Study guide
8.5 Sanitary Sewer Overflows (SSOs): Root Causes, Containment, Reporting & Mitigation
Colorado Water/Wastewater Operator Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: State Laws, Regulations & CCWP Certification
1.1 CDPHE CCWP Program & Regulatory Framework (Regulation 100 / 5 CCR 1003-2) 1.2 Facility Classification & Operator in Responsible Charge (ORC) Requirements 1.3 Certification Levels, Education, Experience & Exam Eligibility (Class D-A, Grade 1-4, Class S/T) 1.4 License Renewal, Training Units (TUs) & Mandatory Regulatory Training 1.5 Colorado Primary Drinking Water Regulations (Regulation 11) & Compliance 1.6 Colorado Discharge Permit System (Regulations 61/62), DMRs & Biosolids Reporting
2 Chapter 2: Source Water & Drinking Water Treatment Processes
2.1 Raw Water Sources, High-Altitude Characteristics & Reservoir Quality 2.2 Coagulation Chemistry, Rapid Mixing & Chemical Dosing (Alum, Ferric, Polymers) 2.3 Flocculation & Sedimentation Basin Design, Operation & Settling Zones 2.4 Granular Media Filtration, Backwash Procedures & Turbidity Standards 2.5 Advanced Treatment: Membranes, Softening, GAC/PAC Adsorption & Aeration 2.6 Groundwater Sources, Well Hydraulics, Static and Pumping Levels & Specific Capacity 2.7 Source Water Characteristics, Contaminant Categories & Watershed Protection Plans 2.8 Pretreatment: Presedimentation, Aeration, Algae Control & Taste-and-Odor Management 2.9 Direct, In-Line, Pressure, Cartridge & Diatomaceous Earth Filtration 2.10 Lime-Soda Softening, Ion Exchange & Water Stabilization 2.11 Water Treatment Plant Residuals: Lagoons, Drying Beds, Land Application & Recycle
3 Chapter 3: Disinfection & Chemical Addition
3.1 Chlorine Chemistry: Hypochlorous Acid, Free/Combined Residual & Breakpoint Chlorination 3.2 Disinfection Kinetics, Baffle Factors, T10 & CT Compliance Calculations 3.3 Disinfection Byproducts (TTHMs, HAA5s) & Stage 1/2 DBP Rules 3.4 Alternative Disinfection: Chloramination, Ultraviolet (UV) Light & Chlorine Dioxide 3.5 Corrosion Control, Lead & Copper Rule Revisions (LCRR) & Fluoridation Practices
4 Chapter 4: Water Treatment Plant Equipment, Instrumentation & Maintenance
4.1 Raw Water Intakes, Screening Equipment & Raw Water Pumping 4.2 Chemical Feed Equipment: Feeders, Day Tanks, Carrier Water & Feed-Rate Calibration 4.3 Chlorination Equipment: Gas Systems, Vacuum Regulators, Hypochlorite Storage & Onsite Generation 4.4 Filter Underdrains, Support Gravel, Surface Wash, Air Scour & Filter-to-Waste 4.5 Plant Process Control, SCADA and PLC Systems, Alarm Management & Records of Operation 4.6 Preventive, Corrective and Predictive Maintenance, Work Orders & Asset Management
5 Chapter 5: Wastewater Treatment Principles & Biological Processes
5.1 Preliminary Treatment: Bar Screens, Shredders, Grit Chambers & Flow Equalization 5.2 Primary Clarification, Solids Separation & Scum Removal Mechanics 5.3 Activated Sludge Fundamentals: Aerobic Microbiology, DO Control & Biomass Growth 5.4 Return & Waste Activated Sludge Management (RAS/WAS Operations & Sludge Age) 5.5 Activated Sludge Troubleshooting: Bulking, Nocardia Foaming, Rising Sludge & Pin Floc 5.6 Wastewater Characteristics, Organic and Hydraulic Loading, Diurnal Flow & Septicity 5.7 Activated Sludge Arrangements: Conventional, Complete Mix, Step Feed, Contact Stabilization, Extended Aeration, Oxidation Ditch, SBR & MBR 5.8 Aeration Systems: Blowers, Diffusers, Surface Aerators, Oxygen Transfer & Altitude Effects
6 Chapter 6: Advanced Wastewater Treatment & Solids Management
