5.3 Incremental Rate of Return, Replacement Analysis, and Break-Even
FE Industrial and Systems Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Exam Overview, CBT Strategy & Handbook Navigation
1.1 FE Industrial Exam Structure, CBT Logistics, and Pacing 1.2 Using the NCEES FE Reference Handbook and Approved Calculators
2 Chapter 2: Mathematics for Industrial Engineers
2.1 Analytic Geometry, Coordinate Systems, and Trigonometry 2.2 Calculus: Differential, Integral, and Series Approximations 2.3 Linear Algebra: Matrix Operations, Systems of Equations, and Vectors
3 Chapter 3: Engineering Sciences Core
3.1 Thermodynamics Fundamentals and Fluid Flow Principles 3.2 Statics, Dynamics, and Mechanics of Materials Core 3.3 Electrical Circuits, DC/AC Analysis, and Power in Industrial Systems
4 Chapter 4: Ethics and Professional Practice
4.1 NCEES Model Rules of Professional Conduct and Technical Society Ethics 4.2 Engineering Licensure, Public Welfare, and Professional Liability 4.3 Engineering Contracts, Intellectual Property, and Conflicts of Interest
5 Chapter 5: Engineering Economics
5.1 Time Value of Money, Discount Factors, and Equivalence 5.2 Evaluating Alternatives: Present Worth, Equivalent Annual Cost, and IRR 5.3 Incremental Rate of Return, Replacement Analysis, and Break-Even 5.4 Depreciation Methods, MACRS, Income Taxes, and Inflation
6 Chapter 6: Probability Foundations & Distributions
6.1 Basic Probability Concepts, Conditional Probability, and Bayes' Theorem 6.2 Discrete Probability Distributions 6.3 Continuous Probability Distributions
7 Chapter 7: Statistical Inference, Regression & Design of Experiments
7.1 Sampling Distributions, Central Limit Theorem, and Confidence Intervals 7.2 Hypothesis Testing: Means, Proportions, and Variances 7.3 Linear Regression, Correlation Analysis, and Design of Experiments (ANOVA)
8 Chapter 8: Data, Logic, Modeling & Linear Programming
8.1 Optimization Modeling: Decision Variables, Objectives, and Constraints 8.2 Linear Programming: Graphical Solutions and Simplex Fundamentals 8.3 Duality, Sensitivity Analysis, and Integer Linear Programming 8.4 Data, Logic Development, and Analytics
9 Chapter 9: Stochastic Models & Simulation
9.1 Queuing Theory: Little's Law, M/M/1, and Multi-Server Systems 9.2 Discrete-Time Markov Chains: Transition Matrices and Steady-State Probabilities 9.3 Discrete-Event Simulation Principles and Monte Carlo Modeling
10 Chapter 10: Engineering Management, Project Planning & Performance Measurement
10.1 Organizational Structure, Leadership, and Worker Motivation Theories 10.2 Project Management: WBS, Critical Path Method (CPM), PERT, and Crashing 10.3 Earned Value Management (EVM), Decision Trees, and Risk Preference 10.4 Performance Measurement: Productivity, KPIs, Wage Systems, and the Balanced Scorecard
11 Chapter 11: Manufacturing & Production Systems
11.1 Manufacturing Processes, Material Processing, and Tolerancing 11.2 Assembly Line Balancing, Takt Time, Cycle Time, and Throughput 11.3 Sustainable Manufacturing, Waste Minimization, and Life-Cycle Assessment
12 Chapter 12: Production Planning, Inventory Control & Sequencing
12.1 Demand Forecasting Methods and Forecast Error Tracking 12.2 Aggregate Planning, Master Production Scheduling (MPS), and MRP 12.3 Deterministic Inventory Models: EOQ, EPQ, and Safety Stock 12.4 Job Sequencing, Dispatching Rules, and Flow Shop Scheduling
13 Chapter 13: Lean Systems & Theory of Constraints
