Study guide
2.3 First Time Yield (FTY) & Rolled Throughput Yield (RTY)
CSSC Certified Six Sigma Green Belt Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Six Sigma Overview & Exam Fundamentals
1.1 CSSC Certification Overview, Exam Structure & Body of Knowledge 1.2 History & Evolution of Six Sigma 1.3 Six Sigma Organizational Roles & Belts Hierarchy 1.4 The DMAIC Methodology Architecture vs. DMADV / DFSS 1.5 Other Process Improvement & Quality Methods, and When to Choose Six Sigma
2 Chapter 2: Quality Fundamentals & Defect Metrics
2.1 Critical to Quality (CTQ) Characteristics & VOC Translation 2.2 Defect Metrics: DPU, DPO, DPMO, & the 1.5-Sigma Shift 2.3 First Time Yield (FTY) & Rolled Throughput Yield (RTY) 2.4 Cost of Quality (COQ) & Cost of Poor Quality (COPQ)
3 Chapter 3: Lean Principles & Waste Elimination
3.1 Foundations of Lean & The Toyota Production System (TPS) 3.2 The Eight Wastes: CSSC's Seven Muda, TIMWOODS, and Muri/Mura 3.3 The 5S Visual Workplace Methodology 3.4 Value Stream Mapping (VSM), Cycle Time & Takt Time
4 Chapter 4: Project Selection & Team Management
4.1 Six Sigma Project Selection & Business Case Development 4.2 Project Charter Architecture 4.3 Stakeholder Management & Communication Planning 4.4 Team Dynamics & Tuckman's Team Development Stages 4.5 The 15-Point Project Viability Model & Process-Level Selection
5 Chapter 5: Define Phase & Process Mapping
5.1 High-Level Process Mapping with SIPOC 5.2 Flowcharts, Swimlane Diagrams & Process Value Analysis 5.3 Quality Function Deployment (QFD) & The House of Quality 5.4 Critical to Quality (CTQ) Flowdown & Operational Definitions 5.5 The CSSC Define Toolset: Ground Rules, In/Out of the Box, Is–Is Not & Tollgate Checklists
6 Chapter 6: Measure Phase & Measurement Systems
6.1 Data Types: Continuous (Variable) vs. Discrete (Attribute) Data 6.2 Data Collection Planning & Sampling Strategies 6.3 Measurement System Analysis (MSA) Foundations & Calibration 6.4 Variable & Attribute Gage R&R Studies
7 Chapter 7: Analyze Phase & Root Cause Analysis
7.1 Qualitative Root Cause Tools: 5 Whys & Cause-and-Effect (Fishbone) Diagrams 7.2 Failure Mode and Effects Analysis (FMEA) & RPN Calculation 7.3 Pareto Analysis & The 80/20 Rule 7.4 Graphical Data Exploration: Histograms, Box Plots, & Multi-Vari Charts 7.5 The Root Cause Verification Matrix
8 Chapter 8: Descriptive Statistics & Distributions
8.1 Measures of Central Tendency & Dispersion 8.2 The Normal Distribution & The Empirical Rule (68-95-99.7) 8.3 Standard Normal Distribution, Z-Scores & Probability Calculations 8.4 Common Non-Normal Distributions: Binomial, Poisson & Chi-Square
9 Chapter 9: Inferential Statistics & Hypothesis Testing
9.1 Fundamentals of Hypothesis Testing: Null vs. Alternative, Alpha & Beta Risks 9.2 One-Sample and Two-Sample t-Tests for Means 9.3 Paired t-Tests & Non-Parametric Alternatives 9.4 Analysis of Variance (One-Way & Two-Way ANOVA) & Chi-Square Contingency Tests 9.5 Sample Size Determination for Hypothesis Tests
10 Chapter 10: Correlation, Regression, & Experimentation
10.1 Linear Correlation & Pearson's Correlation Coefficient (r) 10.2 Simple Linear Regression & Coefficient of Determination (R^2) 10.3 Introduction to Design of Experiments (DOE) & Factorial Designs 10.4 Analyzing Experimental Results: Main Effects & Interaction Plots
11 Chapter 11: Improve Phase & Solution Implementation
11.1 Brainstorming, Creative Thinking & Solution Selection Matrices 11.2 Piloting Solutions & Conducting Risk Assessments 11.3 Implementation Planning & Change Management (ADKAR) 11.4 Mistake-Proofing (Poka-Yoke) & Standard Work
12 Chapter 12: Control Phase, SPC, & Process Capability
12.1 Statistical Process Control (SPC) & Shewhart Control Rules 12.2 Variable Control Charts: I-MR, X-bar & R, X-bar & S 12.3 Attribute Control Charts: p, np, c, and u Charts 12.4 Process Capability & Performance Indices: Cp, Cpk, Pp, Ppk 12.5 Communicating Statistical Results to Business Audiences
2.3 First Time Yield (FTY) & Rolled Throughput Yield (RTY)
Key Takeaways Explain This Topic AI
Traditional or final yield masks internal scrap and rework by only measuring surviving units at the end of the line, completely concealing the costs and capacity losses of the hidden factory.
