Study guide
1.2 Facility Classification & Operator in Responsible Charge (ORC) Requirements
Colorado Water/Wastewater Operator Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: State Laws, Regulations & CCWP Certification
1.1 CDPHE CCWP Program & Regulatory Framework (Regulation 100 / 5 CCR 1003-2) 1.2 Facility Classification & Operator in Responsible Charge (ORC) Requirements 1.3 Certification Levels, Education, Experience & Exam Eligibility (Class D-A, Grade 1-4, Class S/T) 1.4 License Renewal, Training Units (TUs) & Mandatory Regulatory Training 1.5 Colorado Primary Drinking Water Regulations (Regulation 11) & Compliance 1.6 Colorado Discharge Permit System (Regulations 61/62), DMRs & Biosolids Reporting
2 Chapter 2: Source Water & Drinking Water Treatment Processes
2.1 Raw Water Sources, High-Altitude Characteristics & Reservoir Quality 2.2 Coagulation Chemistry, Rapid Mixing & Chemical Dosing (Alum, Ferric, Polymers) 2.3 Flocculation & Sedimentation Basin Design, Operation & Settling Zones 2.4 Granular Media Filtration, Backwash Procedures & Turbidity Standards 2.5 Advanced Treatment: Membranes, Softening, GAC/PAC Adsorption & Aeration 2.6 Groundwater Sources, Well Hydraulics, Static and Pumping Levels & Specific Capacity 2.7 Source Water Characteristics, Contaminant Categories & Watershed Protection Plans 2.8 Pretreatment: Presedimentation, Aeration, Algae Control & Taste-and-Odor Management 2.9 Direct, In-Line, Pressure, Cartridge & Diatomaceous Earth Filtration 2.10 Lime-Soda Softening, Ion Exchange & Water Stabilization 2.11 Water Treatment Plant Residuals: Lagoons, Drying Beds, Land Application & Recycle
3 Chapter 3: Disinfection & Chemical Addition
3.1 Chlorine Chemistry: Hypochlorous Acid, Free/Combined Residual & Breakpoint Chlorination 3.2 Disinfection Kinetics, Baffle Factors, T10 & CT Compliance Calculations 3.3 Disinfection Byproducts (TTHMs, HAA5s) & Stage 1/2 DBP Rules 3.4 Alternative Disinfection: Chloramination, Ultraviolet (UV) Light & Chlorine Dioxide 3.5 Corrosion Control, Lead & Copper Rule Revisions (LCRR) & Fluoridation Practices
4 Chapter 4: Water Treatment Plant Equipment, Instrumentation & Maintenance
4.1 Raw Water Intakes, Screening Equipment & Raw Water Pumping 4.2 Chemical Feed Equipment: Feeders, Day Tanks, Carrier Water & Feed-Rate Calibration 4.3 Chlorination Equipment: Gas Systems, Vacuum Regulators, Hypochlorite Storage & Onsite Generation 4.4 Filter Underdrains, Support Gravel, Surface Wash, Air Scour & Filter-to-Waste 4.5 Plant Process Control, SCADA and PLC Systems, Alarm Management & Records of Operation 4.6 Preventive, Corrective and Predictive Maintenance, Work Orders & Asset Management
5 Chapter 5: Wastewater Treatment Principles & Biological Processes
5.1 Preliminary Treatment: Bar Screens, Shredders, Grit Chambers & Flow Equalization 5.2 Primary Clarification, Solids Separation & Scum Removal Mechanics 5.3 Activated Sludge Fundamentals: Aerobic Microbiology, DO Control & Biomass Growth 5.4 Return & Waste Activated Sludge Management (RAS/WAS Operations & Sludge Age) 5.5 Activated Sludge Troubleshooting: Bulking, Nocardia Foaming, Rising Sludge & Pin Floc 5.6 Wastewater Characteristics, Organic and Hydraulic Loading, Diurnal Flow & Septicity 5.7 Activated Sludge Arrangements: Conventional, Complete Mix, Step Feed, Contact Stabilization, Extended Aeration, Oxidation Ditch, SBR & MBR 5.8 Aeration Systems: Blowers, Diffusers, Surface Aerators, Oxygen Transfer & Altitude Effects
