Study guide

7.2 Finished Water Storage Tanks, Standpipes, Mixing & Water Age Control

Colorado Water/Wastewater Operator Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: State Laws, Regulations & CCWP Certification

1.1 CDPHE CCWP Program & Regulatory Framework (Regulation 100 / 5 CCR 1003-2) 1.2 Facility Classification & Operator in Responsible Charge (ORC) Requirements 1.3 Certification Levels, Education, Experience & Exam Eligibility (Class D-A, Grade 1-4, Class S/T) 1.4 License Renewal, Training Units (TUs) & Mandatory Regulatory Training 1.5 Colorado Primary Drinking Water Regulations (Regulation 11) & Compliance 1.6 Colorado Discharge Permit System (Regulations 61/62), DMRs & Biosolids Reporting

2 Chapter 2: Source Water & Drinking Water Treatment Processes

2.1 Raw Water Sources, High-Altitude Characteristics & Reservoir Quality 2.2 Coagulation Chemistry, Rapid Mixing & Chemical Dosing (Alum, Ferric, Polymers) 2.3 Flocculation & Sedimentation Basin Design, Operation & Settling Zones 2.4 Granular Media Filtration, Backwash Procedures & Turbidity Standards 2.5 Advanced Treatment: Membranes, Softening, GAC/PAC Adsorption & Aeration 2.6 Groundwater Sources, Well Hydraulics, Static and Pumping Levels & Specific Capacity 2.7 Source Water Characteristics, Contaminant Categories & Watershed Protection Plans 2.8 Pretreatment: Presedimentation, Aeration, Algae Control & Taste-and-Odor Management 2.9 Direct, In-Line, Pressure, Cartridge & Diatomaceous Earth Filtration 2.10 Lime-Soda Softening, Ion Exchange & Water Stabilization 2.11 Water Treatment Plant Residuals: Lagoons, Drying Beds, Land Application & Recycle

3 Chapter 3: Disinfection & Chemical Addition

3.1 Chlorine Chemistry: Hypochlorous Acid, Free/Combined Residual & Breakpoint Chlorination 3.2 Disinfection Kinetics, Baffle Factors, T10 & CT Compliance Calculations 3.3 Disinfection Byproducts (TTHMs, HAA5s) & Stage 1/2 DBP Rules 3.4 Alternative Disinfection: Chloramination, Ultraviolet (UV) Light & Chlorine Dioxide 3.5 Corrosion Control, Lead & Copper Rule Revisions (LCRR) & Fluoridation Practices

4 Chapter 4: Water Treatment Plant Equipment, Instrumentation & Maintenance

4.1 Raw Water Intakes, Screening Equipment & Raw Water Pumping 4.2 Chemical Feed Equipment: Feeders, Day Tanks, Carrier Water & Feed-Rate Calibration 4.3 Chlorination Equipment: Gas Systems, Vacuum Regulators, Hypochlorite Storage & Onsite Generation 4.4 Filter Underdrains, Support Gravel, Surface Wash, Air Scour & Filter-to-Waste 4.5 Plant Process Control, SCADA and PLC Systems, Alarm Management & Records of Operation 4.6 Preventive, Corrective and Predictive Maintenance, Work Orders & Asset Management

5 Chapter 5: Wastewater Treatment Principles & Biological Processes

5.1 Preliminary Treatment: Bar Screens, Shredders, Grit Chambers & Flow Equalization 5.2 Primary Clarification, Solids Separation & Scum Removal Mechanics 5.3 Activated Sludge Fundamentals: Aerobic Microbiology, DO Control & Biomass Growth 5.4 Return & Waste Activated Sludge Management (RAS/WAS Operations & Sludge Age) 5.5 Activated Sludge Troubleshooting: Bulking, Nocardia Foaming, Rising Sludge & Pin Floc 5.6 Wastewater Characteristics, Organic and Hydraulic Loading, Diurnal Flow & Septicity 5.7 Activated Sludge Arrangements: Conventional, Complete Mix, Step Feed, Contact Stabilization, Extended Aeration, Oxidation Ditch, SBR & MBR 5.8 Aeration Systems: Blowers, Diffusers, Surface Aerators, Oxygen Transfer & Altitude Effects

