Study guide
Economic Analysis Methods
FE Fundamentals of Engineering Exam
Track your progress as you read
Finished sections get a check mark.
1 Introduction to the FE Exam
About the FE Exam FE Exam Study Strategies Navigating the FE Reference Handbook
2 Mathematics (8–12 Questions)
Analytic Geometry and Trigonometry Single-Variable Calculus Differential Equations Linear Algebra and Matrix Operations Numerical Methods
3 Probability and Statistics (6–9 Questions)
Probability Fundamentals Probability Distributions Statistical Estimation and Hypothesis Testing
4 Chemistry (5–8 Questions)
Chemical Reactions and Stoichiometry Acids, Bases, and pH Oxidation-Reduction and Corrosion
5 Ethics and Professional Practice (5–8 Questions)
Engineering Ethics Fundamentals
6 Engineering Economics (6–9 Questions)
Time Value of Money Economic Analysis Methods
7 Statics (9–14 Questions)
Force Systems and Equilibrium Trusses, Frames, and Machines Centroids and Moments of Inertia Static Friction
8 Dynamics (9–14 Questions)
Particle Kinematics Kinetics: Force, Mass, and Acceleration Work, Energy, Impulse, and Momentum Rigid-Body Rotation and Mechanical Vibrations
9 Strength of Materials (9–14 Questions)
Stress and Strain Fundamentals Beam Analysis: Shear and Moment Diagrams Bending Stress and Torsion Stress Transformation and Material Failure
10 Materials Science (6–9 Questions)
Material Properties and Selection Phase Diagrams and Alloy Systems
11 Fluid Mechanics (12–18 Questions)
Fluid Properties and Statics Fluid Dynamics and Bernoulli's Equation Pumps, Turbines, and Flow Measurement
12 Thermodynamics and Heat Transfer (9–14 Questions)
Laws of Thermodynamics and Properties Thermodynamic Cycles and Applications Heat Transfer: Conduction, Convection, and Radiation
13 Basic Electrical Engineering (6–9 Questions)
Electrical Fundamentals and DC Circuits AC Circuits and Three-Phase Power
14 Safety, Health, and Environment (6–9 Questions)
Industrial Safety and Hazard Management
15 Instrumentation and Controls (4–6 Questions)
Sensors, Data Acquisition, and Control Systems
16 Computational Tools and Computer Science
Spreadsheets, Structured Programming, and Flowcharts
Economic Analysis Methods
Key Takeaways Explain This Topic AI
Present worth (PW) discounts every cash flow to time 0 at the MARR; pick the highest PW, and accept a lone project if PW ≥ 0.
Annual worth (AW = PW × A/P) restates a project as a level yearly amount and compares unequal-life alternatives directly, with no least-common-multiple study period needed.
Rate of return (ROR/IRR) is the i* that drives PW to zero; accept when ROR ≥ MARR, and use incremental ΔROR — never raw ROR — to rank mutually exclusive options.
Benefit-cost ratio B/C = PW(benefits)/PW(costs) governs public projects; B/C > 1 means justified, and ranking also uses incremental ΔB/C.
Sunk costs are ignored; only present and future cash flows (and opportunity costs) affect the decision.
Straight-line depreciation is (cost − salvage)/life; MACRS uses fixed IRS percentages, ignores salvage, and is tabulated in the FE Reference Handbook.
Last updated: June 2026
Present Worth (PW) Analysis
Discount every cash flow to time 0 using the MARR (Minimum Attractive Rate of Return), then sum: P W = ∑ t = 0 n C F t ( 1 + i ) − t PW = \sum_{t=0}^{n} CF_t\,(1+i)^{-t} P W = t = 0 ∑ n C F t ( 1 + i ) − t
Decision rules. For a single project, accept if PW ≥ 0. Among mutually exclusive alternatives, choose the highest PW (least negative cost, or greatest net benefit). A subtle but heavily tested rule: when alternatives have different service lives , a direct PW comparison is invalid. You must evaluate over a common horizon — the least common multiple (LCM) of the lives (e.g. a 3-year and a 4-year option are compared over 12 years, repeating each project) — or switch to annual worth, which sidesteps the problem.
Annual Worth (AW) Analysis
Convert the project's entire cash-flow stream to one equivalent end-of-year amount: A W = P W × ( A / P , i % , n ) AW = PW \times (A/P, i\%, n) A W = P W × ( A / P , i % , n )
AW is often the cleanest method because it automatically handles unequal lives — comparing $/year requires no LCM study period, provided each alternative repeats indefinitely. Decision rule: pick the alternative with the highest AW (for costs, the least-negative AW). AW also reads naturally to a client: "this design costs $8,400 per year."
