14.5 Troubleshooting, Defect Assessment & Repair Control

EASA Part-66 Module 07 — Maintenance Practices Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Safety Precautions — Electricity, Gases & Chemical Hazards

1.1 Electrical-System Hazards, Isolation & Protective Equipment 1.2 Compressed Gases, Pressure Vessels & Oxygen System Safety 1.3 Hazardous Chemicals, Solvents, Oils & Personal Protective Equipment

2 Chapter 2: Safety Precautions — Fire Protection, Confined Spaces & Emergency Response

2.1 Fire Classifications, Extinguishing Agents & Asphyxiation Risks 2.2 Confined-Space Entry, Fuel-Tank Safety & CDCCL Control 2.3 Emergency Response, Accident Remediation & Ballistic Recovery Systems

3 Chapter 3: Workshop Practices, Hand Tools & Precision Measurement

3.1 Workshop Housekeeping, Tool Control & Foreign Object Debris (FOD) 3.2 Engineering Dimensions, Allowances & Tolerances 3.3 Hand Tools, Powered Equipment & Operating Safety 3.4 Precision Measuring Instruments & Standards Traceability

4 Chapter 4: Fastener Torquing & Avionic Test Equipment

4.1 Torque Wrenches, Extension Calculations & Calibration Care 4.2 Multimeters, Megohmmeters & Insulation Testing 4.3 Bonding Testers, Milliohmmeters & Oscilloscopes

5 Chapter 5: Engineering Drawings, Standards & Fits

5.1 Orthographic Projections, Title Blocks & Revision Control 5.2 Drawing Line Conventions, Symbols & ATA Specification 100/iSpec 2200 5.3 Electrical Schematics, Wiring Interconnects & Component Location 5.4 Systems of Limits, Fits, Clearances & Shaft Alignment

6 Chapter 6: Electrical Wiring Interconnection System (EWIS)

6.1 EWIS Principles, Wire Types & Loom Routing Practices 6.2 Crimp Terminations, Connector Pin Insertion & Extraction Tooling 6.3 Electrical Bonding, Grounding Resistance & Electromagnetic Shielding

7 Chapter 7: Aircraft Riveting Practice

7.1 Solid and Blind Rivet Classifications, Materials & Head Markings 7.2 Rivet Spacing, Pitch, Edge Distance & Structural Layout 7.3 Countersinking, Dimpling Techniques & Rivet Installation 7.4 Rivet Joint Inspection, Failure Modes & Drill-Out Procedures

8 Chapter 8: Sheet Metal Working & Composite Materials

8.1 Sheet Metal Forming, Neutral Axis & Bend Allowance Calculations 8.2 Welding, Brazing, Soldering & Structural Adhesive Bonding 8.3 Composite Reinforcements, Pre-Preg Cold Storage & Clean Room Practice 8.4 Additive Manufacturing in Aircraft Maintenance

9 Chapter 9: Pipes, Flexible Hoses & Springs

9.1 Aircraft Rigid Tubing, Bending & 37-Degree Flaring Standards 9.2 Flexible Hoses, Installation Geometry & Serviceability 9.3 Aircraft Springs: Classifications, Rate Testing & Inspection

10 Chapter 10: Bearings & Mechanical Transmissions

10.1 Bearing Classifications, Load Types & Lubrication Practice 10.2 Bearing Defect Analysis: Spalling, Brinelling & Overheating 10.3 Gears, Gearboxes, Backlash Measurement & Belt/Chain Drives

11 Chapter 11: Flight Control Cables & Rigging

11.1 Aircraft Cable Construction, Sizing & Swaged Terminal Fittings 11.2 Cable Rigging, Turnbuckles & Temperature-Compensated Tensioning 11.3 Pulleys, Fairleads, Cable Inspection & Broken Strand Limits

12 Chapter 12: Aircraft Weight and Balance

12.1 Datum, Arm, Moment & Center of Gravity Principles 12.2 Aircraft Weighing Preparation, Equipment & Tare Deduction 12.3 Center of Gravity Calculations, Flight Limits & Ballast Adjustments

13 Chapter 13: Aircraft Handling, Storage & Winter Operations

13.1 Towing, Taxiing Protocols, Shear Pins & Wing Walkers 13.2 Jacking with Locking Collars, Chocking & Severe Weather Mooring 13.3 Ground De-icing and Anti-icing: Fluids, Clean Aircraft Concept & Holdover Times 13.4 Aircraft Parking, Protective Covers & Engine/Airframe Long-Term Preservation

14 Chapter 14: Inspection, Defect Assessment, Maintenance Procedures & Documentation

14.1 NDT Methods: Liquid Penetrant, Magnetic Particle, Eddy Current, Ultrasonic & Radiography 14.2 Corrosion Classifications, Mechanical Removal & Chemical Surface Treatments 14.3 Inspections After Lightning, Heavy Landing & Other Abnormal Events 14.4 Controlled Disassembly, Inspection & Reassembly 14.5 Troubleshooting, Defect Assessment & Repair Control 14.6 Maintenance Documentation, Work Reports & Shift Handover 14.7 Maintenance Planning, Stores Control, CRS & Occurrence Reporting

14.5 Troubleshooting, Defect Assessment & Repair Control

Key Takeaways Explain This Topic AI

Troubleshooting begins with a verified defect statement and uses approved fault-isolation data, system knowledge, and evidence rather than indiscriminate part replacement.

