Study guide
16.5 Sizing Vertical Conductors, Leaders, and Storm Drains
Colorado Journeyworker Plumber Journeyman Plumber
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Passing the Colorado Journeyworker Plumber Exam
1.1 Exam Blueprint, Format, and the 2024 Code Changeover 1.2 Colorado Licenses, Experience Hours, and Apprentice Supervision 1.3 Permits, Inspections, Blue Tags, and Board Enforcement
2 Chapter 2: General Regulations (IPC Chapter 3)
2.1 Approved Materials, Certification, and General Installation Rules 2.2 Protection of Pipes: Contact, Notching, Shield Plates, and Freezing 2.3 Piping Support, Trenching, Bedding, and Backfill 2.4 Required Tests: Water, Air, and Backflow Assembly Testing
3 Chapter 3: Fixtures and Equipment (IPC Chapter 4)
3.1 Minimum Fixture Counts, Separate Facilities, and Toilet Room Location 3.2 Fixture Clearances, Compartments, and Setting Requirements 3.3 Water Closets, Urinals, Lavatories, Sinks, and Flush Devices 3.4 Showers, Bathtubs, Fixture Fittings, and Scald Protection
4 Chapter 4: Water Heaters (IPC Chapter 5)
4.1 Water Heater Installation, Location, Access, and Clearances 4.2 Relief Valves and Discharge Piping 4.3 Water Heater Pans, Pan Drains, and Storage Tank Requirements 4.4 Thermal Expansion Control and Hot Water Temperature Limits
5 Chapter 5: Water Supply Materials and Installation (IPC Chapter 6)
5.1 Water Service and Distribution Materials, and Sewer Separation 5.2 Joints, Connections, and Dissimilar Materials in Water Piping 5.3 Valves, Shutoffs, and Required Valve Locations
6 Chapter 6: Water Supply Sizing and Pressure (IPC Chapter 6 and Appendix E)
6.1 Pressure Limits, Pressure Reducing Valves, and Water Hammer 6.2 Water Supply Fixture Units and Estimating Demand 6.3 Sizing Water Piping with Appendix E and Table E104.1
7 Chapter 7: Cross-Connection Control and Backflow Prevention (IPC Sections 608-610, Chapter 13)
7.1 Cross-Connection Principles, Backsiphonage, and Backpressure 7.2 Air Gaps and the Backflow Preventer Family 7.3 Applying Backflow Protection to Specific Connections 7.4 Nonpotable Water Systems, Identification, and Reclaimed Water
8 Chapter 8: Sanitary Drainage Materials and Fittings (IPC Chapter 7)
8.1 Sanitary Drainage Materials and Where Each May Be Used 8.2 Drainage Joints, Transitions, and Prohibited Connections 8.3 Fittings for Change of Direction and Drainage Flow Patterns
9 Chapter 9: Sanitary Drainage Sizing (IPC Sections 704, 709-711)
9.1 Drainage Fixture Units and Load Estimation 9.2 Slope of Horizontal Drainage and Installation Rules 9.3 Sizing Building Drains, Building Sewers, and Horizontal Branches 9.4 Stacks, Branch Intervals, and Offsets in Tall Buildings
10 Chapter 10: Cleanouts, Sumps and Below-Sewer Drainage (IPC Sections 708, 712-716)
10.1 Cleanouts, Manholes, and Access Requirements 10.2 Backwater Valves and Fixtures Below the Sewer Level 10.3 Sumps, Sewage Ejectors, and Macerating Toilet Systems 10.4 Building Sewers, Private Disposal, and Special Drainage Conditions
11 Chapter 11: Vent Fundamentals and Terminals (IPC Sections 901-905, 908)
11.1 How Vents Work, Trap Seal Loss, and the One-Inch Rule 11.2 Vent Terminals, Roof Penetrations, and Sidewall Terminations 11.3 Vent Connections, Grade, and the Six-Inch Rules
12 Chapter 12: Vent Types and Sizing (IPC Sections 906-911, 917)
12.1 Individual Vents, Common Vents, and Vents for Stack Offsets 12.2 Trap-to-Vent Distance, Trap Arms, and Fixture Drains 12.3 Sizing Stack Vents, Vent Stacks, Branch Vents, and Headers 12.4 Putting a Vent System Together: A Worked Building
13 Chapter 13: Engineered and Special Venting (IPC Sections 912-916, 918-920)
13.1 Horizontal and Vertical Wet Venting 13.2 Waste Stack Vents, Circuit Vents, and Combination Waste and Vent 13.3 Island Fixture Venting and Air Admittance Valves
