Study guide

Document Control, Training & Audits

ASQ Certified Six Sigma Green Belt CSSGB

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Exam Overview

CSSGB Exam Facts & Logistics How to Study for an Open-Book ASQ Exam

2 Six Sigma Foundations

Value of Six Sigma & Quality Leaders Organizational Goals & Six Sigma Projects Organizational Drivers, KPIs & Scorecards

3 Lean Principles in the Organization

Lean Concepts Value Stream Mapping & Waste

4 Design for Six Sigma

DFSS Road Maps: DMADV & IDOV FMEA Basics & Risk Priority Number Design FMEA vs Process FMEA

5 Define: Project Identification

Project Selection & DMAIC Fit Process Elements & Boundaries Benchmarking Types SIPOC & Process Inputs/Outputs

6 Stakeholders & Voice of the Customer

Owners & Stakeholders Customer Identification Customer Data Collection CTQ, QFD & Kano

7 Project Management Core

Agile & Top-Down Project Methods Project Charter & Problem Statements Project Scope Tools Primary & Consequential Metrics

8 Planning, Risk & Closure

WBS, Gantt, CPM, PERT & Tollgates Project Documentation Project Risk Analysis & Management Project Closure & Lessons Learned

9 Management Tools & Business Results

Eight Management & Planning Tools DPU, RTY, CoPQ, DPMO & Sigma Level Organizational Communication

10 Team Dynamics & Performance

Team Stages & Negative Dynamics Six Sigma Roles & RACI Brainstorming, NGT & Multivoting Team Communication

11 Measure: Process & Probability

Process Maps & Documentation Basic Probability Concepts Central Limit Theorem

12 Distributions & Data Collection

Statistical Distributions Data Types & Measurement Scales Sampling & Data Collection Plans Descriptive Statistics

13 Graphical Methods & MSA

Graphical Methods Measurement System Analysis & Gage R&R Bias, Linearity, Stability & P/T

14 Process & Performance Capability

Process Performance vs Specifications Process Capability Studies Cp, Cpk, Pp, Ppk & Cpm Short-Term vs Long-Term Capability & Sigma Shift

15 Analyze: Exploratory Data Analysis

Multi-Vari Studies Correlation & Linear Regression

16 Hypothesis Testing

Hypothesis Testing Basics Tests for Means, Variances & Proportions

17 Gap & Root Cause Analysis

Gap Analysis Root Cause Analysis Tools

18 Design of Experiments

DoE Basic Terms Main Effects & Interaction Plots

19 Implementation Planning & Lean Tools

Implementation Planning & Pilots Waste Elimination Tools Cycle-Time Reduction & SMED Kaizen & Kaizen Blitz

20 Statistical Process Control

SPC Basics: Common vs Special Cause Rational Subgrouping Control Chart Selection & Construction

21 Sustaining Improvements & Lean Control

Control Plans Document Control, Training & Audits Plan-Do-Check-Act (PDCA) TPM & Visual Factory

Document Control, Training & Audits

Key Takeaways Explain This Topic AI

Document control ensures only current, approved procedures and standards are used so improved methods do not silently erode.

Training plans close the skills gap created by new standards, tools, and reaction procedures; verify competence, not attendance alone.

First-party audits are internal self-checks; second-party audits are customer or supplier assessments; third-party audits are independent certification or regulatory assessments.

Audits verify that documented controls are followed in practice and that nonconformances lead to corrective action.

Sustainment fails when documents are uncontrolled, training is incomplete, or audit findings never feed improvement.

Last updated: July 2026

Document Control, Training & Audits (CSSGB BoK VI.B.2–4)

Quick Answer: After improvements, document control keeps only approved current standards in use; training plans build competence on new methods and reaction procedures; audits verify that the system is followed. Know first-party (internal), second-party (customer/supplier), and third-party (independent) audits at the Remember level, and apply document and training practices to sustain Control-phase gains.

Control plans fail in practice when the wrong revision sits at the workstation, operators never practiced the new standard, or nobody checks whether the control system is actually used. VI.B.2–4 cover the sustainment infrastructure around the control plan.

Document Control for Sustainment (VI.B.2)

Document control is the system that creates, reviews, approves, distributes, revises, and retires process documents so people always work from the current authorized version.

Documents that commonly enter control after a Six Sigma project include:

  • Work instructions and standard operating procedures (SOPs)
  • Control plans and reaction plans
  • Visual standards and limit samples (with controlled masters)
  • Forms, checklists, and data-collection sheets
  • Process maps and setup sheets tied to the improved method
  • Training materials that describe the official method
  • Why Document Control Matters

Without control:

Old revisions reappear as “shadow” copies at desks and shared drives.

Two shifts run two different methods.

Auditors find the controlled copy online while the floor uses last year’s printout.

