7.1 Reading Inspection Reports, XRF Results, and Paint-Chip Data
EPA Lead Abatement Supervisor 40 CFR 745 Subpart L
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Exam Facts, Supervisor Role, and Certification Path
1.1 Current Exam Facts 1.2 Supervisor Role, Responsibilities, and On-Site Presence 1.3 Prerequisites, Interim Certification, and the Third-Party Exam
2 Chapter 2: Firm Certification, Recertification, and Enforcement
2.1 Firm Certification vs Individual Certification 2.2 Recertification, 8-Hour Refresher, and 3-Year vs 5-Year Cycles 2.3 Suspension, Revocation, TSCA Violations, and Inspections
3 Chapter 3: Title X, 40 CFR 745, State Programs, and HUD Guidelines
3.1 Title X, TSCA 402–406, and 40 CFR 745 Architecture 3.2 Target Housing, Child-Occupied Facilities, and the 1978 Ban 3.3 EPA-Administered vs Authorized State Programs (Subpart Q) and Reciprocity 3.4 HUD Guidelines and Other Documented Methodologies
4 Chapter 4: Lead Health Effects, Blood-Lead Benchmarks, and Liability
4.1 Lead Toxicology, Child and Adult Health Effects, and Blood-Lead Benchmarks 4.2 Liability, Insurance, and Contract Risk for Abatement Supervisors
5 Chapter 5: What Counts as Abatement
5.1 Abatement vs Interim Controls vs RRP 5.2 Lead-Based Paint Definition and Component Language 5.3 Paint-Lead, Dust-Lead, and Soil-Lead Hazard Definitions
6 Chapter 6: Lead Hazard Recognition in the Field
6.1 Deteriorated Paint and Paint in Poor Condition 6.2 Friction, Impact, and Chewable Surface Hazards 6.3 High-Risk Components, Common Areas, and Dust Pathways
7 Chapter 7: Interpreting Inspection and Risk Assessment Reports
7.1 Reading Inspection Reports, XRF Results, and Paint-Chip Data 7.2 Reading Risk Assessment Reports and Selecting Control Options 7.3 Lead Hazard Screens vs Full Risk Assessments
8 Chapter 8: Occupant Protection Plans
8.1 Occupant Protection Plan Requirements 8.2 Relocation, Isolation of Work Areas, and Sensitive Occupants 8.3 Re-Occupancy Criteria, Occupant Notice, and Access Control
9 Chapter 9: Project Notification and Work Plans
9.1 Five-Business-Day Notification Contents and Electronic Filing 9.2 Updated, Canceled, EBL, and Emergency Notifications 9.3 Work Plans, Method Selection Documentation, and Pre-Abatement Walkthrough
10 Chapter 10: Interior Containment Design
10.1 Critical Barriers, Warning Signs, and Regulated Areas 10.2 Negative Air Pressure and HEPA Air-Filtration Units 10.3 Three-Stage Decontamination Units and Worker Flow
11 Chapter 11: Exterior Containment and Site Control
11.1 Exterior Ground Sheeting, Vertical Containment, and Weather Limits 11.2 Daily Exterior Cleanup, Paint-Chip Control, and Occupied/Multi-Family Logistics
12 Chapter 12: Component Replacement, Enclosure, and Encapsulation
12.1 Component Replacement 12.2 Enclosure Systems and Mechanical Fastening 12.3 Encapsulation Products, Unsuitable Surfaces, and Maintenance Schedules
13 Chapter 13: Paint Removal and Restricted Practices
13.1 Wet Scraping, Chemical Removal, and Heat Guns Below 1100°F 13.2 Restricted and Prohibited Practices 13.3 Selecting Methods, Combining Methods, and Documenting Why
14 Chapter 14: Interior Dust Abatement and Cleaning
14.1 Interior Dust Cleanup Sequence 14.2 Pre-Clearance Visual Inspection and When Cleanup Is Not Done
15 Chapter 15: Soil and Exterior Dust Abatement
15.1 Soil-Lead Hazards and Sampling Interpretation for Supervisors 15.2 Soil Removal and Replacement 15.3 Permanent Covering vs Landscaping
16 Chapter 16: OSHA 1926.62 Worker Protection
