Study guide
8.6 Lift Station Electrical Devices, Level Detection, Telemetry, Gas Detection & Capacity Adjustment
Colorado Water/Wastewater Operator Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: State Laws, Regulations & CCWP Certification
1.1 CDPHE CCWP Program & Regulatory Framework (Regulation 100 / 5 CCR 1003-2) 1.2 Facility Classification & Operator in Responsible Charge (ORC) Requirements 1.3 Certification Levels, Education, Experience & Exam Eligibility (Class D-A, Grade 1-4, Class S/T) 1.4 License Renewal, Training Units (TUs) & Mandatory Regulatory Training 1.5 Colorado Primary Drinking Water Regulations (Regulation 11) & Compliance 1.6 Colorado Discharge Permit System (Regulations 61/62), DMRs & Biosolids Reporting
2 Chapter 2: Source Water & Drinking Water Treatment Processes
2.1 Raw Water Sources, High-Altitude Characteristics & Reservoir Quality 2.2 Coagulation Chemistry, Rapid Mixing & Chemical Dosing (Alum, Ferric, Polymers) 2.3 Flocculation & Sedimentation Basin Design, Operation & Settling Zones 2.4 Granular Media Filtration, Backwash Procedures & Turbidity Standards 2.5 Advanced Treatment: Membranes, Softening, GAC/PAC Adsorption & Aeration 2.6 Groundwater Sources, Well Hydraulics, Static and Pumping Levels & Specific Capacity 2.7 Source Water Characteristics, Contaminant Categories & Watershed Protection Plans 2.8 Pretreatment: Presedimentation, Aeration, Algae Control & Taste-and-Odor Management 2.9 Direct, In-Line, Pressure, Cartridge & Diatomaceous Earth Filtration 2.10 Lime-Soda Softening, Ion Exchange & Water Stabilization 2.11 Water Treatment Plant Residuals: Lagoons, Drying Beds, Land Application & Recycle
3 Chapter 3: Disinfection & Chemical Addition
3.1 Chlorine Chemistry: Hypochlorous Acid, Free/Combined Residual & Breakpoint Chlorination 3.2 Disinfection Kinetics, Baffle Factors, T10 & CT Compliance Calculations 3.3 Disinfection Byproducts (TTHMs, HAA5s) & Stage 1/2 DBP Rules 3.4 Alternative Disinfection: Chloramination, Ultraviolet (UV) Light & Chlorine Dioxide 3.5 Corrosion Control, Lead & Copper Rule Revisions (LCRR) & Fluoridation Practices
4 Chapter 4: Water Treatment Plant Equipment, Instrumentation & Maintenance
4.1 Raw Water Intakes, Screening Equipment & Raw Water Pumping 4.2 Chemical Feed Equipment: Feeders, Day Tanks, Carrier Water & Feed-Rate Calibration 4.3 Chlorination Equipment: Gas Systems, Vacuum Regulators, Hypochlorite Storage & Onsite Generation 4.4 Filter Underdrains, Support Gravel, Surface Wash, Air Scour & Filter-to-Waste 4.5 Plant Process Control, SCADA and PLC Systems, Alarm Management & Records of Operation 4.6 Preventive, Corrective and Predictive Maintenance, Work Orders & Asset Management
5 Chapter 5: Wastewater Treatment Principles & Biological Processes
5.1 Preliminary Treatment: Bar Screens, Shredders, Grit Chambers & Flow Equalization 5.2 Primary Clarification, Solids Separation & Scum Removal Mechanics 5.3 Activated Sludge Fundamentals: Aerobic Microbiology, DO Control & Biomass Growth 5.4 Return & Waste Activated Sludge Management (RAS/WAS Operations & Sludge Age) 5.5 Activated Sludge Troubleshooting: Bulking, Nocardia Foaming, Rising Sludge & Pin Floc 5.6 Wastewater Characteristics, Organic and Hydraulic Loading, Diurnal Flow & Septicity 5.7 Activated Sludge Arrangements: Conventional, Complete Mix, Step Feed, Contact Stabilization, Extended Aeration, Oxidation Ditch, SBR & MBR 5.8 Aeration Systems: Blowers, Diffusers, Surface Aerators, Oxygen Transfer & Altitude Effects
6 Chapter 6: Advanced Wastewater Treatment & Solids Management
