Study guide

16.3 Secondary Roof Drains, Scuppers, and Controlled Flow Systems

Colorado Journeyworker Plumber Journeyman Plumber

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Passing the Colorado Journeyworker Plumber Exam

1.1 Exam Blueprint, Format, and the 2024 Code Changeover 1.2 Colorado Licenses, Experience Hours, and Apprentice Supervision 1.3 Permits, Inspections, Blue Tags, and Board Enforcement

2 Chapter 2: General Regulations (IPC Chapter 3)

2.1 Approved Materials, Certification, and General Installation Rules 2.2 Protection of Pipes: Contact, Notching, Shield Plates, and Freezing 2.3 Piping Support, Trenching, Bedding, and Backfill 2.4 Required Tests: Water, Air, and Backflow Assembly Testing

3 Chapter 3: Fixtures and Equipment (IPC Chapter 4)

3.1 Minimum Fixture Counts, Separate Facilities, and Toilet Room Location 3.2 Fixture Clearances, Compartments, and Setting Requirements 3.3 Water Closets, Urinals, Lavatories, Sinks, and Flush Devices 3.4 Showers, Bathtubs, Fixture Fittings, and Scald Protection

4 Chapter 4: Water Heaters (IPC Chapter 5)

4.1 Water Heater Installation, Location, Access, and Clearances 4.2 Relief Valves and Discharge Piping 4.3 Water Heater Pans, Pan Drains, and Storage Tank Requirements 4.4 Thermal Expansion Control and Hot Water Temperature Limits

5 Chapter 5: Water Supply Materials and Installation (IPC Chapter 6)

5.1 Water Service and Distribution Materials, and Sewer Separation 5.2 Joints, Connections, and Dissimilar Materials in Water Piping 5.3 Valves, Shutoffs, and Required Valve Locations

6 Chapter 6: Water Supply Sizing and Pressure (IPC Chapter 6 and Appendix E)

6.1 Pressure Limits, Pressure Reducing Valves, and Water Hammer 6.2 Water Supply Fixture Units and Estimating Demand 6.3 Sizing Water Piping with Appendix E and Table E104.1

7 Chapter 7: Cross-Connection Control and Backflow Prevention (IPC Sections 608-610, Chapter 13)

7.1 Cross-Connection Principles, Backsiphonage, and Backpressure 7.2 Air Gaps and the Backflow Preventer Family 7.3 Applying Backflow Protection to Specific Connections 7.4 Nonpotable Water Systems, Identification, and Reclaimed Water

8 Chapter 8: Sanitary Drainage Materials and Fittings (IPC Chapter 7)

8.1 Sanitary Drainage Materials and Where Each May Be Used 8.2 Drainage Joints, Transitions, and Prohibited Connections 8.3 Fittings for Change of Direction and Drainage Flow Patterns

9 Chapter 9: Sanitary Drainage Sizing (IPC Sections 704, 709-711)

9.1 Drainage Fixture Units and Load Estimation 9.2 Slope of Horizontal Drainage and Installation Rules 9.3 Sizing Building Drains, Building Sewers, and Horizontal Branches 9.4 Stacks, Branch Intervals, and Offsets in Tall Buildings

10 Chapter 10: Cleanouts, Sumps and Below-Sewer Drainage (IPC Sections 708, 712-716)

10.1 Cleanouts, Manholes, and Access Requirements 10.2 Backwater Valves and Fixtures Below the Sewer Level 10.3 Sumps, Sewage Ejectors, and Macerating Toilet Systems 10.4 Building Sewers, Private Disposal, and Special Drainage Conditions

11 Chapter 11: Vent Fundamentals and Terminals (IPC Sections 901-905, 908)

11.1 How Vents Work, Trap Seal Loss, and the One-Inch Rule 11.2 Vent Terminals, Roof Penetrations, and Sidewall Terminations 11.3 Vent Connections, Grade, and the Six-Inch Rules

12 Chapter 12: Vent Types and Sizing (IPC Sections 906-911, 917)

12.1 Individual Vents, Common Vents, and Vents for Stack Offsets 12.2 Trap-to-Vent Distance, Trap Arms, and Fixture Drains 12.3 Sizing Stack Vents, Vent Stacks, Branch Vents, and Headers 12.4 Putting a Vent System Together: A Worked Building

13 Chapter 13: Engineered and Special Venting (IPC Sections 912-916, 918-920)

13.1 Horizontal and Vertical Wet Venting 13.2 Waste Stack Vents, Circuit Vents, and Combination Waste and Vent 13.3 Island Fixture Venting and Air Admittance Valves

