Study guide
Control Chart Selection & Construction
ASQ Certified Six Sigma Green Belt CSSGB
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
CSSGB Exam Facts & Logistics How to Study for an Open-Book ASQ Exam
2 Six Sigma Foundations
Value of Six Sigma & Quality Leaders Organizational Goals & Six Sigma Projects Organizational Drivers, KPIs & Scorecards
3 Lean Principles in the Organization
Lean Concepts Value Stream Mapping & Waste
4 Design for Six Sigma
DFSS Road Maps: DMADV & IDOV FMEA Basics & Risk Priority Number Design FMEA vs Process FMEA
5 Define: Project Identification
Project Selection & DMAIC Fit Process Elements & Boundaries Benchmarking Types SIPOC & Process Inputs/Outputs
6 Stakeholders & Voice of the Customer
Owners & Stakeholders Customer Identification Customer Data Collection CTQ, QFD & Kano
7 Project Management Core
Agile & Top-Down Project Methods Project Charter & Problem Statements Project Scope Tools Primary & Consequential Metrics
8 Planning, Risk & Closure
WBS, Gantt, CPM, PERT & Tollgates Project Documentation Project Risk Analysis & Management Project Closure & Lessons Learned
9 Management Tools & Business Results
Eight Management & Planning Tools DPU, RTY, CoPQ, DPMO & Sigma Level Organizational Communication
10 Team Dynamics & Performance
Team Stages & Negative Dynamics Six Sigma Roles & RACI Brainstorming, NGT & Multivoting Team Communication
11 Measure: Process & Probability
Process Maps & Documentation Basic Probability Concepts Central Limit Theorem
12 Distributions & Data Collection
Statistical Distributions Data Types & Measurement Scales Sampling & Data Collection Plans Descriptive Statistics
13 Graphical Methods & MSA
Graphical Methods Measurement System Analysis & Gage R&R Bias, Linearity, Stability & P/T
14 Process & Performance Capability
Process Performance vs Specifications Process Capability Studies Cp, Cpk, Pp, Ppk & Cpm Short-Term vs Long-Term Capability & Sigma Shift
15 Analyze: Exploratory Data Analysis
Multi-Vari Studies Correlation & Linear Regression
16 Hypothesis Testing
Hypothesis Testing Basics Tests for Means, Variances & Proportions
17 Gap & Root Cause Analysis
Gap Analysis Root Cause Analysis Tools
18 Design of Experiments
DoE Basic Terms Main Effects & Interaction Plots
19 Implementation Planning & Lean Tools
Implementation Planning & Pilots Waste Elimination Tools Cycle-Time Reduction & SMED Kaizen & Kaizen Blitz
20 Statistical Process Control
SPC Basics: Common vs Special Cause Rational Subgrouping Control Chart Selection & Construction
21 Sustaining Improvements & Lean Control
Control Plans Document Control, Training & Audits Plan-Do-Check-Act (PDCA) TPM & Visual Factory
Control Chart Selection & Construction
Key Takeaways Explain This Topic AI
Select the chart from data type (variables vs attribute), then subgroup size and whether sample size (area of opportunity) is constant.
Variables: I-MR for n = 1; X-bar/R for small n (about 2–9); X-bar/s for larger n; median charts are a robust alternative for small n.
Attribute defectives: np if n constant, p if n varies; defects: c if opportunity constant, u if opportunity varies.
Construction: time-ordered data, centerline from process average, control limits from process variation formulas (often ±3σ of the plotted statistic), dual charts for variables (location + dispersion).
Use decision tables and selection scenarios on the exam—do not default to X-bar/R for every problem.
Last updated: July 2026
Control Chart Selection & Construction (CSSGB BoK VI.A.3 — Apply)
Quick Answer: Choose the chart from data type → subgroup size / constant n → defectives vs defects . Variables: I-MR (n=1), X-bar/R (small n), X-bar/s (larger n), median (small-n alternative). Attributes: p/np for defectives; c/u for defects. Construct with time order, process-based centerline, and process-based control limits; use location and dispersion charts together for variables data.
Decision Table — Which Chart?
- Data Subgroup / sample structure Chart
- Continuous measurements n = 1 (one value per period) I-MR (XmR) — Individuals & Moving Range
- Continuous Small subgroup, typically 2 ≤ n ≤ 9 X-bar and R
- Continuous Larger subgroup, typically n ≥ 10 X-bar and s
- Continuous Small n; want resistance to outliers Median (with range) chart
- Fraction / % nonconforming (defectives) Sample size n varies p chart
- Count of defectives Sample size n constant np chart
- Count of defects (flaws) Area of opportunity constant c chart
- Defects per unit (or per area) Area of opportunity varies u chart
Defectives vs defects:
Defective unit = whole item fail/pass (one decision per unit).
Defect = countable nonconformity; one unit can have many defects.
- Variables Charts — Construction Essentials
- X-bar and R (X̄–R)
Use when: continuous CTQ, rational subgroups of small n (often 3–5 in practice).
Plot:
- X-bar chart: subgroup averages vs time
- R chart: subgroup ranges vs time
Typical limits (constants from tables):
- X-bar: CL = X̿ , UCL/LCL = X̿ ± A₂R̄
- R: CL = R̄ , UCL = D₄R̄ , LCL = D₃R̄ (LCL may be 0 for small n)
Order of use: Evaluate the R chart first . If ranges are out of control, the within-σ estimate is unstable—do not trust X-bar limits until dispersion is stable.
