Study guide

14.2 Target Costing & Kaizen Costing

CPA Program — Strategic Management Accounting Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Role of Strategic Management Accounting & Value Creation

1.1 Evolution & Role of the Strategic Management Accountant 1.2 Defining & Creating Multi-Stakeholder Value 1.3 The Strategic Management Process & Strategy Formation

2 Chapter 2: Strategic Analysis, Environmental Scanning & Professional Ethics

2.1 External Environmental Scanning: PESTEL & Porter's Five Forces 2.2 Internal Capability Analysis, VRIO & Core Competencies 2.3 Professional Ethics, Governance & Risk in Strategic Management Accounting

3 Chapter 3: Information Architecture, Systems & Behavioral Biases

3.1 Data, Information & Knowledge Architecture 3.2 Management Information Systems, ERP & Digital Technologies 3.3 Decision-Making Needs & Cognitive Biases 3.4 Stakeholder Communication, Sources & Information Integration 3.5 Assessing Information-System Deficiencies & Replacement Needs 3.6 Evaluating, Implementing & Reviewing Information Solutions

4 Chapter 4: Relevant Information, Tactical Decisions & Limiting Factors

4.1 Relevant Cost Analysis & Differential Decision-Making 4.2 Short-Term Tactical Decision Scenarios 4.3 Limiting Factors, Theory of Constraints & Throughput Accounting

5 Chapter 5: Strategic Planning, Master Budgets & Budgetary Control

5.1 Master Budget Architecture & Process 5.2 Financial Budgets & Cash Flow Forecasting 5.3 Budgetary Control & Flexible Budgeting 5.4 Service, Not-for-Profit & Departmental Budgets

6 Chapter 6: Modern Budgeting Methodologies & Behavioral Dynamics

6.1 Alternative Budgeting Systems: ZBB, ABB & Rolling Budgets 6.2 Beyond Budgeting Principles & Dynamic Forecasting 6.3 Behavioral Dimensions of Budgeting

7 Chapter 7: Standard Costing & Comprehensive Variance Analysis

7.1 Standard Cost Setting & Direct Cost Variances 7.2 Overhead Variance Analysis 7.3 Sales Variances: Price, Volume, Mix & Quantity 7.4 Planning vs Operational Variances & Variance Investigation

8 Chapter 8: Project Selection, Governance & Financial Appraisal

8.1 Project Fundamentals, Governance & Life Cycle 8.2 Project Selection & Strategic Alignment 8.3 Capital Investment Appraisal Techniques 8.4 Project Structures, Teams, Supplier Contracts & Probity

9 Chapter 9: Project Scheduling, Earned Value Management & Risk

9.1 Project Scheduling, Network Analysis & Resource Management 9.2 Earned Value Management (EVM) & Project Control 9.3 Project Risk Management, Methodologies & Post-Completion Review 9.4 Completion Decisions, Acceptance, Financial Closure & Knowledge

10 Chapter 10: Performance Management Systems & Responsibility Centers

10.1 Management Control Systems & Simons' Levers of Control 10.2 Responsibility Accounting & Organizational Design 10.3 Designing Effective Key Performance Indicators (KPIs)

11 Chapter 11: Divisional Financial Performance & Transfer Pricing

11.1 Return on Investment (ROI) & Residual Income (RI) 11.2 Economic Value Added (EVA) 11.3 Transfer Pricing in Decentralized Organizations

12 Chapter 12: Strategic Performance Frameworks & Executive Incentives

12.1 The Balanced Scorecard Framework 12.2 Strategy Maps & Causal Linkages 12.3 Multidimensional Performance Frameworks 12.4 Executive Compensation, Incentive Systems & Agency Theory

13 Chapter 13: Strategic Cost Management, Value Chains & Activity-Based Costing

13.1 Strategic Cost Management & Value Chain Analysis 13.2 Activity-Based Costing (ABC) Mechanics 13.3 Activity-Based Management (ABM) & Time-Driven ABC

14 Chapter 14: Strategic Pricing, Target Costing & Life-Cycle Costing

14.1 Strategic Pricing Decisions & Policies 14.2 Target Costing & Kaizen Costing 14.3 Life-Cycle Costing & Environmental Management Accounting

15 Chapter 15: Customer Profitability, Lean Supply Chains & Quality Costs

15.1 Customer Profitability Analysis & Cost-to-Serve 15.2 Supply Chain Management & Lean Operations 15.3 Cost of Quality (COQ) Framework & Total Quality Management 15.4 Outsourcing, Offshoring & Downsizing Decisions

14.2 Target Costing & Kaizen Costing

Key Takeaways Explain This Topic AI

Target Costing reverses traditional cost-plus logic by establishing allowable cost from competitive market realities: Target Cost = Target Selling Price - Target Profit Margin.