Rate of Return (ROR / IRR)
The rate of return i* is the interest rate that makes present worth exactly zero: 0 = ∑ t = 0 n C F t ( 1 + i ∗ ) t 0 = \sum_{t=0}^{n} \frac{CF_t}{(1+i^*)^t} 0 = t = 0 ∑ n ( 1 + i ∗ ) t C F t
For a single project, accept if ROR ≥ MARR . The trap: you cannot simply pick the alternative with the highest individual ROR. A small project can show a huge ROR yet leave money on the table.
Incremental (ΔROR) Analysis
To rank mutually exclusive alternatives correctly:
Order them by increasing first cost.
Compute the incremental cash flow of the larger-cost option minus the smaller (defender vs. challenger).
Find the ROR on that increment , Δi*.
If Δi* ≥ MARR, the extra investment earns its keep — keep the higher-cost option; otherwise keep the lower-cost one. The same incremental logic applies to ΔB/C ratios for public projects.
Benefit-Cost (B/C) Analysis
Standard for government/public-sector work: B / C = P W ( benefits ) P W ( costs ) B/C = \frac{PW(\text{benefits})}{PW(\text{costs})} B / C = P W ( costs ) P W ( benefits )
- B/C value Decision
- B/C > 1 Justified (benefits exceed costs)
- B/C = 1 Break-even
- B/C < 1 Not justified
Watch placement: disbenefits may be subtracted from benefits (numerator) or added to costs (denominator) — the two conventions give different ratios, so follow the problem's instruction.
Break-Even Analysis
Find the quantity Q where two alternatives cost the same (or revenue equals cost). Example: Machine A costs $10,000 with $5/unit variable cost; Machine B costs $20,000 with $3/unit. Setting total costs equal:
10,000 + 5Q = 20,000 + 3Q → 2Q = 10,000 → Q = 5,000 units .
Below 5,000 units choose A (lower fixed cost dominates); above 5,000 units choose B (lower variable cost wins).
Capitalized Cost
For assets assumed to last forever (dams, perpetual endowments, roadways with indefinite service), the present worth of a perpetual annual cost A at rate i is the capitalized cost : C C = A i CC = \frac{A}{i} CC = i A
This is the limit of (P/A) as n → ∞. Example: maintaining a structure at $8,000/year forever, at i = 8%, has a capitalized cost of 8,000/0.08 = $100,000. Capitalized cost is the standard way to compare very-long-life public alternatives without an LCM study period.
Choosing the Right Method
- Situation Best method
- Compare equal-life alternatives Present worth (highest PW)
- Compare unequal -life alternatives Annual worth (no LCM needed)
- Public/government project Benefit-cost ratio (incremental ΔB/C)
- Perpetual-life asset Capitalized cost A/i
- Rank by return, mutually exclusive Incremental rate of return (ΔROR ≥ MARR)
All four worth-based methods give the same accept/reject decision for a single project when applied consistently at the same MARR — PW ≥ 0 is equivalent to AW ≥ 0, to ROR ≥ MARR, and to B/C ≥ 1. They can disagree only when misused for ranking mutually exclusive options, which is exactly why incremental analysis exists.
Cost Terminology
- Term Definition
- Sunk cost Already spent and unrecoverable; ignore it in any decision
- Opportunity cost Value of the best alternative forgone
- Fixed cost Independent of output (rent, insurance)
- Variable cost Scales with output (materials, direct labor)
- Marginal cost Cost of one more unit
- Life-cycle cost Acquisition through operation, maintenance, and disposal
The most-tested item is sunk cost : money already paid for a machine you now own does not change which future option is best — only present and future cash flows (and opportunity costs) do.
Depreciation
Depreciation spreads an asset's cost over its useful life for tax accounting.
Straight-Line (SL) D = Cost − Salvage Useful life D = \frac{\text{Cost} - \text{Salvage}}{\text{Useful life}} D = Useful life Cost − Salvage
Equal depreciation each year. Example: a $40,000 asset with $4,000 salvage over 6 years gives D = (40,000 − 4,000)/6 = $6,000/year .
MACRS (Modified Accelerated Cost Recovery System)
The U.S. tax-default method. It applies fixed IRS percentages to the original basis for each year of a stated recovery period (3, 5, 7, … years), ignores salvage value , and front-loads deductions (accelerated). The FE Reference Handbook tabulates the MACRS factors. Year-n depreciation is D_n = (rate_n) × (initial cost).
Book Value B V n = Initial cost − ∑ k = 1 n D k BV_n = \text{Initial cost} - \sum_{k=1}^{n} D_k B V n = Initial cost − k = 1 ∑ n D k
Book value is what remains on the books after accumulated depreciation; under SL it declines linearly toward salvage, while under MACRS it drops faster early.