7.14 Utility Locating, Colorado 811 Damage Prevention, the APWA Color Code & New Construction Inspection
Colorado Water/Wastewater Operator Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: State Laws, Regulations & CCWP Certification
1.1 CDPHE CCWP Program & Regulatory Framework (Regulation 100 / 5 CCR 1003-2) 1.2 Facility Classification & Operator in Responsible Charge (ORC) Requirements 1.3 Certification Levels, Education, Experience & Exam Eligibility (Class D-A, Grade 1-4, Class S/T) 1.4 License Renewal, Training Units (TUs) & Mandatory Regulatory Training 1.5 Colorado Primary Drinking Water Regulations (Regulation 11) & Compliance 1.6 Colorado Discharge Permit System (Regulations 61/62), DMRs & Biosolids Reporting
2 Chapter 2: Source Water & Drinking Water Treatment Processes
2.1 Raw Water Sources, High-Altitude Characteristics & Reservoir Quality 2.2 Coagulation Chemistry, Rapid Mixing & Chemical Dosing (Alum, Ferric, Polymers) 2.3 Flocculation & Sedimentation Basin Design, Operation & Settling Zones 2.4 Granular Media Filtration, Backwash Procedures & Turbidity Standards 2.5 Advanced Treatment: Membranes, Softening, GAC/PAC Adsorption & Aeration 2.6 Groundwater Sources, Well Hydraulics, Static and Pumping Levels & Specific Capacity 2.7 Source Water Characteristics, Contaminant Categories & Watershed Protection Plans 2.8 Pretreatment: Presedimentation, Aeration, Algae Control & Taste-and-Odor Management 2.9 Direct, In-Line, Pressure, Cartridge & Diatomaceous Earth Filtration 2.10 Lime-Soda Softening, Ion Exchange & Water Stabilization 2.11 Water Treatment Plant Residuals: Lagoons, Drying Beds, Land Application & Recycle
3 Chapter 3: Disinfection & Chemical Addition
3.1 Chlorine Chemistry: Hypochlorous Acid, Free/Combined Residual & Breakpoint Chlorination 3.2 Disinfection Kinetics, Baffle Factors, T10 & CT Compliance Calculations 3.3 Disinfection Byproducts (TTHMs, HAA5s) & Stage 1/2 DBP Rules 3.4 Alternative Disinfection: Chloramination, Ultraviolet (UV) Light & Chlorine Dioxide 3.5 Corrosion Control, Lead & Copper Rule Revisions (LCRR) & Fluoridation Practices
4 Chapter 4: Water Treatment Plant Equipment, Instrumentation & Maintenance
4.1 Raw Water Intakes, Screening Equipment & Raw Water Pumping 4.2 Chemical Feed Equipment: Feeders, Day Tanks, Carrier Water & Feed-Rate Calibration 4.3 Chlorination Equipment: Gas Systems, Vacuum Regulators, Hypochlorite Storage & Onsite Generation 4.4 Filter Underdrains, Support Gravel, Surface Wash, Air Scour & Filter-to-Waste 4.5 Plant Process Control, SCADA and PLC Systems, Alarm Management & Records of Operation 4.6 Preventive, Corrective and Predictive Maintenance, Work Orders & Asset Management
5 Chapter 5: Wastewater Treatment Principles & Biological Processes
5.1 Preliminary Treatment: Bar Screens, Shredders, Grit Chambers & Flow Equalization 5.2 Primary Clarification, Solids Separation & Scum Removal Mechanics 5.3 Activated Sludge Fundamentals: Aerobic Microbiology, DO Control & Biomass Growth 5.4 Return & Waste Activated Sludge Management (RAS/WAS Operations & Sludge Age) 5.5 Activated Sludge Troubleshooting: Bulking, Nocardia Foaming, Rising Sludge & Pin Floc 5.6 Wastewater Characteristics, Organic and Hydraulic Loading, Diurnal Flow & Septicity 5.7 Activated Sludge Arrangements: Conventional, Complete Mix, Step Feed, Contact Stabilization, Extended Aeration, Oxidation Ditch, SBR & MBR 5.8 Aeration Systems: Blowers, Diffusers, Surface Aerators, Oxygen Transfer & Altitude Effects
6 Chapter 6: Advanced Wastewater Treatment & Solids Management
