11.4 Mistake-Proofing (Poka-Yoke) & Standard Work
CSSC Certified Six Sigma Green Belt Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Six Sigma Overview & Exam Fundamentals
1.1 CSSC Certification Overview, Exam Structure & Body of Knowledge 1.2 History & Evolution of Six Sigma 1.3 Six Sigma Organizational Roles & Belts Hierarchy 1.4 The DMAIC Methodology Architecture vs. DMADV / DFSS 1.5 Other Process Improvement & Quality Methods, and When to Choose Six Sigma
2 Chapter 2: Quality Fundamentals & Defect Metrics
2.1 Critical to Quality (CTQ) Characteristics & VOC Translation 2.2 Defect Metrics: DPU, DPO, DPMO, & the 1.5-Sigma Shift 2.3 First Time Yield (FTY) & Rolled Throughput Yield (RTY) 2.4 Cost of Quality (COQ) & Cost of Poor Quality (COPQ)
3 Chapter 3: Lean Principles & Waste Elimination
3.1 Foundations of Lean & The Toyota Production System (TPS) 3.2 The Eight Wastes: CSSC's Seven Muda, TIMWOODS, and Muri/Mura 3.3 The 5S Visual Workplace Methodology 3.4 Value Stream Mapping (VSM), Cycle Time & Takt Time
4 Chapter 4: Project Selection & Team Management
4.1 Six Sigma Project Selection & Business Case Development 4.2 Project Charter Architecture 4.3 Stakeholder Management & Communication Planning 4.4 Team Dynamics & Tuckman's Team Development Stages 4.5 The 15-Point Project Viability Model & Process-Level Selection
5 Chapter 5: Define Phase & Process Mapping
5.1 High-Level Process Mapping with SIPOC 5.2 Flowcharts, Swimlane Diagrams & Process Value Analysis 5.3 Quality Function Deployment (QFD) & The House of Quality 5.4 Critical to Quality (CTQ) Flowdown & Operational Definitions 5.5 The CSSC Define Toolset: Ground Rules, In/Out of the Box, Is–Is Not & Tollgate Checklists
6 Chapter 6: Measure Phase & Measurement Systems
6.1 Data Types: Continuous (Variable) vs. Discrete (Attribute) Data 6.2 Data Collection Planning & Sampling Strategies 6.3 Measurement System Analysis (MSA) Foundations & Calibration 6.4 Variable & Attribute Gage R&R Studies
7 Chapter 7: Analyze Phase & Root Cause Analysis
7.1 Qualitative Root Cause Tools: 5 Whys & Cause-and-Effect (Fishbone) Diagrams 7.2 Failure Mode and Effects Analysis (FMEA) & RPN Calculation 7.3 Pareto Analysis & The 80/20 Rule 7.4 Graphical Data Exploration: Histograms, Box Plots, & Multi-Vari Charts 7.5 The Root Cause Verification Matrix
8 Chapter 8: Descriptive Statistics & Distributions
8.1 Measures of Central Tendency & Dispersion 8.2 The Normal Distribution & The Empirical Rule (68-95-99.7) 8.3 Standard Normal Distribution, Z-Scores & Probability Calculations 8.4 Common Non-Normal Distributions: Binomial, Poisson & Chi-Square
9 Chapter 9: Inferential Statistics & Hypothesis Testing
9.1 Fundamentals of Hypothesis Testing: Null vs. Alternative, Alpha & Beta Risks 9.2 One-Sample and Two-Sample t-Tests for Means 9.3 Paired t-Tests & Non-Parametric Alternatives 9.4 Analysis of Variance (One-Way & Two-Way ANOVA) & Chi-Square Contingency Tests 9.5 Sample Size Determination for Hypothesis Tests
10 Chapter 10: Correlation, Regression, & Experimentation
10.1 Linear Correlation & Pearson's Correlation Coefficient (r) 10.2 Simple Linear Regression & Coefficient of Determination (R^2) 10.3 Introduction to Design of Experiments (DOE) & Factorial Designs 10.4 Analyzing Experimental Results: Main Effects & Interaction Plots
11 Chapter 11: Improve Phase & Solution Implementation
11.1 Brainstorming, Creative Thinking & Solution Selection Matrices 11.2 Piloting Solutions & Conducting Risk Assessments 11.3 Implementation Planning & Change Management (ADKAR) 11.4 Mistake-Proofing (Poka-Yoke) & Standard Work
12 Chapter 12: Control Phase, SPC, & Process Capability
12.1 Statistical Process Control (SPC) & Shewhart Control Rules 12.2 Variable Control Charts: I-MR, X-bar & R, X-bar & S 12.3 Attribute Control Charts: p, np, c, and u Charts 12.4 Process Capability & Performance Indices: Cp, Cpk, Pp, Ppk 12.5 Communicating Statistical Results to Business Audiences
11.4 Mistake-Proofing (Poka-Yoke) & Standard Work
Key Takeaways Explain This Topic AI
Shigeo Shingo's Poka-Yoke philosophy establishes that human errors are natural, unavoidable cognitive events, but product and service defects are completely preventable through engineered source inspection.