13.1 Lean Foundations: Value Stream Mapping, Seven Wastes, and 5S 13.2 Pull Systems, Kanban, Just-In-Time (JIT), and SMED Setup Reduction 13.3 Theory of Constraints: Bottleneck Identification and Drum-Buffer-Rope
14 Chapter 14: Facilities Planning & Material Handling
14.1 Facility Location Analysis: Qualitative Factor Rating and Centroid Method 14.2 Facility Layout Design and Flow Analysis 14.3 Material Handling Equipment, Warehousing, and AS/RS
15 Chapter 15: Supply Chain Design & Logistics
15.1 Supply Chain Network Architecture and Transportation Modes 15.2 Distribution Strategies, Cross-Docking, and Vehicle Routing 15.3 The Bullwhip Effect, Risk Pooling, and Supply Chain Coordination
16 Chapter 16: Human Factors & Cognitive Ergonomics
16.1 Cognitive Engineering, Human-Machine Interface, Displays, and Controls 16.2 Anthropometric Principles, Percentile Design, and Biomechanical Posture 16.3 Environmental Ergonomics: Industrial Noise, Lighting, and Heat Stress
17 Chapter 17: Physical Ergonomics & Workplace Safety
17.1 Physical Ergonomics: The NIOSH Manual Lifting Equation 17.2 Cumulative Trauma Disorders and Postural Assessment 17.3 Workplace Safety: OSHA Standards, Hazard Analysis, and Control Hierarchy
18 Chapter 18: Work Design & Measurement
18.1 Methods Engineering, Process Charting, and Principles of Motion Economy 18.2 Direct Stopwatch Time Study: Observed Time, Performance Rating, and Allowances 18.3 Predetermined Time Systems, Work Sampling, and Learning Curves
19 Chapter 19: Quality Management, Six Sigma & Analytical Tools
19.1 Quality Philosophies, Total Quality Management, and Cost of Quality 19.2 Six Sigma DMAIC Methodology and Quality Function Deployment 19.3 The Seven Basic Quality Tools, Root Cause Analysis, and Taguchi Loss Function
20 Chapter 20: Statistical Process Control
20.1 Statistical Process Control Principles, Variation, and Run Rules 20.2 Variable Control Charts: X-bar & R, X-bar & S, and Individual-Moving Range 20.3 Attribute Control Charts: Defectives (p, np) and Defects (c, u)
21 Chapter 21: Process Capability & Acceptance Sampling
21.1 Process Capability Indices and Defect Levels 21.2 Acceptance Sampling Concepts and Operating Characteristic Curves 21.3 Sampling Risks, AQL, LTPD, and Standard Sampling Plans
22 Chapter 22: Systems Engineering & Life-Cycle Management
22.1 The Systems Engineering V-Model, Stakeholder Requirements, and Functional Architecture 22.2 Configuration Management, Interface Control, and Verification & Validation 22.3 Life-Cycle Costing, Maintainability, and System Availability
23 Chapter 23: Reliability Engineering & Risk Analysis
23.1 Reliability Mathematics, Hazard Rates, and the Bathtub Curve 23.2 System Reliability Configurations: Series, Parallel, and k-out-of-n Systems 23.3 Failure Modes and Effects Analysis and Fault Tree Analysis
5.3 Incremental Rate of Return, Replacement Analysis, and Break-Even
Key Takeaways Explain This Topic AI
Selecting the alternative with the highest individual Internal Rate of Return (IRR) among mutually exclusive choices is a classic ranking error that often fails to maximize total dollar wealth.
Incremental Rate of Return (ΔIRR) analysis requires ordering acceptable alternatives by initial capital cost and accepting the higher-cost challenger only if ΔIRR ≥ MARR.
Benefit-Cost (B/C) analysis for public sector investments requires incremental analysis (ΔB/ΔC ≥ 1.0) when choosing among mutually exclusive proposals.
In replacement analysis, all historical costs and book values are strictly sunk costs; the defender's current investment value is its immediate net realizable market salvage value.
