Study guide
7.3 Lead Hazard Screens vs Full Risk Assessments
EPA Lead Abatement Supervisor 40 CFR 745 Subpart L
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Exam Facts, Supervisor Role, and Certification Path
1.1 Current Exam Facts 1.2 Supervisor Role, Responsibilities, and On-Site Presence 1.3 Prerequisites, Interim Certification, and the Third-Party Exam
2 Chapter 2: Firm Certification, Recertification, and Enforcement
2.1 Firm Certification vs Individual Certification 2.2 Recertification, 8-Hour Refresher, and 3-Year vs 5-Year Cycles 2.3 Suspension, Revocation, TSCA Violations, and Inspections
3 Chapter 3: Title X, 40 CFR 745, State Programs, and HUD Guidelines
3.1 Title X, TSCA 402–406, and 40 CFR 745 Architecture 3.2 Target Housing, Child-Occupied Facilities, and the 1978 Ban 3.3 EPA-Administered vs Authorized State Programs (Subpart Q) and Reciprocity 3.4 HUD Guidelines and Other Documented Methodologies
4 Chapter 4: Lead Health Effects, Blood-Lead Benchmarks, and Liability
4.1 Lead Toxicology, Child and Adult Health Effects, and Blood-Lead Benchmarks 4.2 Liability, Insurance, and Contract Risk for Abatement Supervisors
5 Chapter 5: What Counts as Abatement
5.1 Abatement vs Interim Controls vs RRP 5.2 Lead-Based Paint Definition and Component Language 5.3 Paint-Lead, Dust-Lead, and Soil-Lead Hazard Definitions
6 Chapter 6: Lead Hazard Recognition in the Field
6.1 Deteriorated Paint and Paint in Poor Condition 6.2 Friction, Impact, and Chewable Surface Hazards 6.3 High-Risk Components, Common Areas, and Dust Pathways
7 Chapter 7: Interpreting Inspection and Risk Assessment Reports
7.1 Reading Inspection Reports, XRF Results, and Paint-Chip Data 7.2 Reading Risk Assessment Reports and Selecting Control Options 7.3 Lead Hazard Screens vs Full Risk Assessments
8 Chapter 8: Occupant Protection Plans
8.1 Occupant Protection Plan Requirements 8.2 Relocation, Isolation of Work Areas, and Sensitive Occupants 8.3 Re-Occupancy Criteria, Occupant Notice, and Access Control
9 Chapter 9: Project Notification and Work Plans
9.1 Five-Business-Day Notification Contents and Electronic Filing 9.2 Updated, Canceled, EBL, and Emergency Notifications 9.3 Work Plans, Method Selection Documentation, and Pre-Abatement Walkthrough
10 Chapter 10: Interior Containment Design
10.1 Critical Barriers, Warning Signs, and Regulated Areas 10.2 Negative Air Pressure and HEPA Air-Filtration Units 10.3 Three-Stage Decontamination Units and Worker Flow
11 Chapter 11: Exterior Containment and Site Control
11.1 Exterior Ground Sheeting, Vertical Containment, and Weather Limits 11.2 Daily Exterior Cleanup, Paint-Chip Control, and Occupied/Multi-Family Logistics
12 Chapter 12: Component Replacement, Enclosure, and Encapsulation
12.1 Component Replacement 12.2 Enclosure Systems and Mechanical Fastening 12.3 Encapsulation Products, Unsuitable Surfaces, and Maintenance Schedules
13 Chapter 13: Paint Removal and Restricted Practices
13.1 Wet Scraping, Chemical Removal, and Heat Guns Below 1100°F 13.2 Restricted and Prohibited Practices 13.3 Selecting Methods, Combining Methods, and Documenting Why
14 Chapter 14: Interior Dust Abatement and Cleaning
14.1 Interior Dust Cleanup Sequence 14.2 Pre-Clearance Visual Inspection and When Cleanup Is Not Done
15 Chapter 15: Soil and Exterior Dust Abatement
15.1 Soil-Lead Hazards and Sampling Interpretation for Supervisors 15.2 Soil Removal and Replacement 15.3 Permanent Covering vs Landscaping
16 Chapter 16: OSHA 1926.62 Worker Protection
16.1 PEL, Action Level, and Exposure Assessment 16.2 Respiratory Protection, PPE, and Hygiene Facilities 16.3 Biological Monitoring and Medical Removal Protection 16.4 OSHA Competent Person Duties vs EPA Certified Supervisor Duties
17 Chapter 17: RCRA Waste Management
17.1 Abatement Waste Streams 17.2 TCLP Characterization and D008 17.3 Manifests, TSDF, Accumulation, and the Household Exclusion
18 Chapter 18: Action Levels, Post-Abatement Testing, and Records
18.1 Dust-Lead Action Levels vs Reportable-Level Hazards 18.2 Post-Abatement Visual, Dust Sampling, Independence, and the 1-Hour Wait 18.3 Failed Samples, Reclean/Retest, Exterior Visual, and Multi-Family Random Sampling 18.4 Abatement Report, 2026 Hazard Statement, Owner Copies, and 3-Year Retention
7.3 Lead Hazard Screens vs Full Risk Assessments
Key Takeaways Explain This Topic AI
A lead hazard screen may be conducted only by a certified risk assessor (40 CFR 745.227(c)(1)). A person certified only as an inspector, and a certified supervisor, cannot perform a screen.