14 Chapter 14: Traps, Interceptors and Separators (IPC Chapter 10)

14.1 Fixture Traps, Trap Seals, and Prohibited Trap Types 14.2 Trap Seal Protection, Primers, and Barrier Devices 14.3 Grease Interceptors, Oil Separators, and Solids Interceptors

15 Chapter 15: Indirect and Special Waste (IPC Chapter 8)

15.1 Where Indirect Waste Is Required, and Air Gap Versus Air Break 15.2 Waste Receptors, Hub Drains, and Standpipes 15.3 Special Wastes, Chemical Neutralization, and Health Care Drainage

16 Chapter 16: Storm Drainage (IPC Chapter 11 and Appendix B)

16.1 Storm Drainage Scope, Disposal, and Prohibited Connections 16.2 Storm Drainage Materials, Roof Drains, and Conductors 16.3 Secondary Roof Drains, Scuppers, and Controlled Flow Systems 16.4 Rainfall Rates, Roof Area, and the Flow-Rate Conversion 16.5 Sizing Vertical Conductors, Leaders, and Storm Drains 16.6 Gutters, Subsoil Drains, Building Subdrains, and Storm Sumps

17 Chapter 17: Residential Fire Sprinklers (IRC Section P2904)

17.1 Residential Fire Sprinkler Systems (IRC Section P2904)

18 Chapter 18: Isometric Analysis and Plumbing Calculations

18.1 Reading Plumbing Isometrics and Riser Diagrams 18.2 Analyzing a DWV Isometric for Code Compliance 18.3 Offsets, Travel, and the Plumbing Math the Exam Assumes

16.3 Secondary Roof Drains, Scuppers, and Controlled Flow Systems

Key Takeaways Explain This Topic AI

IPC 1108.1 requires secondary emergency overflow roof drains or scuppers where the roof perimeter construction extends above the roof so that water would be entrapped if the primary drains allow buildup.

IPC 1108.2 requires secondary roof drain systems to have an end point of discharge separate from the primary system, above grade, in a location normally observed by building occupants or maintenance personnel.

IPC 1108.3 sizes secondary roof drain systems for the same rainfall rate as the primary system, and states the flow through the primary system shall not be considered.

IPC 1106.5 and 1108.3 require scupper openings to be not less than 4 inches in height with a width equal to or greater than the circumference of a roof drain sized for the same area.

IPC 1110.4 requires not less than two roof drains in controlled flow roof areas of 10,000 square feet or less, and not less than four in roofs over 10,000 square feet.

Last updated: September 2026

Why secondary drainage exists

A flat roof with a parapet is a basin. If the primary drains block — with ice, leaves, a construction tarp, a roofing bucket — the roof fills. Water weighs about 5.2 pounds per square foot per inch of depth . A few inches of ponding across a large roof is tens of thousands of pounds the structure may not have been designed to carry, and roof collapses from ponding are a recognized failure mode.

IPC 1101.7 encodes the design assumption: in determining the maximum possible depth of ponded water, all primary roof drainage means shall be assumed to be blocked .

When secondary drainage is required — IPC 1108.1

Where roof drains are required, secondary (emergency overflow) roof drains or scuppers shall be provided where the roof perimeter construction extends above the roof in such a manner that water will be entrapped if the primary drains allow buildup for any reason . Where primary and secondary roof drains are manufactured as a single assembly , the inlet and outlet for each drain shall be independent .

Two triggers, both required:

Roof drains are required on the roof, and

the perimeter construction extends above the roof so water would be entrapped.

A roof that sheds freely over an unrestricted edge does not need secondary drainage, because the edge itself is the overflow.

The single-assembly rule prevents a manufacturer from sharing a throat or an outlet between the primary and secondary path — which would let a single blockage defeat both.

Separate discharge — IPC 1108.2

Secondary roof drain systems shall have the end point of discharge separate from the primary system. Discharge shall be above grade , in a location that would normally be observed by the building occupants or maintenance personnel .

Three requirements, each with a purpose:

Separate end point — a shared discharge means a blocked primary line blocks the secondary line too.

Above grade — a below-grade tie-in can surcharge.

Normally observed — the secondary system running is the building's alarm that the primary system has failed. Discharging it into a hidden courtyard defeats the warning.

