9.1 Five-Business-Day Notification Contents and Electronic Filing

EPA Lead Abatement Supervisor 40 CFR 745 Subpart L

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Exam Facts, Supervisor Role, and Certification Path

1.1 Current Exam Facts 1.2 Supervisor Role, Responsibilities, and On-Site Presence 1.3 Prerequisites, Interim Certification, and the Third-Party Exam

2 Chapter 2: Firm Certification, Recertification, and Enforcement

2.1 Firm Certification vs Individual Certification 2.2 Recertification, 8-Hour Refresher, and 3-Year vs 5-Year Cycles 2.3 Suspension, Revocation, TSCA Violations, and Inspections

3 Chapter 3: Title X, 40 CFR 745, State Programs, and HUD Guidelines

3.1 Title X, TSCA 402–406, and 40 CFR 745 Architecture 3.2 Target Housing, Child-Occupied Facilities, and the 1978 Ban 3.3 EPA-Administered vs Authorized State Programs (Subpart Q) and Reciprocity 3.4 HUD Guidelines and Other Documented Methodologies

4 Chapter 4: Lead Health Effects, Blood-Lead Benchmarks, and Liability

4.1 Lead Toxicology, Child and Adult Health Effects, and Blood-Lead Benchmarks 4.2 Liability, Insurance, and Contract Risk for Abatement Supervisors

5 Chapter 5: What Counts as Abatement

5.1 Abatement vs Interim Controls vs RRP 5.2 Lead-Based Paint Definition and Component Language 5.3 Paint-Lead, Dust-Lead, and Soil-Lead Hazard Definitions

6 Chapter 6: Lead Hazard Recognition in the Field

6.1 Deteriorated Paint and Paint in Poor Condition 6.2 Friction, Impact, and Chewable Surface Hazards 6.3 High-Risk Components, Common Areas, and Dust Pathways

7 Chapter 7: Interpreting Inspection and Risk Assessment Reports

7.1 Reading Inspection Reports, XRF Results, and Paint-Chip Data 7.2 Reading Risk Assessment Reports and Selecting Control Options 7.3 Lead Hazard Screens vs Full Risk Assessments

8 Chapter 8: Occupant Protection Plans

8.1 Occupant Protection Plan Requirements 8.2 Relocation, Isolation of Work Areas, and Sensitive Occupants 8.3 Re-Occupancy Criteria, Occupant Notice, and Access Control

9 Chapter 9: Project Notification and Work Plans

9.1 Five-Business-Day Notification Contents and Electronic Filing 9.2 Updated, Canceled, EBL, and Emergency Notifications 9.3 Work Plans, Method Selection Documentation, and Pre-Abatement Walkthrough

10 Chapter 10: Interior Containment Design

10.1 Critical Barriers, Warning Signs, and Regulated Areas 10.2 Negative Air Pressure and HEPA Air-Filtration Units 10.3 Three-Stage Decontamination Units and Worker Flow

11 Chapter 11: Exterior Containment and Site Control

11.1 Exterior Ground Sheeting, Vertical Containment, and Weather Limits 11.2 Daily Exterior Cleanup, Paint-Chip Control, and Occupied/Multi-Family Logistics

12 Chapter 12: Component Replacement, Enclosure, and Encapsulation

12.1 Component Replacement 12.2 Enclosure Systems and Mechanical Fastening 12.3 Encapsulation Products, Unsuitable Surfaces, and Maintenance Schedules

13 Chapter 13: Paint Removal and Restricted Practices

13.1 Wet Scraping, Chemical Removal, and Heat Guns Below 1100°F 13.2 Restricted and Prohibited Practices 13.3 Selecting Methods, Combining Methods, and Documenting Why

14 Chapter 14: Interior Dust Abatement and Cleaning

14.1 Interior Dust Cleanup Sequence 14.2 Pre-Clearance Visual Inspection and When Cleanup Is Not Done

15 Chapter 15: Soil and Exterior Dust Abatement

15.1 Soil-Lead Hazards and Sampling Interpretation for Supervisors 15.2 Soil Removal and Replacement 15.3 Permanent Covering vs Landscaping

16 Chapter 16: OSHA 1926.62 Worker Protection

16.1 PEL, Action Level, and Exposure Assessment 16.2 Respiratory Protection, PPE, and Hygiene Facilities 16.3 Biological Monitoring and Medical Removal Protection 16.4 OSHA Competent Person Duties vs EPA Certified Supervisor Duties

17 Chapter 17: RCRA Waste Management

17.1 Abatement Waste Streams 17.2 TCLP Characterization and D008 17.3 Manifests, TSDF, Accumulation, and the Household Exclusion

