Study guide
3.2 Target Housing, Child-Occupied Facilities, and the 1978 Ban
EPA Lead Abatement Supervisor 40 CFR 745 Subpart L
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Exam Facts, Supervisor Role, and Certification Path
1.1 Current Exam Facts 1.2 Supervisor Role, Responsibilities, and On-Site Presence 1.3 Prerequisites, Interim Certification, and the Third-Party Exam
2 Chapter 2: Firm Certification, Recertification, and Enforcement
2.1 Firm Certification vs Individual Certification 2.2 Recertification, 8-Hour Refresher, and 3-Year vs 5-Year Cycles 2.3 Suspension, Revocation, TSCA Violations, and Inspections
3 Chapter 3: Title X, 40 CFR 745, State Programs, and HUD Guidelines
3.1 Title X, TSCA 402–406, and 40 CFR 745 Architecture 3.2 Target Housing, Child-Occupied Facilities, and the 1978 Ban 3.3 EPA-Administered vs Authorized State Programs (Subpart Q) and Reciprocity 3.4 HUD Guidelines and Other Documented Methodologies
4 Chapter 4: Lead Health Effects, Blood-Lead Benchmarks, and Liability
4.1 Lead Toxicology, Child and Adult Health Effects, and Blood-Lead Benchmarks 4.2 Liability, Insurance, and Contract Risk for Abatement Supervisors
5 Chapter 5: What Counts as Abatement
5.1 Abatement vs Interim Controls vs RRP 5.2 Lead-Based Paint Definition and Component Language 5.3 Paint-Lead, Dust-Lead, and Soil-Lead Hazard Definitions
6 Chapter 6: Lead Hazard Recognition in the Field
6.1 Deteriorated Paint and Paint in Poor Condition 6.2 Friction, Impact, and Chewable Surface Hazards 6.3 High-Risk Components, Common Areas, and Dust Pathways
7 Chapter 7: Interpreting Inspection and Risk Assessment Reports
7.1 Reading Inspection Reports, XRF Results, and Paint-Chip Data 7.2 Reading Risk Assessment Reports and Selecting Control Options 7.3 Lead Hazard Screens vs Full Risk Assessments
8 Chapter 8: Occupant Protection Plans
8.1 Occupant Protection Plan Requirements 8.2 Relocation, Isolation of Work Areas, and Sensitive Occupants 8.3 Re-Occupancy Criteria, Occupant Notice, and Access Control
9 Chapter 9: Project Notification and Work Plans
9.1 Five-Business-Day Notification Contents and Electronic Filing 9.2 Updated, Canceled, EBL, and Emergency Notifications 9.3 Work Plans, Method Selection Documentation, and Pre-Abatement Walkthrough
10 Chapter 10: Interior Containment Design
10.1 Critical Barriers, Warning Signs, and Regulated Areas 10.2 Negative Air Pressure and HEPA Air-Filtration Units 10.3 Three-Stage Decontamination Units and Worker Flow
11 Chapter 11: Exterior Containment and Site Control
11.1 Exterior Ground Sheeting, Vertical Containment, and Weather Limits 11.2 Daily Exterior Cleanup, Paint-Chip Control, and Occupied/Multi-Family Logistics
12 Chapter 12: Component Replacement, Enclosure, and Encapsulation
12.1 Component Replacement 12.2 Enclosure Systems and Mechanical Fastening 12.3 Encapsulation Products, Unsuitable Surfaces, and Maintenance Schedules
13 Chapter 13: Paint Removal and Restricted Practices
13.1 Wet Scraping, Chemical Removal, and Heat Guns Below 1100°F 13.2 Restricted and Prohibited Practices 13.3 Selecting Methods, Combining Methods, and Documenting Why
14 Chapter 14: Interior Dust Abatement and Cleaning
14.1 Interior Dust Cleanup Sequence 14.2 Pre-Clearance Visual Inspection and When Cleanup Is Not Done
15 Chapter 15: Soil and Exterior Dust Abatement
15.1 Soil-Lead Hazards and Sampling Interpretation for Supervisors 15.2 Soil Removal and Replacement 15.3 Permanent Covering vs Landscaping
16 Chapter 16: OSHA 1926.62 Worker Protection
16.1 PEL, Action Level, and Exposure Assessment 16.2 Respiratory Protection, PPE, and Hygiene Facilities 16.3 Biological Monitoring and Medical Removal Protection 16.4 OSHA Competent Person Duties vs EPA Certified Supervisor Duties
17 Chapter 17: RCRA Waste Management
17.1 Abatement Waste Streams 17.2 TCLP Characterization and D008 17.3 Manifests, TSDF, Accumulation, and the Household Exclusion
18 Chapter 18: Action Levels, Post-Abatement Testing, and Records
18.1 Dust-Lead Action Levels vs Reportable-Level Hazards 18.2 Post-Abatement Visual, Dust Sampling, Independence, and the 1-Hour Wait 18.3 Failed Samples, Reclean/Retest, Exterior Visual, and Multi-Family Random Sampling 18.4 Abatement Report, 2026 Hazard Statement, Owner Copies, and 3-Year Retention
3.2 Target Housing, Child-Occupied Facilities, and the 1978 Ban
Key Takeaways Explain This Topic AI
Target housing is housing constructed prior to 1978, except housing for the elderly or persons with disabilities or any 0-bedroom dwelling, unless a child less than 6 resides or is expected to reside (745.223).
