9.2 Positive Displacement Pumps (Peristaltic, Diaphragm, Progressive Cavity) & Dosing Systems
Colorado Water/Wastewater Operator Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: State Laws, Regulations & CCWP Certification
1.1 CDPHE CCWP Program & Regulatory Framework (Regulation 100 / 5 CCR 1003-2) 1.2 Facility Classification & Operator in Responsible Charge (ORC) Requirements 1.3 Certification Levels, Education, Experience & Exam Eligibility (Class D-A, Grade 1-4, Class S/T) 1.4 License Renewal, Training Units (TUs) & Mandatory Regulatory Training 1.5 Colorado Primary Drinking Water Regulations (Regulation 11) & Compliance 1.6 Colorado Discharge Permit System (Regulations 61/62), DMRs & Biosolids Reporting
2 Chapter 2: Source Water & Drinking Water Treatment Processes
2.1 Raw Water Sources, High-Altitude Characteristics & Reservoir Quality 2.2 Coagulation Chemistry, Rapid Mixing & Chemical Dosing (Alum, Ferric, Polymers) 2.3 Flocculation & Sedimentation Basin Design, Operation & Settling Zones 2.4 Granular Media Filtration, Backwash Procedures & Turbidity Standards 2.5 Advanced Treatment: Membranes, Softening, GAC/PAC Adsorption & Aeration 2.6 Groundwater Sources, Well Hydraulics, Static and Pumping Levels & Specific Capacity 2.7 Source Water Characteristics, Contaminant Categories & Watershed Protection Plans 2.8 Pretreatment: Presedimentation, Aeration, Algae Control & Taste-and-Odor Management 2.9 Direct, In-Line, Pressure, Cartridge & Diatomaceous Earth Filtration 2.10 Lime-Soda Softening, Ion Exchange & Water Stabilization 2.11 Water Treatment Plant Residuals: Lagoons, Drying Beds, Land Application & Recycle
3 Chapter 3: Disinfection & Chemical Addition
3.1 Chlorine Chemistry: Hypochlorous Acid, Free/Combined Residual & Breakpoint Chlorination 3.2 Disinfection Kinetics, Baffle Factors, T10 & CT Compliance Calculations 3.3 Disinfection Byproducts (TTHMs, HAA5s) & Stage 1/2 DBP Rules 3.4 Alternative Disinfection: Chloramination, Ultraviolet (UV) Light & Chlorine Dioxide 3.5 Corrosion Control, Lead & Copper Rule Revisions (LCRR) & Fluoridation Practices
4 Chapter 4: Water Treatment Plant Equipment, Instrumentation & Maintenance
4.1 Raw Water Intakes, Screening Equipment & Raw Water Pumping 4.2 Chemical Feed Equipment: Feeders, Day Tanks, Carrier Water & Feed-Rate Calibration 4.3 Chlorination Equipment: Gas Systems, Vacuum Regulators, Hypochlorite Storage & Onsite Generation 4.4 Filter Underdrains, Support Gravel, Surface Wash, Air Scour & Filter-to-Waste 4.5 Plant Process Control, SCADA and PLC Systems, Alarm Management & Records of Operation 4.6 Preventive, Corrective and Predictive Maintenance, Work Orders & Asset Management
5 Chapter 5: Wastewater Treatment Principles & Biological Processes
5.1 Preliminary Treatment: Bar Screens, Shredders, Grit Chambers & Flow Equalization 5.2 Primary Clarification, Solids Separation & Scum Removal Mechanics 5.3 Activated Sludge Fundamentals: Aerobic Microbiology, DO Control & Biomass Growth 5.4 Return & Waste Activated Sludge Management (RAS/WAS Operations & Sludge Age) 5.5 Activated Sludge Troubleshooting: Bulking, Nocardia Foaming, Rising Sludge & Pin Floc 5.6 Wastewater Characteristics, Organic and Hydraulic Loading, Diurnal Flow & Septicity 5.7 Activated Sludge Arrangements: Conventional, Complete Mix, Step Feed, Contact Stabilization, Extended Aeration, Oxidation Ditch, SBR & MBR 5.8 Aeration Systems: Blowers, Diffusers, Surface Aerators, Oxygen Transfer & Altitude Effects