A screen is limited: background and occupant-use patterns for children under 6; a visual for deteriorated paint; paint testing only of deteriorated surfaces in poor condition with a distinct painting history; two composite dust samples (floors and windows) where children under 6 are most likely to contact dust; plus common-area composites in multi-family dwellings and child-occupied facilities. Soil sampling is not required.
The screen report includes identifying information and limited results and may recommend a follow-up full risk assessment. It is not required to include the full RA's location/type/severity narrative or the interim-control and abatement options with encapsulant/enclosure monitoring schedules (745.227(c)(5) excluding (d)(11)(xv)–(xviii)).
A screen is not a green light to skip abatement planning. When the screen says a full RA is recommended, do not treat the screen as a complete hazard map or a work order.
Do not start abatement off a screen alone unless the owner has separately scoped certified abatement of identified lead-based paint (for example, replacing windows the screen or an inspection actually tested as LBP). Unsampled soil, untested 1.5 ft² deteriorated patches, and unsampled rooms are not in that scope.
Last updated: August 2026
A screen is a limited look, not a smaller risk assessment
Quick Answer: A lead hazard screen shall be conducted only by a certified risk assessor ( 40 CFR 745.227(c)(1) ). It is a limited evaluation: background on the building and how children under 6 use it; a visual for deteriorated paint and for at least two dust-sampling locations; paint testing only of deteriorated surfaces that are in poor condition and have a distinct painting history ; two composite dust samples (one floors , one windows ) where children under 6 are most likely to contact dust; plus common-area composites in multi-family dwellings and child-occupied facilities. The screen report may recommend a follow-up full risk assessment . It is not a green light to skip abatement planning, and it is not a complete hazard map. Do not start abatement off a screen alone unless the owner has separately scoped certified abatement of identified LBP .
Inspectors who are not risk assessors cannot perform a screen. Supervisors cannot perform a screen. A screen is still a lead-based paint activity under 745.227(a)(2) — if someone labels the visit a screen, it must meet (c) . Calling a walkthrough a screen does not make it one.
Side-by-side: inspection, screen, full RA
- Feature Inspection (b) Lead hazard screen (c) Full risk assessment (d)
- Who Certified inspector or risk assessor Certified risk assessor only Certified risk assessor only
Question answered Is LBP present on each distinct-history component? Might hazards be present in a limited look? Where are the hazards , how severe, and what are the control options ?
Paint testing Each interior and exterior component with distinct painting history, except post-1978 replacements or determined not LBP; common areas in multi-family/COF Only deteriorated paint in poor condition with a distinct painting history Friction/impact with visibly deteriorated paint and all other visibly deteriorated paint
Dust Not required for an inspection Two composites : floors and windows, where children under 6 most likely contact dust; plus common-area composites in multi-family/COF Sills and floors in living areas used by children under 6; extra common-area and COF room/hall/stair samples
Soil Not required Not required Bare soil in play areas , rest of yard , and dripline/foundation
Report options Presence/absence table in method-appropriate units May recommend follow-up RA and further actions; does not have to include the full RA's hazard-severity narrative or control-option/monitoring sections Must include location/type/severity and interim and/or abatement options with prioritization and encapsulant/enclosure monitoring
Poor condition (Chapter 6.1) is the screen's paint-testing gate: more than 2 ft² interior large, 10 ft² exterior large, or 10% of a small component. A 1.5 ft² peeling living-room wall can go untested on a screen. That is a screen limitation , not a finding that the patch is safe. A full RA would test that visibly deteriorated film.