Break-even analysis identifies the operational volume where revenues equal total costs, or where the equivalent annual worth of two competing alternatives is identical.
Last updated: September 2026
A common point of failure on the FE exam is assuming that the mutually exclusive project with the highest Internal Rate of Return (IRR) or highest Benefit-Cost (B/C) ratio should be selected. In engineering practice, capital project selection is constrained by mutually exclusive alternatives where larger initial investments yield larger total cash flows. Making decisions based on individual internal rates of return without incremental analysis leads directly to suboptimal capital allocation.
1. The Ranking Error: Why Individual IRR Cannot Choose Among Mutually Exclusive Options
When evaluating independent projects, comparing each individual project's IRR against the MARR is completely valid. However, when projects are mutually exclusive (where picking one excludes all others), ranking by individual IRR is fundamentally invalid .
The Scale of Investment Fallacy
Consider an extreme example:
Option X : Invest $1,000 today; receive $2,000 at the end of Year 1 ( I R R = 100 % IRR = 100\% I RR = 100% ).
Option Y : Invest $100,000 today; receive $150,000 at the end of Year 1 ( I R R = 50 % IRR = 50\% I RR = 50% ).
Corporate MARR is 10%.
If ranked by IRR, Option X appears vastly superior (100% vs. 50%). However: P W X ( 10 % ) = − 1 , 000 + 2 , 000 1.10 = $ 818.18 PW_X(10\%) = -1,000 + \frac{2,000}{1.10} = \$818.18 P W X ( 10% ) = − 1 , 000 + 1.10 2 , 000 = $818.18 P W Y ( 10 % ) = − 100 , 000 + 150 , 000 1.10 = $ 36 , 363.64 PW_Y(10\%) = -100,000 + \frac{150,000}{1.10} = \$36,363.64 P W Y ( 10% ) = − 100 , 000 + 1.10 150 , 000 = $36 , 363.64
Option Y generates over 44 times more net wealth for the enterprise! The individual IRR reflects only the rate of return on the capital invested within that specific option, completely ignoring the absolute magnitude of capital deployed.
2. Incremental Investment Analysis ( Δ \Delta Δ IRR Procedure)
To resolve the scale problem, industrial engineers evaluate the incremental cash flow ( Δ C F \Delta CF Δ CF ) between pairs of alternatives. Incremental rate of return ( Δ \Delta Δ IRR) answers the question: "Does the extra capital required by the more expensive alternative earn at least the MARR?" Incremental Rate of Return (ΔIRR) Algorithm
1. Filter Alternatives ──> Eliminate any alternative whose individual IRR < MARR
2. Order by Initial Cost ──> P_0 (Do-Nothing) < P_1 < P_2 < P_3 ...
- 3. Set Base Defender ──> Establish lowest-cost alternative as current Defender
- 4. Pair with Challenger ──> Next higher initial cost alternative becomes Challenger
- 5. Calculate ΔCF ──> ΔCF_t = CF_challenger,t - CF_defender,t
- 6. Solve for ΔIRR ──> Find interest rate where PW(ΔCF) = 0
7. Decision Rule:
- ├── If ΔIRR >= MARR ──> Challenger wins! Challenger becomes new Defender
- └── If ΔIRR < MARR ──> Challenger rejected! Current Defender remains
- 8. Iterate ──> Compare winning Defender to next higher Challenger until list ends
- Step-by-Step Procedure
Screen Alternatives : Calculate the overall IRR for each candidate. Eliminate any alternative with I R R < M A R R IRR < MARR I RR < M A RR . (If "Do-Nothing" is an option, it has an initial cost of 0 0 0 and I R R = 0 % IRR = 0\% I RR = 0% ).
Sort by Initial Capital : Rank the surviving alternatives in strictly ascending order of initial investment ( P 1 < P 2 < P 3 < … P_1 < P_2 < P_3 < \dots P 1 < P 2 < P 3 < … ).