18 Chapter 18: Action Levels, Post-Abatement Testing, and Records

18.1 Dust-Lead Action Levels vs Reportable-Level Hazards 18.2 Post-Abatement Visual, Dust Sampling, Independence, and the 1-Hour Wait 18.3 Failed Samples, Reclean/Retest, Exterior Visual, and Multi-Family Random Sampling 18.4 Abatement Report, 2026 Hazard Statement, Owner Copies, and 3-Year Retention

9.1 Five-Business-Day Notification Contents and Electronic Filing

Key Takeaways Explain This Topic AI

A certified firm must notify EPA of lead-based paint abatement activities. Except for EBL or emergency-order jobs, the original notification must be received by EPA at least 5 business days before the start date (40 CFR 745.227(e)(4)(i)).

Business day means Monday through Friday with the exception of Federal holidays (40 CFR 745.223). Do not count Saturday, Sunday, or Federal holidays, and do not treat a sent or attempted filing as received.

Notification must be accomplished electronically. Instructions are at https://www.epa.gov/lead or from the NLIC at 1-800-424-LEAD (5323) (745.227(e)(4)(vii)).

The firm is the notifying party. The notice still lists the project supervisor's name and EPA certification number, plus firm identity, dates, building type, property address including unit, quantity, a brief description, and the firm representative's name, title, and signature (745.227(e)(4)(vi)).

No firm or individual shall engage in abatement before notifying EPA, and work shall not begin on a date or at a location other than specified in the original or updated notice (745.227(e)(4)(viii)–(ix)).

Last updated: August 2026

Five business days, received electronically, by the certified firm

Quick Answer: A certified firm must notify EPA of lead-based paint abatement activities. Except for EBL or emergency-order jobs, the original notification must be received by EPA at least 5 business days before the start date (40 CFR 745.227(e)(4)(i) ). A business day is Monday through Friday except Federal holidays ( 745.223 ). Notification must be accomplished electronically . The firm is the notifying party; the notice still lists the project supervisor's name and EPA certification number .

Inspection, risk assessment, and RRP renovation are not this notice. This paragraph is the abatement-start gate in EPA-administered jurisdictions. In an authorized State , you notify that State's program on that State's timeline — which may be stricter. The federal 5-business-day clock is the EPA-administered baseline , not a nationwide hall pass. Always check the jobsite's jurisdiction before you mobilize (Chapter 3).

The firm notifies; the supervisor is named

745.227(e)(4) opens with the duty-holder: "A certified firm must notify EPA of lead-based paint abatement activities as follows." The individual supervisor does not file "as the supervisor" and thereby cover an uncertified company. 745.227(e)(4)(ix) then closes the gate: "No firm or individual shall engage in lead-based paint abatement activities, as defined in § 745.223, prior to notifying EPA of such activities according to the requirements of this paragraph." Both layers are named. An uncertified firm with a certified supervisor, or a certified firm that never files, both fail.

The notice still has to identify who will run the job . 745.227(e)(4)(vi)(I) requires the name and EPA certification number of the project supervisor . (vi)(D) requires the firm's name, EPA certification number, address, and telephone number . (vi)(L) requires the name, title, and signature of the representative of the certified firm who prepared the notification . Those are three different slots: the firm, the supervisor of record, and the firm representative who signed the filing. They can overlap (a sole proprietor supervisor who signs), but the exam will split them.

Worked example — supervisor files, firm is silent. Dana is a certified supervisor. The company that employs her is not certified. Dana uploads a complete electronic notice using her individual number. Fail. The notifying party must be a certified firm , and that firm must exist. Chapter 2 already taught that after March 1, 2000, firms that perform or offer to perform lead-based paint activities need their own certificate.

Worked example — firm files, wrong supervisor number. The certified firm files on time but lists last month's supervisor, whose card expired, because "we will assign someone Monday." The notice contents are false. The project still needs a certified supervisor under 745.227(e)(2) , and the notice must name that person and that person's EPA certification number .

Five business days is not five calendar days

745.227(e)(4)(i): except for the EBL/emergency shortcut in (e)(4)(ii), "The original notification must be received by EPA at least 5 business days before the start date of any lead-based paint abatement activities."

Two words do the damage on exam items: received and business .