Target costing is deployed primarily during the pre-production concept and product design phase, where a large share of lifecycle costs is determined.

The Cost Gap—the variance between current estimated manufacturing cost and allowable target cost—is eliminated prior to manufacturing launch through cross-functional Value Engineering (VE).

Value Engineering optimizes the relationship between customer perceived utility and component cost through function-cost analysis, tear-down analysis, and component standardization without sacrificing quality.

While Target Costing secures structural cost alignment during pre-production design, Kaizen Costing drives continuous, incremental operational waste reduction during ongoing factory production.

Last updated: October 2026

14.2 Target Costing & Kaizen Costing

In highly competitive global markets, manufacturers are increasingly price takers . When consumers enjoy abundant substitutes, companies cannot simply tally internal costs, add a markup, and dictate the price. Originating in the Japanese automotive industry (notably Toyota and Nissan), Target Costing ( genka kikaku ) inverts traditional accounting: competitive market prices dictate allowable internal costs.

The Target Costing Philosophy & Equation

Traditional cost-plus accounting follows an internally focused, additive sequence: Cost + Target Profit = Selling Price \text{Cost} + \text{Target Profit} = \text{Selling Price} Cost + Target Profit = Selling Price

If the resulting price exceeds market willingness to pay, the firm faces inventory write-downs, margin dilution, and post-launch restructuring.

Target Costing establishes a market-driven deductive relationship: Target Cost = Target Selling Price − Target Profit Margin \text{Target Cost} = \text{Target Selling Price} - \text{Target Profit Margin} Target Cost = Target Selling Price − Target Profit Margin

Target Selling Price: The price customers will pay, determined through competitor benchmarking and market research over the product lifecycle.

Target Profit Margin: Convert the percentage to a currency amount per unit before subtracting from price. It is set by corporate long-term financial plans (e.g., return on sales or return on capital employed).

Target Cost: The maximum allowable full unit cost across all lifecycle stages (R&D, manufacturing, distribution, and warranty).

The 5-Stage Target Costing Process

Target costing follows a structured, cross-functional sequence:

Establish Competitive Target Selling Price: Conduct market analysis to determine customer utility, perceived value, and competitor pricing for comparable offerings over the expected product life.

Determine Required Target Profit Margin: Corporate strategy sets the required return on sales (ROS) or return on capital employed (ROCE).

Calculate Allowable Target Cost: Deduct target profit from target selling price ( Target Cost = Target Price − Target Margin \text{Target Cost} = \text{Target Price} - \text{Target Margin} Target Cost = Target Price − Target Margin ).

Estimate Current Feasible Cost (Drift Cost): Engineering, procurement, and accounting teams calculate expected unit production cost using current designs and components.

Determine and Close the Cost Gap: Identify the difference between current estimated cost and target cost: Cost Gap = Current Estimated Cost − Target Cost \text{Cost Gap} = \text{Current Estimated Cost} - \text{Target Cost} Cost Gap = Current Estimated Cost − Target Cost

If a positive Cost Gap exists, cross-functional teams apply Value Engineering prior to manufacturing launch.

Closing the Cost Gap: Value Engineering & Value Analysis

The primary tool for closing the Cost Gap is Value Engineering (VE) :

Value Engineering (VE): Systematic examination of product design prior to manufacturing launch to achieve required functional performance at minimum cost.

Value Analysis (VA): Examination of cost structures applied to existing products already in active manufacturing to improve margins or extend maturity lifecycles.

Key Value Engineering Techniques

Function-Cost Analysis & The Value Index: Products are decomposed into functional components. Customers rate functional importance, while engineers calculate the cost percentage of each function. Strategic accountants compute the Value Index : Value Index = % of Perceived Customer Value % of Component Cost \text{Value Index} = \frac{\% \text{ of Perceived Customer Value}}{\% \text{ of Component Cost}} Value Index = % of Component Cost % of Perceived Customer Value ​

Value Index < 1.0 (Over-Engineered): Component cost exceeds customer perceived utility. Action: simplify, substitute cheaper materials, or eliminate.