Identify Defender vs. Challenger : Start with the lowest initial cost option as the Defender . The option with the next higher initial cost is the Challenger .
Construct Incremental Cash Flow Series : Δ C F t = C F t , Challenger − C F t , Defender \Delta CF_t = CF_{t,\text{Challenger}} - CF_{t,\text{Defender}} Δ C F t = C F t , Challenger − C F t , Defender Note that Δ C F 0 = − ( P Challenger − P Defender ) < 0 \Delta CF_0 = -(P_{\text{Challenger}} - P_{\text{Defender}}) < 0 Δ C F 0 = − ( P Challenger − P Defender ) < 0 .
Compute Δ \Delta Δ IRR : P W ( Δ i ∗ ) = ∑ t = 0 n Δ C F t ( 1 + Δ i ∗ ) − t = 0 PW(\Delta i^*) = \sum_{t=0}^n \Delta CF_t (1 + \Delta i^*)^{-t} = 0 P W ( Δ i ∗ ) = t = 0 ∑ n Δ C F t ( 1 + Δ i ∗ ) − t = 0
Apply Decision Rule :
If Δ i ∗ ≥ M A R R \Delta i^* \ge MARR Δ i ∗ ≥ M A RR : The incremental investment is justified. The Challenger wins and becomes the new Defender.
If Δ i ∗ < M A R R \Delta i^* < MARR Δ i ∗ < M A RR : The incremental investment is rejected. The current Defender is retained , and the Challenger is permanently discarded.
Repeat : Pair the reigning Defender with the next higher-cost Challenger until all candidates are evaluated. The final surviving Defender is the optimal choice.
3. Benefit-Cost (B/C) Analysis in the Public Sector
Public works projects (highways, dams, flood barriers, mass transit) are evaluated using the Benefit-Cost Ratio ( B / C B/C B / C ) , reflecting societal benefits relative to taxpayer expenditures.
Definitions
B B B (Benefits) : Favorable outcomes experienced by the public (reduced transit times, accident reductions, flood damage avoided).
D D D (Disbenefits) : Adverse outcomes experienced by the public (traffic delays during construction, lost farmland, noise pollution).
C C C (Costs) : Direct capital outlays ( I I I ) and recurring operation and maintenance costs ( O & M O\&M O & M ) incurred by the government agency.
Formulations
Conventional B / C B/C B / C Ratio : B / C = P W ( B ) − P W ( D ) P W ( I ) + P W ( O & M ) = A W ( B ) − A W ( D ) C R + A O C B/C = \frac{PW(B) - PW(D)}{PW(I) + PW(O\&M)} = \frac{AW(B) - AW(D)}{CR + AOC} B / C = P W ( I ) + P W ( O & M ) P W ( B ) − P W ( D ) = CR + A OC A W ( B ) − A W ( D )
Modified B / C B/C B / C Ratio (treats O & M O\&M O & M as a negative benefit): Modified B / C = P W ( B ) − P W ( D ) − P W ( O & M ) P W ( I ) \text{Modified } B/C = \frac{PW(B) - PW(D) - PW(O\&M)}{PW(I)} Modified B / C = P W ( I ) P W ( B ) − P W ( D ) − P W ( O & M )
Decision Criteria
For an isolated single alternative: Accept if B / C ≥ 1.0 B/C \ge 1.0 B / C ≥ 1.0 .
For mutually exclusive public alternatives: Never rank by individual B / C B/C B / C ratio! Rank alternatives by initial government cost and conduct an incremental B / C B/C B / C analysis : Δ B / Δ C = Δ B − Δ D Δ C ≥ 1.0 \Delta B / \Delta C = \frac{\Delta B - \Delta D}{\Delta C} \ge 1.0 Δ B /Δ C = Δ C Δ B − Δ D ≥ 1.0 If Δ B / Δ C ≥ 1.0 \Delta B / \Delta C \ge 1.0 Δ B /Δ C ≥ 1.0 , the additional public expenditure is justified; select the higher-cost challenger.
