Study guide

1.3 Closed-Book Study Strategy for CON 3990V

DAWIA DoD Contracting Professional Certification CON 3990V

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Exam Overview

1.1 Current Exam Facts & Logistics 1.2 Certification Path, Eligibility & Retakes 1.3 Closed-Book Study Strategy for CON 3990V

2 FAR System & Regulatory Map

2.1 FAR Structure, Authority & Hierarchy (Part 1) 2.2 Definitions & Key Terms (Part 2) 2.3 FAR Part Title Map for CON 3990V

3 Guiding Principles: Skills, Roles & Situational Assessment

3.1 Skills and Roles Across the Contract Lifecycle 3.2 Business Acumen for Contracting Decisions 3.3 Situational Assessment & Lessons Learned

4 Guiding Principles: Contract Principles

4.1 Core Contracting Principles 4.2 Competition, Integrity & Transparency Principles 4.3 Terms, Conditions & Contract Formation Fundamentals

5 Ethics, Teams & Communication

5.1 Standards of Conduct & Conflicts of Interest (FAR Part 3) 5.2 Team Dynamics in Acquisition Teams 5.3 Communication and Documentation Best Practices

6 Pre-Award: Plan Solicitation

6.1 Acquisition Planning (FAR Part 7) 6.2 Market Research (FAR Part 10) 6.3 Competition Requirements & JOFOCs (FAR Part 6)

7 Pre-Award: Sources, Commercial & Simplified

7.1 Publicizing Contract Actions (FAR Part 5) 7.2 Required Sources of Supplies and Services (FAR Part 8) 7.3 Commercial Acquisition & Simplified Procedures (Parts 12 & 13)

8 Pre-Award: Request Offers & Seller Awareness

8.1 Building the Solicitation Package 8.2 Requesting Offers: Methods, Evaluation Factors & Clauses 8.3 Seller Planning, Offer Preparation & DFARS Awareness

9 Socioeconomic Programs & Small Business

9.1 Small Business Programs & Set-Asides (FAR Part 19) 9.2 Socioeconomic Preferences & Rule of Two 9.3 Pre-Award Small Business Subcontracting Considerations

10 Award Foundations: Contract Types

10.1 Fixed-Price Contract Types (FAR Part 16) 10.2 Cost-Reimbursement & Hybrid Types 10.3 Selecting & Documenting Contract Type

11 Award: Price & Cost Analysis

11.1 Price Analysis Techniques 11.2 Cost Analysis, Certified Cost or Pricing Data & TINA/TCPD 11.3 Cost Realism & Fair and Reasonable Pricing

12 Award: Negotiation & Source Selection

12.1 Planning Negotiations & Pre-Negotiation Objectives 12.2 Source Selection Methods & Competitive Range (FAR Part 15) 12.3 Responsibility Determinations & Award Documentation (Part 9)

13 Award: Manage Disagreements

13.1 Bid Protests (FAR Part 33) 13.2 Size Status & Pre-Award Challenges 13.3 Managing Disagreements & Constructive Resolution

14 Post-Award: Administer & Quality

14.1 Contract Administration Fundamentals (FAR Part 42) 14.2 Quality Assurance & Surveillance (FAR Part 46) 14.3 Subcontract Management & Consent (FAR Part 44)

15 Post-Award: Changes, Claims & Disputes

15.1 Contract Modifications & Scope 15.2 Constructive Changes, REAs & Claims 15.3 Disputes Under the Contract Disputes Act

16 Terminations, Closeout & Exam Integration

16.1 Terminations for Convenience & Default (FAR Part 49) 16.2 Contract Closeout & Records (Parts 4 & Closeout) 16.3 Lifecycle Integration, High-Yield Traps & Exam Day

1.3 Closed-Book Study Strategy for CON 3990V

Key Takeaways Explain This Topic AI

Official FAI question distribution for CON 3990V is Guiding Principles 42, Pre-Award 30, Award 40, and Post-Award 38 (150 total)—weight study time toward Guiding Principles and Award while keeping Pre- and Post-Award solid.

Build a FAR part title map early for Parts 1, 2, 3, 4, 5, 6, 7, 8, 10, 12, 13, 15, 16, 19, 31, 33, 42, 44, 46, and 49; most exam items are FAR-derived with DFARS at awareness level only.

Adopt a scenario mindset: what should the contracting officer document, decide, approve, or escalate next—not which trivia fact is obscure.

Separate price analysis, cost analysis, and cost realism as three different tools with different triggers; mixing them is a high-frequency exam error.

