Study guide
14.1 Facility Location Analysis: Qualitative Factor Rating and Centroid Method
FE Industrial and Systems Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Exam Overview, CBT Strategy & Handbook Navigation
1.1 FE Industrial Exam Structure, CBT Logistics, and Pacing 1.2 Using the NCEES FE Reference Handbook and Approved Calculators
2 Chapter 2: Mathematics for Industrial Engineers
2.1 Analytic Geometry, Coordinate Systems, and Trigonometry 2.2 Calculus: Differential, Integral, and Series Approximations 2.3 Linear Algebra: Matrix Operations, Systems of Equations, and Vectors
3 Chapter 3: Engineering Sciences Core
3.1 Thermodynamics Fundamentals and Fluid Flow Principles 3.2 Statics, Dynamics, and Mechanics of Materials Core 3.3 Electrical Circuits, DC/AC Analysis, and Power in Industrial Systems
4 Chapter 4: Ethics and Professional Practice
4.1 NCEES Model Rules of Professional Conduct and Technical Society Ethics 4.2 Engineering Licensure, Public Welfare, and Professional Liability 4.3 Engineering Contracts, Intellectual Property, and Conflicts of Interest
5 Chapter 5: Engineering Economics
5.1 Time Value of Money, Discount Factors, and Equivalence 5.2 Evaluating Alternatives: Present Worth, Equivalent Annual Cost, and IRR 5.3 Incremental Rate of Return, Replacement Analysis, and Break-Even 5.4 Depreciation Methods, MACRS, Income Taxes, and Inflation
6 Chapter 6: Probability Foundations & Distributions
6.1 Basic Probability Concepts, Conditional Probability, and Bayes' Theorem 6.2 Discrete Probability Distributions 6.3 Continuous Probability Distributions
7 Chapter 7: Statistical Inference, Regression & Design of Experiments
7.1 Sampling Distributions, Central Limit Theorem, and Confidence Intervals 7.2 Hypothesis Testing: Means, Proportions, and Variances 7.3 Linear Regression, Correlation Analysis, and Design of Experiments (ANOVA)
8 Chapter 8: Data, Logic, Modeling & Linear Programming
8.1 Optimization Modeling: Decision Variables, Objectives, and Constraints 8.2 Linear Programming: Graphical Solutions and Simplex Fundamentals 8.3 Duality, Sensitivity Analysis, and Integer Linear Programming 8.4 Data, Logic Development, and Analytics
9 Chapter 9: Stochastic Models & Simulation
9.1 Queuing Theory: Little's Law, M/M/1, and Multi-Server Systems 9.2 Discrete-Time Markov Chains: Transition Matrices and Steady-State Probabilities 9.3 Discrete-Event Simulation Principles and Monte Carlo Modeling
10 Chapter 10: Engineering Management, Project Planning & Performance Measurement
10.1 Organizational Structure, Leadership, and Worker Motivation Theories 10.2 Project Management: WBS, Critical Path Method (CPM), PERT, and Crashing 10.3 Earned Value Management (EVM), Decision Trees, and Risk Preference 10.4 Performance Measurement: Productivity, KPIs, Wage Systems, and the Balanced Scorecard
11 Chapter 11: Manufacturing & Production Systems
11.1 Manufacturing Processes, Material Processing, and Tolerancing 11.2 Assembly Line Balancing, Takt Time, Cycle Time, and Throughput 11.3 Sustainable Manufacturing, Waste Minimization, and Life-Cycle Assessment
12 Chapter 12: Production Planning, Inventory Control & Sequencing
12.1 Demand Forecasting Methods and Forecast Error Tracking 12.2 Aggregate Planning, Master Production Scheduling (MPS), and MRP 12.3 Deterministic Inventory Models: EOQ, EPQ, and Safety Stock 12.4 Job Sequencing, Dispatching Rules, and Flow Shop Scheduling
13 Chapter 13: Lean Systems & Theory of Constraints
13.1 Lean Foundations: Value Stream Mapping, Seven Wastes, and 5S 13.2 Pull Systems, Kanban, Just-In-Time (JIT), and SMED Setup Reduction 13.3 Theory of Constraints: Bottleneck Identification and Drum-Buffer-Rope
14 Chapter 14: Facilities Planning & Material Handling
14.1 Facility Location Analysis: Qualitative Factor Rating and Centroid Method 14.2 Facility Layout Design and Flow Analysis 14.3 Material Handling Equipment, Warehousing, and AS/RS
15 Chapter 15: Supply Chain Design & Logistics
15.1 Supply Chain Network Architecture and Transportation Modes 15.2 Distribution Strategies, Cross-Docking, and Vehicle Routing 15.3 The Bullwhip Effect, Risk Pooling, and Supply Chain Coordination
16 Chapter 16: Human Factors & Cognitive Ergonomics
16.1 Cognitive Engineering, Human-Machine Interface, Displays, and Controls 16.2 Anthropometric Principles, Percentile Design, and Biomechanical Posture 16.3 Environmental Ergonomics: Industrial Noise, Lighting, and Heat Stress
17 Chapter 17: Physical Ergonomics & Workplace Safety
17.1 Physical Ergonomics: The NIOSH Manual Lifting Equation 17.2 Cumulative Trauma Disorders and Postural Assessment 17.3 Workplace Safety: OSHA Standards, Hazard Analysis, and Control Hierarchy
18 Chapter 18: Work Design & Measurement
18.1 Methods Engineering, Process Charting, and Principles of Motion Economy 18.2 Direct Stopwatch Time Study: Observed Time, Performance Rating, and Allowances 18.3 Predetermined Time Systems, Work Sampling, and Learning Curves
19 Chapter 19: Quality Management, Six Sigma & Analytical Tools
19.1 Quality Philosophies, Total Quality Management, and Cost of Quality 19.2 Six Sigma DMAIC Methodology and Quality Function Deployment 19.3 The Seven Basic Quality Tools, Root Cause Analysis, and Taguchi Loss Function