6.1 Biological Nutrient Removal: Nitrification, Denitrification & Anoxic Zones 6.2 Biological & Chemical Phosphorus Removal (EBPR & Coagulant Precipitation) 6.3 Sludge Thickening, Aerobic & Anaerobic Digestion (Mesophilic/Thermophilic) 6.4 Dewatering Equipment (Centrifuges, Belt Filter Presses) & Biosolids Standards (Reg 64) 6.5 Pond & Lagoon Operations, Trickling Filters & Rotating Biological Contactors (RBCs) 6.6 Secondary Clarification: Overflow and Solids Loading Rates, RAS Rate Setting & Clarifier Diagnostics 6.7 Tertiary Filtration, Effluent Polishing & Wastewater Disinfection with Chlorine, Dechlorination and UV 6.8 Effluent Disposal, Rapid Infiltration Basins, Colorado Water Reuse Law & Regulation 84
7 Chapter 7: Water Distribution Systems
7.1 Distribution Hydraulics, Pressure Zones, Static Head & Friction Headloss 7.2 Finished Water Storage Tanks, Standpipes, Mixing & Water Age Control 7.3 Distribution Piping, Valves (Gate, Butterfly, PRV), Hydrants & Main Flushing 7.4 Cross-Connection Control, Hazard Assessment & Backflow Preventers (RPZ, DCVA, PVB, Air Gap) 7.5 Water Main Installation, Trenching, Repair, Pressure Testing & Disinfection (AWWA C651) 7.6 Network Layout, Pressure Zones, Demand Patterns, Fire Flow & the Hydraulic Grade Line 7.7 Fire Hydrants, Dry Barrel Operation, Fire Flow Testing & Unidirectional Flushing 7.8 Booster Pump Stations, Hydropneumatic Systems, Controls & Surge Protection 7.9 Customer and Master Metering, Meter Sizing, Accuracy Testing, AMR & AMI 7.10 System Mapping, GIS, As-Builts, Operational Analysis & the AWWA Water Audit 7.11 Service Line Installation, Wet Tapping, Curb Stops & the Lead Service Line Inventory 7.12 Leak Detection, District Metered Areas, Minimum Night Flow & Pressure Management 7.13 Storage Facility Inspection, Sanitary Defects, Water Age Control, Cleaning & AWWA C652 Disinfection 7.14 Utility Locating, Colorado 811 Damage Prevention, the APWA Color Code & New Construction Inspection 7.15 Well and Wellhead Maintenance, Sanitary Condition, Rehabilitation & AWWA C654 Disinfection 7.16 Booster Chlorination, Remote Chemical Feed, Chemical Storage, Security & Supply Management 7.17 Distribution Sampling Technique, Chlorine Residual Monitoring & Nitrification Control in Chloraminated Systems
8 Chapter 8: Wastewater Collection Systems
8.1 Gravity Collection Systems: Flow Velocities, Slopes, Pipe Materials & Manholes 8.2 Wastewater Lift Stations: Wet Wells, Submersible Pumps, Level Controls & Force Mains 8.3 Inflow and Infiltration (I&I) Sources, Flow Monitoring, Smoke Testing & CCTV Inspection 8.4 Collection Maintenance: Hydraulic Jetting, Mechanical Rodding & FOG/Root Mitigation 8.5 Sanitary Sewer Overflows (SSOs): Root Causes, Containment, Reporting & Mitigation 8.6 Lift Station Electrical Devices, Level Detection, Telemetry, Gas Detection & Capacity Adjustment 8.7 Lift Station Configurations, Preventive Maintenance, Wet Well Cleaning, Troubleshooting & Emergency Bypass Pumping 8.8 Collection System Rehabilitation: CIPP, Pipe Bursting, Sliplining, Grouting, Manhole Repair & Tap Defects 8.9 Excavation, Hydro Excavation, Bedding and Haunching, Grade Control & Sewer Acceptance Testing 8.10 Collection System Flow Monitoring, Area-Velocity Metering, Weirs and Flumes & Capacity Assessment
9 Chapter 9: Pumps, Motors & Utility Mechanics
9.1 Centrifugal Pumps: Volutes, Impellers, Packing Seals & Mechanical Seals 9.2 Positive Displacement Pumps (Peristaltic, Diaphragm, Progressive Cavity) & Dosing Systems 9.3 Pump Performance Curves, System Head Curves, Cavitation & NPSH Calculations 9.4 Electric Motors (Single/Three Phase), Controls, Variable Frequency Drives (VFDs) & Power 9.5 Flow Meters (Venturi, Magnetic, Ultrasonic), Online Analyzers, PLCs & SCADA Telemetry 9.6 Air Compressors, Conveyors, Hoists and Cranes, Service Piping & Standby Power Generation 9.7 Valve Types and Duties, Air Release and Air-Vacuum Valves, Water Hammer & Surge Control
10 Chapter 10: Laboratory Analysis & Water Quality Monitoring
