16.2 Storm Drainage Materials, Roof Drains, and Conductors
Colorado Journeyworker Plumber Journeyman Plumber
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Passing the Colorado Journeyworker Plumber Exam
1.1 Exam Blueprint, Format, and the 2024 Code Changeover 1.2 Colorado Licenses, Experience Hours, and Apprentice Supervision 1.3 Permits, Inspections, Blue Tags, and Board Enforcement
2 Chapter 2: General Regulations (IPC Chapter 3)
2.1 Approved Materials, Certification, and General Installation Rules 2.2 Protection of Pipes: Contact, Notching, Shield Plates, and Freezing 2.3 Piping Support, Trenching, Bedding, and Backfill 2.4 Required Tests: Water, Air, and Backflow Assembly Testing
3 Chapter 3: Fixtures and Equipment (IPC Chapter 4)
3.1 Minimum Fixture Counts, Separate Facilities, and Toilet Room Location 3.2 Fixture Clearances, Compartments, and Setting Requirements 3.3 Water Closets, Urinals, Lavatories, Sinks, and Flush Devices 3.4 Showers, Bathtubs, Fixture Fittings, and Scald Protection
4 Chapter 4: Water Heaters (IPC Chapter 5)
4.1 Water Heater Installation, Location, Access, and Clearances 4.2 Relief Valves and Discharge Piping 4.3 Water Heater Pans, Pan Drains, and Storage Tank Requirements 4.4 Thermal Expansion Control and Hot Water Temperature Limits
5 Chapter 5: Water Supply Materials and Installation (IPC Chapter 6)
5.1 Water Service and Distribution Materials, and Sewer Separation 5.2 Joints, Connections, and Dissimilar Materials in Water Piping 5.3 Valves, Shutoffs, and Required Valve Locations
6 Chapter 6: Water Supply Sizing and Pressure (IPC Chapter 6 and Appendix E)
6.1 Pressure Limits, Pressure Reducing Valves, and Water Hammer 6.2 Water Supply Fixture Units and Estimating Demand 6.3 Sizing Water Piping with Appendix E and Table E104.1
7 Chapter 7: Cross-Connection Control and Backflow Prevention (IPC Sections 608-610, Chapter 13)
7.1 Cross-Connection Principles, Backsiphonage, and Backpressure 7.2 Air Gaps and the Backflow Preventer Family 7.3 Applying Backflow Protection to Specific Connections 7.4 Nonpotable Water Systems, Identification, and Reclaimed Water
8 Chapter 8: Sanitary Drainage Materials and Fittings (IPC Chapter 7)
8.1 Sanitary Drainage Materials and Where Each May Be Used 8.2 Drainage Joints, Transitions, and Prohibited Connections 8.3 Fittings for Change of Direction and Drainage Flow Patterns
9 Chapter 9: Sanitary Drainage Sizing (IPC Sections 704, 709-711)
9.1 Drainage Fixture Units and Load Estimation 9.2 Slope of Horizontal Drainage and Installation Rules 9.3 Sizing Building Drains, Building Sewers, and Horizontal Branches 9.4 Stacks, Branch Intervals, and Offsets in Tall Buildings
10 Chapter 10: Cleanouts, Sumps and Below-Sewer Drainage (IPC Sections 708, 712-716)
10.1 Cleanouts, Manholes, and Access Requirements 10.2 Backwater Valves and Fixtures Below the Sewer Level 10.3 Sumps, Sewage Ejectors, and Macerating Toilet Systems 10.4 Building Sewers, Private Disposal, and Special Drainage Conditions
11 Chapter 11: Vent Fundamentals and Terminals (IPC Sections 901-905, 908)
11.1 How Vents Work, Trap Seal Loss, and the One-Inch Rule 11.2 Vent Terminals, Roof Penetrations, and Sidewall Terminations 11.3 Vent Connections, Grade, and the Six-Inch Rules
12 Chapter 12: Vent Types and Sizing (IPC Sections 906-911, 917)
12.1 Individual Vents, Common Vents, and Vents for Stack Offsets 12.2 Trap-to-Vent Distance, Trap Arms, and Fixture Drains 12.3 Sizing Stack Vents, Vent Stacks, Branch Vents, and Headers 12.4 Putting a Vent System Together: A Worked Building
13 Chapter 13: Engineered and Special Venting (IPC Sections 912-916, 918-920)
13.1 Horizontal and Vertical Wet Venting 13.2 Waste Stack Vents, Circuit Vents, and Combination Waste and Vent 13.3 Island Fixture Venting and Air Admittance Valves
14 Chapter 14: Traps, Interceptors and Separators (IPC Chapter 10)