Mistake-proofing operates across three distinct levels: Level 1 (Prevention / Inherent Design, physically precluding error), Level 2 (Detection / Immediate Shutdown, arresting process advance), and Level 3 (Warning / Notification, alerting via buzzers or lights).
Poka-Yoke sensing mechanisms rely on three regulatory methods: Contact methods (sensing physical geometry or dimensions), Fixed-Value methods (verifying exact counts of components or cycles), and Motion-Step methods (enforcing mandatory operational sequences).
Standard Work, pioneered by Taiichi Ohno, represents the current best, safest, and most efficient combination of people, materials, and equipment, structured around three mandatory pillars: Takt Time, Standard Work Sequence, and Standard In-Process Stock (SWIP).
Sustaining improvements requires visual management controls (color coding, 5S shadow boards, side-by-side defect photos), ILUO cross-training competency matrices, and daily Layered Process Audits (LPAs).
Last updated: September 2026
11.4 Mistake-Proofing (Poka-Yoke) & Standard Work
Quick Summary: Even the most sophisticated statistical solutions developed in the Improve phase will decay over time if the process relies entirely on human vigilance, memory, and concentration. Human beings are inherently fallible; fatigue, distraction, and cognitive overload make mistakes inevitable. The Lean Six Sigma philosophy, pioneered by Japanese industrial engineer Shigeo Shingo, resolves this vulnerability through Poka-Yoke (Mistake-Proofing) and Standard Work . By engineering physical, optical, and logical mechanisms that separate human errors from product defects, organizations achieve Zero Quality Control (ZQC) , ensuring that processes produce conforming output by structural design rather than downstream inspection.
Shigeo Shingo & the Philosophy of Poka-Yoke
During the evolution of the Toyota Production System (TPS), industrial engineer Shigeo Shingo fundamentally transformed modern manufacturing philosophy. Originally termed Baka-Yoke ("fool-proofing"), Shingo renamed the discipline Poka-Yoke (pronounced POH-kah YOH-kay , translating to "mistake-proofing" or "avoiding inadvertent errors") out of respect for frontline operators. The Shingo Quality Paradigm
- TRADITIONAL QUALITY PARADIGM SHINGO POKA-YOKE PARADIGM
- ┌─────────────────────────────────┐ ┌─────────────────────────────────┐
- │ Human error causes defects. │ │ Human error is natural & unavoidable;│
- │ 'Be more careful!' │ │ Defects are 100% PREVENTABLE. │
- ├─────────────────────────────────┤ ├─────────────────────────────────┤
- │ Statistical Sampling (SQC) │ ───────▶ │ Zero Quality Control (ZQC) │
- │ Inspect after the batch is made │ │ Source Inspection at point of error│
- ├─────────────────────────────────┤ ├─────────────────────────────────┤
- │ Finds defects after waste occurs│ │ Prevents defect from ever existing│
- └─────────────────────────────────┘ └─────────────────────────────────┘
- The Critical Axiom: Error ≠ \ne = Defect
Traditional management assumes that human errors and defects are synonymous. When a defective unit escapes, traditional managers blame the operator: "Pay closer attention," "Read the procedure again," or "You need retraining."
Shingo asserted that this mindset is fundamentally bankrupt:
Human Error is a natural, unavoidable consequence of human cognition. Fatigue, sensory adaptation, emotional stress, and multitasking guarantee that humans will occasionally omit a bolt, transpose two digits, misread a gauge, or press the wrong button.