6.1 Biological Nutrient Removal: Nitrification, Denitrification & Anoxic Zones 6.2 Biological & Chemical Phosphorus Removal (EBPR & Coagulant Precipitation) 6.3 Sludge Thickening, Aerobic & Anaerobic Digestion (Mesophilic/Thermophilic) 6.4 Dewatering Equipment (Centrifuges, Belt Filter Presses) & Biosolids Standards (Reg 64) 6.5 Pond & Lagoon Operations, Trickling Filters & Rotating Biological Contactors (RBCs) 6.6 Secondary Clarification: Overflow and Solids Loading Rates, RAS Rate Setting & Clarifier Diagnostics 6.7 Tertiary Filtration, Effluent Polishing & Wastewater Disinfection with Chlorine, Dechlorination and UV 6.8 Effluent Disposal, Rapid Infiltration Basins, Colorado Water Reuse Law & Regulation 84
7 Chapter 7: Water Distribution Systems
7.1 Distribution Hydraulics, Pressure Zones, Static Head & Friction Headloss 7.2 Finished Water Storage Tanks, Standpipes, Mixing & Water Age Control 7.3 Distribution Piping, Valves (Gate, Butterfly, PRV), Hydrants & Main Flushing 7.4 Cross-Connection Control, Hazard Assessment & Backflow Preventers (RPZ, DCVA, PVB, Air Gap) 7.5 Water Main Installation, Trenching, Repair, Pressure Testing & Disinfection (AWWA C651) 7.6 Network Layout, Pressure Zones, Demand Patterns, Fire Flow & the Hydraulic Grade Line 7.7 Fire Hydrants, Dry Barrel Operation, Fire Flow Testing & Unidirectional Flushing 7.8 Booster Pump Stations, Hydropneumatic Systems, Controls & Surge Protection 7.9 Customer and Master Metering, Meter Sizing, Accuracy Testing, AMR & AMI 7.10 System Mapping, GIS, As-Builts, Operational Analysis & the AWWA Water Audit 7.11 Service Line Installation, Wet Tapping, Curb Stops & the Lead Service Line Inventory 7.12 Leak Detection, District Metered Areas, Minimum Night Flow & Pressure Management 7.13 Storage Facility Inspection, Sanitary Defects, Water Age Control, Cleaning & AWWA C652 Disinfection 7.14 Utility Locating, Colorado 811 Damage Prevention, the APWA Color Code & New Construction Inspection 7.15 Well and Wellhead Maintenance, Sanitary Condition, Rehabilitation & AWWA C654 Disinfection 7.16 Booster Chlorination, Remote Chemical Feed, Chemical Storage, Security & Supply Management 7.17 Distribution Sampling Technique, Chlorine Residual Monitoring & Nitrification Control in Chloraminated Systems
8 Chapter 8: Wastewater Collection Systems
8.1 Gravity Collection Systems: Flow Velocities, Slopes, Pipe Materials & Manholes 8.2 Wastewater Lift Stations: Wet Wells, Submersible Pumps, Level Controls & Force Mains 8.3 Inflow and Infiltration (I&I) Sources, Flow Monitoring, Smoke Testing & CCTV Inspection 8.4 Collection Maintenance: Hydraulic Jetting, Mechanical Rodding & FOG/Root Mitigation 8.5 Sanitary Sewer Overflows (SSOs): Root Causes, Containment, Reporting & Mitigation 8.6 Lift Station Electrical Devices, Level Detection, Telemetry, Gas Detection & Capacity Adjustment 8.7 Lift Station Configurations, Preventive Maintenance, Wet Well Cleaning, Troubleshooting & Emergency Bypass Pumping 8.8 Collection System Rehabilitation: CIPP, Pipe Bursting, Sliplining, Grouting, Manhole Repair & Tap Defects 8.9 Excavation, Hydro Excavation, Bedding and Haunching, Grade Control & Sewer Acceptance Testing 8.10 Collection System Flow Monitoring, Area-Velocity Metering, Weirs and Flumes & Capacity Assessment
9 Chapter 9: Pumps, Motors & Utility Mechanics
9.1 Centrifugal Pumps: Volutes, Impellers, Packing Seals & Mechanical Seals 9.2 Positive Displacement Pumps (Peristaltic, Diaphragm, Progressive Cavity) & Dosing Systems 9.3 Pump Performance Curves, System Head Curves, Cavitation & NPSH Calculations 9.4 Electric Motors (Single/Three Phase), Controls, Variable Frequency Drives (VFDs) & Power 9.5 Flow Meters (Venturi, Magnetic, Ultrasonic), Online Analyzers, PLCs & SCADA Telemetry 9.6 Air Compressors, Conveyors, Hoists and Cranes, Service Piping & Standby Power Generation 9.7 Valve Types and Duties, Air Release and Air-Vacuum Valves, Water Hammer & Surge Control
10 Chapter 10: Laboratory Analysis & Water Quality Monitoring