Housing for the elderly means retirement communities or similar housing reserved for households with one or more persons 62 years of age or more at initial occupancy.
A child-occupied facility is a building or portion constructed prior to 1978, visited regularly by the same child under 6, on at least two different days within any week (Sunday–Saturday), each day’s visit at least 3 hours, combined weekly visits at least 6 hours, and combined annual visits at least 60 hours — for example day-care centers, preschools, and kindergarten classrooms.
The 1978 CPSC ban on residential lead-containing paint is why pre-1978 construction is the trigger. It does not make every pre-1978 coating lead-based paint; LBP is still ≥ 1.0 mg/cm² or ≥ 0.5% by weight and must be tested or assumed.
Exam traps: a 0-bedroom loft is out unless a child under 6 resides or is expected; a 62+ building stays excepted for a visiting grandchild who does not reside; a 1975 church daycare wing can be a COF even if the sanctuary is not; a post-1978 addition is not target housing even when attached to a pre-1978 original.
Last updated: August 2026
Target Housing, Child-Occupied Facilities, and the 1978 Ban
Quick answer: Target housing is housing constructed prior to 1978 , except housing for the elderly or persons with disabilities or any 0-bedroom dwelling , unless a child less than 6 years of age resides or is expected to reside in that housing ( 745.223 ). A child-occupied facility (COF) is a building or portion constructed prior to 1978 that the same child under 6 visits on a four-part hours test. The 1978 CPSC ban is why “pre-1978” is the trigger. Do not treat every pre-1978 painted component as lead-based paint — test it (or assume LBP) against 1.0 mg/cm² or 0.5% by weight .
If you mis-classify the property, you will staff the wrong credential, skip or file the wrong notification, and write the wrong occupant protection plan. This section is a sorting rule, not a history lesson.
Target housing (745.223)
Target housing means any housing constructed prior to 1978 , except:
- Housing for the elderly , or
- Housing for persons with disabilities , or
- Any 0-bedroom dwelling ,
unless any child who is less than 6 years of age resides or is expected to reside in such housing.
Housing for the elderly is defined in the same section: retirement communities or similar types of housing reserved for households composed of one or more persons 62 years of age or more at the time of initial occupancy . “Most residents are retired” is not the test. The community must be reserved for 62+ households at move-in.
A 0-bedroom dwelling is housing in which the sleeping area is not a separate bedroom — typical studio, efficiency, or loft . A 1972 warehouse loft with an open sleeping alcove is a 0-bedroom dwelling. A 1972 two-bedroom flat is ordinary target housing.
Constructed prior to 1978 means the building’s construction date, not the date the current paint was applied, not the date of the last rehab, and not the year the lease started. Housing constructed in 1978 is not target housing under this definition. Housing constructed in 1977 is.
- Property Target housing? Why
- 1965 single-family house, family with a 4-year-old Yes Pre-1978 housing; child under 6 resides
1965 house, couple with no children Yes Pre-1978 housing; elderly / 0-bedroom / disability exceptions do not apply
1982 townhouse No Constructed 1978 or later
1972 open loft, no child under 6 No (0-bedroom exception) 0-bedroom and no child under 6 resides or is expected
1972 loft, toddler will move in next month Yes 0-bedroom exception fails once a child under 6 is expected to reside
1970 62+ retirement community, no child residents No (elderly exception) Reserved for 62+ at initial occupancy
Same 62+ community, a grandchild is moving in with a resident Yes for that dwelling Child under 6 is expected to reside; the exception collapses
The exception is lost dwelling by dwelling when a child under 6 resides or is expected to reside. It is not a building-wide forever exemption once one apartment has a grandchild on the lease.
Child-occupied facility — the hours test
Child-occupied facility means a building, or portion of a building , constructed prior to 1978 , visited regularly by the same child, under 6 years of age , on at least two different days within any week ( Sunday through Saturday ), provided that:
- each day’s visit lasts at least 3 hours , and
- the combined weekly visits last at least 6 hours , and
the combined annual visits last at least 60 hours .
The regulation’s examples: day-care centers, preschools, and kindergarten classrooms . A COF can be an entire building or only a wing, classroom, or basement suite. The rest of the building is not automatically a COF.