A Defect is the physical consequence of an error that escapes the workstation uncorrected and enters the next process step or reaches the customer. D e f e c t = H u m a n E r r o r + L a c k o f M i s t a k e − P r o o f i n g \mathbf{Defect} = \mathbf{Human\ Error} + \mathbf{Lack\ of\ Mistake-Proofing} Defect = Human Error + Lack of Mistake − Proofing
If the process is engineered so that an inadvertent human mistake is physically blocked from becoming a non-conformance, the defect rate drops to zero , even while human operators remain fallible.
Critique of Traditional Inspection
Shingo argued that traditional judgment inspection (end-of-line testing or statistical sampling) is inherently flawed:
It produces zero value-add; it merely sorts good parts from bad parts after material, machine time, and labor have already been destroyed.
In sampling inspection (e.g., AQL tables), management formally condones an acceptable percentage of defects shipping to customers.
Instead, Shingo advocated Zero Quality Control (ZQC) through Source Inspection : checking operating conditions at the exact physical source before the transformation occurs. If conditions are incorrect (e.g., part misaligned, coolant off), the machine physically refuses to cycle.
The Three Levels of Poka-Yoke
Mistake-proofing mechanisms are classified into a rigorous three-tier functional hierarchy based on their operational reliability and degree of reliance on human intervention: The Poka-Yoke Reliability Hierarchy
- LEVEL 1: PREVENTION / INHERENT DESIGN ★★★ HIGHEST RELIABILITY
- Physically impossible to make the error
- Zero human reliance (Keyed plugs, USB-C)
- └────────────────────────┬────────────────┘
- ▼
- LEVEL 2: DETECTION / IMMEDIATE SHUTDOWN ★★ MODERATE RELIABILITY
- Interlock immediately halts process
- Blocks defective unit from advancing (Light curtains)
- └────────────────────────┬────────────────┘
- ▼
- LEVEL 3: WARNING / NOTIFICATION ★ LOWEST RELIABILITY
- Sounds buzzer, flashes beacon, pops modal
- Fully relies on human reaction (Seatbelt chime)
- Level 1: Prevention / Inherent Design (Control / Lockout)
Mechanism : The design of the product, tool, or software makes it physically or logically impossible for the human error to occur in the first place.
Human Reliance : Zero. The operator cannot bypass the protection even if they actively attempt to do so.
Real-World Examples :
Reversible USB-C cables : Unlike legacy USB-A plugs (which required correct orientation), USB-C connectors are symmetrical; improper insertion is physically impossible.
Asymmetrical automotive fuel nozzles : Diesel pump nozzles have a wider diameter than unleaded gasoline filler necks, physically preventing an operator from inserting a diesel nozzle into an unleaded vehicle tank.
Keyed electrical connectors & SIM card trays : Chamfered corners ensure parts seat only in the single correct orientation.
Software constraints : An online date-picker interface that disables and greys out all calendar dates prior to today's date for departure bookings.
Level 2: Detection / Immediate Shutdown (Interlock)
Mechanism : The error occurs, but an automated sensing mechanism detects the error immediately and halts the machine or arrests the workflow , preventing the non-conforming part from advancing to the next operational station.
Human Reliance : Low. The system automatically enforces the stop, but the operator must clear the stoppage and correct the condition.
Real-World Examples :
Microwave door interlock : Opening the microwave door immediately trips a mechanical switch that cuts electrical power to the magnetron tube, preventing hazardous radiation emission.
Safety light curtains on stamping presses : If an operator's hand breaks the infrared optical curtain, the hydraulic ram instantly brakes to an emergency stop before reaching the pinch point.
Lawnmower dead-man handle : Releasing the control lever grounds the spark plug and engages a mechanical flywheel brake within 3 seconds.
Elevator door optical sensors : If an obstruction is detected in the doorway, the closing mechanism immediately reverses and holds the cab stationary.
Level 3: Warning / Notification (Annunciation)
Mechanism : The system senses an error, abnormal condition, or omission and alerts the operator via an audible buzzer, flashing strobe (Andon), or visual warning screen . The system does not physically halt operation.
Human Reliance : Extremely High. The mechanism depends entirely on the operator hearing/seeing the alert, correctly interpreting it, and taking disciplined corrective action.
Limitations : Suffers from alarm fatigue , sensory adaptation, and human habituation. In noisy, high-pressure production environments, warning buzzers are frequently ignored or taped over by frustrated operators.