14.1 Fixture Traps, Trap Seals, and Prohibited Trap Types 14.2 Trap Seal Protection, Primers, and Barrier Devices 14.3 Grease Interceptors, Oil Separators, and Solids Interceptors
15 Chapter 15: Indirect and Special Waste (IPC Chapter 8)
15.1 Where Indirect Waste Is Required, and Air Gap Versus Air Break 15.2 Waste Receptors, Hub Drains, and Standpipes 15.3 Special Wastes, Chemical Neutralization, and Health Care Drainage
16 Chapter 16: Storm Drainage (IPC Chapter 11 and Appendix B)
16.1 Storm Drainage Scope, Disposal, and Prohibited Connections 16.2 Storm Drainage Materials, Roof Drains, and Conductors 16.3 Secondary Roof Drains, Scuppers, and Controlled Flow Systems 16.4 Rainfall Rates, Roof Area, and the Flow-Rate Conversion 16.5 Sizing Vertical Conductors, Leaders, and Storm Drains 16.6 Gutters, Subsoil Drains, Building Subdrains, and Storm Sumps
17 Chapter 17: Residential Fire Sprinklers (IRC Section P2904)
17.1 Residential Fire Sprinkler Systems (IRC Section P2904)
18 Chapter 18: Isometric Analysis and Plumbing Calculations
18.1 Reading Plumbing Isometrics and Riser Diagrams 18.2 Analyzing a DWV Isometric for Code Compliance 18.3 Offsets, Travel, and the Plumbing Math the Exam Assumes
16.2 Storm Drainage Materials, Roof Drains, and Conductors
Key Takeaways Explain This Topic AI
IPC 1102.2 requires inside storm drainage conductors installed above ground to conform to a standard listed in Table 702.1.
IPC 1102.3 requires underground building storm drain pipe to conform to a standard listed in Table 702.2, and IPC 1102.4 requires building storm sewer pipe to conform to Table 1102.4.
IPC 1102.5 requires subsoil drains to be open-jointed, horizontally split or perforated pipe conforming to Table 1102.5.
IPC 1102.6 requires roof drains to conform to ASME A112.3.1 or ASME A112.6.4, tested and rated in accordance with ASME A112.6.4 or ASPE/IAPMO Z1034.
IPC 1105.2 requires the published roof drain flow rate, based on the head of water above the roof drain, to be used to size the storm drainage system.
Last updated: September 2026
Four material tables
Storm drainage borrows two tables from Chapter 7 and adds two of its own.
Application Table Section
Inside storm drainage conductors installed above ground Table 702.1 (above-ground sanitary drainage and vent pipe) 1102.2
Underground building storm drain pipe Table 702.2 (underground building sanitary drainage and vent pipe) 1102.3
- Building storm sewer pipe Table 1102.4 1102.4
- Subsoil drain pipe Table 1102.5 1102.5
- Pipe fittings Table 1102.7 1102.7
IPC 1102.1 sets the general rule: materials and methods for storm drainage comply with Section 1102 and the applicable provisions of Chapter 7 .
Table 1102.4 Building storm sewer pipe
The listed materials:
ABS plastic pipe in IPS diameters, including Schedule 40, DR 22 (PS 200) and DR 24 (PS 140), solid, cellular core or composite wall
- Cast-iron pipe
- Concrete pipe
- Copper or copper-alloy tubing (Type K, L, M or DWV)
- Polyethylene (PE) plastic pipe
- Polypropylene (PP) pipe
PVC plastic pipe (Type DWV, SDR26, SDR35, SDR41, PS50 or PS100) in IPS diameters, including Schedule 40, DR 22 and DR 24
- Stainless steel drainage systems, Type 316L
- Vitrified clay pipe
This list closely parallels Table 702.3 for sanitary building sewers — the same heavy-duty materials, including concrete, vitrified clay and PE, that are not permitted above ground.
Table 1102.5 Subsoil drain pipe
A much shorter list, because subsoil drains must admit ground water:
- Cast-iron pipe
- Polyethylene (PE) plastic pipe
- PVC plastic pipe (type sewer pipe, SDR35, PS25, PS50 or PS100)
- Stainless steel drainage systems, Type 316L
- Vitrified clay pipe
IPC 1102.5 requires subsoil drains to be open-jointed, horizontally split or perforated pipe — the defining characteristic. A solid-wall pipe is not a subsoil drain.