6.1 Biological Nutrient Removal: Nitrification, Denitrification & Anoxic Zones 6.2 Biological & Chemical Phosphorus Removal (EBPR & Coagulant Precipitation) 6.3 Sludge Thickening, Aerobic & Anaerobic Digestion (Mesophilic/Thermophilic) 6.4 Dewatering Equipment (Centrifuges, Belt Filter Presses) & Biosolids Standards (Reg 64) 6.5 Pond & Lagoon Operations, Trickling Filters & Rotating Biological Contactors (RBCs) 6.6 Secondary Clarification: Overflow and Solids Loading Rates, RAS Rate Setting & Clarifier Diagnostics 6.7 Tertiary Filtration, Effluent Polishing & Wastewater Disinfection with Chlorine, Dechlorination and UV 6.8 Effluent Disposal, Rapid Infiltration Basins, Colorado Water Reuse Law & Regulation 84
7 Chapter 7: Water Distribution Systems
7.1 Distribution Hydraulics, Pressure Zones, Static Head & Friction Headloss 7.2 Finished Water Storage Tanks, Standpipes, Mixing & Water Age Control 7.3 Distribution Piping, Valves (Gate, Butterfly, PRV), Hydrants & Main Flushing 7.4 Cross-Connection Control, Hazard Assessment & Backflow Preventers (RPZ, DCVA, PVB, Air Gap) 7.5 Water Main Installation, Trenching, Repair, Pressure Testing & Disinfection (AWWA C651) 7.6 Network Layout, Pressure Zones, Demand Patterns, Fire Flow & the Hydraulic Grade Line 7.7 Fire Hydrants, Dry Barrel Operation, Fire Flow Testing & Unidirectional Flushing 7.8 Booster Pump Stations, Hydropneumatic Systems, Controls & Surge Protection 7.9 Customer and Master Metering, Meter Sizing, Accuracy Testing, AMR & AMI 7.10 System Mapping, GIS, As-Builts, Operational Analysis & the AWWA Water Audit 7.11 Service Line Installation, Wet Tapping, Curb Stops & the Lead Service Line Inventory 7.12 Leak Detection, District Metered Areas, Minimum Night Flow & Pressure Management 7.13 Storage Facility Inspection, Sanitary Defects, Water Age Control, Cleaning & AWWA C652 Disinfection 7.14 Utility Locating, Colorado 811 Damage Prevention, the APWA Color Code & New Construction Inspection 7.15 Well and Wellhead Maintenance, Sanitary Condition, Rehabilitation & AWWA C654 Disinfection 7.16 Booster Chlorination, Remote Chemical Feed, Chemical Storage, Security & Supply Management 7.17 Distribution Sampling Technique, Chlorine Residual Monitoring & Nitrification Control in Chloraminated Systems
8 Chapter 8: Wastewater Collection Systems
8.1 Gravity Collection Systems: Flow Velocities, Slopes, Pipe Materials & Manholes 8.2 Wastewater Lift Stations: Wet Wells, Submersible Pumps, Level Controls & Force Mains 8.3 Inflow and Infiltration (I&I) Sources, Flow Monitoring, Smoke Testing & CCTV Inspection 8.4 Collection Maintenance: Hydraulic Jetting, Mechanical Rodding & FOG/Root Mitigation 8.5 Sanitary Sewer Overflows (SSOs): Root Causes, Containment, Reporting & Mitigation 8.6 Lift Station Electrical Devices, Level Detection, Telemetry, Gas Detection & Capacity Adjustment 8.7 Lift Station Configurations, Preventive Maintenance, Wet Well Cleaning, Troubleshooting & Emergency Bypass Pumping 8.8 Collection System Rehabilitation: CIPP, Pipe Bursting, Sliplining, Grouting, Manhole Repair & Tap Defects 8.9 Excavation, Hydro Excavation, Bedding and Haunching, Grade Control & Sewer Acceptance Testing 8.10 Collection System Flow Monitoring, Area-Velocity Metering, Weirs and Flumes & Capacity Assessment
9 Chapter 9: Pumps, Motors & Utility Mechanics