Separate cause from symptom, confirm test conditions, and consider interfaces, power, grounds, wiring, mechanical inputs, software, and environmental factors.

Visual findings must be located, described, measured, and compared with approved limits before repair or continued-service decisions.

Structural damage is assessed against the applicable SRM or other approved repair data; similarity to a previous repair is not approval.

After rectification, restore configuration, perform required tests, check for collateral effects, and document both the defect and corrective action.

Last updated: September 2026

14.5 Troubleshooting, Defect Assessment & Repair Control

Troubleshooting is a controlled process for turning a reported symptom into an evidenced cause and an approved corrective action. A warning message, leak, vibration, failed test, or crew report may be incomplete or intermittent. Replacing the first plausible component can waste serviceable parts and leave the real fault in the aircraft.

Define and reproduce the defect

Read the technical log and speak with the reporter when possible. Clarify when the event occurred, system configuration, environmental conditions, associated messages, reset attempts, and whether the symptom is repeatable. Review maintenance history and recent disturbed areas without assuming that the latest work must be the cause.

Make the aircraft safe and establish the test configuration in approved data. Confirm required power, fluid quantity, temperature, software or configuration state, and test-equipment setup. A test performed under the wrong conditions can create a false fault or false pass.

Follow evidence

Use the fault-isolation manual, wiring diagrams, schematics, maintenance messages, built-in test information, and system description. Understand what each test separates. Work from shared inputs and simple external causes toward intrusive action when the procedure supports that order.

Check power and grounds, connectors, pins, wiring, bonding, pipes, mechanical linkages, sensors, data buses, software state, and environmental effects as applicable. Never defeat a protection or substitute an uncontrolled jumper merely to make the symptom disappear. Record readings with units, conditions, instrument identity where required, and the expected range.

An intermittent fault needs evidence. Inspect for chafe, fretting, moisture, heat, vibration, poor support, disturbed connectors, and load-dependent behaviour. Do not shake or stress wiring outside approved limits. If a fault cannot be reproduced, follow the specified no-fault-found process rather than declaring the aircraft serviceable without completing the required assessment.

Visual inspection and damage description

Good defect assessment is precise. State component or zone, side, station or reference, orientation, dimensions, depth if measurable by an approved method, distance from holes or edges, finish condition, and related leakage or distortion. Photographs should include scale and orientation.

Distinguish a crack from a scratch only through the prescribed inspection method. Clean using an authorised method before inspection. Do not blend corrosion, drill-stop a crack, straighten structure, or remove material simply to improve appearance before the limits and repair route are known.

Structural limits and repair

Use the current Structural Repair Manual or other approved data applicable to the exact aircraft, material, location, and configuration. Damage limits often depend on size, spacing, edge distance, adjacent repairs, load path, and remaining material. A repair from another model, a previous work order, or an online illustration is not automatically applicable.

If damage is outside published limits, if required data are ambiguous, or if the configuration differs, obtain an approved engineering disposition through the organisation’s process. Temporary and permanent repairs must be identified as such, with any inspection interval, life, or operating limitation recorded and controlled.

Prove the correction

After rectification, inspect the work, restore all disturbed systems and protections, and perform the specified operational or functional tests. Confirm that the original symptom is cleared and that the intervention did not create a new fault. Repeatedly clearing a message without finding or addressing the cause is not proof.

Document the original defect, findings, measurements, data used, parts or repair installed, test results, and work status. Communicate unresolved or intermittent conditions at handover. Systematic troubleshooting is disciplined uncertainty reduction: verify, isolate, measure, compare, correct under authority, and prove.

Building and testing a fault hypothesis

A fault tree is useful when several symptoms share a source. If multiple indications fail together, first consider a common power supply, ground, data source, or environmental cause before replacing separate receivers. If only one channel fails, compare channels only where the approved procedure permits and where swapping will not transfer configuration or create an unrecorded change. Every test should answer a defined question and have a safe next step for either result.

Test equipment can also create symptoms. Verify calibration or serviceability, correct adapters, loading, software version, and reference connection. A meter with the wrong input impedance or an oscilloscope grounded at an unsuitable point can alter or damage the circuit. Built-in test messages are evidence, not necessarily the failed-part name.

When a repair removes the symptom, examine whether the proposed cause explains all observations. A connector reseated during diagnosis may temporarily clear fretting or moisture without establishing a durable rectification. Inspect, clean, repair, or replace it only under the approved instructions, then repeat the required test under representative conditions. Where a removed component is sent to a shop, communicate the recorded symptoms and test conditions so the workshop can reproduce the problem rather than returning it as no fault found without context.

Evidence Loop

Verify the symptom and test configuration.

Predict what each possible cause would make the next measurement show.

Test through the approved fault-isolation procedure with suitable equipment.

Compare the result with the stated value or decision point.

Correct only under applicable maintenance or repair authority.

Prove the rectification, restore configuration and record the outcome.