14.6 Maintenance Documentation, Work Reports & Shift Handover
EASA Part-66 Module 07 — Maintenance Practices Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Safety Precautions — Electricity, Gases & Chemical Hazards
1.1 Electrical-System Hazards, Isolation & Protective Equipment 1.2 Compressed Gases, Pressure Vessels & Oxygen System Safety 1.3 Hazardous Chemicals, Solvents, Oils & Personal Protective Equipment
2 Chapter 2: Safety Precautions — Fire Protection, Confined Spaces & Emergency Response
2.1 Fire Classifications, Extinguishing Agents & Asphyxiation Risks 2.2 Confined-Space Entry, Fuel-Tank Safety & CDCCL Control 2.3 Emergency Response, Accident Remediation & Ballistic Recovery Systems
3 Chapter 3: Workshop Practices, Hand Tools & Precision Measurement
3.1 Workshop Housekeeping, Tool Control & Foreign Object Debris (FOD) 3.2 Engineering Dimensions, Allowances & Tolerances 3.3 Hand Tools, Powered Equipment & Operating Safety 3.4 Precision Measuring Instruments & Standards Traceability
4 Chapter 4: Fastener Torquing & Avionic Test Equipment
4.1 Torque Wrenches, Extension Calculations & Calibration Care 4.2 Multimeters, Megohmmeters & Insulation Testing 4.3 Bonding Testers, Milliohmmeters & Oscilloscopes
5 Chapter 5: Engineering Drawings, Standards & Fits
5.1 Orthographic Projections, Title Blocks & Revision Control 5.2 Drawing Line Conventions, Symbols & ATA Specification 100/iSpec 2200 5.3 Electrical Schematics, Wiring Interconnects & Component Location 5.4 Systems of Limits, Fits, Clearances & Shaft Alignment
6 Chapter 6: Electrical Wiring Interconnection System (EWIS)
6.1 EWIS Principles, Wire Types & Loom Routing Practices 6.2 Crimp Terminations, Connector Pin Insertion & Extraction Tooling 6.3 Electrical Bonding, Grounding Resistance & Electromagnetic Shielding
7 Chapter 7: Aircraft Riveting Practice
7.1 Solid and Blind Rivet Classifications, Materials & Head Markings 7.2 Rivet Spacing, Pitch, Edge Distance & Structural Layout 7.3 Countersinking, Dimpling Techniques & Rivet Installation 7.4 Rivet Joint Inspection, Failure Modes & Drill-Out Procedures
8 Chapter 8: Sheet Metal Working & Composite Materials
8.1 Sheet Metal Forming, Neutral Axis & Bend Allowance Calculations 8.2 Welding, Brazing, Soldering & Structural Adhesive Bonding 8.3 Composite Reinforcements, Pre-Preg Cold Storage & Clean Room Practice 8.4 Additive Manufacturing in Aircraft Maintenance
9 Chapter 9: Pipes, Flexible Hoses & Springs
9.1 Aircraft Rigid Tubing, Bending & 37-Degree Flaring Standards 9.2 Flexible Hoses, Installation Geometry & Serviceability 9.3 Aircraft Springs: Classifications, Rate Testing & Inspection
10 Chapter 10: Bearings & Mechanical Transmissions
10.1 Bearing Classifications, Load Types & Lubrication Practice 10.2 Bearing Defect Analysis: Spalling, Brinelling & Overheating 10.3 Gears, Gearboxes, Backlash Measurement & Belt/Chain Drives
11 Chapter 11: Flight Control Cables & Rigging
11.1 Aircraft Cable Construction, Sizing & Swaged Terminal Fittings 11.2 Cable Rigging, Turnbuckles & Temperature-Compensated Tensioning 11.3 Pulleys, Fairleads, Cable Inspection & Broken Strand Limits
12 Chapter 12: Aircraft Weight and Balance
12.1 Datum, Arm, Moment & Center of Gravity Principles 12.2 Aircraft Weighing Preparation, Equipment & Tare Deduction 12.3 Center of Gravity Calculations, Flight Limits & Ballast Adjustments
13 Chapter 13: Aircraft Handling, Storage & Winter Operations
13.1 Towing, Taxiing Protocols, Shear Pins & Wing Walkers 13.2 Jacking with Locking Collars, Chocking & Severe Weather Mooring 13.3 Ground De-icing and Anti-icing: Fluids, Clean Aircraft Concept & Holdover Times 13.4 Aircraft Parking, Protective Covers & Engine/Airframe Long-Term Preservation
14 Chapter 14: Inspection, Defect Assessment, Maintenance Procedures & Documentation
14.1 NDT Methods: Liquid Penetrant, Magnetic Particle, Eddy Current, Ultrasonic & Radiography 14.2 Corrosion Classifications, Mechanical Removal & Chemical Surface Treatments 14.3 Inspections After Lightning, Heavy Landing & Other Abnormal Events 14.4 Controlled Disassembly, Inspection & Reassembly 14.5 Troubleshooting, Defect Assessment & Repair Control 14.6 Maintenance Documentation, Work Reports & Shift Handover 14.7 Maintenance Planning, Stores Control, CRS & Occurrence Reporting
14.6 Maintenance Documentation, Work Reports & Shift Handover
Key Takeaways Explain This Topic AI
Maintenance uses current applicable data; revision status and task applicability must be confirmed before and during the work.