9.1 Centrifugal Pumps: Volutes, Impellers, Packing Seals & Mechanical Seals 9.2 Positive Displacement Pumps (Peristaltic, Diaphragm, Progressive Cavity) & Dosing Systems 9.3 Pump Performance Curves, System Head Curves, Cavitation & NPSH Calculations 9.4 Electric Motors (Single/Three Phase), Controls, Variable Frequency Drives (VFDs) & Power 9.5 Flow Meters (Venturi, Magnetic, Ultrasonic), Online Analyzers, PLCs & SCADA Telemetry 9.6 Air Compressors, Conveyors, Hoists and Cranes, Service Piping & Standby Power Generation 9.7 Valve Types and Duties, Air Release and Air-Vacuum Valves, Water Hammer & Surge Control
10 Chapter 10: Laboratory Analysis & Water Quality Monitoring
10.1 Regulatory Sampling Procedures, Chain of Custody, Holding Times & Preservation Techniques 10.2 Physical & Chemical Drinking Water Testing: Turbidity, pH, Alkalinity, Hardness & Chlorine (DPD) 10.3 Wastewater Laboratory Analysis: BOD5, COD, Total Suspended Solids (TSS) & Settleometry 10.4 Microbiological Testing: Total Coliform, E. coli (Colilert, Membrane Filtration) & QA/QC 10.5 Bench-Scale Jar Testing, Coagulant Optimization & Streaming Current Monitoring 10.6 Laboratory Equipment, Calibration and Verification, QA/QC Program & Certified Laboratory Requirements 10.7 Nutrient Series, Metals Sampling, Whole Effluent Toxicity & Electrode Measurements (DO, pH, ORP, H2S)
11 Chapter 11: Operator Mathematics & Applied Calculations
11.1 Core Conversions, Geometric Area, Pipe Volume & Continuous Flow Rate (MGD, GPM, cfs) 11.2 Chemical Dosage, The Standard "Pounds Formula", Active Chemical & Solution Purity 11.3 Hydraulic Retention Time (HRT), Surface Overflow Rate (SOR) & Weir Overflow Rates 11.4 Process Control Calculations: F/M Ratio, MCRT/Solids Retention Time (SRT) & Sludge Volume Index (SVI) 11.5 Distribution Pressure, Static vs Dynamic Head, Water Horsepower & Wire-to-Water Efficiency 11.6 CT Calculations: Baffling Factors, T10, Temperature and pH Corrections & Multi-Segment Compliance
12 Chapter 12: Safety, Emergency Operations & Compliance
12.1 Permit-Required Confined Space (PRCS) Entry, Atmospheric Testing (O2/LEL/H2S/CO) & Rescue 12.2 Control of Hazardous Energy: Lockout/Tagout (LOTO), Arc Flash & Electrical Safety 12.3 Chemical Safety: Chlorine Gas Handling, Ton Cylinders, Sulfur Dioxide, Ammonia & SDS/GHS 12.4 Trenching & Excavation: Soil Classification, Sloping, Shoring, Shielding & Competent Person Rules 12.5 Emergency Action Plans, Security Vulnerability, Spill Containment & CDPHE Tier 1/2/3 Public Notice 12.6 Work Zone Traffic Control, PPE, Fall Protection, Fire Extinguishers, First Aid & Bloodborne Pathogens 12.7 Standard Operating Procedures, Operating Records, Regulatory Reporting, Customer Complaints & Supervisory Duties
8.5 Sanitary Sewer Overflows (SSOs): Root Causes, Containment, Reporting & Mitigation
Key Takeaways Explain This Topic AI
Sanitary Sewer Overflows (SSOs) are unpermitted raw sewage discharges triggered by grease blockages, root intrusions, lift station power outages, severe wet-weather I&I overloading, or structural pipe collapse.
Immediate emergency response prioritizes site safety and perimeter security, erecting containment berms/sandbags to prevent sewage entry into storm drains or state waters, and deploying bypass pumping.
Contaminated soil surfaces are remediated by removing solids and applying hydrated lime (Ca(OH)2) to raise soil pH above 12 for pathogen destruction, while vacuum trucks extract all free liquid.
Under CDPHE Water Quality Control Division regulations, any wastewater spill that enters or threatens state waters requires verbal/written notification within 24 hours and a comprehensive formal written report within 5 days.