Real-World Examples :
Automotive seatbelt chime : Sounds an audible chime and flashes an icon on the dashboard when a passenger is unbuckled, but the vehicle remains fully drivable.
Car headlights-on buzzer : Sounds an alert when the driver opens the door while headlights remain illuminated.
Software confirmation modal : "Warning: You have unread changes. Are you sure you want to exit?"
- Feature Level 1: Prevention Level 2: Detection / Shutdown Level 3: Warning
- Action on Error Precludes error physically Arrests process immediately Alerts operator via sound/light
Process Halting Not applicable (error cannot happen) Enforced automatic shutdown None (process continues running)
- Operator Dependence Zero Minimal Total
- Defect Escapes 0% (Impossible) Near 0% (Captured at workstation) Variable (High risk under fatigue)
- Six Sigma Status Gold Standard Preferred Operational Control Minimal Acceptable Countermeasure
- Poka-Yoke Regulatory Mechanisms
Shingo categorized the physical and sensing mechanisms that trigger mistake-proofing into three distinct regulatory functions : Three Poka-Yoke Regulatory Mechanisms
- 1. CONTACT METHODS 2. FIXED-VALUE METHODS 3. MOTION-STEP METHODS
- ┌───────────────────────┐ ┌───────────────────────┐ ┌───────────────────────┐
- │ Senses Physical │ │ Senses Numerical │ │ Enforces Mandatory │
- │ Attributes │ │ Quantities │ │ Operational Sequence │
- │ • Dimensions & Shapes │ │ • Part counts │ │ • Interlocked stages │
- │ • Limit switches │ │ • Critical cycle counts│ │ • Barcode gating │
- │ • Proximity sensors │ │ • Kitting trays │ │ • Key exchange (Trapp)│
- └───────────────────────┘ └───────────────────────┘ └───────────────────────┘
- 1. Contact Methods (Geometric & Physical Sensing)
Operational Principle : Detects physical, geometric, or material discrepancies—such as dimensions, shapes, weight, orientation, or surface finish—using direct physical contact or non-contact optical/magnetic proximity switches.
Example A (Asymmetrical Pin) : An engine bracket must be installed with the oil port facing upward. A locating dowel pin is mounted on the fixture. If the operator inserts the bracket upside down, the bracket hits the pin and cannot seat, preventing the clamping fixture from closing.
Example B (Optical Thickness Gate) : A sheet metal stamping feed line passes under a photoelectric beam set to exactly 1.5 mm 1.5\text{ mm} 1.5 mm . If two sheets stick together due to oil surface tension (double-sheet feed), the excessive height trips the optical beam and locks the feeder.
2. Fixed-Value Methods (Counting & Quantity Verification)
Operational Principle : Used when an operation requires a fixed, unvarying number of repetitive actions or identical components (e.g., driving exactly four screws, inserting six clips, stamping five holes). The mechanism verifies that the exact predetermined count is satisfied before releasing the part.
Example A (Kitting Trays / Shadow Boxes) : An engine subassembly requires exactly six specialized cylinder head bolts. Rather than taking bolts from a bulk bin (where the operator might forget one), bolts are pre-staged in an ergonomic "egg carton" tray holding exactly six units. If an empty pocket remains in the tray when the engine leaves the station, an omission is instantly evident.
Example B (Optical Pick-to-Light) : An operator must assemble a customized computer chassis. An automated system illuminates green LEDs over the four correct component bins. Each bin has an infrared beam-break sensor. If the operator attempts to pull from an unlit bin, or reaches into Bin 3 only once instead of twice, an alarm sounds and the assembly pallet remains locked.
3. Motion-Step Methods (Sequence Enforcement)
Operational Principle : Enforces a strict, mandatory sequential order of operational steps. Step B B B physically cannot be initiated until Step A A A has been verified as complete and within specification.
Example A (Smart Torque Tool Interlock) : An aircraft technician must torque six wing spar bolts in an alternating star pattern to 85 Nm 85\text{ Nm} 85 Nm . The digital torque wrench communicates with the assembly programmable logic controller (PLC). The socket only energizes on Bolt 1; once 85 Nm 85\text{ Nm} 85 Nm is registered, the PLC unlocks access to Bolt 2. If the technician attempts to torque Bolt 4 out of sequence, the wrench disables drive power.