16.1 PEL, Action Level, and Exposure Assessment 16.2 Respiratory Protection, PPE, and Hygiene Facilities 16.3 Biological Monitoring and Medical Removal Protection 16.4 OSHA Competent Person Duties vs EPA Certified Supervisor Duties
17 Chapter 17: RCRA Waste Management
17.1 Abatement Waste Streams 17.2 TCLP Characterization and D008 17.3 Manifests, TSDF, Accumulation, and the Household Exclusion
18 Chapter 18: Action Levels, Post-Abatement Testing, and Records
18.1 Dust-Lead Action Levels vs Reportable-Level Hazards 18.2 Post-Abatement Visual, Dust Sampling, Independence, and the 1-Hour Wait 18.3 Failed Samples, Reclean/Retest, Exterior Visual, and Multi-Family Random Sampling 18.4 Abatement Report, 2026 Hazard Statement, Owner Copies, and 3-Year Retention
7.1 Reading Inspection Reports, XRF Results, and Paint-Chip Data
Key Takeaways Explain This Topic AI
A lead-based paint inspection may be conducted only by a certified inspector or risk assessor (40 CFR 745.227(b)(1)). A supervisor interprets the report to write the OPP, select methods, notify, and later prepare the abatement report, and does not perform the inspection unless also certified as an inspector or risk assessor.
Inspection is surface-by-surface: each interior and exterior component with a distinct painting history must be tested, except components determined to have been replaced after 1978 or not to contain LBP. Multi-family dwellings and child-occupied facilities also require every common-area component with a distinct painting history (745.227(b)(2)).
The inspection report must include dates, address, construction date, unit numbers, owner, name/signature/certification number of the inspector or risk assessor, firm, testing method and device including XRF serial number and quality-control data, specific locations tested, and results in method-appropriate units (745.227(b)(4)).
Lead-based paint is present at ≥ 1.0 mg/cm² or ≥ 0.5% by weight on a tested surface, and on like surfaces in the same room equivalent with a similar painting history (745.227(h)(1)). HUD Guidelines / the device PCS classify XRF readings as positive, negative, or inconclusive.
Never treat an inconclusive XRF as 'no lead.' Confirm with an NLLAP (TSCA 405(b)) paint chip or assume the surface is positive. A chip at 0.6% is LBP; a chip at 0.4% is not. Paint, dust, and soil samples under 745.227(f) are collected only by an inspector or risk assessor.
Last updated: August 2026
The supervisor reads the inspection; the inspector wrote it
Quick Answer: A lead-based paint inspection may be conducted only by a person certified as an inspector or risk assessor ( 40 CFR 745.227(b)(1) ). It is a surface-by-surface determination of whether lead-based paint (LBP) is present — not a hazard assessment. Paint is tested on each component with a distinct painting history (and each such exterior component), except components the inspector or risk assessor determines were replaced after 1978 or do not contain LBP . In a multi-family dwelling or child-occupied facility (COF) , every common-area component with a distinct painting history is tested the same way. X-ray fluorescence (XRF) results are classified by the device's Performance Characteristic Sheet (PCS) as positive, negative, or inconclusive . Inconclusive is not 'no lead.' Confirm with a National Lead Laboratory Accreditation Program (NLLAP) paint chip or treat the surface as positive. LBP is ≥ 1.0 mg/cm² or ≥ 0.5% by weight , plus like surfaces in the same room equivalent with a similar painting history ( 745.227(h)(1) ).
