Study guide
Waste Elimination Tools
ASQ Certified Six Sigma Green Belt CSSGB
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
CSSGB Exam Facts & Logistics How to Study for an Open-Book ASQ Exam
2 Six Sigma Foundations
Value of Six Sigma & Quality Leaders Organizational Goals & Six Sigma Projects Organizational Drivers, KPIs & Scorecards
3 Lean Principles in the Organization
Lean Concepts Value Stream Mapping & Waste
4 Design for Six Sigma
DFSS Road Maps: DMADV & IDOV FMEA Basics & Risk Priority Number Design FMEA vs Process FMEA
5 Define: Project Identification
Project Selection & DMAIC Fit Process Elements & Boundaries Benchmarking Types SIPOC & Process Inputs/Outputs
6 Stakeholders & Voice of the Customer
Owners & Stakeholders Customer Identification Customer Data Collection CTQ, QFD & Kano
7 Project Management Core
Agile & Top-Down Project Methods Project Charter & Problem Statements Project Scope Tools Primary & Consequential Metrics
8 Planning, Risk & Closure
WBS, Gantt, CPM, PERT & Tollgates Project Documentation Project Risk Analysis & Management Project Closure & Lessons Learned
9 Management Tools & Business Results
Eight Management & Planning Tools DPU, RTY, CoPQ, DPMO & Sigma Level Organizational Communication
10 Team Dynamics & Performance
Team Stages & Negative Dynamics Six Sigma Roles & RACI Brainstorming, NGT & Multivoting Team Communication
11 Measure: Process & Probability
Process Maps & Documentation Basic Probability Concepts Central Limit Theorem
12 Distributions & Data Collection
Statistical Distributions Data Types & Measurement Scales Sampling & Data Collection Plans Descriptive Statistics
13 Graphical Methods & MSA
Graphical Methods Measurement System Analysis & Gage R&R Bias, Linearity, Stability & P/T
14 Process & Performance Capability
Process Performance vs Specifications Process Capability Studies Cp, Cpk, Pp, Ppk & Cpm Short-Term vs Long-Term Capability & Sigma Shift
15 Analyze: Exploratory Data Analysis
Multi-Vari Studies Correlation & Linear Regression
16 Hypothesis Testing
Hypothesis Testing Basics Tests for Means, Variances & Proportions
17 Gap & Root Cause Analysis
Gap Analysis Root Cause Analysis Tools
18 Design of Experiments
DoE Basic Terms Main Effects & Interaction Plots
19 Implementation Planning & Lean Tools
Implementation Planning & Pilots Waste Elimination Tools Cycle-Time Reduction & SMED Kaizen & Kaizen Blitz
20 Statistical Process Control
SPC Basics: Common vs Special Cause Rational Subgrouping Control Chart Selection & Construction
21 Sustaining Improvements & Lean Control
Control Plans Document Control, Training & Audits Plan-Do-Check-Act (PDCA) TPM & Visual Factory
Waste Elimination Tools
Key Takeaways Explain This Topic AI
Pull systems produce only when the downstream process signals demand, reducing overproduction and inventory.
Kanban is a visual pull signal (card, bin, electronic) that authorizes replenishment within defined limits.
5S (Sort, Set in order, Shine, Standardize, Sustain) creates organized workplaces that expose waste and defects.
Standard work documents the current best method—sequence, timing, and work-in-process—so variation drops.
Poka-yoke (error-proofing) prevents defects or makes them immediately obvious so they cannot proceed.
Last updated: July 2026
Waste Elimination Tools (CSSGB BoK V.C.1 — Apply)
Quick Answer: Core lean tools that cut waste include pull systems and kanban (stop overproduction), 5S (organize the workplace), standard work (stabilize the method), and poka-yoke (error-proof processes). Green Belts apply these tools in Improve once root causes show waste or error-prone steps.
BoK V.C.1 is at the Apply level: match the tool to the problem—overproduction, disorganized workplaces, method variation, or human error—not memorize slogans alone.
Pull Systems
A pull system authorizes production or movement only when the downstream process (or customer) signals need. Contrast with push , where upstream makes to a schedule or forecast and often floods the next step with WIP.
- Attribute Push Pull
- Trigger Forecast/schedule Downstream signal
- Typical waste Overproduction, inventory Controlled WIP
- Visibility Hidden queues Signals and limits visible
- Quality feedback Delayed (large batches) Faster (smaller lots)
Pull reduces overproduction —often the worst TIMWOOD waste—and shortens lead time. Prerequisites include reasonably stable quality, known takt or demand, and enough process reliability that empty buffers are not constant crisis.