6 Chapter 6: Advanced Wastewater Treatment & Solids Management

6.1 Biological Nutrient Removal: Nitrification, Denitrification & Anoxic Zones 6.2 Biological & Chemical Phosphorus Removal (EBPR & Coagulant Precipitation) 6.3 Sludge Thickening, Aerobic & Anaerobic Digestion (Mesophilic/Thermophilic) 6.4 Dewatering Equipment (Centrifuges, Belt Filter Presses) & Biosolids Standards (Reg 64) 6.5 Pond & Lagoon Operations, Trickling Filters & Rotating Biological Contactors (RBCs) 6.6 Secondary Clarification: Overflow and Solids Loading Rates, RAS Rate Setting & Clarifier Diagnostics 6.7 Tertiary Filtration, Effluent Polishing & Wastewater Disinfection with Chlorine, Dechlorination and UV 6.8 Effluent Disposal, Rapid Infiltration Basins, Colorado Water Reuse Law & Regulation 84

7 Chapter 7: Water Distribution Systems

7.1 Distribution Hydraulics, Pressure Zones, Static Head & Friction Headloss 7.2 Finished Water Storage Tanks, Standpipes, Mixing & Water Age Control 7.3 Distribution Piping, Valves (Gate, Butterfly, PRV), Hydrants & Main Flushing 7.4 Cross-Connection Control, Hazard Assessment & Backflow Preventers (RPZ, DCVA, PVB, Air Gap) 7.5 Water Main Installation, Trenching, Repair, Pressure Testing & Disinfection (AWWA C651) 7.6 Network Layout, Pressure Zones, Demand Patterns, Fire Flow & the Hydraulic Grade Line 7.7 Fire Hydrants, Dry Barrel Operation, Fire Flow Testing & Unidirectional Flushing 7.8 Booster Pump Stations, Hydropneumatic Systems, Controls & Surge Protection 7.9 Customer and Master Metering, Meter Sizing, Accuracy Testing, AMR & AMI 7.10 System Mapping, GIS, As-Builts, Operational Analysis & the AWWA Water Audit 7.11 Service Line Installation, Wet Tapping, Curb Stops & the Lead Service Line Inventory 7.12 Leak Detection, District Metered Areas, Minimum Night Flow & Pressure Management 7.13 Storage Facility Inspection, Sanitary Defects, Water Age Control, Cleaning & AWWA C652 Disinfection 7.14 Utility Locating, Colorado 811 Damage Prevention, the APWA Color Code & New Construction Inspection 7.15 Well and Wellhead Maintenance, Sanitary Condition, Rehabilitation & AWWA C654 Disinfection 7.16 Booster Chlorination, Remote Chemical Feed, Chemical Storage, Security & Supply Management 7.17 Distribution Sampling Technique, Chlorine Residual Monitoring & Nitrification Control in Chloraminated Systems

8 Chapter 8: Wastewater Collection Systems

8.1 Gravity Collection Systems: Flow Velocities, Slopes, Pipe Materials & Manholes 8.2 Wastewater Lift Stations: Wet Wells, Submersible Pumps, Level Controls & Force Mains 8.3 Inflow and Infiltration (I&I) Sources, Flow Monitoring, Smoke Testing & CCTV Inspection 8.4 Collection Maintenance: Hydraulic Jetting, Mechanical Rodding & FOG/Root Mitigation 8.5 Sanitary Sewer Overflows (SSOs): Root Causes, Containment, Reporting & Mitigation 8.6 Lift Station Electrical Devices, Level Detection, Telemetry, Gas Detection & Capacity Adjustment 8.7 Lift Station Configurations, Preventive Maintenance, Wet Well Cleaning, Troubleshooting & Emergency Bypass Pumping 8.8 Collection System Rehabilitation: CIPP, Pipe Bursting, Sliplining, Grouting, Manhole Repair & Tap Defects 8.9 Excavation, Hydro Excavation, Bedding and Haunching, Grade Control & Sewer Acceptance Testing 8.10 Collection System Flow Monitoring, Area-Velocity Metering, Weirs and Flumes & Capacity Assessment

9 Chapter 9: Pumps, Motors & Utility Mechanics

9.1 Centrifugal Pumps: Volutes, Impellers, Packing Seals & Mechanical Seals 9.2 Positive Displacement Pumps (Peristaltic, Diaphragm, Progressive Cavity) & Dosing Systems 9.3 Pump Performance Curves, System Head Curves, Cavitation & NPSH Calculations 9.4 Electric Motors (Single/Three Phase), Controls, Variable Frequency Drives (VFDs) & Power 9.5 Flow Meters (Venturi, Magnetic, Ultrasonic), Online Analyzers, PLCs & SCADA Telemetry 9.6 Air Compressors, Conveyors, Hoists and Cranes, Service Piping & Standby Power Generation 9.7 Valve Types and Duties, Air Release and Air-Vacuum Valves, Water Hammer & Surge Control