Typical deliberate prep after required coursework is 6–10 weeks; use CON 3910, CON 3900V when required, FCN resources where applicable, A FAR Better View, SaFARi, timed mixed sets, and diagnostic reports after any fail.

Last updated: August 2026

1.3 Closed-Book Study Strategy for CON 3990V

Quick Answer: Weight study to the official FAI split— Guiding Principles 42 , Pre-Award 30 , Award 40 , Post-Award 38 . Memorize a FAR part title map , practice contracting officer next-step scenarios, and never confuse price analysis , cost analysis , and cost realism . Plan 6–10 weeks after coursework with CON 3910 , timed mixed sets, and diagnostic-driven remediation.

Logistics and eligibility get you into the room. Study strategy decides whether you leave with a pass. CON 3990V punishes open-book habits: if your only skill is “I can find it in the FAR,” you are unprepared. This section converts the official blueprint into a closed-book plan you can execute in roughly six to ten weeks after required training.

Why strategy beats raw hours

Two candidates can each “study 80 hours” and produce opposite results:

Candidate A re-reads CON slide decks, highlights FAR PDFs, and never times a 150-item set.

Candidate B builds a part-title map, drills 25–40 mixed scenarios daily, and weekly runs a full timed block with review.

Candidate B matches the exam’s cognitive demand: recognize the issue → pick the correct regulatory or process path → choose the CO’s next responsible action under time pressure. Your plan should force that behavior daily.

Official FAI distribution (use this as your calendar weights)

Phase Question count Share of 150 Study implication

1. Guiding Principles 42 28% Ethics, roles, contract principles, communication—high volume; easy to under-study because it “feels soft”

  • 2. Pre-Award 30 20% Planning, market research, competition, solicitation package, commercial/simplified paths
  • 3. Award 40 27% Price/cost analysis, negotiation, source selection, disagreements—dense rule sets
  • 4. Post-Award 38 25% Administration, quality, subcontracts, changes, closeout—often neglected until too late
  • Total 150 100% Random selection still requires full-spectrum readiness

A practical weekly split after foundations are in place: roughly Guiding Principles 25–30% , Award 25–30% , Post-Award 20–25% , Pre-Award 20% , with mixed timed sets stitching them together so you do not overfit one chapter.

Within Guiding Principles, Contract Principles is especially heavy in the detailed competency table (on the order of 18 items in FAI’s published breakdown). Do not skim “principles” as motivational fluff—competition, documentation, and formation fundamentals show up as scored items.

Step 1 — Build the FAR part title map first

FAI indicates most questions derive from the FAR, including these parts. Before deep scenario work, you should be able to recite what each part is about without opening a book:

  • FAR Part Title / focus to memorize
  • 1 Federal Acquisition Regulations System
  • 2 Definitions of Words and Terms
  • 3 Improper Business Practices and Personal Conflicts of Interest
  • 4 Administrative and Information Matters
  • 5 Publicizing Contract Actions
  • 6 Competition Requirements
  • 7 Acquisition Planning
  • 8 Required Sources of Supplies and Services
  • 10 Market Research
  • 12 Acquisition of Commercial Products and Commercial Services
  • 13 Simplified Acquisition Procedures
  • 15 Contracting by Negotiation
  • 16 Types of Contracts
  • 19 Small Business Programs
  • 31 Contract Cost Principles and Procedures
  • 33 Protests, Disputes, and Appeals
  • 42 Contract Administration and Audit Services
  • 44 Subcontracting Policies and Procedures
  • 46 Quality Assurance
  • 49 Termination of Contracts

Drill: write the number, hide the title, reverse it. Then attach one exam trigger per part (for example, Part 6 → “full and open vs exception documentation”; Part 15 → “competitive range / negotiations / tradeoff”; Part 31 → “allowability”).

DFARS = awareness level

Know that DFARS supplements the FAR for DoD and that some defense-unique policies exist. Do not spend the majority of your hours memorizing DFARS clause numbers. If a scenario smells defense-unique, choose the answer that respects DoD policy awareness layered on FAR fundamentals , not an invented DFARS trivia fact.

Step 2 — Train the scenario mindset

Almost every hard item is a mini case file. Translate the stem into one of four CO verbs:

Document — What belongs in the file (competition, price reasonableness, responsibility, determination and findings)?

Decide — Which procedure, contract type, or evaluation path is appropriate?

Approve / withhold approval — Consent to subcontract, payment, modification authority?

Escalate / refer — Legal, small business specialist, competition advocate, higher-level authority, suspension/debarment channels?