14 Chapter 14: Traps, Interceptors and Separators (IPC Chapter 10)
14.1 Fixture Traps, Trap Seals, and Prohibited Trap Types 14.2 Trap Seal Protection, Primers, and Barrier Devices 14.3 Grease Interceptors, Oil Separators, and Solids Interceptors
15 Chapter 15: Indirect and Special Waste (IPC Chapter 8)
15.1 Where Indirect Waste Is Required, and Air Gap Versus Air Break 15.2 Waste Receptors, Hub Drains, and Standpipes 15.3 Special Wastes, Chemical Neutralization, and Health Care Drainage
16 Chapter 16: Storm Drainage (IPC Chapter 11 and Appendix B)
16.1 Storm Drainage Scope, Disposal, and Prohibited Connections 16.2 Storm Drainage Materials, Roof Drains, and Conductors 16.3 Secondary Roof Drains, Scuppers, and Controlled Flow Systems 16.4 Rainfall Rates, Roof Area, and the Flow-Rate Conversion 16.5 Sizing Vertical Conductors, Leaders, and Storm Drains 16.6 Gutters, Subsoil Drains, Building Subdrains, and Storm Sumps
17 Chapter 17: Residential Fire Sprinklers (IRC Section P2904)
17.1 Residential Fire Sprinkler Systems (IRC Section P2904)
18 Chapter 18: Isometric Analysis and Plumbing Calculations
18.1 Reading Plumbing Isometrics and Riser Diagrams 18.2 Analyzing a DWV Isometric for Code Compliance 18.3 Offsets, Travel, and the Plumbing Math the Exam Assumes
16.5 Sizing Vertical Conductors, Leaders, and Storm Drains
Key Takeaways Explain This Topic AI
IPC Table 1106.2 rates a 4-inch vertical storm drain at 180 gpm and a 4-inch horizontal storm drain at 81 gpm at 1/16 inch per foot, 115 gpm at 1/8, 163 gpm at 1/4 and 231 gpm at 1/2.
IPC Table 1106.2 rates a 6-inch vertical storm drain at 538 gpm and a 6-inch horizontal drain at 344 gpm at 1/8 inch per foot.
IPC Table 1106.3 rates a 2-inch vertical leader at 30 gpm, 3-inch at 92 gpm, 4-inch at 192 gpm, 5-inch at 360 gpm, 6-inch at 563 gpm and 8-inch at 1,208 gpm.
IPC Table 1106.3 lists rectangular leader shapes with the same capacity as their round equivalents, such as 2 by 4 inches at 92 gpm, matching a 3-inch round leader.
IPC 1101.5 prohibits reducing the size of a storm drainage pipe in the direction of flow.
Last updated: September 2026
Two sizing tables
Table Sizes Variable
1106.2 Storm drain pipe sizing Vertical and horizontal storm drain piping Vertical capacity, plus horizontal capacity at four slopes
1106.3 Vertical leader sizing Vertical leaders — the exterior downspouts from gutters or roof drains Round and rectangular shapes
Both are read in gallons per minute , the flow you computed from Equation 11-1.
Table 1106.2 — storm drain pipe sizing
- Pipe size (in) Vertical drain (gpm) Horizontal at 1/16 in/ft at 1/8 in/ft at 1/4 in/ft at 1/2 in/ft
- 2 34 15 22 31 44
- 3 87 39 55 79 111
- 4 180 81 115 163 231
- 5 311 117 165 234 331
- 6 538 243 344 487 689
- 8 1,117 505 714 1,010 1,429
- 10 2,050 927 1,311 1,855 2,623
- 12 3,272 1,480 2,093 2,960 4,187
- 15 5,543 2,508 3,546 5,016 7,093
Three observations that resolve most sizing items:
A vertical pipe carries far more than the same horizontal pipe. A 4-inch vertical drain passes 180 gpm ; the same pipe at 1/8 inch per foot passes 115 gpm — 36 percent less.
Doubling the slope multiplies horizontal capacity by about 1.41 (the square root of 2). Check: 4-inch at 1/8 is 115 gpm, at 1/4 is 163 gpm. 115 x 1.414 = 162.6. That relationship holds down every row.
Capacity scales steeply with diameter. From 4 inches to 6 inches at 1/8 inch per foot: 115 to 344 gpm, nearly triple, for a 50 percent increase in diameter.
Unlike sanitary Table 704.1, Table 1106.2 tabulates the 1/16 inch per foot column for every size , including small pipe. That does not override Table 704.1 where it applies; it reflects that storm piping is often engineered at flatter slopes.
