Study guide
2.1 Testing Matrix Facts for AMG, AMA, and AMP
FAA A&P Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Orientation: Eligibility, FTN, Authorization, Three-Test Path, and Retakes
1.1 Certificate Ratings and the Three-Test Roadmap 1.2 Baseline Eligibility and the Experience Path 1.3 AMTS and Military Eligibility Pathways 1.4 FTN, IACRA, and the Authorization File 1.5 Knowledge-Test Logistics and Scoring 1.6 AKTRs, Retakes, and the DME Transition
2 ACS Map, Testing Matrix, Embedded Images, Supplements, and Study Workflow
2.1 Testing Matrix Facts for AMG, AMA, and AMP 2.2 ACS Map and Subject-Area Boundaries 2.3 AKTR ACS-Code Diagnostics 2.4 Testing Supplement and Embedded Images 2.5 Three-Test Study Workflow 2.6 Final Review and Test-Day Source Control
3 General I: Electricity, Drawings, Weight and Balance, Math, and Physics
3.1 Electricity and Electronics Foundations 3.2 AC/DC Measurement and Schematic Troubleshooting 3.3 Aircraft Drawings, Blueprints, and Schematics 3.4 Weight and Balance Equations and Records 3.5 Maintenance Math and Unit Discipline 3.6 Physics for Aviation: Forces, Fluids, and Flight
4 General II: Lines, Materials, Servicing, Corrosion, Records, Inspection, and Human Factors
4.1 Fluid Lines, Fittings, and Installation Risk 4.2 Materials, Hardware, and Process Control 4.3 Ground Operations, Servicing, and Ramp Safety 4.4 Cleaning, Corrosion Control, and Finishing 4.5 Regulations, Forms, Records, and Publications 4.6 Inspection Concepts, Human Factors, and Maintenance Judgment
5 Airframe I: Structures, Flight Controls, and Airframe Inspection
5.1 Metallic Structure Inspection and Damage Patterns 5.2 Sheet-Metal Repairs, Fasteners, and Riveting Judgment 5.3 Non-Metallic Structures: Composites, Wood, Fabric, and Plastics 5.4 Flight Control Systems, Rigging, and Travel 5.5 Control Surface Balance, Flutter, and Freeplay 5.6 Airframe Inspection, Records, ADs, and Corrosion Decisions
6 Airframe II: Landing Gear, Hydraulics, Pneumatics, Environmental, Instruments, and Comms
6.1 Landing Gear, Wheels, Tires, and Brakes 6.2 Retraction, Steering, Anti-Skid, and Warning Systems 6.3 Hydraulic Systems: Components, Fluids, and Troubleshooting 6.4 Pneumatic, Vacuum, and Bleed-Air Systems 6.5 Environmental Systems: Pressurization, Heating, Cooling, and Oxygen 6.6 Instrument Systems: Pitot-Static, Gyros, and Displays 6.7 Communication, Navigation, Antennas, and Avionics Inspection
7 Airframe III: Fuel, Electrical, Ice/Rain, Fire, Rotorcraft, and Water/Waste Systems
7.1 Airframe Fuel System Boundaries and Safe Servicing 7.2 Airframe Electrical Power, Wiring, and Protection 7.3 Ice and Rain Control System Inspection and Limits 7.4 Airframe Fire Protection Detection, Extinguishing, and Squib Safety 7.5 Rotorcraft Fundamentals, Controls, Drives, and Vibration 7.6 Water and Waste Systems Service Boundaries and Contamination Control
8 Powerplant I: Reciprocating, Turbine Engine Theory, and Engine Inspection
8.1 Reciprocating Engine Cycles, Components, and Operating Boundaries 8.2 Horizontally Opposed and Radial Engine Components 8.3 Reciprocating Engine Performance, Ground Operation, and Preservation 8.4 Turbine Engine Airflow, Sections, and Performance 8.5 Turbine Engine Maintenance, FOD, Bleed Air, and Post-Installation Checks 8.6 Engine Inspection, Records, Compression, Borescope, and Airworthiness
9 Powerplant II: Instruments, Fire, Electrical, Lubrication, Ignition, and Starting
9.1 Engine Instrument Scan and Trend Logic 9.2 Pressure, Temperature, and Flow Indications 9.3 Engine Fire Protection, Detection, and Extinguishing 9.4 Engine Electrical Generation and Protection 9.5 Lubrication System Flow, Pressure, and Contamination 9.6 Ignition and Starting Troubleshooting
10 Powerplant III: Fuel Metering, Induction, Cooling, Turbine Air, Exhaust, Reversers, and Propellers
10.1 Engine Fuel System Flow, Contamination, and Vapor 10.2 Carburetors, Fuel Injection, and Metering Logic 10.3 Reciprocating Induction, Turbocharging, and Cooling 10.4 Turbine Air Systems, Bleed Air, and Anti-Ice 10.5 Exhaust Systems, Thrust Reversers, and Temperature Patterns 10.6 Propeller Systems, Governors, and Inspection
11 Oral/Practical Bridge: AKTR ACS Codes, DME Expectations, and Maintenance Judgment
11.1 Turn AKTR ACS Codes Into an Oral and Practical Remediation Plan 11.2 What the DME Oral Exam Is Really Testing 11.3 Practical Projects, Tools, Equipment, and Safety Discipline 11.4 Risk Management and Human Factors in the DME Environment 11.5 Documentation, Maintenance Records, and Data Discipline 11.6 Return-to-Service Judgment and Final DME Readiness
12 Final Review: Test Day Strategy, Three-Test Schedule, and Next Steps
12.1 Build the Final Study Calendar Around AMG, AMA, and AMP 12.2 PSI Test-Day Checklist Without Guesswork 12.3 Pacing for the 60-Question and 100-Question Knowledge Tests 12.4 Formula, Supplement, and Embedded-Image Final Review 12.5 Retake Decision Tree After a Failed or Weak Knowledge Test 12.6 DME Scheduling and Post-Pass Next Steps
2.1 Testing Matrix Facts for AMG, AMA, and AMP
Key Takeaways Explain This Topic AI
The FAA Airman Knowledge Testing Matrix (dated September 25, 2026) lists AMG, AMA, and AMP as three separate Aviation Maintenance Technician knowledge tests.