6 Chapter 6: Advanced Wastewater Treatment & Solids Management
6.1 Biological Nutrient Removal: Nitrification, Denitrification & Anoxic Zones 6.2 Biological & Chemical Phosphorus Removal (EBPR & Coagulant Precipitation) 6.3 Sludge Thickening, Aerobic & Anaerobic Digestion (Mesophilic/Thermophilic) 6.4 Dewatering Equipment (Centrifuges, Belt Filter Presses) & Biosolids Standards (Reg 64) 6.5 Pond & Lagoon Operations, Trickling Filters & Rotating Biological Contactors (RBCs) 6.6 Secondary Clarification: Overflow and Solids Loading Rates, RAS Rate Setting & Clarifier Diagnostics 6.7 Tertiary Filtration, Effluent Polishing & Wastewater Disinfection with Chlorine, Dechlorination and UV 6.8 Effluent Disposal, Rapid Infiltration Basins, Colorado Water Reuse Law & Regulation 84
7 Chapter 7: Water Distribution Systems
7.1 Distribution Hydraulics, Pressure Zones, Static Head & Friction Headloss 7.2 Finished Water Storage Tanks, Standpipes, Mixing & Water Age Control 7.3 Distribution Piping, Valves (Gate, Butterfly, PRV), Hydrants & Main Flushing 7.4 Cross-Connection Control, Hazard Assessment & Backflow Preventers (RPZ, DCVA, PVB, Air Gap) 7.5 Water Main Installation, Trenching, Repair, Pressure Testing & Disinfection (AWWA C651) 7.6 Network Layout, Pressure Zones, Demand Patterns, Fire Flow & the Hydraulic Grade Line 7.7 Fire Hydrants, Dry Barrel Operation, Fire Flow Testing & Unidirectional Flushing 7.8 Booster Pump Stations, Hydropneumatic Systems, Controls & Surge Protection 7.9 Customer and Master Metering, Meter Sizing, Accuracy Testing, AMR & AMI 7.10 System Mapping, GIS, As-Builts, Operational Analysis & the AWWA Water Audit 7.11 Service Line Installation, Wet Tapping, Curb Stops & the Lead Service Line Inventory 7.12 Leak Detection, District Metered Areas, Minimum Night Flow & Pressure Management 7.13 Storage Facility Inspection, Sanitary Defects, Water Age Control, Cleaning & AWWA C652 Disinfection 7.14 Utility Locating, Colorado 811 Damage Prevention, the APWA Color Code & New Construction Inspection 7.15 Well and Wellhead Maintenance, Sanitary Condition, Rehabilitation & AWWA C654 Disinfection 7.16 Booster Chlorination, Remote Chemical Feed, Chemical Storage, Security & Supply Management 7.17 Distribution Sampling Technique, Chlorine Residual Monitoring & Nitrification Control in Chloraminated Systems
8 Chapter 8: Wastewater Collection Systems
8.1 Gravity Collection Systems: Flow Velocities, Slopes, Pipe Materials & Manholes 8.2 Wastewater Lift Stations: Wet Wells, Submersible Pumps, Level Controls & Force Mains 8.3 Inflow and Infiltration (I&I) Sources, Flow Monitoring, Smoke Testing & CCTV Inspection 8.4 Collection Maintenance: Hydraulic Jetting, Mechanical Rodding & FOG/Root Mitigation 8.5 Sanitary Sewer Overflows (SSOs): Root Causes, Containment, Reporting & Mitigation 8.6 Lift Station Electrical Devices, Level Detection, Telemetry, Gas Detection & Capacity Adjustment 8.7 Lift Station Configurations, Preventive Maintenance, Wet Well Cleaning, Troubleshooting & Emergency Bypass Pumping 8.8 Collection System Rehabilitation: CIPP, Pipe Bursting, Sliplining, Grouting, Manhole Repair & Tap Defects 8.9 Excavation, Hydro Excavation, Bedding and Haunching, Grade Control & Sewer Acceptance Testing 8.10 Collection System Flow Monitoring, Area-Velocity Metering, Weirs and Flumes & Capacity Assessment