If two answer choices both “sound right,” pick the one that matches authority, sequence, and documentation duty —not the one that merely restates a definition.

Step 3 — Separate price analysis, cost analysis, and cost realism

Mixing these three is a classic CON 3990V failure mode.

Tool Core question Typical context

Price analysis Is the price fair and reasonable based on comparisons and market data? Adequate price competition, commercial items, catalog comparisons, historical prices

Cost analysis Are the proposed costs reasonable in light of cost elements and cost principles? When cost data are required / cost analysis is warranted under Part 15 frameworks

Cost realism Are estimated costs realistic for the work (especially cost-reimbursement or when realism is required)? Evaluating whether an offeror understands the requirement and proposed costs are realistic

Study them as separate decision trees . When a stem says “cost realism,” do not answer with a pure price-comparison technique. When competition already supports price reasonableness, do not invent a full cost analysis requirement that policy does not demand.

Step 4 — Use official and semi-official prep assets

  • Resource How to use it
  • CON 3910 First-attempt online prep; take early to learn item style
  • CON 3900V Deeper / component-required prep after a fail or when you need structure

FCN resources (where your component provides Federal Credentialing Network tools) Supplemental practice aligned to contracting competencies

  • A FAR Better View Structured FAR orientation—pair with your part title map
  • SaFARi Guided FAR exploration; use to build associations, then close the book and recreate from memory
  • ExamFinch free practice sets Timed mixed questions and chapter quizzes to simulate random draws
  • Diagnostic report (after a fail) Non-negotiable study map for attempt two

Passive video watching without retrieval practice is weak. After any open-book exploration in SaFARi or a FAR viewer, close the tool and write: part number → title → three rules → one scenario.

Step 5 — Timed mixed sets (non-negotiable)

Closed-book certification exams reward interleaving .

Daily: 20–40 mixed items across Guiding Principles / Pre-Award / Award / Post-Award.

Twice weekly: 50–75 item blocks under time (~1 minute average).

Weekly (final 3–4 weeks): at least one 150-item simulation or two 75-item halves with full review.

After every set: error log with columns: topic , FAR part , CO verb missed , why the distractor looked attractive .

If you only practice pure “Part 19 days” or pure “termination days,” you will be brittle when the real exam jumps from ethics to cost realism to closeout in five consecutive items.

Step 6 — After a fail: diagnostic-first recovery

Save the diagnostic competency breakdown immediately.

Map each weak competency to chapters and FAR parts in this guide.

Complete CON 3900V if your component requires it.

Rebuild with spaced retrieval on weak domains for at least 2–3 weeks (not 48 hours of cramming).

Re-run full timed mixed sets until weak domains no longer collapse under fatigue.

Rebook only when readiness—not the 30-day minimum alone—says you are ready.

A sample 6–10 week plan (after CON coursework)

Weeks Focus

1–2 FAR part title map mastery; Guiding Principles (ethics, roles, principles, documentation); light mixed quizzes

3–4 Pre-Award deep dive (Parts 5–8, 10, 12, 13, 19) + continue principles; first 75-item timed block

5–6 Award block (Parts 15, 16, 31, 33 disagreements; price/cost/realism separation); second full or near-full timed set

7–8 Post-Award (Parts 42, 44, 46, 49 + changes/claims concepts); full 150-item sims; weak-area surgery

9–10 (if needed) Diagnostic-style remediation, CON 3900V if required, logistics rehearsal (in-person vs OnVUE), taper volume, sleep

Adjust shorter if you already have strong experience and high practice scores; extend if diagnostics show multi-domain weakness.

What not to do

Do not study as if the exam is open book.

Do not over-invest in obscure DFARS clause lists.

Do not ignore Guiding Principles because they feel “soft.”

Do not treat price, cost, and cost realism as synonyms.

Do not burn a retake at day 30 without a diagnostic plan.

Do not apply civilian FAC-C authorization or retake rules to a DoD attempt, or vice versa.

How the rest of this guide is organized

Later chapters follow the lifecycle and FAR map: FAR foundations, guiding principles, pre-award, award (types, price/cost, source selection, disagreements), and post-award (administration, quality, changes, disputes, closeout/termination). Each section ends with quizzes so retrieval practice is built in—use them closed-book.

Bottom line: Prepare like a contracting officer under fire— map the FAR , weight FAI’s 42/30/40/38 distribution , drill next-step scenarios , separate price/cost/cost realism , and time mixed 150-item practice over 6–10 weeks , using CON 3910/3900V , FCN tools where available, A FAR Better View , SaFARi , and diagnostics—not open-book hope.