Value Index > 1.0 (High Value Opportunity): Component delivers high customer value at modest cost. Action: potential to enhance differentiation.

Tear-Down Analysis (Reverse Engineering): Dismantling competitor products to benchmark assembly methods, component choices, and manufacturing tolerances.

Design for Manufacture and Assembly (DFMA): Redesigning components to reduce part counts, eliminate threaded fasteners (using snap-fits), and minimize assembly touch time.

Component Standardization: Using common parts and modules across product families to leverage bulk purchasing discounts and reduce inventory handling.

Feature Pruning: Eliminating unnecessary features that customers do not appreciate or pay for.

Kaizen Costing: Operational Cost Reduction

While Target Costing operates during pre-production design, Kaizen Costing drives continuous, incremental cost reductions during the active manufacturing phase .

Derived from the Japanese philosophy of kaizen (continuous improvement), Kaizen Costing empowers shop-floor workers, cell leaders, and process engineers to eliminate waste ( muda ). Instead of standard costing's static focus on avoiding negative variances, Kaizen Costing establishes progressively declining monthly cost standards.

  • Feature Target Costing Kaizen Costing
  • Lifecycle Phase Pre-production (concept, R&D, design) Active commercial manufacturing phase
  • Primary Focus Product design and component architecture Manufacturing processes and operational workflows
  • Core Method Value Engineering, Tear-Down, DFMA Kaizen events, Gemba walks, setup reduction

Key Personnel Design engineers, procurement, marketers, SMA accountants Factory workers, shop-floor supervisors, line engineers

Cost Reduction Scope Radical, structural product redesign Incremental, continuous operational gains

Cost Standard Allowable cost set by competitive market price Target cost reductions below previous actual costs

Corporate Application: Vanguard Biomedical Ltd

Vanguard Biomedical Ltd is developing a portable point-of-care blood analyzer (Model VB-400):

  • Target Selling Price (based on competitor analysis): $1,200
  • Required corporate Return on Sales (ROS): 25.0%
  • Target Profit Margin: $1,200 × 25.0% = $300
  • Allowable Target Cost: $1,200 - $300 = $900
  • Engineering Cost Estimates & Value Engineering Interventions

Assume the estimate includes all manufacturer lifecycle costs allocated per expected unit, including development and support. Initial engineering estimates indicated a full lifecycle unit cost of $1,080 , revealing a Cost Gap of $180 ($1,080 - $900). A Value Engineering team decomposed the gap across five subsystems:

Subsystem Initial Cost Target Cost Cost Gap Value Engineering Interventions

Optical Sensors $380 $300 +$80 Replaced CNC brass housing with molded medical polymer; consolidated dual ASIC chip set

Microfluidics $260 $220 +$40 Simplified manifold flow geometry; eliminated two micro-valves; refined ultrasonic weld seams

Motherboard & Display $240 $220 +$20 Sourced high-volume commercial OLED panel instead of custom touchscreen display

Casing & Mechanical $110 $90 +$20 Converted to snap-fit casing assembly, eliminating 16 threaded screws and brass inserts

Assembly & Testing $90 $70 +$20 DFMA design reduced manual cycle time from 42 to 18 minutes; automated optical testing

  • Total Per Unit $1,080 $900 +$180 Full $180 Cost Gap closed prior to tooling freeze
  • Post-Launch Kaizen Costing

Following production launch at the $900 target cost, Vanguard instituted a 3.0% Year 1 Kaizen reduction target. Factory floor initiatives eliminated $27 per unit in scrap and calibration time, lowering unit cost to $873 and expanding operating margin to 27.25%.

Exam Traps to Avoid

Warning

Quality Dilution Trap: Closing the Cost Gap must never compromise product quality or core customer functionality. Target costing is fundamentally customer-driven; stripping out functions that customers value destroys sales volume.

Note

Phase Confusion: Target Costing operates upstream during pre-production design when the product architecture is fluid. Kaizen Costing operates downstream during active manufacturing when design is frozen.

Loading diagram... Integrated Target Costing and Kaizen Costing Lifecycle