9 Chapter 9: Pumps, Motors & Utility Mechanics
9.1 Centrifugal Pumps: Volutes, Impellers, Packing Seals & Mechanical Seals 9.2 Positive Displacement Pumps (Peristaltic, Diaphragm, Progressive Cavity) & Dosing Systems 9.3 Pump Performance Curves, System Head Curves, Cavitation & NPSH Calculations 9.4 Electric Motors (Single/Three Phase), Controls, Variable Frequency Drives (VFDs) & Power 9.5 Flow Meters (Venturi, Magnetic, Ultrasonic), Online Analyzers, PLCs & SCADA Telemetry 9.6 Air Compressors, Conveyors, Hoists and Cranes, Service Piping & Standby Power Generation 9.7 Valve Types and Duties, Air Release and Air-Vacuum Valves, Water Hammer & Surge Control
10 Chapter 10: Laboratory Analysis & Water Quality Monitoring
10.1 Regulatory Sampling Procedures, Chain of Custody, Holding Times & Preservation Techniques 10.2 Physical & Chemical Drinking Water Testing: Turbidity, pH, Alkalinity, Hardness & Chlorine (DPD) 10.3 Wastewater Laboratory Analysis: BOD5, COD, Total Suspended Solids (TSS) & Settleometry 10.4 Microbiological Testing: Total Coliform, E. coli (Colilert, Membrane Filtration) & QA/QC 10.5 Bench-Scale Jar Testing, Coagulant Optimization & Streaming Current Monitoring 10.6 Laboratory Equipment, Calibration and Verification, QA/QC Program & Certified Laboratory Requirements 10.7 Nutrient Series, Metals Sampling, Whole Effluent Toxicity & Electrode Measurements (DO, pH, ORP, H2S)
11 Chapter 11: Operator Mathematics & Applied Calculations
11.1 Core Conversions, Geometric Area, Pipe Volume & Continuous Flow Rate (MGD, GPM, cfs) 11.2 Chemical Dosage, The Standard "Pounds Formula", Active Chemical & Solution Purity 11.3 Hydraulic Retention Time (HRT), Surface Overflow Rate (SOR) & Weir Overflow Rates 11.4 Process Control Calculations: F/M Ratio, MCRT/Solids Retention Time (SRT) & Sludge Volume Index (SVI) 11.5 Distribution Pressure, Static vs Dynamic Head, Water Horsepower & Wire-to-Water Efficiency 11.6 CT Calculations: Baffling Factors, T10, Temperature and pH Corrections & Multi-Segment Compliance
12 Chapter 12: Safety, Emergency Operations & Compliance
12.1 Permit-Required Confined Space (PRCS) Entry, Atmospheric Testing (O2/LEL/H2S/CO) & Rescue 12.2 Control of Hazardous Energy: Lockout/Tagout (LOTO), Arc Flash & Electrical Safety 12.3 Chemical Safety: Chlorine Gas Handling, Ton Cylinders, Sulfur Dioxide, Ammonia & SDS/GHS 12.4 Trenching & Excavation: Soil Classification, Sloping, Shoring, Shielding & Competent Person Rules 12.5 Emergency Action Plans, Security Vulnerability, Spill Containment & CDPHE Tier 1/2/3 Public Notice 12.6 Work Zone Traffic Control, PPE, Fall Protection, Fire Extinguishers, First Aid & Bloodborne Pathogens 12.7 Standard Operating Procedures, Operating Records, Regulatory Reporting, Customer Complaints & Supervisory Duties
9.2 Positive Displacement Pumps (Peristaltic, Diaphragm, Progressive Cavity) & Dosing Systems
Key Takeaways Explain This Topic AI
Positive displacement (PD) pumps trap a fixed volume of liquid per stroke or revolution and force it into the discharge line, delivering a constant flow rate regardless of discharge head pressure.