10.1 Regulatory Sampling Procedures, Chain of Custody, Holding Times & Preservation Techniques 10.2 Physical & Chemical Drinking Water Testing: Turbidity, pH, Alkalinity, Hardness & Chlorine (DPD) 10.3 Wastewater Laboratory Analysis: BOD5, COD, Total Suspended Solids (TSS) & Settleometry 10.4 Microbiological Testing: Total Coliform, E. coli (Colilert, Membrane Filtration) & QA/QC 10.5 Bench-Scale Jar Testing, Coagulant Optimization & Streaming Current Monitoring 10.6 Laboratory Equipment, Calibration and Verification, QA/QC Program & Certified Laboratory Requirements 10.7 Nutrient Series, Metals Sampling, Whole Effluent Toxicity & Electrode Measurements (DO, pH, ORP, H2S)
11 Chapter 11: Operator Mathematics & Applied Calculations
11.1 Core Conversions, Geometric Area, Pipe Volume & Continuous Flow Rate (MGD, GPM, cfs) 11.2 Chemical Dosage, The Standard "Pounds Formula", Active Chemical & Solution Purity 11.3 Hydraulic Retention Time (HRT), Surface Overflow Rate (SOR) & Weir Overflow Rates 11.4 Process Control Calculations: F/M Ratio, MCRT/Solids Retention Time (SRT) & Sludge Volume Index (SVI) 11.5 Distribution Pressure, Static vs Dynamic Head, Water Horsepower & Wire-to-Water Efficiency 11.6 CT Calculations: Baffling Factors, T10, Temperature and pH Corrections & Multi-Segment Compliance
12 Chapter 12: Safety, Emergency Operations & Compliance
12.1 Permit-Required Confined Space (PRCS) Entry, Atmospheric Testing (O2/LEL/H2S/CO) & Rescue 12.2 Control of Hazardous Energy: Lockout/Tagout (LOTO), Arc Flash & Electrical Safety 12.3 Chemical Safety: Chlorine Gas Handling, Ton Cylinders, Sulfur Dioxide, Ammonia & SDS/GHS 12.4 Trenching & Excavation: Soil Classification, Sloping, Shoring, Shielding & Competent Person Rules 12.5 Emergency Action Plans, Security Vulnerability, Spill Containment & CDPHE Tier 1/2/3 Public Notice 12.6 Work Zone Traffic Control, PPE, Fall Protection, Fire Extinguishers, First Aid & Bloodborne Pathogens 12.7 Standard Operating Procedures, Operating Records, Regulatory Reporting, Customer Complaints & Supervisory Duties
7.14 Utility Locating, Colorado 811 Damage Prevention, the APWA Color Code & New Construction Inspection
Key Takeaways Explain This Topic AI
Colorado law requires notice to 811 at least two business days before excavation, excluding the notice day, weekends, and holidays, with no exemption for utilities digging in their own streets.
In the APWA color code, blue marks potable water and purple marks reclaimed water, irrigation, and slurry lines.
Inside the tolerance zone around locate marks, mechanical excavation is prohibited and only hand digging or vacuum excavation is permitted until the facility is exposed.
PVC and HDPE mains cannot be located electromagnetically, so continuous tracer wire tested for continuity at acceptance is what makes them findable.
New main acceptance verifies 10 feet horizontal and 18 inches vertical separation from sewers, thrust restraint, pressure testing, and AWWA C651 disinfection with satisfactory bacteriological samples.
Last updated: August 2026
Before the shovel goes in the ground
WPI lists "perform underground locating, marking, and notification" and "inspect new construction" as distribution job tasks, and the Wastewater Collection outline lists "determine location of underground utilities." In Colorado this is statutory, not merely good practice.
Colorado 811 and the Underground Damage Prevention Safety Commission
Colorado's excavation notification law is codified at C.R.S. Title 9, Article 1.5 . Its core requirements:
Every excavator must notify Colorado 811 (the Utility Notification Center of Colorado) before excavating. This applies to homeowners and utilities alike ; there is no exemption for a utility digging in its own street.