4. Replacement Analysis: Defender vs. Challenger
Replacement analysis addresses whether existing production assets ( the Defender ) should be retained for another period or replaced immediately by modern equipment ( the Challenger ).
The Sunk Cost Principle
A fundamental tenet of engineering economy is the strict exclusion of sunk costs :
Sunk Cost Rule : Money spent in the past cannot be recovered or altered by any future engineering decision. Book values, original purchase prices, and past maintenance expenditures are completely irrelevant to a replacement decision.
Defender Initial Investment : The defender's capital value is its current net market salvage value ( S 0 S_0 S 0 ) , NOT its accounting book value or original acquisition price. Retaining the defender forfeits the cash that could be collected today by selling it—making S 0 S_0 S 0 an opportunity cost.
Economic Service Life (ESL)
The Economic Service Life (ESL) of an asset is the operational lifespan n ∗ n^* n ∗ that minimizes its Equivalent Uniform Annual Cost ( E U A C EUAC E U A C ): E U A C ( n ) = P − S n ( P / F , i , n ) + ∑ t = 1 n A O C t ( P / F , i , t ) ( P / A , i , n ) EUAC(n) = \frac{P - S_n(P/F, i, n) + \sum_{t=1}^n AOC_t(P/F, i, t)}{(P/A, i, n)} E U A C ( n ) = ( P / A , i , n ) P − S n ( P / F , i , n ) + ∑ t = 1 n A O C t ( P / F , i , t )
As service life n n n increases:
Capital Recovery Cost decreases because the initial capital outlay is amortized over more operating years.
Annual Operating & Maintenance Cost increases due to physical wear, declining efficiency, and parts degradation.
The minimum point of the total E U A C EUAC E U A C curve identifies the asset's ESL ( n ∗ n^* n ∗ ). Cost ($/yr)
- │ Total EUAC Curve
- │ \ │ /
- │ \ ──┼── / <-- Minimum point defines Economic Service Life (ESL)
- │ Capital \ │ / Annual Operating Costs (AOC)
- │ Recovery \ │ / (Increases with age)
- │ (CR) \ │ /
- │ (Decreases) \ │ /
- └─────────────────┴─────────────────── Time (Years)
- n*
- Replacement Decision Rule
If E U A C Defender > E U A C Challenger EUAC_{\text{Defender}} > EUAC_{\text{Challenger}} E U A C Defender > E U A C Challenger (evaluated over their respective economic lives), replace the defender now.
Marginal Cost Approach : When the defender's marginal cost for the upcoming year ( M C t + 1 = S t − S t + 1 + i ⋅ S t + A O C t + 1 MC_{t+1} = S_t - S_{t+1} + i \cdot S_t + AOC_{t+1} M C t + 1 = S t − S t + 1 + i ⋅ S t + A O C t + 1 ) exceeds the minimum E U A C EUAC E U A C of the challenger, replace the defender immediately.
5. Break-Even Analysis
Break-even analysis identifies the threshold value of an operational parameter (typically production volume Q Q Q ) at which two decision alternatives are economically equivalent.
Single-Variable Break-Even (Revenue vs. Cost)
Total Revenue: T R ( Q ) = p ⋅ Q TR(Q) = p \cdot Q TR ( Q ) = p ⋅ Q , where p p p is unit selling price.
Total Cost: T C ( Q ) = F C + v ⋅ Q TC(Q) = FC + v \cdot Q TC ( Q ) = FC + v ⋅ Q , where F C FC FC is fixed costs and v v v is unit variable cost.