A dedicated, correctly sized Pressure Relief Valve (PRV) must always be installed on the PD pump discharge piping upstream of any isolation valves to prevent catastrophic overpressurization and pipe rupture.
Diaphragm metering pumps deliver highly accurate chemical feed (sodium hypochlorite, alum, caustic soda) controlled by dual adjustments of stroke length (displacement volume) and stroke speed (frequency).
Peristaltic hose pumps utilize rotating rollers to occlude flexible elastomer tubing, providing self-priming, seal-less, dry-run-capable delivery that completely eliminates vapor locking from off-gassing chemicals like sodium hypochlorite.
Progressive cavity pumps utilize a single helical steel rotor turning inside a double helical elastomer stator to convey high-viscosity sludge and polymers with non-shearing laminar flow, but suffer rapid stator destruction if operated dry.
Last updated: August 2026
Positive Displacement Pumps & Chemical Dosing Systems
While centrifugal pumps dominate high-volume bulk fluid transfer, positive displacement (PD) pumps are indispensable across water and wastewater treatment plants for precision chemical dosing, high-viscosity sludge transfer, and shear-sensitive polymer feed. Certified operators must understand the fundamental mechanical distinction between centrifugal and PD hydraulics, manage safety relief equipment, and master liquid chemical feed calibration calculations.
1. Operating Principles: PD Pumps vs. Centrifugal Mechanics
The fundamental operational principle of a positive displacement pump is the mechanical entrapment of a fixed, discrete volume of liquid in a cavity, followed by the physical expulsion of that volume into the discharge piping system. +-------------------------------------------------------------------------+
- | HYDRAULIC COMPARISON: CENTRIFUGAL VS. PD |
- | |
- | PARAMETER CENTRIFUGAL PUMP POSITIVE DISPL. |
- | ───────────────────────────────────────────────────────────────────── |
- | Flow vs. Head Flow decreases as head Flow remains constant|
- | increases regardless of head |
- | Discharge Deadheading Churns liquid; pressure Pressure builds |
- | caps at shutoff head until pipe bursts |
- | Self-Priming Ability Poor (requires flooded Excellent |
- | suction or foot valve) (pulls deep vacuum) |
- | Viscosity Handling Efficiency drops sharply Handles thick sludges|
- | above 100 cP up to 50,000+ cP |
- +-------------------------------------------------------------------------+
- The Deadhead Hazard and Pressure Relief Valves (PRVs)
Because a positive displacement pump continues pushing its fixed volume into the discharge line regardless of resistance, closing a discharge isolation valve (or encountering a downstream line blockage) creates an immediate, dangerous spike in pressure. The pump will continue building hydraulic pressure until:
- The electric motor stalls or trips on thermal overload,
- The drive shaft, connecting rod, or pump housing fractures, or
Downstream piping, hoses, or chemical tubing catastrophically rupture, spraying hazardous chemicals (e.g., 93% sulfuric acid or 50% caustic soda).
CRITICAL SAFETY MANDATE: Pressure Relief Valves (PRVs) Every positive displacement pump installation MUST have an approved, spring-loaded or diaphragm-actuated Pressure Relief Valve (PRV) installed on the discharge line upstream of the first downstream isolation valve . The PRV discharge must be piped safely back to the chemical storage tank or pump suction supply vessel.
2. Chemical Metering Pumps: Diaphragm & Peristaltic Designs
Water treatment facilities rely on precise chemical metering pumps to inject disinfectants (sodium hypochlorite), coagulants (alum, polyaluminum chloride), oxidants (potassium permanganate), and pH adjustment chemicals (sodium hydroxide, sulfuric acid).
Mechanical & Hydraulic Diaphragm Metering Pumps
Diaphragm pumps use a flexible reciprocating diaphragm (typically PTFE / Teflon facing with an EPDM elastomeric backing) to displace fluid in a specialized liquid head:
Suction Stroke : The drive mechanism retracts the diaphragm, expanding liquid head volume and lowering internal pressure. Atmospheric pressure forces the suction ball check valve off its seat, drawing chemical into the head while the discharge ball check valve is pulled tightly closed onto its seat.
