the top of the stack to be vented per Section 907 and sized in three parts.

IPC 711.3 requires no change in stack diameter for a vertical offset below the lowest horizontal branch, but sizes a horizontal offset below the lowest branch as a building drain.

Last updated: September 2026

Branch intervals

IPC 202 defines a branch interval as a vertical measurement of distance, 8 feet or more in developed length, between the connections of horizontal branches to a drainage stack . Measurements are taken down the stack from the highest horizontal branch connection.

Three consequences follow:

A stack in a building with 9-foot floors has one branch interval per floor .

A stack in a building with an 18-foot two-story atrium where branches connect only at the top has one branch interval spanning that height, not two.

A mezzanine 6 feet above the floor below, with branches connecting at both levels, still yields one branch interval, because the 8-foot minimum is not met.

Branch intervals matter because Table 710.1(2) sizes stacks in three columns keyed to them.

Reading the stack columns

Column Meaning

Total discharge into one branch interval The maximum dfu that may enter the stack at any single branch interval . A local limit.

Total for stack of three branch intervals or less The maximum dfu for the whole stack where the stack spans three or fewer branch intervals.

Total for stack greater than three branch intervals The maximum dfu for the whole stack where it spans more than three branch intervals.

A 4-inch stack, for example, permits 90 dfu into any one branch interval , 240 dfu total if the stack spans three intervals or fewer, and 500 dfu total if it spans more.

Why does a taller stack carry more? Because falling water reaches terminal velocity within roughly one to two stories and then spreads into an annular sheet along the pipe wall, leaving a stable air core. Load entering at widely separated intervals has time to re-establish that pattern. Load dumped into a single interval does not — hence the much lower single-interval column.

Both tests must pass

A 12-story stack serves 20 dfu at every floor.

Whole-stack test : 12 x 20 = 240 dfu , greater than three branch intervals. Table 710.1(2) gives 3-inch = 72 (fails), 4-inch = 500 (passes).

Single-interval test : 20 dfu at one interval. For 4-inch pipe the limit is 90 (passes). For 3-inch it would be 20 — exactly at the limit — but the whole-stack test already ruled out 3 inches.

Now change the case: a 2-story stack receiving 100 dfu on the first floor only .

Whole-stack test : 100 dfu, three intervals or less: 4-inch = 240 (passes).

Single-interval test : 100 dfu into one interval: 4-inch allows 90 — fails . A 5-inch stack is required, since it allows 200 into one interval.

The single-interval column is the one candidates forget.

Reducing stack size — footnote b

Stacks shall be sized based on the total accumulated connected load at each story or branch interval. As the total accumulated connected load decreases, stacks are permitted to be reduced in size . Stack diameters shall not be reduced to less than one-half of the diameter of the largest stack size required .

So a stack that must be 6 inches at its base may be reduced as it rises, but never below 3 inches . This is not a violation of IPC 704.2 (no reduction in the direction of flow) because in a stack, flow travels downward — reducing the size going up is reducing it against the direction of flow, which is permitted.

Offsets in buildings of five stories or more — IPC Section 711

Section 711's title limits it to buildings of five stories or more . Within that scope, the trigger throughout is "more than four branch intervals below the top of the stack."

711.1 Horizontal branch connections near a vertical stack offset

If a horizontal branch connects to the stack within 2 feet above or below a vertical stack offset , and the offset is located more than four branch intervals below the top of the stack , the offset shall be vented in accordance with Section 907 .

711.1.1 Omission of vents : not required where the stack and its offset are sized as a building drain per Table 710.1(1).

711.2 Horizontal stack offsets

A stack with a horizontal offset located more than four branch intervals below the top of the stack shall be vented per Section 907 and sized in three parts:

Above the offset : sized as a vertical stack based on the total dfu above the offset .

The offset itself : sized per 710.1.1 — that is, as a building drain per Table 710.1(1).

Below the offset : sized as for the offset, or based on the total dfu on the entire stack , whichever is larger (Table 710.1(2), the "greater than three branch intervals" column).

711.2.1 Omission of vents : not required where the stack and its offset are one pipe size larger than required for a building drain, and the entire stack and offset are not less in cross-sectional area than a straight stack plus the area of the offset vent required by Section 907.

711.3 Offsets below the lowest branch

Offset type Requirement

Vertical offset below the lowest horizontal branch No change in stack diameter is required because of the offset

Horizontal offset below the lowest horizontal branch The offset and the stack below it are sized as a building drain per Table 710.1(1)

Below the lowest branch, nothing discharges into the stack there, so pressure transients from the offset cannot reach a trap. That is why the venting requirements of 711.1 and 711.2 do not apply and only the sizing rule survives.

Worked example: an eight-story office building

An 8-story stack, one branch interval per floor, carries 36 dfu per floor and must offset horizontally at the sixth floor — that is, two branch intervals below the top, counting down from floor 8.

Step 1 — is 711.2 triggered? The offset is located two branch intervals below the top of the stack, which is not more than four. Section 711.2's venting and three-part sizing requirements are not triggered. The stack is sized straight from Table 710.1(2).

Change the case: the offset is at the third floor , which is five branch intervals below the top . Now 711.2 applies.

Step 2 — size the portion above the offset. Floors 4 through 8 contribute 5 x 36 = 180 dfu . Greater than three branch intervals: 3-inch = 72 (fails), 4-inch = 500 (passes). Use 4 inches .

Step 3 — size the offset. Per 710.1.1, use Table 710.1(1) as a building drain carrying 180 dfu . At 1/4 inch per foot, 4-inch carries 216 — passes. Use 4 inches at 1/4 inch per foot.

Step 4 — size the stack below the offset. The larger of (a) the offset size, or (b) the total dfu on the entire stack, which is 8 x 36 = 288 dfu . Table 710.1(2), greater than three branch intervals: 4-inch = 500 — passes. Use 4 inches .

Step 5 — vent the offset per Section 907 , unless the 711.2.1 relief applies — the stack and offset one pipe size larger than required for a building drain, with the combined cross-sectional area not less than a straight stack plus the offset vent area.

Step 6 — check the single-interval column. 36 dfu into one branch interval; a 4-inch stack permits 90 . Passes.

Loading diagram... Stack sizing tests and offset rules