Word in the rule What it is What it is not

Received EPA has the electronic notice "We hit send after hours and it bounced"; "we mailed it Friday"; "the owner knew"

Business day Monday through Friday except Federal holidays (745.223) Saturday, Sunday, or a Federal holiday (New Year's Day, MLK Day, Presidents' Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day, and any other day treated as a Federal holiday)

5 business days before the start date Count back five business days from the planned start; do not count the start date itself; do not count weekends or Federal holidays Five calendar days; "a work week"; "Monday to Monday if we skip the weekend in our heads"

Worked example — Friday file, Monday start. The firm files Friday afternoon and wants to start Monday. Between Friday and Monday sit Saturday and Sunday, which are not business days. You have not given EPA five business days. Friday is one business day before Monday. Fail.

Worked example — holiday sandwich. Planned start is Monday, November 30, 2026 . Thanksgiving Day 2026 is Thursday, November 26 (Federal holiday). Count backward from Monday the 30th, skipping the holiday and the weekend:

  • 1 business day before = Friday, November 27 (the day after Thanksgiving is not a Federal holiday)
  • 2 = Wednesday, November 25 (Thursday the 26th is skipped)
  • 3 = Tuesday, November 24
  • 4 = Monday, November 23
  • 5 = Friday, November 20

EPA must receive the original notice no later than Friday, November 20 . Filing the Wednesday before Thanksgiving (the 25th) looks "almost a week" on a wall calendar and is still only two business days before the 30th. Fail.

Worked example — received, not intended. The firm representative completes the form on Tuesday and assumes the electronic system "will go through." The submission errors. Nobody checks. EPA never receives a notice. The crew starts the following Wednesday. 745.227(e)(4)(i) is a received-by rule, not a we-tried rule. 745.227(e)(4)(ix) then bars any firm or individual from engaging in the abatement before notifying.

Do not count the start date as one of the five. Do not treat a Saturday start as extra credit. If you must start on a Monday after a Friday Federal holiday, that holiday dropped out of the count and you need an earlier filing.

Electronic filing is mandatory

745.227(e)(4)(vii): "Notification must be accomplished electronically." Instructions are at https://www.epa.gov/lead or from the National Lead Information Center (NLIC) at 1-800-424-LEAD (5323) .

That sentence is the method. A paper notice left on a regional-office counter, a fax confirmation sheet, or a certified-mail receipt does not accomplish this paragraph. If the electronic system rejects the filing, you do not have a received notice. Call NLIC or follow EPA's current electronic instructions rather than improvising a paper workaround. Electronic filing does not shorten the 5-business-day clock and does not shrink the contents list in (e)(4)(vi).

Contents checklist — 745.227(e)(4)(vi)

Every notification — original, updated, or cancellation — must include:

  • Cite Required item Field note
  • (A) Notification type Original , updated , or cancellation

(B) Start date The date activities will start — the 5-business-day clock and the "shall not begin on a date other than specified" rule both hang on this date

  • (C) End date An approximation using best professional judgement — it may be an estimate; it is still required
  • (D) Firm identity Name, EPA certification number, address, telephone number
  • (E) Building type e.g., single family dwelling , multi-family dwelling , child-occupied facility
  • (F) Property name If applicable
  • (G) Property address Including apartment or unit number(s) if applicable
  • (H) EBL or emergency documentation Only if you are using the abbreviated clock in (e)(4)(ii)
  • (I) Project supervisor Name and EPA certification number
  • (J) Quantity Approximate square footage / acreage to be abated
  • (K) Scope Brief description of abatement activities to be performed

(L) Firm representative Name, title, and signature of the representative of the certified firm who prepared the notification

Missing the unit number is how two apartments in the same building become a location problem in Section 9.2. Missing the supervisor number is how a firm files a notice that does not identify a legal supervisor of record. Putting "TBD" in the start date is not a start date.

745.227(e)(4)(viii) then nails the start: lead-based paint abatement activities "shall not begin on a date, or at a location other than that specified" in the original or updated notification. The notice is not a vague neighborhood courtesy. It is the date and address EPA thinks you are working.

Authorized-state overlay, and what this notice is not

If the jobsite is in an EPA-authorized State or Tribal program (Chapter 3), you notify that program on that program's timeline. Some authorized programs use more than 5 business days, a different portal, or extra local forms. An EPA electronic filing does not satisfy a State that runs its own notice. Conversely, in EPA-administered states and in Indian country without an authorized program, 745.227(e)(4) is the rule: 5 business days, received, electronic, full contents.

This notice is also not the RRP pre-renovation pamphlet, not the occupant protection plan (Chapter 8), and not the later abatement report (Chapter 18). Those documents can share facts with the notice. None of them is the notice.

Official sources: 40 CFR 745.227(e)(4) and 40 CFR 745.223 (business day).