Study guide
11.3 Practical Projects, Tools, Equipment, and Safety Discipline
FAA A&P Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Orientation: Eligibility, FTN, Authorization, Three-Test Path, and Retakes
1.1 Certificate Ratings and the Three-Test Roadmap 1.2 Baseline Eligibility and the Experience Path 1.3 AMTS and Military Eligibility Pathways 1.4 FTN, IACRA, and the Authorization File 1.5 Knowledge-Test Logistics and Scoring 1.6 AKTRs, Retakes, and the DME Transition
2 ACS Map, Testing Matrix, Embedded Images, Supplements, and Study Workflow
2.1 Testing Matrix Facts for AMG, AMA, and AMP 2.2 ACS Map and Subject-Area Boundaries 2.3 AKTR ACS-Code Diagnostics 2.4 Testing Supplement and Embedded Images 2.5 Three-Test Study Workflow 2.6 Final Review and Test-Day Source Control
3 General I: Electricity, Drawings, Weight and Balance, Math, and Physics
3.1 Electricity and Electronics Foundations 3.2 AC/DC Measurement and Schematic Troubleshooting 3.3 Aircraft Drawings, Blueprints, and Schematics 3.4 Weight and Balance Equations and Records 3.5 Maintenance Math and Unit Discipline 3.6 Physics for Aviation: Forces, Fluids, and Flight
4 General II: Lines, Materials, Servicing, Corrosion, Records, Inspection, and Human Factors
4.1 Fluid Lines, Fittings, and Installation Risk 4.2 Materials, Hardware, and Process Control 4.3 Ground Operations, Servicing, and Ramp Safety 4.4 Cleaning, Corrosion Control, and Finishing 4.5 Regulations, Forms, Records, and Publications 4.6 Inspection Concepts, Human Factors, and Maintenance Judgment
5 Airframe I: Structures, Flight Controls, and Airframe Inspection
5.1 Metallic Structure Inspection and Damage Patterns 5.2 Sheet-Metal Repairs, Fasteners, and Riveting Judgment 5.3 Non-Metallic Structures: Composites, Wood, Fabric, and Plastics 5.4 Flight Control Systems, Rigging, and Travel 5.5 Control Surface Balance, Flutter, and Freeplay 5.6 Airframe Inspection, Records, ADs, and Corrosion Decisions
6 Airframe II: Landing Gear, Hydraulics, Pneumatics, Environmental, Instruments, and Comms
6.1 Landing Gear, Wheels, Tires, and Brakes 6.2 Retraction, Steering, Anti-Skid, and Warning Systems 6.3 Hydraulic Systems: Components, Fluids, and Troubleshooting 6.4 Pneumatic, Vacuum, and Bleed-Air Systems 6.5 Environmental Systems: Pressurization, Heating, Cooling, and Oxygen 6.6 Instrument Systems: Pitot-Static, Gyros, and Displays 6.7 Communication, Navigation, Antennas, and Avionics Inspection
7 Airframe III: Fuel, Electrical, Ice/Rain, Fire, Rotorcraft, and Water/Waste Systems
7.1 Airframe Fuel System Boundaries and Safe Servicing 7.2 Airframe Electrical Power, Wiring, and Protection 7.3 Ice and Rain Control System Inspection and Limits 7.4 Airframe Fire Protection Detection, Extinguishing, and Squib Safety 7.5 Rotorcraft Fundamentals, Controls, Drives, and Vibration 7.6 Water and Waste Systems Service Boundaries and Contamination Control
8 Powerplant I: Reciprocating, Turbine Engine Theory, and Engine Inspection
8.1 Reciprocating Engine Cycles, Components, and Operating Boundaries 8.2 Horizontally Opposed and Radial Engine Components 8.3 Reciprocating Engine Performance, Ground Operation, and Preservation 8.4 Turbine Engine Airflow, Sections, and Performance 8.5 Turbine Engine Maintenance, FOD, Bleed Air, and Post-Installation Checks 8.6 Engine Inspection, Records, Compression, Borescope, and Airworthiness
9 Powerplant II: Instruments, Fire, Electrical, Lubrication, Ignition, and Starting
9.1 Engine Instrument Scan and Trend Logic 9.2 Pressure, Temperature, and Flow Indications 9.3 Engine Fire Protection, Detection, and Extinguishing 9.4 Engine Electrical Generation and Protection 9.5 Lubrication System Flow, Pressure, and Contamination 9.6 Ignition and Starting Troubleshooting
10 Powerplant III: Fuel Metering, Induction, Cooling, Turbine Air, Exhaust, Reversers, and Propellers
10.1 Engine Fuel System Flow, Contamination, and Vapor 10.2 Carburetors, Fuel Injection, and Metering Logic 10.3 Reciprocating Induction, Turbocharging, and Cooling 10.4 Turbine Air Systems, Bleed Air, and Anti-Ice 10.5 Exhaust Systems, Thrust Reversers, and Temperature Patterns 10.6 Propeller Systems, Governors, and Inspection
11 Oral/Practical Bridge: AKTR ACS Codes, DME Expectations, and Maintenance Judgment
11.1 Turn AKTR ACS Codes Into an Oral and Practical Remediation Plan 11.2 What the DME Oral Exam Is Really Testing 11.3 Practical Projects, Tools, Equipment, and Safety Discipline 11.4 Risk Management and Human Factors in the DME Environment 11.5 Documentation, Maintenance Records, and Data Discipline 11.6 Return-to-Service Judgment and Final DME Readiness
12 Final Review: Test Day Strategy, Three-Test Schedule, and Next Steps
12.1 Build the Final Study Calendar Around AMG, AMA, and AMP 12.2 PSI Test-Day Checklist Without Guesswork 12.3 Pacing for the 60-Question and 100-Question Knowledge Tests 12.4 Formula, Supplement, and Embedded-Image Final Review 12.5 Retake Decision Tree After a Failed or Weak Knowledge Test 12.6 DME Scheduling and Post-Pass Next Steps
11.3 Practical Projects, Tools, Equipment, and Safety Discipline
Key Takeaways Explain This Topic AI
The practical test uses standalone projects: 9 for General and 11 each for Airframe and Powerplant, and projects can no longer be combined.