Discharge Stroke : The drive mechanism pushes the diaphragm forward, compressing liquid volume. The suction check valve is forced closed onto its seat, while the discharge check valve unseats, expelling chemical into the discharge tubing.
Dual Control Adjustments :
Stroke Speed (Frequency) : Regulates the number of strokes per minute (0–120 SPM) via motor speed or electronic solenoid pulses.
Stroke Length (Displacement) : Regulates the physical distance traveled by the diaphragm per stroke (0–100%).
Operating Rule : For maximum volumetric dosing accuracy and repeatability, never operate a mechanical diaphragm pump with a stroke length setting below 20% (target 40% to 90% operating window). +-------------------------------------------------------------------------+
- | DIAPHRAGM CHEMICAL METERING PUMP PIPING TRAIN |
- | |
- | [Bulk Storage Tank] |
- | │ |
- | [Calibration Column] ──┐ |
- | │ ▼ |
- | [Y-Strainer] ──► [Diaphragm Pump Head] ──► [Pulsation Dampener] |
- | │ |
- | [PRV (Relief to Tank)] ◄─────────────────────────┤ |
- | ▼ |
- | [Backpressure Valve (15-25 psi)] ──► [Antisiphon Quill in Main Line] |
- +-------------------------------------------------------------------------+
- Peristaltic (Hose / Tubing) Pumps
Peristaltic pumps utilize rotating shoes or rollers mounted on a central rotor to progressively compress and occlude a resilient elastomeric hose (Norprene, EPDM, or polyurethane) against a circular pump housing.
Seal-Less & Valve-Less : The chemical remains completely contained inside the flexible tube; it never touches bearings, shafts, or check valves.
Elimination of Off-Gas Vapor Locking : Chemicals like sodium hypochlorite (NaOCl) naturally decompose, releasing trapped chlorine and oxygen gases. In diaphragm pumps, gas bubbles collect inside the check valve chamber, causing the pump to lose prime and "vapor lock." Peristaltic pumps positively displace both liquids and gases simultaneously, making them virtually immune to vapor locking.
Dry Run Capability : Peristaltic pumps can run dry indefinitely without mechanical damage, provided the casing contains proper tube lubricant (glycerine or silicone bath).
3. High-Solids & Sludge Pumps: Progressive Cavity & Rotary Lobe
Wastewater treatment facilities and water plant residuals processes require heavy-duty positive displacement pumps to move thickened sludge, primary sludge, and concentrated polymer emulsions.
Progressive Cavity Pumps (Moyno Pumps)
A progressive cavity pump consists of two primary internal components:
Rotor : A single-lead helical screw machined from high-strength chrome-plated alloy steel or stainless steel.
Stator : A stationary double-lead internal helix molded from a resilient synthetic elastomer (Buna-N, EPDM, or Viton) bonded inside a steel cylinder.
As the rotor revolves eccentrically within the stator, a continuous series of sealed, honeycomb-shaped cavities form and travel progressively from the suction port to the discharge flange.
Non-Shearing Laminar Flow : Flow is exceptionally smooth, pulsation-free, and low-shear. This makes progressive cavity pumps ideal for feeding long-chain flocculant polymers (which would shear and lose effectiveness in centrifugal impellers) and dewatered sludge cake (up to 15–25% total suspended solids).
Thermal Dry-Run Hazard : The tight mechanical interference fit between rotor and stator requires fluid film lubrication. Operating a progressive cavity pump dry for even 30 to 60 seconds creates extreme friction that melts and chars the elastomer stator, permanently destroying it. Plants install thermal stator temperature sensors or inline conductivity dry-run switches interlocked with motor starters.
Rotary Lobe Pumps
Rotary lobe pumps utilize two intermeshing, multi-lobe rotors (typically 2-wing, 3-wing, or 4-wing rubber-coated lobes) timed by external synchronizing gears to rotate in opposite directions inside a casing. They handle high-solids primary sludge, clarifier scum, and abrasive grit with compact physical footprints and reversible flow capability.