AMG has 60 questions; AMA and AMP each have 100 questions; all three allow 2.0 hours and require a 70 to pass.
Validation questions may appear, are not scored, are excluded from the listed counts, and are covered by the listed allotted time.
There is no single combined A&P written test; passing one code does not pass the others, each yields its own AKTR, and all tests, including the oral and practical, must be passed within 24 months (14 CFR 65.71(a)(3)).
Authorization for the AMT tests is FAA Form 8610-2, authenticated Part 147 AMTS graduation documentation, or a military Certificate of Eligibility.
Last updated: October 2026
The matrix is the controlling logistics map
The FAA Airman Knowledge Testing Matrix (current edition dated September 25, 2026 ) is the authoritative source for the logistics of the Aviation Maintenance Technician (AMT) knowledge tests. It lists three separate test codes: AMG (Aviation Mechanic General), AMA (Aviation Mechanic Airframe), and AMP (Aviation Mechanic Powerplant). For each test the matrix publishes the test code, test name, number of questions, allotted time, passing score, and the acceptable authorization document.
These tests are administered under 14 CFR Part 65 (the certification rule for airmen other than flight crew) at PSI computer-testing centers using FAA's contracted delivery system.
The numbers are simple but easy to distort if written from memory, so anchor them to the matrix exactly:
- Test code Test name Questions Time Passing score
- AMG Aviation Mechanic General 60 2.0 hours 70
- AMA Aviation Mechanic Airframe 100 2.0 hours 70
- AMP Aviation Mechanic Powerplant 100 2.0 hours 70
There is no single combined "A&P written." A candidate pursuing both ratings sits three distinct tests, earns three distinct Airman Knowledge Test Reports (AKTRs) , and is graded against three separate 70 thresholds. Passing AMG does not satisfy AMA or AMP, and vice versa.
Validation questions and the 24-month clock
The matrix warns that any AMT test may include validation questions (pretest items the FAA is statistically calibrating for future use). Validation questions are not scored and do not count for or against the result. The published count — 60, 100, 100 — is the scored count and excludes validation questions, but the 2.0-hour allotted time already includes time to answer them. So a candidate may see more than 60 or 100 screens, and that is normal; it is not a sign of a malfunction or a harder test.
Under 14 CFR 65.71(a)(3) , all prescribed tests must be passed within a period of 24 months , so the candidate must complete the oral and practical (O&P) test with a Designated Mechanic Examiner (DME) within 24 months of the first passed knowledge test. A knowledge test that falls outside that window must be retaken. Because the three tests can be passed on different dates, the earliest-dated AKTR effectively starts the practical-test clock for that rating's path.
How matrix facts drive pacing and scheduling
Use the matrix to build disciplined pacing rather than anxiety:
AMG: 60 scored questions in 120 minutes ≈ 2.0 minutes per question — generous, leaving time to read embedded figures.
AMA / AMP: 100 scored questions in 120 minutes = 1.2 minutes per question — tighter; practice timed 100-question sets.
Build a separate tracker for each code so progress in one is never confused with another.
Expect possible validation items and keep a steady cadence; do not slow down because the screen total looks high.
Confirm your authorization document matches the code you are scheduling: an FAA Form 8610-2 with the appropriate boxes checked, authenticated Part 147 Aviation Maintenance Technician School (AMTS) graduation paperwork, or a military Certificate of Eligibility .
Knowing all three tests share the same 2.0-hour clock lets you rehearse different question counts under one fixed time standard. Knowing they share a 70 passing score keeps you from inventing per-test thresholds. And knowing the validation rule prevents the most common test-day surprise — an unexpected extra question that an unprepared candidate misreads as a problem.
Where the matrix sits in the wider Part 65 path
The knowledge tests are one stage of the 14 CFR Part 65 mechanic-certification path, and the matrix only governs that stage.
The full path is: eligibility (at least 18 years old and able to read, write, speak, and understand English) → experience (either 18 months of documented practical experience for a single rating, 30 months for both Airframe and Powerplant, or graduation from an FAA-approved Part 147 AMTS ) → the three knowledge tests in this matrix → the oral and practical (O&P) with a Designated Mechanic Examiner.
The matrix logistics matter precisely because they sit in the middle of that chain: a 24-month-valid AKTR is the token that lets you proceed to the O&P, and an expired or missing AKTR stalls the whole path.
Common matrix traps to avoid
Several predictable errors cost candidates time or confidence:
Assuming a bundled exam. There is no one combined A&P written. Schedule, pay for, and prepare for AMG, AMA, and AMP as three events.
Mis-stating the counts. It is 60 / 100 / 100, not 100 for all three and not 60 for all three.
Treating the 70 as a percentage of raw screens. The 70 is scored against the scored questions; validation items never move your score.
Ignoring the test order. The FAA's mechanic test-requirements page says you must take the General (AMG) knowledge test first, followed by the Airframe and/or Powerplant test(s); a certificated mechanic adding a rating does not retake AMG.
Letting an AKTR expire. Track the 24-month deadline from each AKTR's date so the O&P is completed in time.
Finally, the matrix is a living document — the FAA reissues it periodically (this guide was checked against the September 25, 2026 edition). Always confirm against the current edition before test day rather than a cached copy, because question counts, supplement references, and delivery notes can be updated between editions.