Roof drains — IPC 1102.6 and Section 1105
1102.6 Materials : roof drains shall conform to ASME A112.3.1 or ASME A112.6.4 . Roof drains other than siphonic roof drains shall be tested and rated in accordance with ASME A112.6.4 or ASPE/IAPMO Z1034 .
1105.1 General : roof drains shall be installed in accordance with the manufacturer's instructions . The inside opening for the roof drain shall not be obstructed by the roofing membrane material.
That second sentence describes the single most common roof drain defect: a roofer laps membrane over the drain throat, cutting the effective opening in half. The drain was rated at a published flow; the installed assembly delivers far less.
1105.2 Roof drain flow rate :
The published roof drain flow rate, based on the head of water above the roof drain, shall be used to size the storm drainage system in accordance with Section 1106. The flow rate used for sizing the storm drainage piping shall be based on the maximum anticipated ponding at the roof drain .
This is the 2021 IPC's key methodological point. A roof drain does not have a single capacity; it has a flow rate that varies with the depth of water standing over it . A drain that passes 40 gpm at 1 inch of head may pass 90 gpm at 3 inches. You size the piping to the flow the drain will actually deliver at the ponding depth the roof will actually reach .
And 1106.2 closes the loop from the other side: the flow rate calculated from rainfall and area must be checked against the roof drain manufacturer's published flow rate for the specific model and size to verify the selected drain will handle the anticipated flow.
Conductors and leaders — IPC 1104
Rule Requirement
1104.1 Conductor pipes shall not be used as soil, waste or vent pipes , and soil, waste or vent pipes shall not be used as conductors
1104.2 Floor drains shall not be connected to a storm drain
The vocabulary distinction matters on exam items:
A conductor is the interior vertical pipe carrying rainwater from the roof drain down through the building.
A leader is the exterior vertical pipe — the downspout — carrying water from a gutter or scupper.
Both are sized by the same tables, but 1106.2 covers storm drain piping (vertical and horizontal) and 1106.3 covers vertical leaders specifically.
Fittings, cleanouts and change of direction
1101.6 : connections and changes in direction use approved drainage-type fittings in accordance with Table 706.3 ; fittings shall not obstruct or retard flow .
1102.7 Fittings : approved for the piping material installed, conforming to the respective pipe standards or Table 1102.7 ; no ledges, shoulders or reductions capable of retarding or obstructing flow; threaded drainage pipe fittings shall be of the recessed drainage type .
1101.8 Cleanouts required : cleanouts in the storm drainage system comply with the sanitary drainage cleanout provisions of Section 708 — 100-foot intervals , at horizontal direction changes greater than 45 degrees , sized per 708.1.5, with the clearances of 708.1.10. Exception: subsurface drainage system.
1101.5 Change in size : the size of a drainage pipe shall not be reduced in the direction of flow.
Testing
1101.4 Tests : the conductors and the building storm drain shall be tested in accordance with Section 312 .
312.8 Storm drainage system test : storm drain systems within a building shall be tested by water or air in accordance with Section 312.2 or 312.3 — that is, a 10-foot head of water or 5 psi of air , held 15 minutes . Recall that under the model code plastic piping shall not be tested using air (312.3), a sentence Colorado deletes.
Installation checklist for a commercial roof
- Item Requirement Section
- Roof drain standard ASME A112.3.1 or ASME A112.6.4 1102.6
- Roof drain rating Tested and rated to ASME A112.6.4 or ASPE/IAPMO Z1034 1102.6
- Membrane at the drain Inside opening not obstructed by roofing membrane 1105.1
- Sizing basis Published flow rate at the anticipated ponding head 1105.2, 1106.2
- Interior conductor material Table 702.1 materials 1102.2
- Underground storm drain material Table 702.2 materials 1102.3
- Building storm sewer material Table 1102.4 materials 1102.4
- Fittings Table 706.3 patterns, recessed drainage type if threaded 1101.6, 1102.7
- No reduction in the direction of flow — 1101.5
- Cleanouts Per Section 708 1101.8
- Backwater valve if subject to backflow Per Section 714 1101.9
- Trap Only if connected to a combined sewer 1103.1
- Test Water or air per 312.2 or 312.3 312.8, 1101.4