X-bar and s (X̄–s)
Use when: continuous data with larger n (commonly n ≥ 10) so the sample standard deviation is a better dispersion statistic than R.
Plot: X-bar and s (subgroup sample SD).
Limits: X̿ ± A₃s̄ for averages; B₄s̄ / B₃s̄ style limits for s (table constants). Same philosophy as X̄–R with s replacing R.
I-MR / XmR (Individuals and Moving Range)
Use when: n = 1—batch processes, expensive tests, one reading per day, accounting metrics, or no natural rational subgroup.
Plot:
- I chart: each individual xᵢ
- MR chart: moving range MRᵢ = |xᵢ − xᵢ₋₁| (usually span 2)
Typical limits:
- I: CL = X̄ , UCL/LCL = X̄ ± E₂MR̄ (equivalently X̄ ± 3(MR̄/d₂) with d₂ ≈ 1.128 for MR of 2)
- MR: CL = MR̄ , UCL = D₄MR̄
Caution: Individuals charts are more sensitive to non-normality than X-bar charts (averages normalize by CLT). Still the correct default when n = 1.
Median Chart
Use when: small subgroup size and you want a location statistic less pulled by outliers than the mean, or when calculation simplicity on the floor matters.
Plot: subgroup median (and usually range). Slightly less statistically efficient than X-bar under normality, but Apply-level recognition: it is a valid variables option for small n—not the first default when X-bar is fine.
- Attribute Charts — Construction Essentials
- p Chart (fraction nonconforming)
- Statistic: p̂ = (defectives in sample) / n
Use when: each unit is good/bad and n may change by period.
Limits: CL = p̄ , UCL/LCL = p̄ ± 3√[p̄(1−p̄)/nᵢ] — limits step when nᵢ changes.
np Chart
Statistic: number of defectives in the sample (np).
Use when: defectives data and n is constant .
Limits: based on n and p̄; simpler communication (“how many bad in each sample of 50”).
c Chart
Statistic: count of defects in a constant opportunity (e.g., defects per 100 m of cable, flaws per identical panel).
Limits: CL = c̄ , UCL/LCL = c̄ ± 3√c̄ (Poisson model). LCL floored at 0 when negative.
u Chart
Statistic: u = defects / opportunity size (defects per unit, per m², etc.) when opportunity varies .
Limits: ū ± 3√(ū/nᵢ) with nᵢ = opportunity size—limits vary with nᵢ.
- Construction Checklist (All Charts)
- Operational definition of the CTQ and of “defective” or “defect.”
Time-ordered sampling with rational subgroups (or n = 1 honestly).
Collect a baseline (often 20–25 subgroups for variables charts—follow your org’s standard).
Compute CL and trial control limits from process data.
Remove special-cause points only with cause identified (or stratify), then revise limits if policy allows.
Extend limits for ongoing control; react to signals with defined actions.
- Never set control limits equal to specs “to make the chart look customer-focused.”
- Worked Selection Scenarios
Scenario 1: Hourly, measure the diameter of four consecutive shafts from one lathe.
→ X-bar and R (continuous, small n = 4).
Scenario 2: One hardness reading per heat-treated batch; batches are sequential.
→ I-MR (n = 1).
Scenario 3: Each shift inspects exactly 200 switches; record how many fail continuity.
→ np chart (defectives, constant n). A p chart also works; np is natural when n fixed.
Scenario 4: Daily inspection sample size varies (80–150 claims); track fraction with coding errors.
→ p chart (defectives, varying n).
Scenario 5: Count paint defects on each identical door panel (same area every time).
→ c chart (defects, constant opportunity).
Scenario 6: Count scratches on glass sheets of different areas ; report defects per m².
→ u chart (defects, varying opportunity).
Scenario 7: Subgroups of n = 12 thickness readings per roll.
→ X-bar and s (continuous, larger n).
Scenario 8: Small n = 3; floor staff already plot medians and want outlier resistance.
→ Median and range chart is acceptable; X-bar/R remains the more common efficient choice if means are fine.
Using Charts (Apply Behaviors)
R or s (or MR) out of control → investigate variation sources (tool wear scatter, measurement, mixture) before over-interpreting averages.
X-bar or I out of control with stable dispersion → mean shift: setup, material lot, temperature, method change.
p or np rise → more defectives: process or incoming quality change.
c or u rise → more defects per opportunity: handling, contamination, process chaos.
After a sustained process improvement , recalculate limits so charts monitor the new common-cause system—not the old, worse baseline forever.
Common Selection Traps
- Trap Fix
- Using X-bar/R when only one measurement exists I-MR
- Using c chart when sheet size changes u chart
- Using np when daily n changes p chart
- Calling every flaw a “defective” without a unit-level pass/fail rule Define defect vs defective
- Plotting % defective on an X-bar chart without subgroup logic Use p/np
- Setting UCL at USL Separate control from specs
- Bottom Line for VI.A.3
Apply means you can walk from a process description to the right chart and know what to plot and why. Memorize the decision table: variables vs attribute, n = 1 vs small vs large n, constant vs varying opportunity, defectives vs defects. Construct with process-based limits, keep dual variables charts in the correct analysis order, and use signals to drive the right investigation.