Improvements silently reverse because the obsolete method is easier or more familiar.

Core Document-Control Practices

Unique identification — document number, title, and revision level on every controlled page or electronic record.

Approval authority — defined roles for author, reviewer, and approver (often process owner and quality).

Effective date — clear start of the new revision and retirement of the prior one.

Distribution and access — ensure users can get the current version; remove or mark obsolete copies.

Change control — request, impact review, approval, and communication for revisions.

Retention and archive — keep historical revisions as required by policy or regulation, clearly marked obsolete.

Master list / document register — single source listing current revision of each controlled document.

Electronic systems (PLM, QMS portals, controlled wikis) help, but discipline matters more than software. A laminated card with the wrong revision is still a document-control failure.

Link to the Control Plan

The control plan should reference controlled document numbers for SOPs, charts, and reaction instructions. When the process changes, update both the control plan and the related work instructions under the same change-control process.

Training Plans (VI.B.3)

New standards only work if people can execute them. A training plan defines who must learn what, by when, to what competence level, and how effectiveness is verified.

Training Plan Elements

  • Element Content
  • Audience Roles affected (operators, inspectors, supervisors, support staff)
  • Learning objectives Observable skills: run the chart, apply the poka-yoke, execute the reaction plan
  • Content Linked to controlled documents and real tools/screens
  • Method Classroom, e-learning, on-the-job, simulation, side-by-side coaching
  • Trainer Qualified trainer or process expert
  • Schedule Timing before go-live and for new hires afterward
  • Competence verification Quiz, observed demonstration, first-article success, audit of work
  • Records Who was trained, when, on which revision, result of verification
  • Training Beyond Kickoff

Sustainment training includes:

  • Initial rollout before or at process change cutover
  • New-hire and transfer training so turnover does not erase gains
  • Refresher training after audit findings, process drifts, or major revisions
  • Cross-training where coverage gaps would force use of untrained substitutes

Attendance alone is weak evidence. Prefer demonstrated competence on the actual task and reaction scenario. For chart-based controls, operators should know how to plot or read signals and what to do when a rule is broken—not only that “we have an X-bar chart.”

  • Common Training Failure Modes
  • Training completed on a draft procedure that later changed without re-training
  • Supervisors trained but night-shift operators not trained
  • Reaction plans taught verbally without practice
  • No training record, so audits cannot confirm readiness
  • Training treated as a project checkbox rather than a living onboarding requirement
  • Audits (VI.B.4) — First, Second, and Third Party

Audits are systematic, independent (relative to the work being checked), and documented examinations of whether activities comply with planned arrangements and whether those arrangements are effective. In Control, audits confirm that documented controls and training are real on the floor.

Party Types (Remember Level)

Type Who performs it Typical purpose

First-party audit The organization audits itself (internal audit) Self-check of QMS/process compliance; prepare for external audits; drive internal corrective action

Second-party audit A customer audits a supplier, or a company audits its supplier Assess supplier capability/compliance; contractual or supply-chain assurance

Third-party audit An independent external body (certification body, regulator) Certification (e.g., ISO 9001), regulatory compliance, unbiased external assurance

Remember the labels:

First = self (internal).

Second = other interested business party in the chain (customer/supplier relationship).

Third = independent outsider.

Audit Focus in Sustainment

Green Belts and process owners use audits to ask:

Is the current controlled revision at the point of use?

Are control-plan frequencies and methods followed?

Do operators know and use reaction plans?

Are training records complete for people doing the job?

Do nonconformances produce corrective actions that stick?

Layered process audits (LPAs) are short, frequent checks by multiple management layers that standards are followed—often weekly or daily micro-audits rather than annual system audits. They support sustainment even when not named as a separate BoK leaf.

Audit Findings and Follow-Through

Audits create value only when findings lead to containment (if needed), root cause, corrective action, and verification of effectiveness. A filing cabinet of open findings is not a control system. Connect audit results back to document updates, retraining, and control-plan revisions.

How the Three Work Together

Document control freezes the improved method as the official standard.

Training builds competence to execute that standard and the reaction plan.

Audits verify that people use the current standard and that the control system works.

Gaps trigger corrective action, document change, and retraining—closing the loop with PDCA.

Skip any one of the three and sustainment weakens: uncontrolled documents train people on the wrong method; perfect documents without training create paper compliance; training without audits allows silent drift.

Exam Focus

Document control: current revision, approval, obsolete removal, change control.

Training: plan elements and competence verification, not attendance theater.

Audits: correctly classify first-, second-, and third-party scenarios (Remember).

Scenarios may ask which sustainment gap caused a regression after a successful pilot.

Key takeaway: Lock improvements with controlled documents, competent trained people, and audits that verify practice—and know who is auditing whom when first-, second-, or third-party labels appear.