Spill volumes must be quantified using defensible engineering methods (area-depth calculations, duration-flow rate hydrographs, or lift station pump run times) and integrated into a long-term CMOM program.
Last updated: August 2026
Sanitary Sewer Overflows (SSOs): Root Causes, Containment, Reporting & Mitigation
A Sanitary Sewer Overflow (SSO) is an unpermitted discharge of untreated or partially treated wastewater from a municipal collection network prior to reaching the wastewater treatment facility. SSOs represent acute environmental emergencies that threaten surface water quality, public drinking water supplies, and public health.
1. Primary Root Causes & Public Health Hazards
SSOs are categorized into dry-weather events and wet-weather events based on their initiating root cause: +-------------------------------------------------------------------------+
- | PRIMARY ROOT CAUSES OF SSOs |
- +-------------------------------------------------------------------------+
- | 1. Pipe Blockages (Leading Cause of Dry-Weather SSOs): |
- | - Accumulation of congealed Fats, Oils, and Grease (FOG). |
- | - Severe tree root intrusions trapping rags and non-dispersible wipes|
- | - Vandalism or foreign object deposition (rocks, construction debris)|
- | |
- | 2. Mechanical & Electrical Failures: |
- | - Lift station total utility power blackout without standby generator|
- | - Pump mechanical failure, impeller jamming, or check valve seizure. |
- | - SCADA / float level control sensor failure. |
- | |
- | 3. Wet-Weather Hydraulic Overloading: |
- | - Extreme precipitation or rapid snowmelt driving massive I&I |
- | surges exceeding the physical carrying capacity of the pipeline. |
- | |
- | 4. Structural Infrastructure Failures: |
- | - Pipe crown collapse from biogenic sulfuric acid (H2SO4) corrosion. |
- | - External line strikes during third-party excavation. |
- | - Washouts from riverbed erosion or geological slope failures. |
- +-------------------------------------------------------------------------+
- Environmental and Public Health Hazards
Pathogen Exposure: Raw wastewater carries dangerous concentrations of waterborne pathogenic organisms, including enteric bacteria ( Escherichia coli , Salmonella enterica , Shigella ), viruses ( Norovirus , Hepatitis A , Enterovirus ), and protozoan parasites ( Giardia lamblia , Cryptosporidium parvum ).
Aquatic Eutrophication & Dissolved Oxygen Depletion: High concentrations of carbonaceous biochemical oxygen demand ( BOD 5 \text{BOD}_5 BOD 5 ) and un-ionized ammonia ( NH 3 \text{NH}_3 NH 3 ) rapidly strip dissolved oxygen from receiving streams, causing extensive fish kills and aquatic ecosystem devastation.
Drinking Water Intake Contamination: Spills into rivers or alluvial aquifers threaten downstream municipal drinking water treatment plant intakes.
Private Property Inundation: Surcharged collection lines force raw sewage backwards through building laterals, contaminating private basements and indoor living environments.
