Study guide
10.3 Type III Recovery and Procedures
EPA 608 Technician Certification Exam
Track your progress as you read
Finished sections get a check mark.
1 Introduction to EPA 608 Certification
1.1 What EPA 608 Is and Who Needs It 1.2 Exam Format, Scoring, and Administration 1.3 How to Study for EPA 608
2 Regulations and the Clean Air Act
2.1 Clean Air Act Overview 2.2 Penalties and Enforcement 2.3 Montreal Protocol and International Agreements 2.4 AIM Act and HFC Phasedown Schedule 2.5 SNAP Program and Refrigerant Transitions
3 Refrigerants and Ozone Science
3.1 The Science of Ozone Depletion (ODP and GWP) 3.2 Refrigerant Classification, ASHRAE Numbering, and Safety Groups 3.3 Common Refrigerants: Properties, Applications, and Phaseout Status 3.4 Refrigerant Blends: Glide, Fractionation, and Liquid Charging
4 The Refrigeration Cycle
4.1 The Basic Refrigeration Cycle 4.2 System Components in Detail 4.3 Heat Transfer and Pressure-Temperature Relationships
5 Refrigerant Safety and Handling
5.1 Refrigerant Hazards and Health Effects 5.2 Safe Handling Practices, PPE, and Cylinders 5.3 A2L (Mildly Flammable) Refrigerant Safety
6 Recovery, Recycling, and Reclaiming
6.1 The Three Rs: Recover, Recycle, Reclaim 6.2 Recovery Equipment Requirements 6.3 Required Levels of Evacuation 6.4 Refrigerant Sales Restrictions and Recordkeeping
7 Leak Detection and Repair
7.1 Leak Detection Methods 7.2 Leak Repair Requirements and Trigger Rates 7.3 Leak-Rate Calculation, Recordkeeping, and Reporting
8 Type I — Small Appliances
8.1 What Counts as a Small Appliance 8.2 Type I Recovery Requirements 8.3 Type I Procedures, Access Valves, and the Open-Book Exam
9 Type II — High-Pressure Appliances
9.1 What Type II Covers: High-Pressure System Overview 9.2 Type II Recovery Methods and Required Evacuation Levels 9.3 Leak Detection, the Repair Triggers, and Recordkeeping 9.4 The R-22 Phaseout, Retrofits, and the Move to Lower-GWP A2Ls
10 Type III — Low-Pressure Appliances
10.1 Low-Pressure System Fundamentals 10.2 Purge Units and Air Management 10.3 Type III Recovery and Procedures 10.4 Type III Leak Testing
11 10. Disposal, Shipping, and Compliance
11.1 Equipment Disposal Requirements 11.2 Refrigerant Shipping and Transport 11.3 Compliance Checklist and Best Practices
12 Final Review and Exam Strategy
12.1 High-Yield Core Section Review 12.2 Type I vs Type II vs Type III: Side-by-Side Review 12.3 How the Exam Works and Exam-Day Strategy
10.3 Type III Recovery and Procedures
Key Takeaways Explain This Topic AI
Low-pressure recovery target: 25 mm Hg absolute with recovery equipment of any age (before or after Nov 15, 1993) — not 25 in. Hg vacuum
Keep water circulating through the tubes — or drain it — during recovery; refrigerant boiling under deep vacuum chills the tubes and can freeze and rupture them
For leak tests, raise pressure with controlled hot water or a built-in heating/pressurization device first, then nitrogen, and stay below the rupture-disc rating set by the manufacturer
When recharging, introduce vapor before liquid (so water in the tubes does not freeze) and charge centrifugals through the evaporator charging valve
Verify the final evacuation level with a micron/absolute gauge after the system stabilizes, not while the pump is still pulling
Last updated: October 2026
The Recovery Standard for Low-Pressure Systems
Type III recovery is governed by one number you must commit to memory: the required evacuation level. Before a major repair or disposal of a low-pressure appliance, the technician must reduce the system to a deep vacuum. Unlike the higher-pressure classes, the target does not change with the age of the recovery equipment:
- Recovery/recycling equipment Required evacuation level
- Manufactured on or after November 15, 1993 25 mm Hg absolute
- Manufactured before November 15, 1993 25 mm Hg absolute
25 mm Hg absolute is a near-complete evacuation — only 25 mm of mercury above a perfect vacuum. Read it on a micron (absolute) gauge , never a compound gauge. The notorious exam trap is confusing 25 mm Hg absolute with 25 in. Hg vacuum : 25 mm Hg absolute is about 0.98 in. Hg absolute (roughly 28.9 in. Hg vacuum), while 25 in. Hg vacuum leaves about 4.9 in. Hg (about 125 mm Hg) absolute — roughly five times the absolute pressure of the real target. The same 25 mm Hg absolute level applies before disposing of a low-pressure appliance.