6 Chapter 6: Advanced Wastewater Treatment & Solids Management
6.1 Biological Nutrient Removal: Nitrification, Denitrification & Anoxic Zones 6.2 Biological & Chemical Phosphorus Removal (EBPR & Coagulant Precipitation) 6.3 Sludge Thickening, Aerobic & Anaerobic Digestion (Mesophilic/Thermophilic) 6.4 Dewatering Equipment (Centrifuges, Belt Filter Presses) & Biosolids Standards (Reg 64) 6.5 Pond & Lagoon Operations, Trickling Filters & Rotating Biological Contactors (RBCs) 6.6 Secondary Clarification: Overflow and Solids Loading Rates, RAS Rate Setting & Clarifier Diagnostics 6.7 Tertiary Filtration, Effluent Polishing & Wastewater Disinfection with Chlorine, Dechlorination and UV 6.8 Effluent Disposal, Rapid Infiltration Basins, Colorado Water Reuse Law & Regulation 84
7 Chapter 7: Water Distribution Systems
7.1 Distribution Hydraulics, Pressure Zones, Static Head & Friction Headloss 7.2 Finished Water Storage Tanks, Standpipes, Mixing & Water Age Control 7.3 Distribution Piping, Valves (Gate, Butterfly, PRV), Hydrants & Main Flushing 7.4 Cross-Connection Control, Hazard Assessment & Backflow Preventers (RPZ, DCVA, PVB, Air Gap) 7.5 Water Main Installation, Trenching, Repair, Pressure Testing & Disinfection (AWWA C651) 7.6 Network Layout, Pressure Zones, Demand Patterns, Fire Flow & the Hydraulic Grade Line 7.7 Fire Hydrants, Dry Barrel Operation, Fire Flow Testing & Unidirectional Flushing 7.8 Booster Pump Stations, Hydropneumatic Systems, Controls & Surge Protection 7.9 Customer and Master Metering, Meter Sizing, Accuracy Testing, AMR & AMI 7.10 System Mapping, GIS, As-Builts, Operational Analysis & the AWWA Water Audit 7.11 Service Line Installation, Wet Tapping, Curb Stops & the Lead Service Line Inventory 7.12 Leak Detection, District Metered Areas, Minimum Night Flow & Pressure Management 7.13 Storage Facility Inspection, Sanitary Defects, Water Age Control, Cleaning & AWWA C652 Disinfection 7.14 Utility Locating, Colorado 811 Damage Prevention, the APWA Color Code & New Construction Inspection 7.15 Well and Wellhead Maintenance, Sanitary Condition, Rehabilitation & AWWA C654 Disinfection 7.16 Booster Chlorination, Remote Chemical Feed, Chemical Storage, Security & Supply Management 7.17 Distribution Sampling Technique, Chlorine Residual Monitoring & Nitrification Control in Chloraminated Systems
8 Chapter 8: Wastewater Collection Systems
8.1 Gravity Collection Systems: Flow Velocities, Slopes, Pipe Materials & Manholes 8.2 Wastewater Lift Stations: Wet Wells, Submersible Pumps, Level Controls & Force Mains 8.3 Inflow and Infiltration (I&I) Sources, Flow Monitoring, Smoke Testing & CCTV Inspection 8.4 Collection Maintenance: Hydraulic Jetting, Mechanical Rodding & FOG/Root Mitigation 8.5 Sanitary Sewer Overflows (SSOs): Root Causes, Containment, Reporting & Mitigation 8.6 Lift Station Electrical Devices, Level Detection, Telemetry, Gas Detection & Capacity Adjustment 8.7 Lift Station Configurations, Preventive Maintenance, Wet Well Cleaning, Troubleshooting & Emergency Bypass Pumping 8.8 Collection System Rehabilitation: CIPP, Pipe Bursting, Sliplining, Grouting, Manhole Repair & Tap Defects 8.9 Excavation, Hydro Excavation, Bedding and Haunching, Grade Control & Sewer Acceptance Testing 8.10 Collection System Flow Monitoring, Area-Velocity Metering, Weirs and Flumes & Capacity Assessment
9 Chapter 9: Pumps, Motors & Utility Mechanics