Example B (Trapped Key Interlocking - Castell System) : To service a high-voltage electrical substation, the technician must first insert Key A into the master power breaker and turn it to OFF. Turning the breaker off physically releases Key B from the switchgear. Key B must then be carried to unlock the access door to the transformer cage. It is physically impossible to open the cage door while power is energized.
Standard Operating Procedures (SOPs) & Standard Work
In many organizations, Standard Operating Procedures (SOPs) are voluminous, dense text binders stored in quality assurance offices that operators consult only when an audit occurs. In Lean Six Sigma, this is replaced by Standard Work .
As Toyota pioneer Taiichi Ohno famously declared:
"Where there is no standard, there can be no Kaizen (continuous improvement)."
Standard Work represents the current single best, safest, and most efficient combination of people, materials, equipment, and methods. It forms the baseline from which all future DMAIC improvements are launched. If a process lacks standard work, process variance is dominated by operator-to-operator inconsistency, making statistical root cause isolation impossible. The Three Core Elements of Standard Work
- TAKT TIME STANDARD WORK SEQUENCE STANDARD IN-PROCESS
- (Operational Heartbeat) (Exact Order of Tasks) STOCK (SWIP)
- ┌─────────────────────┐ ┌───────────────────────┐ ┌─────────────────────┐
- │ Pace of customer │ ────▶ │ Repeatable sequence of│ ───▶ │ Minimum parts needed│
- │ demand: Net Time / │ │ operator movements to │ │ to sustain continuous│
- │ Customer Demand │ │ complete cycle │ │ one-piece flow │
- └─────────────────────┘ └───────────────────────┘ └─────────────────────┘
- The Three Pillars of Standard Work
- 1. Takt Time
Definition : The theoretical pace or rhythm at which a process must produce units to exactly synchronize with the rate of customer demand. Derived from the German word Takt (musical baton/tempo).
Formula : Takt Time = Net Available Operating Time per Period Customer Demand per Period \text{Takt Time} = \frac{\text{Net Available Operating Time per Period}}{\text{Customer Demand per Period}} Takt Time = Customer Demand per Period Net Available Operating Time per Period
Worked Example : A manufacturing cell operates on a single 8-hour shift ( 480 minutes 480\text{ minutes} 480 minutes ). The shift includes two 15-minute paid rest breaks and 10 minutes of scheduled maintenance clean-up: Net Operating Time = 480 − 15 − 15 − 10 = 440 minutes = 26 , 400 seconds \text{Net Operating Time} = 480 - 15 - 15 - 10 = 440 \text{ minutes} = 26,400 \text{ seconds} Net Operating Time = 480 − 15 − 15 − 10 = 440 minutes = 26 , 400 seconds Customer demand is 600 units per shift: Takt Time = 26 , 400 seconds 600 units = 44 seconds/unit \text{Takt Time} = \frac{26,400 \text{ seconds}}{600 \text{ units}} = 44 \text{ seconds/unit} Takt Time = 600 units 26 , 400 seconds = 44 seconds/unit The cell must produce exactly one completed unit every 44 seconds. If cell cycle time is 55 seconds, the company misses customer delivery; if cycle time is 30 seconds, the company overproduces (creating Muda of inventory).
2. Standard Work Sequence
Definition : The exact, highly specific, and unvarying sequential order in which an operator executes tasks within the workstation cycle (walking, picking, loading, machining, inspecting, and unloading).
Preserving a standardized sequence ensures consistent motion economy, prevents ergonomic strain, and guarantees that every unit experiences identical thermal, mechanical, or chemical dwell times.
3. Standard In-Process Stock (SWIP)
Definition : The absolute minimum quantity of unfinished parts (work-in-progress) required inside a cell or workstation to maintain continuous, smooth one-piece flow without operator idle waiting.