10.1 Regulatory Sampling Procedures, Chain of Custody, Holding Times & Preservation Techniques 10.2 Physical & Chemical Drinking Water Testing: Turbidity, pH, Alkalinity, Hardness & Chlorine (DPD) 10.3 Wastewater Laboratory Analysis: BOD5, COD, Total Suspended Solids (TSS) & Settleometry 10.4 Microbiological Testing: Total Coliform, E. coli (Colilert, Membrane Filtration) & QA/QC 10.5 Bench-Scale Jar Testing, Coagulant Optimization & Streaming Current Monitoring 10.6 Laboratory Equipment, Calibration and Verification, QA/QC Program & Certified Laboratory Requirements 10.7 Nutrient Series, Metals Sampling, Whole Effluent Toxicity & Electrode Measurements (DO, pH, ORP, H2S)
11 Chapter 11: Operator Mathematics & Applied Calculations
11.1 Core Conversions, Geometric Area, Pipe Volume & Continuous Flow Rate (MGD, GPM, cfs) 11.2 Chemical Dosage, The Standard "Pounds Formula", Active Chemical & Solution Purity 11.3 Hydraulic Retention Time (HRT), Surface Overflow Rate (SOR) & Weir Overflow Rates 11.4 Process Control Calculations: F/M Ratio, MCRT/Solids Retention Time (SRT) & Sludge Volume Index (SVI) 11.5 Distribution Pressure, Static vs Dynamic Head, Water Horsepower & Wire-to-Water Efficiency 11.6 CT Calculations: Baffling Factors, T10, Temperature and pH Corrections & Multi-Segment Compliance
12 Chapter 12: Safety, Emergency Operations & Compliance
12.1 Permit-Required Confined Space (PRCS) Entry, Atmospheric Testing (O2/LEL/H2S/CO) & Rescue 12.2 Control of Hazardous Energy: Lockout/Tagout (LOTO), Arc Flash & Electrical Safety 12.3 Chemical Safety: Chlorine Gas Handling, Ton Cylinders, Sulfur Dioxide, Ammonia & SDS/GHS 12.4 Trenching & Excavation: Soil Classification, Sloping, Shoring, Shielding & Competent Person Rules 12.5 Emergency Action Plans, Security Vulnerability, Spill Containment & CDPHE Tier 1/2/3 Public Notice 12.6 Work Zone Traffic Control, PPE, Fall Protection, Fire Extinguishers, First Aid & Bloodborne Pathogens 12.7 Standard Operating Procedures, Operating Records, Regulatory Reporting, Customer Complaints & Supervisory Duties
8.6 Lift Station Electrical Devices, Level Detection, Telemetry, Gas Detection & Capacity Adjustment
Key Takeaways Explain This Topic AI
Single phasing keeps a three-phase motor running while current spikes on the remaining legs, so phase-loss relays and three-leg amperage checks are standard protection.
A robust lift station uses a continuous level device for control plus independent float switches for high-level alarm and backup, so one fouled sensor cannot cause an overflow.
A communication-failure alarm at the SCADA end is essential, because a silent station looks identical to a station with nothing to report.
Cycle time equals fill time plus draw-down time, where fill time is usable volume divided by inflow and draw-down time is usable volume divided by pump rate minus inflow.
Slowing a pump with a VFD below the speed that maintains roughly 2 feet per second in the force main allows grit and grease to settle out and restrict the main.
Last updated: August 2026
The 18 percent content area
Lift Station Operation and Maintenance is 18 percent of the WPI Wastewater Collection Operator Class I exam , and the outline splits it into three device families plus one control task: ensuring electrical devices (fuses, motors, relays, starters) function; ensuring electronic devices (alarms, controllers, gas detection, level detection, telemetry RTUs, SCADA, PLCs, control devices) function; ensuring mechanical devices (piping, pressure relief valves, compressors, water heaters, chemical addition, pumps, valves, wet wells, vacuum valves, force mains, air relief, seals, air exchangers and exhaust fans, bar screens) function; and adjusting equipment such as SCADA, VFD, PLC, and control panel to increase or decrease pumping capacity for proper flow .