Supermarket pull: a controlled inventory of finished or intermediate items; downstream withdraws; upstream replenishes only what was taken, up to a max level.
Kanban
Kanban is a signal (card, empty bin, electronic message, square on the floor) that authorizes replenishment or production. Classic rules (simplified):
Downstream process withdraws only what it needs.
Upstream produces only what the kanban authorizes.
No items move without a kanban (no “extras”).
Kanban quantity and number of cards set WIP limits .
Defective product is not passed with a kanban.
Types (exam-level)
Production kanban: tells a process to make more.
Withdrawal (conveyance) kanban: authorizes moving material from a supermarket or prior process.
Signal / triangle kanban: used for batch processes (e.g., start a lot when stock hits a trigger).
Worked sketch
If average daily demand is 100 units, replenishment lead time is 2 days, and safety stock is 20 units, rough kanban inventory target might be on the order of demand × lead time + safety ≈ 220 units, then divided into container sizes to set card count. Exact formulas vary by system; the exam concept is that kanban sets a finite WIP and links production to consumption .
Exam tip: kanban is a pull mechanism ; “implement kanban” without defining signals and limits is incomplete.
5S
5S organizes the workplace so waste and abnormalities are visible:
- S Japanese (common) Meaning Actions
- 1 Seiri Sort Remove unneeded items
- 2 Seiton Set in order Place for items; labels; point-of-use
- 3 Seiso Shine Clean and inspect while cleaning
- 4 Seiketsu Standardize Rules, checklists, visuals so 1–3 stick
- 5 Shitsuke Sustain Audits, habits, leadership follow-through
5S is not only housekeeping. Sort and Set reduce motion and search time ; Shine reveals leaks and defects; Standardize/Sustain prevent backsliding. Red-tag campaigns, shadow boards, floor marking, and audit scores are common practices.
Trap: treating 5S as a one-time cleanup event without Sustain—gains reverse within weeks.
Standard Work
Standard work documents the current best known method : work sequence, takt or target cycle time, and standard WIP. It is the baseline for training and for further kaizen—not a rigid forever rule that forbids improvement.
Elements often include:
Sequence of steps (and quality checks).
Timing (cycle time vs takt).
Standard in-process inventory.
Layout and key points (safety, quality, knacks).
Without standard work, each operator invents a method → variation , harder root-cause analysis, and unstable pilots. With standard work, deviations are visible and improvements can be locked into Control.
Relationship: 5S supports standard work by making tools and materials consistently available; standard work embeds the improved process after pull or poka-yoke is introduced.
Poka-Yoke (Error-Proofing)
Poka-yoke designs the process so mistakes are prevented or detected immediately before they become customer defects. Types:
Type Intent Examples
Prevention Make the wrong action impossible Asymmetric connectors; fixture that only accepts correct orientation; required field before save
Detection / warning Alert or stop when error occurs Sensor that stops the line if a part is missing; barcode scan that blocks wrong SKU
Shigeo Shingo’s error-proofing philosophy prefers designing out human reliance on “be more careful.” Inspection that only sorts good from bad after the fact is weaker than poka-yoke at the source.
Green Belt applications
Service: forced choice drop-downs, dual-entry for critical numbers, checklist that blocks incomplete tickets.
Manufacturing: pin locations, color coding, torque tools that click only at spec, interlocks.
Healthcare/admin: barcode matching, hard stops for allergy conflicts.
Link to FMEA: high RPN human-error modes are prime poka-yoke candidates.
Choosing Tools on the Exam
- Symptom Likely tool
- Upstream piles inventory “just in case” Pull / kanban
- Searching for tools; cluttered benches 5S
- Every operator does steps differently Standard work
- Recurring wrong-part / wrong-data human errors Poka-yoke
- Need both flow and fewer defects Combine pull + standard work + error-proofing
Integration with DMAIC: Measure/Analyze show waste and error modes; Improve installs pull, 5S, standard work, and poka-yoke; Control audits 5S, monitors kanban discipline, and updates standard work when better methods emerge.
Master these five tools as a set: pull and kanban attack flow waste; 5S and standard work stabilize the workplace and method; poka-yoke attacks defect waste at the source.