First Time Yield (FTY) treats any reworked or repaired unit as a failure, reflecting the true proportion of units that pass a specific process step correctly on the initial attempt.
Rolled Throughput Yield (RTY) is the mathematical product of all individual step first time yields ( R T Y = Y 1 × Y 2 × ⋯ × Y n RTY = Y_1 \times Y_2 \times \dots \times Y_n RT Y = Y 1 × Y 2 × ⋯ × Y n ), exposing the true cumulative probability of error-free processing.
The Poisson yield equation ( Y i e l d = e − D P U Yield = e^{-DPU} Yi e l d = e − D P U ) establishes a direct mathematical bridge between defect counts (DPU) and zero-defect probability under random defect arrival.
Green Belts leverage RTY to locate process bottlenecks, quantify hidden factory capacity drain, and build compelling business cases for root-cause variation reduction.
Last updated: September 2026
2.3 First Time Yield (FTY) & Rolled Throughput Yield (RTY)
Core Principle: Traditional quality reporting relies on Final Yield —the percentage of units that pass final inspection and ship to customers. In modern Six Sigma, Final Yield is viewed as dangerously deceptive because it conceals internal rework loops, repairs, and scrap. To uncover true process performance, Green Belts utilize First Time Yield (FTY) and Rolled Throughput Yield (RTY) to expose the "hidden factory" that drains organizational profitability.
The Fallacy of Final Yield & The Hidden Factory
For decades, manufacturing and service organizations evaluated operational health using Traditional Yield (also called Final Yield ): Final Yield = Units Meeting Final Acceptance Total Units Started \text{Final Yield} = \frac{\text{Units Meeting Final Acceptance}}{\text{Total Units Started}} Final Yield = Total Units Started Units Meeting Final Acceptance
Consider an electronic device assembly line that starts 1,000 units on Monday morning. By Friday afternoon, 950 finished units pass final inspection and ship to customers. Management happily reports a 95% Final Yield . What this metric completely ignores is what transpired between Monday and Friday:
150 units failed Step 2 and were sent to an offline rework station for manual de-soldering.
80 units failed Step 4 testing, were disassembled, re-flashed with firmware, and re-tested twice.
Technicians spent 120 hours of unbudgeted overtime diagnosing intermittent electrical shorts.
This unmeasured, undocumented rework loop is known as the Hidden Factory —a concept formulated by quality pioneer Dr. Armand Feigenbaum.
Loading diagram...
The Severe Costs of the Hidden Factory
Devoured Capacity: Machines and personnel spend 15% to 30% of their operational hours reworking products that should have been produced correctly the first time.
Inflated Work-in-Process (WIP): Large buffers of inventory accumulate around rework stations, increasing carrying costs and extending overall manufacturing lead time.
Latent Defects in the Field: Products that undergo rework and repair suffer from significantly higher field failure rates and warranty claims than products that pass through the process cleanly on the first pass. Rework often damages adjacent components, weakens solder joints, or introduces thermal stress.