Table 1106.3 — vertical leader sizing
- Size of leader Capacity (gpm)
- 2 in round; 2 x 2; 1-1/2 x 2-1/2 30
- 2-1/2 in round; 2-1/2 x 2-1/2 54
- 3 in round; 2 x 4; 2-1/2 x 3 92
- 4 in round; 3 x 4-1/4; 3-1/2 x 4 192
- 5 in round; 4 x 5; 4-1/2 x 4-1/2 360
- 6 in round; 5 x 6; 5-1/2 x 5-1/2 563
- 8 in round; 6 x 8 1,208
IPC 1106.3 : vertical leaders shall be sized based on the flow rate from horizontal gutters or the maximum flow rate through roof drains , and the flow rate through vertical leaders shall not exceed Table 1106.3.
The rectangular shapes are the practical value of this table: a 2 x 4 inch rectangular downspout has the same 92 gpm capacity as a 3-inch round leader, and a 3 x 4-1/4 inch downspout matches a 4-inch round at 192 gpm . That lets you substitute a commercially available rectangular profile without a separate calculation.
Compare the vertical leader values against the vertical storm drain values in Table 1106.2 — 4-inch leader 192 gpm versus 4-inch vertical drain 180 gpm — and note they are close but not identical . Use the table that matches the pipe.
Full worked sizing: a Denver warehouse
Given: a 20,000 square foot roof in Denver, four roof drains with equal 5,000 square foot tributary areas, interior conductors dropping to a horizontal collector under the slab at 1/8 inch per foot , then out to a building storm sewer.
Step 1 — design rainfall rate
Denver: R = 2.4 inches per hour (Appendix B / Figure 1106.1(1)).
Step 2 — flow per drain
Q = 0.0104 x 5,000 x 2.4 = 124.8 gpm per drain.
Total = 4 x 124.8 = 499.2 gpm .
Step 3 — verify the roof drains
Check each drain's published flow rate at the anticipated ponding head (1105.2, 1106.2). A drain rated for at least 125 gpm at the design head is required.
Step 4 — size each vertical conductor
Table 1106.2, vertical drain column, for 124.8 gpm :
3-inch = 87 gpm — too small .
4-inch = 180 gpm — sufficient.
Each conductor is 4 inches.
Step 5 — size the horizontal collector, segment by segment
The collector picks up the four conductors in series at 1/8 inch per foot .
- Segment Accumulated flow Table 1106.2 at 1/8 in/ft Size
- After drain 1 124.8 gpm 4-inch = 115 (too small); 6-inch = 344 6 inch
- After drain 2 249.6 gpm 5-inch = 165 (too small); 6-inch = 344 6 inch
- After drain 3 374.4 gpm 6-inch = 344 (too small); 8-inch = 714 8 inch
- After drain 4 499.2 gpm 8-inch = 714 8 inch
Note that at 124.8 gpm a 5-inch horizontal at 1/8 inch per foot carries 165 gpm and would also work for the first segment. Because 1101.5 prohibits reducing size in the direction of flow , and because the run will reach 8 inches anyway, most designers would start at 6 inches.
Step 6 — consider slope
If the collector could be run at 1/4 inch per foot instead:
- Accumulated flow Size at 1/4 in/ft
- 124.8 gpm 4-inch = 163 gpm — 4 inch
- 249.6 gpm 5-inch = 234 (too small); 6-inch = 487
- 374.4 gpm 6-inch = 487
- 499.2 gpm 6-inch = 487 (too small); 8-inch = 1,010
Doubling the slope drops the first segment from 6 inches to 4 inches and the third from 8 inches to 6 inches — a substantial saving where the fall is available.
Step 7 — secondary system
Required because of the parapet (1108.1). Sized for the same 499.2 gpm with no credit for the primary system (1108.3), discharging separately, above grade, in an observed location (1108.2).
Step 8 — the rest of the checklist
Item Requirement
Materials Conductors above ground per Table 702.1 ; underground storm drain per Table 702.2 ; storm sewer per Table 1102.4
- Fittings Table 706.3 patterns (1101.6)
- No size reduction in the direction of flow 1101.5
- Cleanouts Per Section 708 (1101.8)
- Backwater valve Per Section 714 where subject to backflow (1101.9)
- Trap Only if connected to a combined sewer (1103.1)
- Test Water or air per 312.2 or 312.3 (312.8)
- Storm sewer connection Independent connection where the public sewer is combined (1109.1)
- A leader example
A gutter collects 3,000 square feet of roof in Pueblo (R = 2.5).
Q = 0.0104 x 3,000 x 2.5 = 78 gpm .
Table 1106.3: 2-1/2 inch round = 54 gpm — too small; 3-inch round = 92 gpm — sufficient.
Rectangular alternatives at the same 92 gpm: 2 x 4 inches or 2-1/2 x 3 inches .
Move the same building to Lamar (R = 3.0): Q = 0.0104 x 3,000 x 3.0 = 93.6 gpm , which exceeds the 3-inch leader's 92 gpm. The leader goes to 4 inches (192 gpm) or a 3 x 4-1/4 inch rectangular profile.