The electrical chain
Power flows through a predictable chain, and troubleshooting follows it in order:
Utility service → main disconnect → transfer switch (if standby power) → motor control center bus → circuit breaker or fused disconnect → starter → overload relay → motor
- Device Function Failure signature
- Fuses One-time overcurrent protection A single blown fuse on a three-phase circuit causes single phasing
Circuit breaker Resettable overcurrent and short-circuit protection Trips on overload; repeated trips mean a real fault, not a nuisance
Motor starter (contactor) Switches motor power on command Pitted or welded contacts; chattering from low control voltage
Overload relay Thermal or electronic protection against sustained overcurrent Trips on a bound pump, high head, or single phasing
Control transformer Steps voltage down for the control circuit Failure kills the control circuit while power remains on the load side
- Relays and contactors Logic and switching Sticking, coil failure
- Motor Converts electrical to mechanical energy Insulation breakdown, bearing failure, winding short
Single phasing deserves emphasis. If one of three phases is lost — a blown fuse, a broken utility conductor, a loose lug — a running three-phase motor keeps turning but draws greatly increased current on the remaining phases and overheats rapidly. It will not restart if stopped. Phase monitors and phase-loss relays are installed to shut the motor down, and reading amperage on all three legs is standard practice for exactly this reason.
Variable frequency drives vary motor speed by varying frequency and voltage. In a lift station they allow the pump to match inflow rather than cycling on and off, which reduces starts, smooths flow to the treatment plant, and can keep velocity in the force main above the scouring minimum. VFD-specific issues include harmonics, the need for inverter-duty motors, shaft currents requiring grounding rings, and heat in the enclosure — VFD cabinets need working cooling.
Level detection
Level control determines when pumps start and stop, and level failure is the leading cause of both dry running and overflows.
- Device Principle Notes
- Float switches Tilt or mercury switch on a tethered float Simple, cheap, reliable; fouled by grease and rags
Submersible pressure transducer Hydrostatic pressure at the sensor Continuous level signal; needs a vented cable; fouls
Bubbler Air pressure required to bubble from a fixed tube Tolerant of debris; needs a compressor
Ultrasonic Time of flight to the liquid surface Non-contact, but confused by foam, grease buildup on the transducer face, and turbulence
- Radar Microwave time of flight Tolerant of foam and vapor; more expensive
- Conductance probes Electrode contact with liquid Coats with grease
A robust station uses a continuous level device for control plus independent float switches for high-level alarm and pump backup . That redundancy is what prevents a single fouled sensor from causing an overflow. A high-high float wired directly to the alarm dialer, bypassing the PLC, is cheap insurance.
Alarms, telemetry, and gas detection
Telemetry by radio, cellular, or fiber links the station's RTU or PLC to SCADA. Alarm points that matter: high wet well level , pump failure or fail-to-start , power failure , phase loss , intrusion , and communication failure . A communication-failure alarm at the SCADA end is essential, because a station that goes silent looks identical to a station with nothing to report.
Autodialers provide a backup path for critical alarms independent of SCADA.
Gas detection. Lift station wet wells generate hydrogen sulfide and, where industrial or illicit discharges occur, methane and flammable vapors . Fixed detection in dry wells and enclosed structures, plus personal four-gas monitors for anyone approaching an opening, are standard. Detection must alarm both locally and remotely.
Ventilation. Wet wells and dry wells have exhaust fans and air exchangers, and the WPI outline lists them explicitly. Continuous ventilation of a dry well and forced ventilation before and during any wet well entry are basic.
Adjusting pumping capacity
The listed task is "adjust equipment (SCADA, VFD, PLC, control panel) to increase or decrease pumping capacity for proper flow." In practice:
Raise or lower start and stop setpoints to change the working volume and therefore the cycle time.
Change lead, lag, and standby assignments and enable alternation so pumps share runtime.
Adjust VFD speed setpoints or the level-to-speed control curve so the station matches inflow.
Verify minimum velocity in the force main. Slowing a pump too far drops force main velocity below the roughly 2 ft/s needed to keep solids moving, and the main begins to accumulate grit and grease. This is the most common unintended consequence of adding a VFD to an existing station.
Worked example of cycle time. A wet well has a usable volume between start and stop setpoints of 900 gallons. Inflow is 60 gpm and the pump delivers 220 gpm.
- Fill time = 900 ÷ 60 = 15.0 minutes
- Draw-down time = 900 ÷ (220 − 60) = 900 ÷ 160 = 5.6 minutes
- Cycle time = 15.0 + 5.6 = 20.6 minutes , giving about 2.9 starts per hour
That is comfortably within typical motor limits. If the usable volume were only 300 gallons, cycle time would fall to 6.9 minutes and starts would rise to nearly 9 per hour, which shortens motor life.