Setting T R ( Q ∗ ) = T C ( Q ∗ ) TR(Q^*) = TC(Q^*) TR ( Q ∗ ) = TC ( Q ∗ ) : p ⋅ Q ∗ = F C + v ⋅ Q ∗ ⟹ Q ∗ = F C p − v p \cdot Q^* = FC + v \cdot Q^* \quad \implies \quad Q^* = \frac{FC}{p - v} p ⋅ Q ∗ = FC + v ⋅ Q ∗ ⟹ Q ∗ = p − v FC The denominator ( p − v ) (p - v) ( p − v ) is the unit contribution margin .
Two-Alternative Break-Even Point
When deciding between two manufacturing processes—Process 1 (low fixed cost, high variable cost) and Process 2 (high fixed cost, low variable cost): T C 1 ( Q ) = F C 1 + v 1 Q TC_1(Q) = FC_1 + v_1 Q T C 1 ( Q ) = F C 1 + v 1 Q T C 2 ( Q ) = F C 2 + v 2 Q TC_2(Q) = FC_2 + v_2 Q T C 2 ( Q ) = F C 2 + v 2 Q
Equating total annual costs: F C 1 + v 1 Q ∗ = F C 2 + v 2 Q ∗ ⟹ Q ∗ = F C 2 − F C 1 v 1 − v 2 FC_1 + v_1 Q^* = FC_2 + v_2 Q^* \quad \implies \quad Q^* = \frac{FC_2 - FC_1}{v_1 - v_2} F C 1 + v 1 Q ∗ = F C 2 + v 2 Q ∗ ⟹ Q ∗ = v 1 − v 2 F C 2 − F C 1
If expected volume Q < Q ∗ Q < Q^* Q < Q ∗ : Select Process 1 (lower fixed capital).
If expected volume Q > Q ∗ Q > Q^* Q > Q ∗ : Select Process 2 (lower marginal cost).
When capital costs require time-value amortization, replace F C FC FC with equivalent annual capital recovery: A W Cost , 1 ( Q ∗ ) = A W Cost , 2 ( Q ∗ ) AW_{\text{Cost}, 1}(Q^*) = AW_{\text{Cost}, 2}(Q^*) A W Cost , 1 ( Q ∗ ) = A W Cost , 2 ( Q ∗ ) .
- 6. Step-by-Step Worked Engineering Calculations
- Worked Example 5.3.1: Incremental Rate of Return Selection
Problem : An industrial plant is selecting between three mutually exclusive automated packaging machines. The firm's MARR is 10%, and all machines have a service life of 5 years with zero salvage value:
- Machine Initial Cost ( P P P ) Annual Net Benefit ( A A A ) Individual IRR
- A $20,000 $6,200 16.7%
- B $35,000 $10,000 13.2%
- C $50,000 $13,500 10.9%
Which machine should the plant select?
Solution :
Screening : All three machines have individual I R R > M A R R ( 10 % ) IRR > MARR (10\%) I RR > M A RR ( 10% ) . All are economically viable. Ranking by initial cost: A < B < C A < B < C A < B < C .