Loading diagram... SSO Emergency Response Protocol, Containment, Regulatory Reporting & CMOM
2. Emergency Response, Containment & Remediation Protocols
When an overflow occurs, certified collection operators must execute a systematic emergency response: +-------------------------------------------------------------------------+
- | SSO EMERGENCY INCIDENT ACTION PLAN |
- +-------------------------------------------------------------------------+
- | Phase 1: Site Security & Safety |
- | - Don mandatory PPE (Tyvek protective suits, nitrile/rubber gloves, |
- | face shields, steel-toe boots). |
- | - Establish perimeter control using barricades, warning tape, and |
- | bilingual sanitary hazard warning signs to protect the public. |
- | |
- | Phase 2: Containment & Diversion |
- | - Erect earthen berms, sandbag dikes, or absorbent containment booms |
- | to halt overland flow. |
- | - Seal storm drain catch basins with pneumatic plugs or magnetic mats |
- | to prevent raw sewage from entering the municipal storm network. |
- | |
- | Phase 3: Flow Elimination & Bypass Pumping |
- | - Deploy trailer-mounted, diesel-driven self-priming bypass pumps |
- | between upstream and downstream intact manholes around blockage. |
- | - Clear the mainline blockage via high-velocity hydro-jetting. |
- | |
- | Phase 4: Vacuum Recovery & Surface Decontamination |
- | - Recover all pooled liquid and sludge using combination Jet-Vac units|
- | - Collect gross solids, toilet paper, and plastics for landfill. |
- | - Disinfect soil: Apply agricultural or hydrated lime (Ca(OH)2) |
- | evenly over soil surfaces to raise pH >= 12.0 for pathogen kill. |
- | - Hard Surfaces: Power-wash into vacuum pickup; apply EPA disinfectant|
- +-------------------------------------------------------------------------+
- 3. CDPHE Regulatory Reporting Requirements (Colorado Standards)
In Colorado, discharges of unpermitted wastewater are strictly regulated by the Colorado Department of Public Health and Environment (CDPHE) Water Quality Control Division (WQCD) under the Colorado Water Quality Control Act (CRS 25-8-601 et seq.) and Regulation 61:
The 24-Hour Verbal / Electronic Notification Mandate
Mandatory Reporting Threshold: Any unauthorized spill, release, or overflow of untreated or partially treated wastewater that impacts or threatens to impact "State Waters" (including streams, rivers, dry gulches, irrigation ditches, stormwater conveyances, wetlands, or alluvial groundwater) must be reported to the CDPHE Environmental Spill Reporting Hotline within twenty-four (24) hours of the utility becoming aware of the event.
Initial Information Required:
Location of the discharge (street address and GPS coordinates).
Estimated spill volume and duration.
Receiving water body name or drainage pathway.
Preliminary root cause determination.
Emergency containment and mitigation actions taken.
The 5-Day Formal Written Spill Report
A detailed, comprehensive written engineering report must be formally submitted to the CDPHE WQCD within five (5) calendar days following the incident.
Mandatory Elements of the 5-Day Report:
Exact date, start time, and stop time (total spill duration in hours/minutes).
Defensible mathematical calculation methodology utilized to quantify total spill volume.
Map showing overflow location, overland flow path, and receiving water sampling points.
Surface water quality monitoring results (ambient dissolved oxygen, E . c o l i E. coli E . co l i , and ammonia upstream and downstream of impact point).
Comprehensive root cause analysis (e.g., FOG accumulation, root blockage, power outage).
Description of all cleanup, containment, vacuum extraction, and lime disinfection measures.
Long-term Corrective Action Plan (CAP) detailing capital improvements, maintenance adjustments, or enforcement actions to guarantee the spill does not recur.
4. Defensible Spill Volume Estimation Methodologies
Regulatory reporting requires operators to provide scientifically defensible mathematical volume estimates rather than unverified guesses: +-------------------------------------------------------------------------+
- | SPILL VOLUME ESTIMATION METHODOLOGIES |
- +-------------------------------------------------------------------------+
- | Method 1: Area and Average Ponding Depth |
- | Volume (gal) = Area (sq ft) * Avg Depth (ft) * 7.48 gal/cu ft |
- | |
- | Method 2: Overflow Rate Multiplied by Spill Duration |
- | Volume (gal) = Overflow Rate (gpm) * Total Duration (minutes) |
- | *Flow rate estimated using empirical visual manhole bubbling charts |
- | |
- | Method 3: Lift Station Inflow Differential (SCADA Run-Time) |
- | Spill Rate (gpm) = Basin Average Inflow Rate - Pump Pumping Rate |
- | Volume (gal) = Spill Rate (gpm) * Power Outage Duration (minutes) |
- | |
- | Method 4: Vacuum Recovery Reconciliation |
- | Total Spill Volume = Gallons Recovered by Vac Trucks + Residual Loss |
- +-------------------------------------------------------------------------+
- 5. Capacity, Management, Operation, and Maintenance (CMOM)
The EPA and CDPHE Capacity, Management, Operation, and Maintenance (CMOM) program provides an overarching asset management framework designed to eliminate avoidable SSOs:
Capacity: Utilize hydraulic computer modeling, continuous flow metering, and rainfall gauging to ensure sewer mains and lift stations possess adequate hydraulic carrying capacity for peak wet-weather design events.