You do not perform this inspection unless you also hold inspector or risk-assessor certification. Supervisor curriculum topic 745.225(d)(3)(v) is interpretation of inspection and risk-assessment reports. The report is how you know which sashes, casings, and troughs are LBP before you write the occupant protection plan (OPP) , pick methods, file the five-business-day notice, and later write the abatement report (Chapters 8, 9, and 18). It is not a menu you can rewrite with a supervisor-owned XRF.
Chapter 5.2 already defined LBP, components, and distinct painting history. This section is how you read the table those rules produce — including the 1.2 / 0.8 / inconclusive XRF rows and the 0.6% / 0.4% chip rows the exam will put in front of you.
What 745.227(b) actually sampled
745.227(b)(2) is the sampling rule, not a suggestion:
Building What must be tested What may be skipped
Residential dwelling or COF Each component with a distinct painting history , and each exterior component with a distinct painting history Components the inspector or risk assessor determines were replaced after 1978 , or determines do not contain LBP
Multi-family dwelling or COF The dwelling/COF rule plus each common-area component with a distinct painting history Same post-1978 / not-LBP determinations
Distinct painting history ( 745.223 ) is the application history of coatings on a component or room, shown by visual appearance or a record of application . Check whether the table actually tested each distinct history, or silently grouped a 2015 stripped sash with a never-stripped 1958 sash.
Paint is sampled under 745.227(b)(3) by documented methodologies that incorporate adequate quality control , and/or by paint-chip samples analyzed under 745.227(f) . HUD Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing are listed as documented methodologies in 745.227(a)(3) , along with EPA residential sampling protocols and authorized-state methods. That is why inspection tables look like HUD Chapter 7 tables even on an EPA job: the PCS classification, quality-control shots, and inconclusive-confirmation path come from that documented methodology.
745.227(f) is a hard stop for supervisors. Any paint-chip, dust, or soil sample collected under these work-practice standards shall be collected by a certified inspector or risk assessor and analyzed by a laboratory recognized by EPA under TSCA section 405(b) — NLLAP. You do not grab a chip to confirm the report. You do not run clearance wipes. Post-abatement testing is 745.227(e)(8) , inspector or risk assessor only.
Required inspection-report contents — 745.227(b)(4)
If a page is missing these items, you do not have a complete inspection report:
- Required element Why the supervisor cares
- Date of each inspection Snapshot date; paint can fail after this date
- Address of building Must match the notice, OPP, and abatement report
- Date of construction Pre-1978 is why this is target housing or a COF (Chapter 3)
- Apartment numbers (if applicable) Unit-by-unit scope; do not copy Unit 2 onto Unit 4
- Owner name, address, telephone Who contracted; who gets copies under 745.227(i)
Name, signature , and certification number of each inspector or risk assessor Unsigned or uncertified is not this report
Certified firm name, address, telephone (if applicable) Firm is certified under 745.226
Each testing method and device and/or sampling procedure, including quality-control data and, if used, the serial number of any XRF No serial number, no QC — you cannot defend the numbers
Specific locations of each painted component tested Form, function, location — not a row that just says windows
Results expressed in terms appropriate to the sampling method mg/cm² for XRF; % by weight for chips
Results in the wrong unit are a red flag. An XRF line reported as 0.6% or a chip reported as 1.2 mg/cm² means someone mixed the two languages. Send the report back; do not translate units yourself.
Decode the table: 1.2 vs 0.8 vs inconclusive, 0.6% vs 0.4%
XRF measures loading in mg/cm² . The federal LBP number is 1.0 mg/cm² . The inspector does not simply compare the raw reading to 1.0 in isolation. HUD documented methodology uses that device's PCS to classify each reading as:
Positive — LBP is present on that testing combination.
Negative — LBP is not present on that testing combination.
Inconclusive — the reading sits in the PCS range where the instrument cannot classify the surface relative to 1.0 mg/cm².