Iteration 1: Defender A vs. Challenger B :
Incremental capital: Δ P = 35 , 000 − 20 , 000 = $ 15 , 000 \Delta P = 35,000 - 20,000 = \text{\textdollar}15,000 Δ P = 35 , 000 − 20 , 000 = $ 15 , 000
Incremental annual benefit: Δ A = 10 , 000 − 6 , 200 = $ 3 , 800 \Delta A = 10,000 - 6,200 = \text{\textdollar}3,800 Δ A = 10 , 000 − 6 , 200 = $ 3 , 800
Set up present worth equation: − 15 , 000 + 3 , 800 ( P / A , Δ i ∗ , 5 ) = 0 -15,000 + 3,800(P/A, \Delta i^*, 5) = 0 − 15 , 000 + 3 , 800 ( P / A , Δ i ∗ , 5 ) = 0
( P / A , Δ i ∗ , 5 ) = 15 , 000 3 , 800 = 3.94737 (P/A, \Delta i^*, 5) = \frac{15,000}{3,800} = 3.94737 ( P / A , Δ i ∗ , 5 ) = 3 , 800 15 , 000 = 3.94737
Look up / evaluate factors for n = 5 n = 5 n = 5 :
- At i = 8 % i = 8\% i = 8% : ( P / A , 8 % , 5 ) = 3.9927 (P/A, 8\%, 5) = 3.9927 ( P / A , 8% , 5 ) = 3.9927
- At i = 9 % i = 9\% i = 9% : ( P / A , 9 % , 5 ) = 3.8897 (P/A, 9\%, 5) = 3.8897 ( P / A , 9% , 5 ) = 3.8897
Interpolating: Δ i ∗ ≈ 8 % + 1 % [ 3.9927 − 3.9474 3.9927 − 3.8897 ] = 8 % + 0.0453 0.1030 = 8.44 % \Delta i^* \approx 8\% + 1\% \left[\frac{3.9927 - 3.9474}{3.9927 - 3.8897}\right] = 8\% + \frac{0.0453}{0.1030} = 8.44\% Δ i ∗ ≈ 8% + 1% [ 3.9927 − 3.8897 3.9927 − 3.9474 ] = 8% + 0.1030 0.0453 = 8.44%
Decision : Since Δ i ∗ = 8.44 % < M A R R ( 10 % ) \Delta i^* = 8.44\% < MARR (10\%) Δ i ∗ = 8.44% < M A RR ( 10% ) , the extra $15,000 investment is not justified . Reject Challenger B. Defender A remains .
Iteration 2: Defender A vs. Challenger C :
Incremental capital: Δ P = 50 , 000 − 20 , 000 = $ 30 , 000 \Delta P = 50,000 - 20,000 = \text{\textdollar}30,000 Δ P = 50 , 000 − 20 , 000 = $ 30 , 000
Incremental annual benefit: Δ A = 13 , 500 − 6 , 200 = $ 7 , 300 \Delta A = 13,500 - 6,200 = \text{\textdollar}7,300 Δ A = 13 , 500 − 6 , 200 = $ 7 , 300
( P / A , Δ i ∗ , 5 ) = 30 , 000 7 , 300 = 4.1096 (P/A, \Delta i^*, 5) = \frac{30,000}{7,300} = 4.1096 ( P / A , Δ i ∗ , 5 ) = 7 , 300 30 , 000 = 4.1096
At i = 7 % i = 7\% i = 7% : ( P / A , 7 % , 5 ) = 4.1002 (P/A, 7\%, 5) = 4.1002 ( P / A , 7% , 5 ) = 4.1002 . Thus Δ i ∗ ≈ 6.9 % \Delta i^* \approx 6.9\% Δ i ∗ ≈ 6.9% .
Decision : Since Δ i ∗ ≈ 6.9 % < M A R R ( 10 % ) \Delta i^* \approx 6.9\% < MARR (10\%) Δ i ∗ ≈ 6.9% < M A RR ( 10% ) , reject Challenger C.
Final Conclusion : Select Machine A . Even though Machine B has an attractive 13.2% individual return, its incremental return on the additional $15,000 capital is only 8.4%, which destroys value relative to the 10% MARR.
Worked Example 5.3.2: Two-Alternative Process Break-Even Volume
Problem : A firm can manufacture an industrial sensor housing using either manual CNC machining (Option 1) or automated injection molding (Option 2) at i = 10 % i = 10\% i = 10% over a 4-year life:
Option 1 : Tooling initial cost = $15,000; variable labor/material cost = $12.00 per unit; annual tooling maintenance = $2,000.
Option 2 : Automated tooling initial cost = $75,000; variable cost = $3.50 per unit; annual machine maintenance = $6,000.
What is the annual production volume ( Q ∗ Q^* Q ∗ ) at which both options break even?