10 Chapter 10: Laboratory Analysis & Water Quality Monitoring

10.1 Regulatory Sampling Procedures, Chain of Custody, Holding Times & Preservation Techniques 10.2 Physical & Chemical Drinking Water Testing: Turbidity, pH, Alkalinity, Hardness & Chlorine (DPD) 10.3 Wastewater Laboratory Analysis: BOD5, COD, Total Suspended Solids (TSS) & Settleometry 10.4 Microbiological Testing: Total Coliform, E. coli (Colilert, Membrane Filtration) & QA/QC 10.5 Bench-Scale Jar Testing, Coagulant Optimization & Streaming Current Monitoring 10.6 Laboratory Equipment, Calibration and Verification, QA/QC Program & Certified Laboratory Requirements 10.7 Nutrient Series, Metals Sampling, Whole Effluent Toxicity & Electrode Measurements (DO, pH, ORP, H2S)

11 Chapter 11: Operator Mathematics & Applied Calculations

11.1 Core Conversions, Geometric Area, Pipe Volume & Continuous Flow Rate (MGD, GPM, cfs) 11.2 Chemical Dosage, The Standard "Pounds Formula", Active Chemical & Solution Purity 11.3 Hydraulic Retention Time (HRT), Surface Overflow Rate (SOR) & Weir Overflow Rates 11.4 Process Control Calculations: F/M Ratio, MCRT/Solids Retention Time (SRT) & Sludge Volume Index (SVI) 11.5 Distribution Pressure, Static vs Dynamic Head, Water Horsepower & Wire-to-Water Efficiency 11.6 CT Calculations: Baffling Factors, T10, Temperature and pH Corrections & Multi-Segment Compliance

12 Chapter 12: Safety, Emergency Operations & Compliance

12.1 Permit-Required Confined Space (PRCS) Entry, Atmospheric Testing (O2/LEL/H2S/CO) & Rescue 12.2 Control of Hazardous Energy: Lockout/Tagout (LOTO), Arc Flash & Electrical Safety 12.3 Chemical Safety: Chlorine Gas Handling, Ton Cylinders, Sulfur Dioxide, Ammonia & SDS/GHS 12.4 Trenching & Excavation: Soil Classification, Sloping, Shoring, Shielding & Competent Person Rules 12.5 Emergency Action Plans, Security Vulnerability, Spill Containment & CDPHE Tier 1/2/3 Public Notice 12.6 Work Zone Traffic Control, PPE, Fall Protection, Fire Extinguishers, First Aid & Bloodborne Pathogens 12.7 Standard Operating Procedures, Operating Records, Regulatory Reporting, Customer Complaints & Supervisory Duties

7.2 Finished Water Storage Tanks, Standpipes, Mixing & Water Age Control

Key Takeaways Explain This Topic AI

Finished water storage provides three fundamental capacities: equalization storage for diurnal peak hourly demands, fire suppression reserve, and emergency storage.

Standpipes differ from elevated tanks because only the upper volume above the minimum hydraulic grade line provides usable operating pressure, while the lower volume acts as supporting water column.

Operating protocols should achieve a 20% to 30% daily tank turnover rate to maintain total water age below 3 to 5 days, preventing disinfectant loss and disinfection byproduct (DBP) formation.

Chloraminated distribution systems face severe risk of nitrification in stagnant storage, marked by drops in total chlorine residual, increases in nitrite/nitrate, and loss of free ammonia.

CDPHE Regulation 11 mandates periodic comprehensive sanitary inspections of storage facilities on a 5-year cycle, with strict security, venting (24-mesh non-corrodible screens), and hatch requirements.

Last updated: August 2026

Finished Water Storage Tanks, Standpipes, Mixing & Water Age Control

Finished water storage facilities serve as critical buffers within municipal water distribution systems. They decouple fluctuating instantaneous customer demands from water treatment plant production, stabilize pressure zones, and provide dedicated reserves for structural fire suppression and emergency outages. However, oversized or unmixed storage tanks can rapidly degrade water quality through excessive water age, thermal stratification, loss of disinfectant residual, and nitrification.