In an automated machining cell where machines cycle unattended, SWIP includes the parts currently inside the machines plus the units staged at transfer points: SWIP = ∑ ( Machine Automatic Cycle Time Takt Time ) + Manual Stations \text{SWIP} = \sum \left( \frac{\text{Machine Automatic Cycle Time}}{\text{Takt Time}} \right) + \text{Manual Stations} SWIP = ∑ ( Takt Time Machine Automatic Cycle Time ) + Manual Stations
Visual Work Instructions & 5S Integration
Modern Standard Work relies on Visual Management . Dense paragraphs of text are replaced with graphical Visual Work Instructions (VWIs) posted directly at eye level at the Gemba (the place where value is created). Visual Management at the Workstation
- COLOR CODING PHOTO STANDARDS 5S SHADOW BOARDS
- ┌─────────────────────┐ ┌─────────────────────┐ ┌─────────────────────┐
- │ Green: OK Range │ │ Clear Side-by-Side: │ │ Tool silhouettes cut│
- │ Yellow: Caution │ │ [GOOD] vs [DEFECT]│ │ into foam drawer; │
- │ Red: Critical Out │ │ High-resolution │ │ Missing tool shows │
- │ of Specification │ │ macro photos │ │ bright red backing │
- └─────────────────────┘ └─────────────────────┘ └─────────────────────┘
- Core Elements of Visual Standard Work
Side-by-Side Photo Defect Standards : Showing high-resolution macro photography of acceptable versus unacceptable conditions (e.g., "Good Solder Joint: Smooth concave wetting fillet" vs. "Defective: Cold solder joint, granular dull finish" ).
5S Workplace Organization : Standard work cannot function in clutter. Workbenches utilize Shadow Boards (cutout vinyl silhouettes where every torque wrench, gauge, and safety glove has a dedicated, labeled outline). If a tool is missing, an unmistakable bright red void alerts the team immediately.
Color-Coded Visual Limits : Analog pressure gauges and digital displays feature color-coded vinyl overlays: Green (operating band: 40-60 PSI), Yellow (warning buffer: 35-40, 60-65 PSI), Red (emergency shutdown: < 35 < 35 < 35 , > 65 > 65 > 65 PSI).
Training Matrix & Operator Sign-Off Protocols
To lock in the improvements of the Improve phase across all shifts, organizations maintain a visual Cross-Training Matrix (frequently called the ILUO Matrix ): The ILUO Competency Progression
- 'I' 'L' 'U' 'O'
- ┌─────────┐ ┌─────────┐ ┌─────────┐ ┌─────────┐
- │ │ │ │ │ │ │ │ │ │ │ ┌───┐ │
- │ │ │ │ │ │ │ │ │ │ │ │ │ │
- │ │ │ │ └─── │ │ └───┘ │ │ └───┘ │
- └─────────┘ └─────────┘ └─────────┘ └─────────┘
Trainee: Capable: Independent: Teacher:
- Understands Executes with Operates to takt Master trainer;
- principles assistance consistently audits process
Stage I (Trainee) : Understands the purpose, safety protocols, and basic mechanics of the standard work instruction.
Stage L (Learner / Supervised) : Can execute the task under the direct observation and physical guidance of a designated mentor.
Stage U (Autonomous / Capable) : Executes standard work independently, meeting takt time and zero-defect requirements consistently across full shifts.
Stage O (Trainer / Master) : Demonstrates comprehensive procedural knowledge; capable of training peers, executing Layered Process Audits (LPAs), and identifying opportunities to revise standard work via Kaizen.
Operator Sign-Offs & Layered Process Audits
Before closing the Improve phase and entering Control, every operator assigned to the process must sign an official Standard Work Acknowledgment . Furthermore, supervisors execute daily Layered Process Audits (LPAs) —spending 10 minutes at the workstation asking three core questions:
Is the operator following the standard work sequence?
Are all Poka-Yoke interlocks operational and verified at shift start?
Are takt time and quality tracking charts populated in real time?
Critical Exam Traps to Avoid
Trap 1: Confusing Level 1 (Prevention) with Level 3 (Warning) — Warning buzzers, flashing lights, and pop-up error screens are Level 3 mistake-proofing devices; they rely entirely on human compliance and do not make errors impossible.
Trap 2: Believing Standard Work is Static and Permanent — Standard work is the current baseline for continuous improvement. It is never frozen; it must be continually refined whenever a new Kaizen event discovers a safer or more efficient work sequence.
Trap 3: Misidentifying Fixed-Value Regulatory Mechanisms — Fixed-value methods count discrete items or repetitive operations (e.g., ensuring four screws are installed, or drawing six parts from a kit). They do not measure elapsed time or geometric dimensions.
Trap 4: Equating Takt Time with Cycle Time — Takt time is governed purely by customer demand and available time ; it is an external requirement. Cycle time is the actual speed at which the internal process operates .