Sizing the secondary system — IPC 1108.3

Secondary (emergency) roof drain systems shall be sized in accordance with Section 1106 based on the rainfall rate for which the primary system is sized . Scuppers shall be sized to prevent the depth of ponding water from exceeding that for which the roof was designed as determined by Section 1101.7. Scuppers shall have an opening dimension of not less than 4 inches in height and have an opening width equal to the circumference of the roof drain required for the area served. The flow through the primary system shall not be considered when sizing the secondary roof drain system.

The last sentence is the one exam items test. You do not credit the primary system with any capacity. The secondary system carries the entire design rainfall on its own, because the design case is that the primary system is blocked.

Scupper dimensions

  • Dimension Requirement
  • Height of the opening Not less than 4 inches
  • Width of the opening Equal to or greater than the circumference of a roof drain sized for the same roof area

IPC 1106.5 Parapet wall scuppers states the parallel rule for scuppers used as primary roof drainage:

Where scuppers are used for primary roof drainage or for secondary (emergency overflow) roof drainage or both , the quantity, size, location and inlet elevation of the scuppers shall be chosen to prevent the depth of ponding water on the roof from exceeding the maximum water depth the roof was designed for, as determined by Section 1611.1 of the International Building Code . Scupper openings shall be not less than 4 inches in height and have a width equal to or greater than the circumference of a roof drain sized for the same roof area . The flow through the primary system shall not be considered when locating and sizing secondary scuppers.

Worked scupper width

A roof area requires a 6-inch roof drain. What width must a secondary scupper be?

Circumference of a 6-inch circle = pi x diameter = 3.1416 x 6 = 18.85 inches .

Required scupper opening: not less than 4 inches high and not less than approximately 18.9 inches wide .

For an 8-inch drain: 3.1416 x 8 = 25.1 inches wide.

Siphonic roof drainage — IPC 1107

Siphonic roof drains and drainage systems shall be designed in accordance with ASME A112.6.9 and ASPE 45.

A siphonic system runs full bore by design, using an air baffle at the drain to exclude air and create a siphon in the horizontal collector. Because it runs full, the collector can be nearly level and much smaller than a conventional gravity system. It is an engineered design; the IPC delegates it entirely to the two referenced standards.

Note that 1102.6 excludes siphonic roof drains from the ASME A112.6.4 / ASPE-IAPMO Z1034 flow-rating requirement, because a siphonic drain's performance is a property of the whole system, not the drain alone.

Controlled flow roof drain systems — IPC 1110

The opposite approach: deliberately store water on the roof and release it slowly, reducing peak load on the storm sewer.

Rule Requirement

1110.1 General The roof shall be designed for the storage of water . The system shall be an engineered system meeting the design, submittal, approval, inspection and testing requirements of Section 316.1 , designed on the required rainfall rate per 1106.1

1110.2 Control devices Installed so the rate of discharge per minute does not exceed the values for continuous flow indicated in 1110.1

1110.3 Installation Runoff control by control devices , which shall be protected by strainers

1110.4 Minimum number of roof drains Not less than two roof drains in roof areas 10,000 square feet or less ; not less than four roof drains in roofs over 10,000 square feet

1110.4 is the most testable line in the section : two drains up to 10,000 square feet, four drains above it. A controlled-flow roof depends on standing water, so a single blocked drain is an unacceptable risk — redundancy is mandatory.

1110.1's cross-reference to Section 316.1 is the alternative engineered design section from Chapter 2 of this guide: a registered design professional, technical data, two sets of signed and sealed construction documents including a riser diagram, and code official approval recorded on the permit.

Putting the primary and secondary systems together

A warehouse has a 12,000 square foot roof surrounded by a 3-foot parapet, in Denver .

  • Step Result Basis
  • Is secondary drainage required? Yes — the parapet entraps water 1108.1
  • Design rainfall rate 2.4 inches per hour for Denver Appendix B / Figure 1106.1(1)
  • Total design flow 0.0104 x 12,000 x 2.4 = 299.5 gpm Equation 11-1

Primary system sizing Size conductors and horizontal drains for 299.5 gpm across the drains provided 1106.2, 1106.3

  • Secondary system sizing Size for the same 299.5 gpm , with no credit for the primary system 1108.3
  • Secondary discharge Separate end point , above grade , normally observed 1108.2

If scuppers are used 4 inches minimum height , width at least the circumference of a roof drain sized for the same area 1106.5, 1108.3

If a single primary/secondary assembly is used Independent inlet and outlet for each drain 1108.1

If a controlled flow system is used Engineered per 316.1 ; four roof drains minimum, since the roof exceeds 10,000 square feet 1110.1, 1110.4