9.1 Centrifugal Pumps: Volutes, Impellers, Packing Seals & Mechanical Seals 9.2 Positive Displacement Pumps (Peristaltic, Diaphragm, Progressive Cavity) & Dosing Systems 9.3 Pump Performance Curves, System Head Curves, Cavitation & NPSH Calculations 9.4 Electric Motors (Single/Three Phase), Controls, Variable Frequency Drives (VFDs) & Power 9.5 Flow Meters (Venturi, Magnetic, Ultrasonic), Online Analyzers, PLCs & SCADA Telemetry 9.6 Air Compressors, Conveyors, Hoists and Cranes, Service Piping & Standby Power Generation 9.7 Valve Types and Duties, Air Release and Air-Vacuum Valves, Water Hammer & Surge Control
10 Chapter 10: Laboratory Analysis & Water Quality Monitoring
10.1 Regulatory Sampling Procedures, Chain of Custody, Holding Times & Preservation Techniques 10.2 Physical & Chemical Drinking Water Testing: Turbidity, pH, Alkalinity, Hardness & Chlorine (DPD) 10.3 Wastewater Laboratory Analysis: BOD5, COD, Total Suspended Solids (TSS) & Settleometry 10.4 Microbiological Testing: Total Coliform, E. coli (Colilert, Membrane Filtration) & QA/QC 10.5 Bench-Scale Jar Testing, Coagulant Optimization & Streaming Current Monitoring 10.6 Laboratory Equipment, Calibration and Verification, QA/QC Program & Certified Laboratory Requirements 10.7 Nutrient Series, Metals Sampling, Whole Effluent Toxicity & Electrode Measurements (DO, pH, ORP, H2S)
11 Chapter 11: Operator Mathematics & Applied Calculations
11.1 Core Conversions, Geometric Area, Pipe Volume & Continuous Flow Rate (MGD, GPM, cfs) 11.2 Chemical Dosage, The Standard "Pounds Formula", Active Chemical & Solution Purity 11.3 Hydraulic Retention Time (HRT), Surface Overflow Rate (SOR) & Weir Overflow Rates 11.4 Process Control Calculations: F/M Ratio, MCRT/Solids Retention Time (SRT) & Sludge Volume Index (SVI) 11.5 Distribution Pressure, Static vs Dynamic Head, Water Horsepower & Wire-to-Water Efficiency 11.6 CT Calculations: Baffling Factors, T10, Temperature and pH Corrections & Multi-Segment Compliance
12 Chapter 12: Safety, Emergency Operations & Compliance
12.1 Permit-Required Confined Space (PRCS) Entry, Atmospheric Testing (O2/LEL/H2S/CO) & Rescue 12.2 Control of Hazardous Energy: Lockout/Tagout (LOTO), Arc Flash & Electrical Safety 12.3 Chemical Safety: Chlorine Gas Handling, Ton Cylinders, Sulfur Dioxide, Ammonia & SDS/GHS 12.4 Trenching & Excavation: Soil Classification, Sloping, Shoring, Shielding & Competent Person Rules 12.5 Emergency Action Plans, Security Vulnerability, Spill Containment & CDPHE Tier 1/2/3 Public Notice 12.6 Work Zone Traffic Control, PPE, Fall Protection, Fire Extinguishers, First Aid & Bloodborne Pathogens 12.7 Standard Operating Procedures, Operating Records, Regulatory Reporting, Customer Complaints & Supervisory Duties
1.2 Facility Classification & Operator in Responsible Charge (ORC) Requirements
Key Takeaways Explain This Topic AI
Colorado no longer uses a point-rating score: Regulation 100 sections 100.4.2, 100.5.2, and 100.7.2 classify treatment facilities from a treatment-type by design-flow table, and the highest-classified process in use sets the facility class.
Water treatment and domestic and industrial wastewater treatment facilities are all classified Class D (lowest) through Class A (highest).
Water distribution and wastewater collection systems use a two-step process: Step 1 is population served (Class 1 up to 3,300; Class 2 for 3,301-25,000; Class 3 for 25,001-100,000; Class 4 over 100,000), and Step 2 raises a Class 1 or Class 2 system for listed complexities.