First Time Yield (FTY)
To strip away the disguise of the hidden factory, Six Sigma utilizes First Time Yield (FTY) (also known as First Pass Yield ): FTY = Units Entering Step − Scrap − Rework Units Entering Step = Units Passing Initial Inspection with Zero Rework Total Units Entering Step \text{FTY} = \frac{\text{Units Entering Step} - \text{Scrap} - \text{Rework}}{\text{Units Entering Step}} = \frac{\text{Units Passing Initial Inspection with Zero Rework}}{\text{Total Units Entering Step}} FTY = Units Entering Step Units Entering Step − Scrap − Rework = Total Units Entering Step Units Passing Initial Inspection with Zero Rework
Critical Rules of FTY:
Rework is Treated as a Defect: Even if a unit is successfully repaired, calibrated, and eventually made fully functional, it cannot be counted in FTY. If it required human intervention, repair, or a second test cycle, it failed the first pass.
Step-Specific Metric: FTY is calculated for each discrete step in a value stream.
Worked Example of Step FTY:
An insurance claims department processes 500 medical claims through Step 3 (Eligibility Verification):
440 claims pass verification immediately on the first attempt.
35 claims contain missing member IDs, are routed to an administrative queue for manual telephone lookup, and are eventually corrected.
25 claims are permanently rejected and scrapped due to fraudulent policy numbers. Final Step Yield = 440 + 35 500 = 475 500 = 95.0 % \text{Final Step Yield} = \frac{440 + 35}{500} = \frac{475}{500} = 95.0\% Final Step Yield = 500 440 + 35 = 500 475 = 95.0% FTY = 500 − 25 − 35 500 = 440 500 = 88.0 % \text{FTY} = \frac{500 - 25 - 35}{500} = \frac{440}{500} = 88.0\% FTY = 500 500 − 25 − 35 = 500 440 = 88.0%
While final step yield shows 95.0%, the true First Time Yield is only 88.0% . The 7.0% discrepancy represents the hidden factory of claim rework.
Rolled Throughput Yield (RTY)
In any real-world manufacturing or transactional environment, a product or service passes through multiple sequential operations. While each individual step may exhibit a respectable FTY (e.g., 95%), the cumulative probability of a unit passing through all steps without a defect degrades exponentially.
Rolled Throughput Yield (RTY) is the probability that a single unit will pass through an entire multi-step process from start to finish without requiring rework, repair, or scrap.
The Mathematical Formula for RTY
For an n n n -step process, RTY is the mathematical product of the First Time Yields of each individual step: RTY = Y 1 × Y 2 × Y 3 × ⋯ × Y n = ∏ i = 1 n Y i \text{RTY} = Y_1 \times Y_2 \times Y_3 \times \dots \times Y_n = \prod_{i=1}^{n} Y_i RTY = Y 1 × Y 2 × Y 3 × ⋯ × Y n = i = 1 ∏ n Y i
Where:
Y i Y_i Y i = First Time Yield of process step i i i expressed as a decimal.
Loading diagram...