Management: Establish standard operating procedures (SOPs), GIS asset mapping, computerized maintenance management systems (CMMS), continuous operator safety training, and aggressive commercial FOG pretreatment ordinances.
Operation: Execute scheduled hydro-jetting of high-risk sewer reaches, conduct weekly lift station mechanical inspections, and monitor root growth.
Maintenance: Implement prioritized trenchless rehabilitation (Cured-in-Place Pipe / CIPP lining, pipe bursting, slip-lining), manhole epoxy rehabilitation, and maintain emergency bypass pumping equipment ready for instant deployment.
- 6. Worked SSO Calculations
- Worked Example 7.5.1: Area-Depth Volume Estimation for Overland Spill
A surcharged sewer manhole overflows onto a low-lying park lawn. Operators measure the resulting sewage pool as approximately 120 feet long by 45 feet wide . Depth measurements taken at grid intervals yield an average liquid ponding depth of 3.5 inches ( 0.2917 ft 0.2917\text{ ft} 0.2917 ft ). Calculate the estimated total spill volume in gallons.
Step 1: Calculate surface area ( A A A in square feet): A = 120 ft × 45 ft = 5 , 400 ft 2 A = 120\text{ ft} \times 45\text{ ft} = 5,400\text{ ft}^2 A = 120 ft × 45 ft = 5 , 400 ft 2
Step 2: Convert average depth to feet: Depth = 3.5 in 12 in/ft = 0.2917 ft \text{Depth} = \frac{3.5\text{ in}}{12\text{ in/ft}} = 0.2917\text{ ft} Depth = 12 in/ft 3.5 in = 0.2917 ft
Step 3: Calculate volume in cubic feet: Volume = 5 , 400 ft 2 × 0.2917 ft = 1 , 575.18 ft 3 \text{Volume} = 5,400\text{ ft}^2 \times 0.2917\text{ ft} = 1,575.18\text{ ft}^3 Volume = 5 , 400 ft 2 × 0.2917 ft = 1 , 575.18 ft 3
Step 4: Convert cubic feet to gallons ( 1 ft 3 = 7.48 gal 1\text{ ft}^3 = 7.48\text{ gal} 1 ft 3 = 7.48 gal ): Total Spill Volume = 1 , 575.18 ft 3 × 7.48 gal/ft 3 = 11 , 782 gallons \text{Total Spill Volume} = 1,575.18\text{ ft}^3 \times 7.48\text{ gal/ft}^3 = 11,782\text{ gallons} Total Spill Volume = 1 , 575.18 ft 3 × 7.48 gal/ft 3 = 11 , 782 gallons
Worked Example 7.5.2: Lift Station Power Outage Spill Estimation
A severe electrical storm causes a total utility blackout at a municipal lift station lacking an automatic standby generator. The lift station serves a basin with a continuous dry-weather diurnal inflow rate of 450 gpm . The wet well has a reserve emergency storage capacity of 3,000 gallons above the high alarm float before overflowing through the emergency vent.
If the utility power outage lasts for exactly 2.5 hours (150 minutes) before portable emergency generators restore pumping, calculate the total volume of raw sewage discharged during the SSO event.
Step 1: Calculate total wastewater volume entering the station during the 150-minute outage: Total Inflow = 450 gpm × 150 minutes = 67 , 500 gallons \text{Total Inflow} = 450\text{ gpm} \times 150\text{ minutes} = 67,500\text{ gallons} Total Inflow = 450 gpm × 150 minutes = 67 , 500 gallons
Step 2: Subtract the wet well internal reserve storage capacity: Overflow Volume = Total Inflow − Wet Well Reserve Storage \text{Overflow Volume} = \text{Total Inflow} - \text{Wet Well Reserve Storage} Overflow Volume = Total Inflow − Wet Well Reserve Storage Overflow Volume = 67 , 500 gal − 3 , 000 gal = 64 , 500 gallons \text{Overflow Volume} = 67,500\text{ gal} - 3,000\text{ gal} = 64,500\text{ gallons} Overflow Volume = 67 , 500 gal − 3 , 000 gal = 64 , 500 gallons
Conclusion: The estimated total volume discharged during the SSO is 64,500 gallons . This spill must be reported to the CDPHE spill hotline within 24 hours followed by a 5-day written report.