Every regulated facility must have at least one Operator in Responsible Charge holding a valid certificate in the same category at a class equal to or higher than the facility classification.
Facility owners must submit the division contact update form no later than 30 days after any change in the certified operator in responsible charge, facility identification, or PWSID/CDPS permit number.
Last updated: August 2026
Principles of Facility Classification
Colorado matches the complexity of water infrastructure to the certified competency of the people operating it. Under Regulation 100 (5 CCR 1003-2) , facilities are grouped into operating categories, each divided into four progressive tiers:
Water Treatment (WT) — Class D (lowest) through Class A (highest), section 100.4.
Domestic Wastewater Treatment (WWT) — Class D through Class A, section 100.5.
Industrial Wastewater Treatment (IWT) — Class D through Class A, section 100.7. Industrial facilities use the same D/C/B/A letters as domestic facilities, not Roman numerals.
Water Distribution (WD) — Class 1 (lowest) through Class 4 (highest), section 100.8.
Wastewater Collection (WC) — Class 1 through Class 4, section 100.9.
Reclaimed water and graywater treatment and distribution — section 100.6.
Two hybrid operator certificates exist for small systems. A Class S water certificate is valid only where the system serves no more than 3,300 persons and the works would be classified Class D treatment and/or Class 1 distribution. A Class S wastewater certificate applies on the same 3,300-person basis to Class D wastewater treatment and Class 1 collection. A Class T certificate is narrower still: it is valid only for a transient non-community public water system on groundwater that is not under the direct influence of surface water, serving fewer than 100 individuals per day , using non-gaseous chlorine disinfection only , that would classify as Class D treatment and/or Class 1 distribution.
Treatment Facility Classification: Treatment Type by Design Flow
A very common exam trap is the belief that Colorado adds up "points" for source water, flow, and processes. It does not. The Board deleted the old point tables in the November 2018 rulemaking (effective March 1, 2019) and refined the replacement tables effective May 30, 2021. Today the Division reads a matrix : find the treatment process in the left-hand column, read across to the column for the plant's design flow rate , and take the class shown.
For water treatment (section 100.4.2), the flow columns are less than 350 gpm , 350 to 1,400 gpm , and more than 1,400 gpm . A sample of the table:
- Treatment process < 350 gpm 350-1,400 gpm > 1,400 gpm
- Granular media filtration with coagulants or polymers (direct or conventional) B A A
- Membrane filtration (MF or UF) C B A
- Slow sand or diatomaceous earth C C B
- Granular media filtration with pre-chlorine feed (typical groundwater iron removal) D C C
- Ozone B A A
- Gas chlorine C B A
- Monochloramine (chlorine and ammonia) C B A
- Ultraviolet light D C C
- Sodium or calcium hypochlorite D D C
- Fluoridation C B B
- pH or alkalinity adjustment (caustic, soda ash, lime, calcite contactor, acid, CO2) C C B
- Aeration towers D C C
For domestic wastewater treatment (section 100.5.2) the columns are design hydraulic capacity bands: below 0.5 MGD, 0.5-1.00, 1.01-2.00, 2.01-4.00, and above 4.00 MGD. Rows run from coarse solids reduction and screening through secondary and advanced treatment to solids handling — for example, thickening and conditioning is Class C below 0.5 MGD but Class A above 4.00 MGD, and thermal hydrolysis is Class B at the smallest sizes and Class A at 1.01 MGD and above.
The controlling rule in sections 100.4.4, 100.5.4, and 100.7.4: when a facility uses two or more listed processes, it is classified at the highest class produced by any of them. The Division may also raise a classification for facility-specific complexity — unusual design features, a difficult source of supply, a hard-to-treat waste, or receiving-water standards demanding an unusually high degree of operational control.
Worked classification example
A drinking water plant has a design flow of 900 gpm and runs conventional granular media filtration with alum, gas chlorine disinfection, and caustic soda for pH adjustment.
Granular media filtration with coagulants at 350-1,400 gpm → Class A .
Gas chlorine at 350-1,400 gpm → Class B .
pH adjustment at 350-1,400 gpm → Class C .