Composite dust on a screen is two samples, not a room-by-room map. 745.227(g) still applies: at least two subsamples , every component being tested included, and do not mix component types (floors and windows stay separate composites). A single blended house-dust number is not a screen.
No soil. A screen can miss a 900 ppm play area entirely. Starting the abatement from a screen that never sampled the sandbox is how children keep eating the yard while the windows get replaced.
What the screen report is required to contain — and what it leaves out
745.227(c)(5)(i) points to the RA report list (d)(11)(i) through (xiv) — identity of the property, the assessor, the laboratory, visual results, paint-testing method and locations, XRF quality-control data and serial number, and laboratory results — and excludes (d)(11)(xv) through (xviii) . Background collected under (c)(2)(i) is added back. Then (c)(5)(ii) requires recommendations, if warranted, for a follow-up risk assessment , and as appropriate any further actions.
Read the exclusion. A screen is not required to include:
The full RA's (xvii) description of location, type, and severity of identified LBP hazards
The full RA's (xviii) interim controls and/or abatement options with prioritization and encapsulant/enclosure monitoring schedules
That is why you cannot write a complete hazard-based work plan off a screen the way Section 7.2 taught you to write one off an RA. The document is allowed to stop at limited results plus I recommend a full risk assessment .
Two exam traps — both fail the same way
Trap 1 — Full RA recommended, and the owner wants abatement Monday. The screen found deteriorated paint in poor condition on two windows and a floor-dust composite that is reportable. The assessor wrote follow-up risk assessment recommended . That sentence is doing its regulatory job. It is not a scope of work. It is not a finding that soil is clean. It is not permission to skip the OPP, the five-business-day notice, or method documentation. Do not start a hazard-based abatement off that screen alone. Get the full RA , then translate options as in Section 7.2.
Exception the exam will also test: the owner may separately scope certified abatement of identified LBP . Example: a complete inspection (or even the screen's two poor-condition windows that tested as LBP) plus a contract that says the certified firm shall permanently eliminate those identified LBP components — replace those window assemblies; take dust below action levels. Inspection answers presence; abatement can proceed on identified LBP the owner chose to eliminate permanently. A screen's two tested windows are not a whole-house hazard map. Do not expand those two sashes are LBP into untested soil, untested 1.5 ft² patches, and unsampled bedrooms just because a screen exists.
Trap 2 — treating a clean-looking screen as a pass to skip planning. The visual found no poor-condition paint, both composites are non-detect, and the assessor did not recommend a full RA. That is still not clearance . It is not a finding of no LBP in the building. It is not a finding of no soil-lead hazard. Intact LBP on friction sashes can still grind dust after the screen date. If the owner later wants abatement , you still need a real presence determination (inspection) and/or a full RA, plus OPP, notice, and inspector or risk-assessor post-abatement testing. A screen is not a green light to skip abatement planning when abatement is the job.
Supervisor actions when the file is only a screen
What the screen says What you do What you do not do
Follow-up full RA recommended Stop the hazard-based abatement-planning clock until a (d) RA is in the file, unless the owner has a separate, written abatement scope limited to identified LBP Write an OPP for all hazards in the unit off two composites and two windows
Two poor-condition windows tested LBP; no soil data If separately scoped, you may abate those windows as identified LBP under Subpart L Assume the play area is fine; assume other deteriorated paint is non-LBP
Composites non-detect; no poor-condition paint Treat it as a limited look. If the owner wants abatement or a hazard-based plan, get inspection and/or a full RA Declare the property lead-free, skip notice, or self-clear
Screen signed by a person certified only as an inspector It is not a 745.227(c) screen Use it as if (c) were satisfied
Owner asks you to finish the screen with supervisor soil samples Refuse. 745.227(f) Collect soil, dust, or chips
You will still use a proper inspection or RA, when you have one, to write the OPP, select methods, notify, and prepare the abatement report. You will still not collect clearance dust. A screen does not change 745.227(e)(8) or (f) . It only changes how little you know until the full RA arrives.
Worked example — three files, three decisions. File A is a screen that recommends a full RA after a reportable floor composite. The owner says start abatement of the whole house Monday. Stop. Get the RA unless a separate contract already names specific identified LBP components to abate. File B is the same screen plus a contract to replace the two poor-condition living-room windows that tested as LBP, as certified abatement, with dust below action levels. Those windows can proceed as identified-LBP abatement; the sandbox is still not in the scope. File C is a full RA with play-area soil at 850 ppm and friction windows. Now Section 7.2 applies: you cannot drop the play area from an abatement contract that is designed to eliminate the identified hazards.