The DME must ask 2 practical (research) questions relevant to each project at a safe, appropriate point in the work.
Reference material IS allowed during the practical, mirroring real maintenance performed with approved data open.
The DME grades the whole process: safe setup, correct tool and equipment selection, task execution, inspection, and cleanup.
Tool calibration, personal protective equipment, foreign object control, and lockout habits are part of the performance standard, not extras.
Last updated: June 2026
How the Practical Test Is Structured
Under the Mechanic ACS, the practical test is built from standalone projects — discrete tasks the DME selects from the ACS for your rating. The published project counts are 9 projects for the General rating and 11 projects each for the Airframe and Powerplant ratings . A key change the ACS brought is that projects can no longer be combined during testing; each is performed and graded on its own, so you cannot rely on one demonstration to satisfy two requirements.
For every project, the DME must, at a safe and appropriate time during your performance, ask two practical questions (sometimes called research questions) that are relevant to that project. Crucially, reference material is permitted during the practical — unlike the oral. This mirrors the real flight line: a professional mechanic looks up torque values, tolerances, and procedures in the approved data rather than trusting memory. The research questions specifically test whether you can find and apply the correct data, which is itself a core skill element of the ACS.
Rating Practical projects Research questions per project References allowed?
- General 9 2 Yes
- Airframe 11 2 Yes
- Powerplant 11 2 Yes
Because the General must be passed before either rating is issued, candidates typically complete all three orals and practicals in one testing event arranged with the DME, though scheduling varies. A full Airframe-and-Powerplant event combining three orals and 31 total practical projects is a long day — often running the better part of a working shift — which is one reason fatigue and time pressure (both Dirty Dozen factors covered in 11.4) are real test-day risks, not just textbook concepts.
Safe Work Starts Before the First Tool Moves
A practical project is not merely proof you can turn a wrench; the DME is grading a mechanic process . The expected sequence is: understand the task, gather the approved data , identify the hazards, select and verify the right tools and equipment, perform the work methodically, inspect the result, and clean up. Skipping the front end — diving in before consulting data or considering hazards — is a common reason candidates lose points even when the final result looks correct.
Elements the DME is specifically watching include:
Tool selection and condition — using the correct tool for the fastener or measurement, and confirming that precision tools (torque wrenches, micrometers, calipers) are within calibration.
Personal protective equipment (PPE) — eye protection, gloves, and hearing protection appropriate to the task.
Foreign object debris (FOD) control — accounting for hardware, lockwire clippings, rags, and tools so nothing is left in a structure or engine.
Energy control / communication — never energizing, pressurizing, or moving a system without verifying the area is clear and announcing the action.
Cleanup and tool accountability — returning the work area and aircraft to a safe condition and confirming all tools are accounted for.
These are not bonus behaviors; they are scored performance items. A technically correct repair completed with an uncalibrated torque wrench, missing eye protection, or an unaccounted-for tool is an unsafe outcome in the DME's eyes.
Brief the Task, Then Execute Methodically
The most effective way to show process quality is to brief the project aloud before touching the aircraft, engine, or component: state what the task is, what reference you will use, what hazards are present, and what tools you need. Then work in the order the data specifies, verifying each step. When you reach a point where the DME's two research questions fit naturally — for example, the torque value for a fitting or the inspection criteria for a part — you demonstrate the lookup, which is exactly what the research questions reward.
Finish by inspecting your own work and verifying the result against the standard before declaring the project complete. A worked example: on a fluid-line fitting project, you would identify the fitting type, look up the manufacturer's torque and any lockwire requirement, apply the correct torque with a calibrated wrench, safety the fitting per AC 43.13-1B acceptable methods, then inspect for proper engagement and leaks before signing off mentally. Claiming completion before inspecting is a frequent error.
Think of each project as a miniature real-world maintenance task with a witness. The DME is watching whether you would be safe and methodical when no examiner is present — because that is the behavior the certificate authorizes for the rest of your career.
Finally, do not improvise around missing resources. If the correct tool, part, or data is not at hand, the professional response is to say so and stop, not to substitute an incorrect tool or guess at a value. The DME would far rather hear "I can't complete this safely without the calibrated torque wrench and the manufacturer's value" than watch a candidate force a fastener to a remembered number. Lack of resources is one of the recognized human-factors traps, and recognizing it on a practical project is scored as good judgment, not as failure to perform.