4. Chemical Feed Dosing & Drawdown Cylinder Calculations
Operators must regularly calibrate liquid chemical feed systems using a graduated drawdown calibration cylinder installed on the pump suction line to verify actual volumetric delivery against the plant SCADA dosing setpoint.
Mathematical Formulation for Drawdown Calibration Flow Rate (mL/min) = Volume Displaced (mL) Time Elapsed (seconds) × 60 s/min \text{Flow Rate (mL/min)} = \frac{\text{Volume Displaced (mL)}}{\text{Time Elapsed (seconds)}} \times 60\text{ s/min} Flow Rate (mL/min) = Time Elapsed (seconds) Volume Displaced (mL) × 60 s/min Feed Rate (GPH) = Flow Rate (mL/min) × 1.44 60 = Flow Rate (mL/min) × 0.01585 \text{Feed Rate (GPH)} = \frac{\text{Flow Rate (mL/min)} \times 1.44}{60} = \text{Flow Rate (mL/min)} \times 0.01585 Feed Rate (GPH) = 60 Flow Rate (mL/min) × 1.44 = Flow Rate (mL/min) × 0.01585 Feed Rate (GPD) = Flow Rate (mL/min) × 0.3805 \text{Feed Rate (GPD)} = \text{Flow Rate (mL/min)} \times 0.3805 Feed Rate (GPD) = Flow Rate (mL/min) × 0.3805
Step-by-Step Worked Calibration Problem
A water treatment plant operator isolates the bulk sodium hypochlorite tank and opens the valve to a 500 mL suction calibration column. The diaphragm metering pump is set at 70% stroke length and 60% stroke speed. The operator records that the pump draws down exactly 185 mL of chemical in 45.0 seconds .
Step 1: Calculate volumetric feed rate in mL/min: mL/min = 185 mL 45.0 s × 60 s/min = 246.67 mL/min \text{mL/min} = \frac{185\text{ mL}}{45.0\text{ s}} \times 60\text{ s/min} = 246.67\text{ mL/min} mL/min = 45.0 s 185 mL × 60 s/min = 246.67 mL/min
Step 2: Convert mL/min to Gallons Per Hour (GPH): GPH = 246.67 mL/min × 1 gal 3 , 785.4 mL × 60 min 1 hr = 3.91 GPH \text{GPH} = 246.67\text{ mL/min} \times \frac{1\text{ gal}}{3,785.4\text{ mL}} \times \frac{60\text{ min}}{1\text{ hr}} = 3.91\text{ GPH} GPH = 246.67 mL/min × 3 , 785.4 mL 1 gal × 1 hr 60 min = 3.91 GPH
Step 3: Convert to Gallons Per Day (GPD): GPD = 3.91 GPH × 24 hr/day = 93.84 GPD \text{GPD} = 3.91\text{ GPH} \times 24\text{ hr/day} = 93.84\text{ GPD} GPD = 3.91 GPH × 24 hr/day = 93.84 GPD
Step 4: Verify against target chemical dose: If the plant is treating 2.5 MGD with 12.5% trade strength sodium hypochlorite (containing 1.25 lb available C l 2 Cl_2 C l 2 /gal), the available active chlorine delivered is: lb C l 2 /day = 93.84 GPD × 1.25 lb C l 2 /gal = 117.3 lb C l 2 /day \text{lb } Cl_2\text{/day} = 93.84\text{ GPD} \times 1.25\text{ lb } Cl_2\text{/gal} = 117.3\text{ lb } Cl_2\text{/day} lb C l 2 /day = 93.84 GPD × 1.25 lb C l 2 /gal = 117.3 lb C l 2 /day Dosage (mg/L) = 117.3 lb/day 2.5 MGD × 8.34 lb/gal = 5.63 mg/L C l 2 \text{Dosage (mg/L)} = \frac{117.3\text{ lb/day}}{2.5\text{ MGD} \times 8.34\text{ lb/gal}} = 5.63\text{ mg/L } Cl_2 Dosage (mg/L) = 2.5 MGD × 8.34 lb/gal 117.3 lb/day = 5.63 mg/L C l 2