The highest class governs, so the facility is a Class A water treatment facility and its ORC must hold an active Colorado Class A water treatment certificate. Notice that no arithmetic was performed: one qualifying process was enough.
Distribution and Collection: The Two-Step Process
Linear systems are classified in two steps under sections 100.8.2 and 100.9.2.
Step 1 — population served. "Population served" means the average daily population during the busiest month of the year or normal operating periods, including resident, non-transient, and transient population.
- Class Population served
- Class 1 3,300 or less
- Class 2 3,301 - 25,000
- Class 3 25,001 - 100,000
- Class 4 Over 100,000
The same Step 1 table applies to both water distribution and wastewater collection. Memorize the two break points — 3,300 and 25,000 and 100,000 — because guessing "10,000" or "50,000" is the most common error candidates make on this item.
Step 2 — complexity uplift. The Division then raises a Class 1 or Class 2 system based on listed features. A system already Class 3 or Class 4 by population is not further increased, and a classification can never be lower than Step 1.
Distribution uplifts include 3 to 5 pressure zones (minimum Class 2), 6 or more pressure zones (Class 3), normal operating pressures greater than 150 psi (Class 3), chloramine residual instead of free chlorine (Class 2), booster chlorine stations inside the distribution system (Class 2), more than 2 percent of system pipe length at 24 inches diameter or larger (Class 3), 5 to 9 entry points (Class 2), and 10 or more entry points (Class 3). A pressure zone counts only if it serves at least 15 service connections.
Collection uplifts are keyed to lift stations and industrial users: 3 to 5 qualifying lift stations with at least one at 0.15 MGD firm capacity or greater (Class 2); 6 or more (Class 3); any single lift station with firm capacity of 0.35 to 2.49 MGD (Class 2); any single lift station at 2.5 MGD or more (Class 3); two significant industrial users (Class 2); three or more significant industrial users (Class 3). Firm capacity means installed pumping capacity with the largest unit out of service.
Operator in Responsible Charge (ORC)
Under sections 100.10 and 100.12 , every owner of a regulated facility must have at least one designated Operator in Responsible Charge . The ORC holds the technical authority — and the personal liability — for process control and system integrity. +-------------------------------------------------------------------------+
- | MANDATORY ORC QUALIFICATION RULE |
- +-------------------------------------------------------------------------+
- | The ORC must hold a VALID certificate in the SAME certification |
- | category, at a class EQUAL TO OR HIGHER THAN the facility class. |
- | |
- | Class A facility -> A |
- | Class B facility -> A or B |
- | Class C facility -> A, B, or C |
- | Class D facility -> A, B, C, D, or S (S only per 100.10.5(e)) |
- | Class 4 system -> 4 |
- | Class 1 system -> 4, 3, 2, 1, or S (S only per 100.10.5(e)) |
- +-------------------------------------------------------------------------+
- Duties reserved to the ORC
Process control and system integrity decisions. Sections 100.12.2 and 100.12.3 reserve drinking water quality and effluent quality process-control decisions to the certified ORC — chemical dosing, filter and backwash sequencing, sludge wasting, and disinfection setpoints.
Written operating plan. Section 100.12.6 requires the ORC to develop and maintain a written operating plan so that other staff can run the facility correctly when the ORC is not on site.
Availability. Section 100.10.3 requires the ORC to be available to the facility as needed to make timely decisions, including outside normal hours.
Compliance oversight. Supervising regulatory sampling, verifying data, and signing operating reports submitted to CDPHE.
Reasonable care. Section 100.11.1 holds certified operators to the level of reasonable care and skill ordinarily exercised by others in the profession.
Owner obligations
30-day reporting (section 100.10.4). The owner must submit the division contact update form no later than 30 days after a facility goes online, and thereafter within 30 days of any change to the legal representative's contact information, the name and operator identification number of the ORC , the facilities each ORC covers, or the PWSID or CDPS permit number .
Site-specific ORC (section 100.10.8). A limited site-specific designation exists to give owners temporary flexibility when specific conditions are met.
Enforcement (section 100.10.6). The Division investigates owner violations of sections 100.10.1 through 100.10.5 and enforces under section 25-9-110, C.R.S.