1. Storage Tank Classifications and Structural Types

Public water systems utilize several distinct storage tank configurations depending on local topography, required hydraulic grade lines, and capital economics: +-------------------------------------------------------------------------+

  • | FINISHED WATER STORAGE CONFIGURATIONS |
  • +-------------------------------------------------------------------------+
  • | 1. Elevated Storage Tanks (Multi-column, Pedestal Spheroid, Composite): |
  • | - Elevated on structural legs or concrete pedestal above ground. |
  • | - Entire storage volume is situated above the required minimum HGL. |
  • | - 100% of stored water provides usable gravity working pressure. |
  • | |
  • | 2. Ground-Level Storage Reservoirs (Steel or Prestressed Concrete): |
  • | - Situated on hilltops or high ground to generate gravity head. |
  • | - Low capital cost per gallon; large storage capacity (1–20+ MG). |
  • | |
  • | 3. Standpipes (Tall Cylindrical Steel Tanks): |
  • | - Tank height is greater than its diameter. |
  • | - Upper Volume: Provides usable gravity distribution pressure. |
  • | - Lower Volume (Supporting Column): Dead storage; unusable without |
  • | booster pumping; acts purely to support the upper water head. |
  • | |
  • | 4. Hydropneumatic Pressure Tanks (Closed Pressure Vessels): |
  • | - Contains pressurized air cushion (1/3 air, 2/3 water) over water. |
  • | - Utilized in small groundwater systems without elevated storage. |
  • | - Governed by Boyle's Law: P1*V1 = P2*V2. Does not provide fire flow.|
  • +-------------------------------------------------------------------------+
  • Standpipe Hydraulics: Effective vs. Non-Effective Storage

In a standpipe, water depth creates pressure head. If a distribution system requires a minimum pressure of 35 psi at the base of the tank, the bottom 81 feet of water ( 35 psi × 2.31 ft/psi = 80.85 ft 35\text{ psi} \times 2.31\text{ ft/psi} = 80.85\text{ ft} 35 psi × 2.31 ft/psi = 80.85 ft ) cannot be delivered to customers by gravity at acceptable operating pressure. Only the volume in the top portion above this cutoff represents effective (usable) storage , while the bottom portion represents non-effective (supporting) storage .

2. Functional Storage Volume Allocation

To ensure operational reliability, total distribution storage is partitioned into three distinct functional components: Total Storage Volume = Equalization Volume + Fire Suppression Reserve + Emergency Reserve \text{Total Storage Volume} = \text{Equalization Volume} + \text{Fire Suppression Reserve} + \text{Emergency Reserve} Total Storage Volume = Equalization Volume + Fire Suppression Reserve + Emergency Reserve

Equalization (Operational) Storage: Absorbs hourly diurnal demand peaks. During peak morning and evening hours when customer consumption exceeds treatment plant capacity, equalization storage discharges into the grid. During low-demand nighttime hours, base-load plant output refills the tank.

Fire Suppression Reserve: Dedicated water volume reserved to sustain maximum required fire flows (e.g., 1 , 500 to 3 , 500 gpm 1,500\text{ to }3,500\text{ gpm} 1 , 500 to 3 , 500 gpm for 2 to 4 hours per ISO/AWWA standards) while maintaining at least 20 psi residual pressure throughout the network.

Emergency Reserve: Backup volume to maintain basic sanitary service during unforeseen disruptions, such as raw water transmission main breaks, clearwell pump failures, or regional electrical grid blackouts (typically sized for 1 to 2 days of average daily demand).

Loading diagram... Storage Tank Sanitary Barriers, Active Mixing & Stratification Control

3. Water Age, Turnover Rates & Thermal Stratification

Excessive water age (hydraulic retention time) is the single greatest contributor to water quality deterioration in distribution storage. High water age causes three major failure modes:

Disinfectant Residual Decay: Free chlorine or chloramine reacts with natural organic matter (NOM) and tank surface biofilms, depleting the chemical residual below regulatory limits ( < 0.20 mg/L < 0.20\text{ mg/L} < 0.20 mg/L free chlorine).

Disinfection Byproduct (DBP) Formation: Extended contact time between decaying chlorine residuals and organic precursors drives the continued formation of regulated Total Trihalomethanes (TTHMs) and Haloacetic Acids (HAA5s) .

Biological Regrowth & Pathogen Colonization: As residuals dissipate, heterotrophic plate count (HPC) bacteria, coliforms, and opportunistic pathogens ( Legionella , Mycobacteria ) multiply within bottom sediment layers.