Solution :
Find capital recovery for each option ( n = 4 , i = 10 % n = 4, i = 10\% n = 4 , i = 10% ): ( A / P , 10 % , 4 ) = 0.10 ( 1.10 ) 4 ( 1.10 ) 4 − 1 = 0.14641 0.4641 = 0.31547 (A/P, 10\%, 4) = \frac{0.10(1.10)^4}{(1.10)^4 - 1} = \frac{0.14641}{0.4641} = 0.31547 ( A / P , 10% , 4 ) = ( 1.10 ) 4 − 1 0.10 ( 1.10 ) 4 = 0.4641 0.14641 = 0.31547
C R 1 = 15 , 000 × 0.31547 = $ 4 , 732 CR_1 = 15,000 \times 0.31547 = \text{\textdollar}4,732 C R 1 = 15 , 000 × 0.31547 = $ 4 , 732
C R 2 = 75 , 000 × 0.31547 = $ 23 , 660 CR_2 = 75,000 \times 0.31547 = \text{\textdollar}23,660 C R 2 = 75 , 000 × 0.31547 = $ 23 , 660
Formulate Equivalent Uniform Annual Cost as a function of annual volume Q Q Q :
E U A C 1 ( Q ) = C R 1 + Maint 1 + v 1 Q = 4 , 732 + 2 , 000 + 12.00 Q = 6 , 732 + 12.00 Q EUAC_1(Q) = CR_1 + \text{Maint}_1 + v_1 Q = 4,732 + 2,000 + 12.00 Q = 6,732 + 12.00 Q E U A C 1 ( Q ) = C R 1 + Maint 1 + v 1 Q = 4 , 732 + 2 , 000 + 12.00 Q = 6 , 732 + 12.00 Q
E U A C 2 ( Q ) = C R 2 + Maint 2 + v 2 Q = 23 , 660 + 6 , 000 + 3.50 Q = 29 , 660 + 3.50 Q EUAC_2(Q) = CR_2 + \text{Maint}_2 + v_2 Q = 23,660 + 6,000 + 3.50 Q = 29,660 + 3.50 Q E U A C 2 ( Q ) = C R 2 + Maint 2 + v 2 Q = 23 , 660 + 6 , 000 + 3.50 Q = 29 , 660 + 3.50 Q
Equate E U A C 1 ( Q ∗ ) = E U A C 2 ( Q ∗ ) EUAC_1(Q^*) = EUAC_2(Q^*) E U A C 1 ( Q ∗ ) = E U A C 2 ( Q ∗ ) : 6 , 732 + 12.00 Q ∗ = 29 , 660 + 3.50 Q ∗ 6,732 + 12.00 Q^* = 29,660 + 3.50 Q^* 6 , 732 + 12.00 Q ∗ = 29 , 660 + 3.50 Q ∗ 8.50 Q ∗ = 22 , 928 ⟹ Q ∗ = 22 , 928 8.50 ≈ 2 , 697.4 units/year 8.50 Q^* = 22,928 \quad \implies \quad Q^* = \frac{22,928}{8.50} \approx 2,697.4\text{ units/year} 8.50 Q ∗ = 22 , 928 ⟹ Q ∗ = 8.50 22 , 928 ≈ 2 , 697.4 units/year
Engineering Conclusion : The annual break-even volume is 2,698 units/year . For production volumes exceeding 2,698 units/year, Option 2 is superior.
7. NCEES Reference Handbook Tips & Realistic Exam Traps
Never Pick by Highest IRR : On mutually exclusive questions, one distractor is always the alternative with the highest individual IRR. Do not fall into this trap! Use incremental analysis.
Sunk Cost Recognition : If a problem states "The existing lathe was bought 4 years ago for $80,000 and has a book value of $30,000, but can be sold today for $12,000," the ONLY number that enters the replacement study is the $12,000 market value. The $80,000 and $30,000 are sunk costs.
Order of Subtraction in Δ \Delta Δ CF : Always subtract the lower initial cost option from the higher initial cost option: Challenger − Defender \text{Challenger} - \text{Defender} Challenger − Defender . This ensures the incremental initial investment at t = 0 t = 0 t = 0 is negative, representing an incremental investment.