Comprehensive Worked Example: The 5-Step Process
Scenario: A precision medical device manufacturer produces laparoscopic surgical instruments through a five-stage value stream. The Green Belt audits each station and records initial units entering, scrapped units, and units requiring rework:
Process Step Units Entering ( N i n N_{in} N in ) Scrap Units Rework Units Units Passing Cleanly ( N c l e a n N_{clean} N c l e an ) Step First Time Yield ( Y i Y_i Y i )
Step 1: Laser Cutting 1,000 10 30 960 Y 1 = 960 / 1 , 000 = 0.960 Y_1 = 960 / 1,000 = \mathbf{0.960} Y 1 = 960/1 , 000 = 0.960 (96.0%)
Step 2: CNC Machining 960 15 25 920 Y 2 = 920 / 960 = 0.9583 Y_2 = 920 / 960 = \mathbf{0.9583} Y 2 = 920/960 = 0.9583 (95.83%)
Step 3: Ultrasonic Cleaning 920 0 18 902 Y 3 = 902 / 920 = 0.9804 Y_3 = 902 / 920 = \mathbf{0.9804} Y 3 = 902/920 = 0.9804 (98.04%)
Step 4: Sub-Assembly 902 12 45 845 Y 4 = 845 / 902 = 0.9368 Y_4 = 845 / 902 = \mathbf{0.9368} Y 4 = 845/902 = 0.9368 (93.68%)
Step 5: Laser Calibration 845 5 35 805 Y 5 = 805 / 845 = 0.9527 Y_5 = 805 / 845 = \mathbf{0.9527} Y 5 = 805/845 = 0.9527 (95.27%)
(Note: For simplified exam calculations, step yields are often given directly as round percentages. Let us evaluate a canonical exam case where each of the 5 steps has an identical FTY of 95.0%, or 0.950). RTY = Y 1 × Y 2 × Y 3 × Y 4 × Y 5 = 0.95 × 0.95 × 0.95 × 0.95 × 0.95 = ( 0.95 ) 5 \text{RTY} = Y_1 \times Y_2 \times Y_3 \times Y_4 \times Y_5 = 0.95 \times 0.95 \times 0.95 \times 0.95 \times 0.95 = (0.95)^5 RTY = Y 1 × Y 2 × Y 3 × Y 4 × Y 5 = 0.95 × 0.95 × 0.95 × 0.95 × 0.95 = ( 0.95 ) 5 RTY = 0.7738 = 77.38 % \text{RTY} = 0.7738 = \mathbf{77.38\%} RTY = 0.7738 = 77.38%
The Management Eye-Opener:
Management sees a line where each manager reports: "My station runs at 95% yield!"
Final inspection at the end of the line might show 98% because rejected units were reworked offline and pushed through.
Yet only 77.38% of the units started actually navigated the five process steps without encountering an error, scrap event, or rework cycle!
22.62% of the entire production volume was entangled in the hidden factory.
Poisson-Based Yield Calculation from DPU
When a product contains many defect opportunities, defects typically follow a Poisson distribution . The Poisson probability distribution gives the probability of observing exactly x x x defects on a unit when the average defect rate is λ = DPU \lambda = \text{DPU} λ = DPU : P ( x ) = e − DPU × ( DPU ) x x ! P(x) = \frac{e^{-\text{DPU}} \times (\text{DPU})^x}{x!} P ( x ) = x ! e − DPU × ( DPU ) x
In quality engineering, a unit is deemed "defect-free" (yield) only if it contains exactly zero defects ( x = 0 x = 0 x = 0 ): P ( 0 ) = e − DPU × ( DPU ) 0 0 ! = e − DPU × 1 1 = e − DPU P(0) = \frac{e^{-\text{DPU}} \times (\text{DPU})^0}{0!} = \frac{e^{-\text{DPU}} \times 1}{1} = e^{-\text{DPU}} P ( 0 ) = 0 ! e − DPU × ( DPU ) 0 = 1 e − DPU × 1 = e − DPU
This yields the famous Poisson Yield Equation : Yield = e − DPU \text{Yield} = e^{-\text{DPU}} Yield = e − DPU
Where:
e e e = Mathematical constant (Euler's number ≈ 2.71828 \approx 2.71828 ≈ 2.71828 ).
DPU \text{DPU} DPU = Defects Per Unit.