Some PCS documents use an inconclusive range around 1.0; others use a single threshold with no inconclusive band. That is why the classification column , not your mental subtraction of 0.8 from 1.0, controls. If the PCS classified 0.8 mg/cm² as negative , the XRF path says not LBP (unless a chip on that same history says otherwise). If the PCS classified 0.8 as inconclusive , it is not a pass .
Inconclusive typically needs paint-chip confirmation by an NLLAP laboratory, unless the owner assumes the surface is positive (HUD's documented alternative). Never treat inconclusive as no lead. A supervisor who sees 0.8 mg/cm², notices that 0.8 is below 1.0, and crosses the casing off the work order has just made an inspector decision without a PCS and without a chip.
Paint chips speak percent by weight . ≥ 0.5% (5,000 ppm) is LBP. 0.6% is LBP. 0.4% is not. A chip finishes an inconclusive XRF. A chip is not required to confirm a PCS-positive 1.2 mg/cm² sash — that sash is already LBP.
Like surfaces. 745.227(h)(1)(ii) extends LBP to any surface like a tested surface in the same room equivalent with a similar painting history . If one living-room sash is positive at 1.2 mg/cm² and three other living-room sashes share the same color stack, those three are LBP without each being shot. Bedroom sashes in a different room equivalent are not pulled in.
Worked example — one inspection page
Room / location Component Method Result PCS / lab class What the supervisor puts on the work order
Living room Window sash A XRF SN 45211 1.2 mg/cm² Positive LBP. Replacement or another abatement method. No chip required.
Living room Window sashes B–D, same color stack, not stripped Not tested — Like-surface LBP under (h)(1)(ii) LBP. Same methods as sash A. Do not skip them because they have no XRF line.
Living room Door casing XRF SN 45211 0.8 mg/cm² Inconclusive Not a negative. Do not drop it.
Living room Door casing (confirmation) Paint chip, NLLAP 0.6% by weight LBP (≥ 0.5%) LBP. Treating 0.8 as below 1.0 would have hidden this.
Stair Newel (inconclusive XRF, then chip) Paint chip, NLLAP 0.4% by weight Not LBP Not LBP. Confirmation finished the inconclusive. Do not abate it as LBP.
Bedroom Baseboard Paint chip only 0.6% by weight LBP LBP. Either threshold is enough; no XRF needed.
Kitchen Door slab, replaced 1995 per invoice Not tested — Excluded as post-1978 replacement Not LBP on this report. Original 1960 casing around it still needs its own line.
Common hall (multi-family) Handrail, original coating XRF 1.8 mg/cm² Positive LBP. Common-area components with distinct histories are in the inspection, not optional extras.
Field traps on this page:
0.8 is not an automatic negative. PCS inconclusive plus a 0.6% chip is LBP.
A 0.4% chip after inconclusive is a completed negative , not close enough to abate as LBP unless the contract assumes all paint is LBP.
Untested similar sashes in the same room equivalent are in play.
Post-1978 replacement excludes that component, not every painted part of the opening.
Missing XRF serial number or QC data means you cannot treat the sheet as a finished (b)(4) report.
What you do with a complete inspection (and what you do not)
Use the inspection to name which components are LBP before method selection (Chapter 13) and before notification quantities (Chapter 9). Use it later so the abatement report's locations of rooms and/or components where abatement occurred match the inspection map.
Do not :
Collect confirmatory chips or dust because the table looks thin ( 745.227(f) ).
Treat an inspection as a risk assessment . Inspection answers whether LBP is present. Risk assessment (Section 7.2) answers where the hazards are and what the control options are. Intact LBP on a closet shelf is still LBP; it may not be a current hazard.
Self-clear after abatement. 745.227(e)(8) post-abatement visual and dust testing is inspector or risk assessor only.
If the owner skipped inspection and the contract simply assumes all paint is LBP , that is a scope choice, not a 745.227(h)(1) determination. You still need a certified inspector or risk assessor for post-abatement sampling. You still cannot fill an inspection-report blank with supervisor guesses.