Operational Turnover Guidelines

Target Daily Turnover: Operators should cycle between 20% and 30% of total tank volume daily under normal conditions.

Maximum Recommended Water Age: Total water age from treatment plant clearwell to the furthest customer tap should not exceed 3 to 5 days (72 to 120 hours).

Thermal Stratification Mechanics

In warm summer months, solar radiation heats the upper water layer inside a storage tank. This warm, lower-density water forms a stable floating layer ( epilimnion ). Cooler, denser water entering from the distribution main enters and exits through the bottom ( hypolimnion ) without mixing with the upper volume. +-------------------------------------------------------------------------+

  • | THERMAL STRATIFICATION IN UNMIXED TANK |
  • +-------------------------------------------------------------------------+
  • | [ Warm, Stagnant Epilimnion ] -> Water Age > 14 days, Zero Residual, |
  • | High TTHMs, Microbial Regrowth |
  • | ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Thermocline Barrier ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ |
  • | [ Cold, Flowing Hypolimnion ] -> Short-circuits between Inlet & Outlet |
  • +-------------------------------------------------------------------------+

To eradicate stratification, utilities install active submersible mechanical mixers or hydrodynamic nozzle systems (such as Tideflex duckbill mixing manifolds) that induce continuous top-to-bottom circulation, homogenizing temperature and disinfectant residual within 4 to 8 hours.

4. Nitrification in Chloraminated Storage Systems

In utilities utilizing chloramines (monochloramine, NH 2 Cl \text{NH}_2\text{Cl} NH 2 ​ Cl ) for secondary distribution disinfection, stagnant storage tanks present an acute risk of biological nitrification .

The Nitrification Reaction Sequence

When monochloramine degrades due to heat or high water age, it releases free ammonia ( NH 3 \text{NH}_3 NH 3 ​ ). Autotrophic Ammonia-Oxidizing Bacteria (AOB) (e.g., Nitrosomonas ) utilize this free ammonia as an energy source, converting it into nitrite ( NO 2 − \text{NO}_2^- NO 2 − ​ ): NH 3 + 1.5 O 2 → AOB NO 2 − + H + + H 2 O \text{NH}_3 + 1.5\text{ O}_2 \xrightarrow{\text{AOB}} \text{NO}_2^- + \text{H}^+ + \text{H}_2\text{O} NH 3 ​ + 1.5 O 2 ​ AOB ​ NO 2 − ​ + H + + H 2 ​ O

Subsequently, Nitrite-Oxidizing Bacteria (NOB) (e.g., Nitrobacter ) oxidize nitrite into nitrate ( NO 3 − \text{NO}_3^- NO 3 − ​ ): NO 2 − + 0.5 O 2 → NOB NO 3 − + Energy \text{NO}_2^- + 0.5\text{ O}_2 \xrightarrow{\text{NOB}} \text{NO}_3^- + \text{Energy} NO 2 − ​ + 0.5 O 2 ​ NOB ​ NO 3 − ​ + Energy

The Nitrification Feedback Loop

Nitrite rapidly and chemically exerts an immediate chlorine demand, destroying additional monochloramine residual. This releases even more free ammonia, triggering an exponential microbial bloom and total residual collapse. Monochloramine Decay ---> Releases Free Ammonia (NH3) ---> AOB Bacteria Bloom

  • ^ |
  • | v
  • Residual Collapse <--- Nitrite Exerts Chemical Demand <--- Generates Nitrite (NO2-)

Nitrification Stage Monochloramine Residual Nitrite ( NO 2 − -N \text{NO}_2^-\text{-N} NO 2 − ​ -N ) Level Free Ammonia ( NH 3 -N \text{NH}_3\text{-N} NH 3 ​ -N ) Required Operator Action

Baseline / Stable 2.0 – 3.5 mg/L < 0.010 mg/L < 0.010\text{ mg/L} < 0.010 mg/L 0.05 – 0.15 mg/L Routine weekly monitoring.

Early Warning / Action Minor drop (1.5 – 2.0 mg/L) 0.015 – 0.049 mg/L 0.015 \text{--} 0.049\text{ mg/L} 0.015 – 0.049 mg/L Trending downward Increase tank cycling; deep drawdown to 50% capacity.