Calculating Yield from DPU
If an automotive paint line has a baseline defect rate of DPU = 0.05 \text{DPU} = 0.05 DPU = 0.05 defects per car body: Yield = e − 0.05 ≈ 0.9512 = 95.12 % \text{Yield} = e^{-0.05} \approx 0.9512 = \mathbf{95.12\%} Yield = e − 0.05 ≈ 0.9512 = 95.12%
If the process is a complex avionics module with DPU = 0.40 \text{DPU} = 0.40 DPU = 0.40 defects per module: Yield = e − 0.40 ≈ 0.6703 = 67.03 % \text{Yield} = e^{-0.40} \approx 0.6703 = \mathbf{67.03\%} Yield = e − 0.40 ≈ 0.6703 = 67.03%
Inverting the Formula: Finding DPU from Observed Yield
Green Belts frequently know the empirical yield and need to determine the underlying DPU. Taking the natural logarithm ( ln \ln ln ) of both sides: ln ( Yield ) = ln ( e − DPU ) = − DPU \ln(\text{Yield}) = \ln(e^{-\text{DPU}}) = -\text{DPU} ln ( Yield ) = ln ( e − DPU ) = − DPU DPU = − ln ( Yield ) \text{DPU} = -\ln(\text{Yield}) DPU = − ln ( Yield )
Example: An audit of 5,000 software code modules reveals that 92.0% pass static security analysis without any vulnerabilities ( Yield = 0.920 \text{Yield} = 0.920 Yield = 0.920 ). What is the underlying DPU? DPU = − ln ( 0.920 ) = − ( − 0.0834 ) = 0.0834 defects per module \text{DPU} = -\ln(0.920) = -(-0.0834) = \mathbf{0.0834} \text{ defects per module} DPU = − ln ( 0.920 ) = − ( − 0.0834 ) = 0.0834 defects per module
Combining Multi-Step Processes via DPU
Because exponents add when multiplying like bases ( e a × e b = e a + b e^a \times e^b = e^{a+b} e a × e b = e a + b ), Rolled Throughput Yield across n n n steps can be calculated directly by summing step DPUs: RTY = e − DPU 1 × e − DPU 2 × ⋯ × e − DPU n = e − ∑ i = 1 n DPU i = e − DPU total \text{RTY} = e^{-\text{DPU}_1} \times e^{-\text{DPU}_2} \times \dots \times e^{-\text{DPU}_n} = e^{-\sum_{i=1}^n \text{DPU}_i} = e^{-\text{DPU}_{\text{total}}} RTY = e − DPU 1 × e − DPU 2 × ⋯ × e − DPU n = e − ∑ i = 1 n DPU i = e − DPU total
This mathematical property makes DPU exceptionally powerful: while individual step yields must be multiplied, step defect rates (DPU) can simply be added !
How Green Belts Leverage RTY in DMAIC Projects
Pinpointing Value Stream Bottlenecks: In the Measure and Analyze phases, calculating FTY at each station immediately highlights which process step is driving the degradation of overall RTY.
Building the Business Case: Executive sponsors often resist funding Six Sigma projects when final inspection yield appears high (e.g., 97%). Showing that true RTY is 68% demonstrates that 32% of operational capacity is trapped in the hidden factory, immediately justifying capital investment.
Validating Real Process Improvements: In the Improve phase, Green Belts track RTY to verify that an improvement at Step 2 did not inadvertently push defects downstream to Step 4.
Common Exam Traps
Trap 1: Adding Step Yields Instead of Multiplying. When computing RTY for a 3-step process with 90%, 90%, and 90% yields, never add them ( 90 + 90 + 90 ) / 3 = 90 % (90 + 90 + 90) / 3 = 90\% ( 90 + 90 + 90 ) /3 = 90% . RTY is a compound probability: 0.90 × 0.90 × 0.90 = 0.729 = 72.9 % 0.90 \times 0.90 \times 0.90 = 0.729 = 72.9\% 0.90 × 0.90 × 0.90 = 0.729 = 72.9% .
Trap 2: Counting Reworked Units in First Time Yield. If 100 units enter a step, 10 are scrapped, 15 are repaired and passed, and 75 pass cleanly, the FTY is 75 / 100 = 75 % 75 / 100 = 75\% 75/100 = 75% , NOT 90 / 100 = 90 % 90 / 100 = 90\% 90/100 = 90% .
Trap 3: Linear Subtraction Instead of Poisson Yield. If asked to find yield when DPU = 0.15 \text{DPU} = 0.15 DPU = 0.15 , do not simply calculate 1 − 0.15 = 0.85 1 - 0.15 = 0.85 1 − 0.15 = 0.85 (85%). The exact Poisson yield is e − 0.15 = 0.8607 e^{-0.15} = 0.8607 e − 0.15 = 0.8607 (86.07%). Linear subtraction ignores defect clustering.