Pressure References You Must Keep Straight
Type III is the only section that mixes vacuum scales, so anchor these reference points:
- Reference Value Meaning
- Perfect vacuum 0 mm Hg absolute = 29.92 in. Hg vacuum No gas molecules
- Recovery target (any recovery equipment) 25 mm Hg absolute ≈ 28.9 in. Hg vacuum Very deep vacuum
25 in. Hg vacuum (not a Table 1 level) ≈ 125 mm Hg absolute About five times the absolute pressure of the target
Atmospheric (sea level) 760 mm Hg absolute = 0 in. Hg vacuum = 0 psig Reference zero for psig
Rupture disc Rated at the chiller's maximum working pressure (Trane R-123 CenTraVac: 15 psig ±2 psig) Above atmospheric — a big overpressure for a vacuum machine
The Freezing Hazard — Keep Water Flowing
Here is the procedure point the exam loves. As you pull a vacuum, the remaining liquid refrigerant boils violently at the low pressure and absorbs heat from the water tubes . If the cooling and chilled-water pumps are off, that heat is drawn from the now-stagnant water, which can freeze and rupture the evaporator or condenser tubes . The rule: keep water circulating through the tubes during recovery — or drain the water from the tubes — so it cannot freeze; moving water also feeds heat to vaporize the refrigerant. Stop the water and you risk thousands of dollars in burst-tube damage.
Recovery Procedure and Pressurization Limits
A typical low-pressure recovery sequence:
Prepare — shut down the chiller, let pressures equalize, connect recovery equipment, and stage enough recovery cylinders (charges are often hundreds of pounds).
Keep water flowing (or drain it) — circulate condenser and chilled water, or remove it from the tubes, to prevent tube freezing.
Liquid recovery — transfer liquid from the shells first; low-pressure refrigerant is easy to handle as a liquid because it boils so high.
Vapor recovery — pull the remaining vapor with the recovery machine; apply gentle heat to the shells to vaporize the last liquid.
Reach the target — continue until 25 mm Hg absolute is achieved (with recovery equipment of any age).
Verify — isolate, wait a few minutes, and read the final level on a micron/absolute gauge. If the pressure rises back above the target, liquid refrigerant remains in the system or the oil, so keep recovering.
Oil — if oil must be drained, heat it to 130 °F first so less refrigerant leaves with it.
Pressurizing a Low-Pressure Machine
Raise the pressure of a low-pressure chiller only with EPA's preferred methods and within the manufacturer's limits. For a leak test , EPA's order of preference is controlled hot water or a built-in heating/pressurization device (such as Prevac) first, then nitrogen — never air or oxygen. Stay below the rupture-disc rating, which is set at the chiller's maximum working pressure (Trane, for example, rates the disc on its R-123 CenTraVac chillers at 15 psig ±2 psig), or the disc can burst and vent the charge.
For a non-major repair that will not be followed by evacuation, the appliance must be pressurized to no higher than 0 psig before it is opened, with openings covered when isolation is not possible. On machines whose refrigerant boils at or below 85 °F (R-11, R-123), use heat only — methods such as nitrogen that require later purging are not allowed; on R-113 machines, use heat as far as possible and nitrogen only to bring the pressure the rest of the way to atmospheric.
Example: A technician recovering a 700-lb R-123 charge wants to "speed things up" by pushing nitrogen into the machine and lets the gauge climb toward the rupture-disc rating. The disc lets go, venting nitrogen and refrigerant and forcing a costly disc replacement. The correct method is to recover with the machine — liquid first, then vapor — while water keeps moving through the tubes, and never to use nitrogen to push the charge out.
For the Exam: Recover to 25 mm Hg absolute with recovery equipment of any age (25 mm Hg absolute, not 25 in. Hg). Keep water circulating or drain the tubes to prevent freezing. Heat oil to 130 °F before draining it. Recharge vapor before liquid, through the evaporator charging valve. For leak tests, raise pressure with hot water or a built-in heater first, then nitrogen, below the rupture-disc rating. Verify the vacuum on a micron gauge after the system stabilizes.