Severe / Acute Nitrification Rapid crash ( < 0.50 mg/L < 0.50\text{ mg/L} < 0.50 mg/L ) ≥ 0.050 mg/L \ge 0.050\text{ mg/L} ≥ 0.050 mg/L Depleted ( < 0.02 mg/L < 0.02\text{ mg/L} < 0.02 mg/L ) Deep tank dump/flush; chemical booster chlorination; temporary free-chlorine burn.

5. CDPHE Regulation 11 Periodic Sanitary Inspection Mandates

Under CDPHE Regulation 11, Section 11.28 , public water systems in Colorado must safeguard finished storage reservoirs against contamination and complete periodic sanitary inspections:

5-Year Comprehensive Inspection Cycle: Every finished water storage tank must undergo a comprehensive internal and external sanitary inspection by a qualified professional (commercial diver, ROV, or drained inspection) at least once every five (5) years .

Roof & Access Hatches: Must feature watertight, overlapping "shoebox-style" lids with minimum 2-inch downward perimeter lips , continuous neoprene rubber gaskets, and heavy-duty tamper-proof padlocks. Hatches must be elevated at least 4 inches above the roof surface (and ≥ 24 inches \ge 24\text{ inches} ≥ 24 inches for buried tanks).

Vents: All tank vents must be constructed in a downward-turned gooseneck or hooded configuration and equipped with a 24-mesh non-corrodible stainless steel or brass screen to prevent insect and bird entry.

Overflow & Drain Pipes: Tank overflows must terminate in a downward direction 12 to 24 inches above a concrete splash pad with an intact 24-mesh stainless screen and a weighted flapper/duckbill valve. Direct physical connections to sanitary or storm sewers are strictly prohibited ; discharge must pass through an approved physical air gap .

  • 6. Worked Storage Calculations
  • Worked Example 6.2.1: Hydraulic Retention Time (Water Age)

A municipal storage reservoir has an internal diameter of 80 feet and operates at an average water depth of 30 feet . The distribution system draws an average flow of 400 gpm from the tank. Calculate the total volume in gallons and the theoretical hydraulic retention time (water age) in days.

Step 1: Calculate tank volume in cubic feet ( V = π × r 2 × h V = \pi \times r^2 \times h V = π × r 2 × h ): r = 80 ft 2 = 40 ft r = \frac{80\text{ ft}}{2} = 40\text{ ft} r = 2 80 ft ​ = 40 ft V = 3.14159 × ( 40 ft ) 2 × 30 ft = 3.14159 × 1 , 600 × 30 = 150 , 796 ft 3 V = 3.14159 \times (40\text{ ft})^2 \times 30\text{ ft} = 3.14159 \times 1,600 \times 30 = 150,796\text{ ft}^3 V = 3.14159 × ( 40 ft ) 2 × 30 ft = 3.14159 × 1 , 600 × 30 = 150 , 796 ft 3

Step 2: Convert cubic feet to gallons ( 1 ft 3 = 7.48 gal 1\text{ ft}^3 = 7.48\text{ gal} 1 ft 3 = 7.48 gal ): Volume = 150 , 796 ft 3 × 7.48 gal/ft 3 = 1 , 127 , 954 gallons ≈ 1.13 MG \text{Volume} = 150,796\text{ ft}^3 \times 7.48\text{ gal/ft}^3 = 1,127,954\text{ gallons} \approx 1.13\text{ MG} Volume = 150 , 796 ft 3 × 7.48 gal/ft 3 = 1 , 127 , 954 gallons ≈ 1.13 MG

Step 3: Calculate daily volumetric throughput: Daily Flow = 400 gpm × 1 , 440 min/day = 576 , 000 gallons/day \text{Daily Flow} = 400\text{ gpm} \times 1,440\text{ min/day} = 576,000\text{ gallons/day} Daily Flow = 400 gpm × 1 , 440 min/day = 576 , 000 gallons/day

Step 4: Calculate Hydraulic Retention Time (HRT): HRT (days) = Tank Volume Daily Flow = 1 , 127 , 954 gal 576 , 000 gal/day = 1.96 days \text{HRT (days)} = \frac{\text{Tank Volume}}{\text{Daily Flow}} = \frac{1,127,954\text{ gal}}{576,000\text{ gal/day}} = 1.96\text{ days} HRT (days) = Daily Flow Tank Volume ​ = 576 , 000 gal/day 1 , 127 , 954 gal ​ = 1.96 days

Conclusion: The average water age in the reservoir is approximately 1.96 days (47 hours) , which complies comfortably with the operational target of < 3 to 5 days < 3\text{ to }5\text{ days} < 3 to 5 days .