All four time elements must be true for the same child under 6 . A building that many different children pass through for 20 minutes does not become a COF. A child who comes every weekday for 4 hours easily clears 3 hours/day, 2 days, 6 hours/week, and 60 hours/year.
Scenario COF? Failed or passed element
Licensed daycare in a 1975 church education wing, same preschoolers 7:30–4:00, Monday–Friday Yes (the wing) Pre-1978 portion; same children under 6; hours far above the floor
- Same church’s 1975 sanctuary used 90 minutes on Sunday Not by that use One day, under 3 hours
- After-school program, ages 8–11, in a 1972 gym No Children are not under 6
- 1985 daycare in a strip-mall suite built in 1985 No Constructed 1978 or later
Grandchild visits a 62+ apartment 2 hours every Sunday No One day, under 3 hours; not “regular” two-day/week COF use
Home daycare in a 1968 house, same toddler 8:00–3:00, Tuesday and Thursday Yes (the portion used) Two days, ≥3 hours/day, ≥6 hours/week; annual hours will exceed 60 if the arrangement continues
Why 1978 exists — and what it does not prove
The U.S. Consumer Product Safety Commission (CPSC) banned consumer paint above 0.06 percent lead, effective for residential use in 1978 . That ban is why Title X and 745.223 use construction prior to 1978 as the housing trigger. After the ban, new residential paint was not supposed to be formulated as lead-based paint.
That history does not mean:
- every pre-1978 painted component is lead-based paint, or
- every post-1978 painted component is lead-free, or
- you may skip inspection, XRF, or paint-chip analysis because “the house is old.”
Lead-based paint is still a measured definition: ≥ 1.0 milligrams per square centimeter or ≥ 0.5 percent by weight ( 745.227(h)(1) ). Pre-1978 paint is more likely to be LBP, especially on housing built before 1960, but likelihood is not a laboratory result. Inspectors and risk assessors test components with a distinct painting history. Supervisors read those reports. If the report says a 1971 door casing is below the LBP definition, you do not abate it as LBP just because the house is pre-1978. If no testing was done and the contract treats all paint as LBP, that is a contract assumption , not a 745.223 definition.
Industrial coatings, marine paint, and some specialty products are outside the CPSC consumer-paint ban story. Do not import those into a residential Subpart L exam item unless the fact pattern gives you a tested result.
Four exam traps to sort on paper
1. The 0-bedroom loft. A 1974 converted mill loft with a sleeping loft and no separate bedroom is not target housing unless a child less than 6 resides or is expected to reside. A childless couple’s loft is out. The same loft listed for a family with a 2-year-old is in. Do not confuse “small apartment” with 0-bedroom: a one-bedroom efficiency that actually has a walled bedroom is target housing.
2. The 62+ building with a visiting grandchild. Housing reserved for 62+ at initial occupancy is not target housing. A grandchild who visits does not, by itself, make the dwelling target housing. The exception falls only if a child under 6 resides or is expected to reside . Weekend visits fail that test. A court-ordered custody arrangement that places the child in the unit during the school week is “resides or expected to reside.” Separately, if the same grandchild’s visits also meet the COF hours test in a portion of the building (unlikely for a two-hour Sunday visit; possible for daily all-day caregiving), that portion can be a COF even when the dwelling is not target housing. Ask both questions.
3. Daycare in a 1975 church wing. The education wing is a classic COF if the same children under 6 attend on the hours test. The 1975 sanctuary used for adult worship is not a COF merely because it shares a roof and a construction date. Abate the wing as a COF; do not automatically expand Subpart L to the entire church campus.
4. Post-1978 addition vs. pre-1978 original. A 1955 house with a 1990 family-room addition is mixed. The 1955 original is target housing. The 1990 addition was not constructed prior to 1978, so it is not target housing. 745.227(b)(2) even lets an inspector skip components determined to have been replaced after 1978 . You still follow the risk-assessment report: soil against the old foundation, dust in the original living area, and any pre-1978 components remaining in the addition chase (windows reused from the original house, for example) may still be in play. Do not write one “whole house is target housing because part of it is old” sentence and stop thinking.
What the supervisor does with the classification
Once you know whether the site is target housing, a COF, both, or neither:
Neither (post-1978 office with no COF, 1985 apartment, 62+ building with no child residents and no COF daycare): Subpart L abatement certification is not the federal trigger. Other rules (OSHA, State, contract, HUD if assistance is involved) may still apply.
Target housing and/or COF: certified firm, certified supervisor, 745.227 (or the authorized-state equivalent), notification, occupant protection plan, post-abatement testing by a certified inspector or risk assessor.
Classification happens before you bid. Construction year comes from tax records, a plaque, or the inspection report — not from the color of the trim.