Notice must be given at least two business days before excavation , not counting the day of notice, weekends, or legal holidays. A ticket has a defined life and must be renewed if work extends beyond it.
Excavators must pre-mark the proposed excavation area in white paint, flags, or stakes so locators know where to look.
Facility owners and operators must locate and mark their facilities within the notice period, or notify the excavator that they have no facilities in the area.
Colorado requires facility owners to have their underground facilities mapped , and the 2018 legislation created the Underground Damage Prevention Safety Commission to enforce and adjudicate damage-prevention violations.
Damage must be reported. Contact with a facility, even without an immediate leak or outage, must be reported to the owner and, for hazardous facilities, to emergency services.
The APWA uniform color code
Memorize this table; it appears on exams and it prevents fatalities.
- Color Facility
- White Proposed excavation (marked by the excavator)
- Pink Temporary survey markings
- Red Electric power lines, cables, conduit, lighting cables
- Yellow Gas, oil, steam, petroleum, or other gaseous or flammable material
- Orange Communication, alarm or signal lines, cables, or conduit
- Blue Potable water
- Purple Reclaimed water , irrigation, and slurry lines
- Green Sewers and drain lines
Note the two that matter most to a water operator: blue for potable and purple for reclaimed . The purple convention is the same one used for reuse piping, valve boxes, and signage, and it exists so that no one ever mistakes a non-potable line for a drinking water line.
Tolerance zone and safe excavation
Locate marks are not survey-accurate. Colorado, like most states, defines a tolerance zone extending a specified horizontal distance on each side of the marked centerline — commonly 18 inches — within which mechanical excavation is prohibited . Inside the tolerance zone, excavation must be by hand digging or vacuum (hydro or air) excavation until the facility is exposed.
Additional field rules:
Maintain the marks. If they are destroyed by weather or traffic, request a re-mark rather than guessing.
Expose and verify the facility before crossing it with machinery.
Support exposed lines rather than letting them span an open trench.
Stop and call when you find an unmarked facility, and when marks and field conditions disagree.
Abandoned lines are still a hazard , and unmarked private facilities beyond the meter are common. Private locating services exist for that reason.
Locating equipment
Electromagnetic pipe and cable locators consist of a transmitter that induces or directly connects a signal onto a conductive line and a receiver that traces it. Direct connection is the most accurate method ; inductive clamping is next; broadcast induction is least accurate and most prone to coupling onto adjacent utilities.
Tracer wire is installed with non-conductive pipe — PVC, HDPE — precisely because those materials cannot be located electromagnetically. A broken or unterminated tracer wire makes a plastic main effectively invisible , so tracer wire continuity testing is part of new construction acceptance.
Ground penetrating radar locates non-conductive lines and voids where soil conditions permit; it performs poorly in wet clay.
Acoustic pipe locators and metal detectors for valve boxes and curb boxes.
Sondes pushed or floated into a non-metallic line for point location.
Inspecting new construction
Accepting a developer's or contractor's work makes it the utility's permanent liability, so inspection is an operator function with real consequences. Items verified against the utility's standard specification:
Materials. Correct pipe class, fittings, valves, hydrants, and gaskets, with certifications, and confirmation that all wetted materials are lead free and certified to NSF/ANSI 61 and 372.
Trench and bedding. Depth below the frost line, correct bedding material and compaction, no rocks against the pipe, and proper haunching.
Separation from sewer. Water mains are kept a minimum 10 feet horizontally from sanitary sewers and, at crossings, at least 18 inches above with joints located as far as practical from the crossing.
Thrust restraint. Thrust blocks bearing against undisturbed soil, or restrained joints per the design, at all bends, tees, plugs, and hydrants.
Tracer wire installed continuously with plastic pipe and tested for continuity, and marker tape placed above the pipe.
Valves and hydrants set plumb, boxes centered and to grade, hydrant drainage pockets built with clean rock.
Pressure and leakage testing to the specification.
Disinfection under AWWA C651 with satisfactory bacteriological samples before the main is placed in service.
As-built documentation and GIS update at closeout.
An operator who signs off on construction without verifying separation from sewer, thrust restraint, disinfection results, and tracer wire continuity has accepted problems the utility will pay for over the next fifty years.