Work records should be clear, permanent, traceable, and sufficient to show what was done, what data controlled it, who performed or inspected it, and the final status.
Ambiguous, incorrect, or incomplete maintenance data are reported through the organisation rather than locally reinterpreted without authority.
A handover communicates aircraft or component status, incomplete steps, isolations, open panels, tools, parts, test results, hazards, and the next required action.
A CRS is issued only by appropriately authorised staff when the applicable release conditions are met; it is not a substitute for complete task records.
Last updated: September 2026
14.6 Maintenance Documentation, Work Reports & Shift Handover
Maintenance documentation controls the work before, during, and after physical action. A correct repair with an unclear record can lose configuration, life, or compliance evidence. A perfect record cannot make unauthorised or incomplete work airworthy. Part-145 therefore links current applicable maintenance data, work cards, task sign-off, handover, and release.
Maintenance data
Before starting, verify that the task applies to the aircraft or component, modification state, and work scope. Confirm revision status through the organisation’s controlled system. The data may include maintenance manuals, component manuals, wiring or schematic data, structural repair information, service information incorporated into the programme, airworthiness directives, engineering orders, and organisation procedures.
Read cautions, prerequisites, access, consumables, tooling, independent-inspection points, and close-up steps—not only the central removal or installation paragraph. If data appear inaccurate, ambiguous, or incomplete, stop and report the problem through the defined process. Do not silently rewrite a limit or improvise a step that changes the approved instruction.
Work cards and task recording
Work cards divide a package into controllable steps and sign-off points. Record completion when the work is actually performed and verified. Do not pre-sign, backfill from memory, or use another person’s identity. Entries should be legible and durable and use approved terminology, units, references, and correction methods.
The record should establish, as applicable: aircraft or component identity; defect or task; data and revision; parts and serial numbers; life information; consumables or batch data; measurements and test results; deviations or engineering instructions; persons performing, supervising, or independently inspecting; dates; and final status. A cross-reference is useful only if the referenced record remains identifiable and retrievable.
Corrections preserve traceability. The original entry remains readable, the correction is identified and dated as the procedure requires, and electronic records use controlled credentials and audit trails. Blank signed spaces and informal side notes create risk.
Incomplete work and handover
A shift ending does not change the technical state. The outgoing team must make the item safe and communicate what is complete, incomplete, disturbed, isolated, or exposed. A good handover identifies the exact task and status; open panels or disconnected items; electrical, hydraulic, pneumatic, mechanical, or software isolations; installed or removed parts; tools, test equipment, loose articles, and materials still controlled to the job; measurements and tests; hazards; outstanding inspections or data questions; and the next authorised action.
Use both written status and direct verbal handover where the organisation requires it. The incoming person verifies critical physical conditions rather than relying on assumption. Shift-handover records must be accessible to supervisors and certifying staff.
Release to service
A Certificate of Release to Service is issued only by staff holding the necessary licence, scope, and organisational authorisation and only when the applicable regulatory conditions are met. The release identifies the maintenance and any limitations or incompleteness handled under the permitted process. It does not erase an open task, missing tool, unresolved data query, or failed test.
Before release, review task completion, sign-offs, parts and data, independent inspections, close-up, tests, deferred items, and technical-log entries. When several people worked the package, the certifying person relies on controlled records and verification, not vague assurance.
For the exam, remember that documentation is an active safety barrier. Current data tells the team what to do; work cards show controlled progress; handover preserves the live state across people and time; and the release records the authorised airworthiness decision.
Recording measurements and status
A result such as “checked OK” may be insufficient when the task requires a value. Record the measured result, unit, applicable limit, and test condition in the location prescribed by the work card. If a task has multiple identical items, identify exactly which one was inspected or replaced. Part and serial numbers must be transcribed or captured accurately; a single digit can break traceability.
Status labels and tags support, but do not replace, the formal record. Their wording and attachment should prevent an isolated control, open line, or unserviceable part from being mistaken for a normal condition. When a tag is transferred or removed, the work system must show who is responsible and why the technical state is safe.
At handover, walk the critical area with the incoming person where practical. Point out access limitations, temporary supports, protected openings, parts awaiting disposition, and any test setup left installed. Compare the physical state with the written work card. The incoming team then acknowledges or records acceptance as the organisation requires. This closed-loop approach reduces the risk that a vague phrase such as “continue installation” hides an untorqued fitting, an unperformed independent inspection, or an energised test configuration.
Minimum Handover Checklist
Exact aircraft, component, work-order and task status.
Incomplete or disturbed steps, open access and installed temporary protection.
Isolations, locks, tags, grounds, supports and test configurations.
Removed or installed parts, controlled tools, loose articles and materials.
Measurements, findings, tests, independent inspections and engineering queries.
Hazards, access restrictions, next authorised action and controlling data.