20 Chapter 20: Statistical Process Control
20.1 Statistical Process Control Principles, Variation, and Run Rules 20.2 Variable Control Charts: X-bar & R, X-bar & S, and Individual-Moving Range 20.3 Attribute Control Charts: Defectives (p, np) and Defects (c, u)
21 Chapter 21: Process Capability & Acceptance Sampling
21.1 Process Capability Indices and Defect Levels 21.2 Acceptance Sampling Concepts and Operating Characteristic Curves 21.3 Sampling Risks, AQL, LTPD, and Standard Sampling Plans
22 Chapter 22: Systems Engineering & Life-Cycle Management
22.1 The Systems Engineering V-Model, Stakeholder Requirements, and Functional Architecture 22.2 Configuration Management, Interface Control, and Verification & Validation 22.3 Life-Cycle Costing, Maintainability, and System Availability
23 Chapter 23: Reliability Engineering & Risk Analysis
23.1 Reliability Mathematics, Hazard Rates, and the Bathtub Curve 23.2 System Reliability Configurations: Series, Parallel, and k-out-of-n Systems 23.3 Failure Modes and Effects Analysis and Fault Tree Analysis
14.1 Facility Location Analysis: Qualitative Factor Rating and Centroid Method
Key Takeaways Explain This Topic AI
Facility location analysis follows a hierarchical multi-level decision framework spanning global (tariffs, currency risk), regional (raw materials, labor markets), community (taxes, zoning, local workforce), and specific site selection (parcel acreage, utilities, soil bearing capacity).
The Qualitative Factor Rating method combines objective and subjective evaluation criteria by assigning normalized importance weights (summing to 1.0) and scoring candidate sites on a standardized scale to calculate a composite weighted score.
The Center-of-Gravity (Centroid) method identifies optimal coordinates for a single intermediate distribution facility by calculating weighted averages: x* = Σ(w_i * x_i) / Σ(w_i) and y* = Σ(w_i * y_i) / Σ(w_i), where weights represent shipping volumes or freight costs.
Distance metrics fundamentally dictate location models: Euclidean distance (L2 norm) represents straight-line travel, Rectilinear distance (L1 norm) models orthogonal grid streets and factory aisles, and Chebyshev distance (L-infinity norm) models simultaneous independent machine travel.
Location break-even analysis determines cost-volume optimality across competing locations by equating total cost lines (TC = FC + VC * Q) to calculate crossover production quantities.
Last updated: September 2026
Facility location decisions represent some of the most capital-intensive, strategically binding commitments an industrial enterprise can make. A suboptimally placed manufacturing plant or regional distribution center imposes recurring penalties in freight expenses, unfavorable labor rates, supply chain vulnerability, and diminished customer service that cannot be easily engineered away through operational improvements. On the FE Industrial and Systems exam, facility location problems test both qualitative multi-criteria decision frameworks and rigorous quantitative models, including center-of-gravity formulations, distance metric derivations, and cost-volume break-even analyses.
1. Multi-Level Facility Location Decisions
Industrial engineers evaluate location alternatives through a structured, top-down spatial hierarchy that progresses from international considerations down to specific parcel boundary characteristics: Spatial Hierarchy of Facility Location
- ├── 1. Global / International Level
- │ ├── Trade agreements & tariffs (e.g., USMCA, WTO rules)
- │ ├── Currency stability & exchange rate volatility
- │ ├── Geopolitical stability & intellectual property protection
- │ └── Cultural factors, labor laws, & environmental mandates
- ├── 2. Regional Level
- │ ├── Proximity to raw material suppliers vs. final customer markets
- │ ├── Transportation infrastructure (interstate highways, rail heads, deep-water ports)
- │ ├── Regional labor supply, wage structures, & unionization density
- │ └── Utility availability (electrical grid capacity, natural gas, industrial water)
- ├── 3. Community Level
- │ ├── Local municipal tax abatements & economic development incentives
- │ ├── Local zoning ordinances, building codes, & EPA attainment status
- │ ├── Technical workforce training programs (community colleges, trade schools)
- │ └── Community quality of life (housing affordability, schools, public safety)
- └── 4. Specific Site Selection Level
- ├── Parcel acreage, terrain topography, & expansion potential
- ├── Soil load-bearing capacity & seismic/flood-plain status (FEMA maps)
- ├── Direct utility hookups (fiber optic, high-voltage substations, sewer discharge)
- └── Traffic ingress/egress, turning radii for 53-ft trailers, & rail siding access
- Raw Material vs. Market Orientation (Weber's Classification)
A foundational principle in regional location theory, first formalized by Alfred Weber, categorizes manufacturing processes by their material weight transformation:
Weight-Losing (Raw Material-Oriented) Processes : When raw materials lose significant weight, bulk, or perishability during processing (e.g., paper mills, copper smelting, timber milling), shipping raw inputs costs substantially more than shipping finished goods. Facilities must be located near raw material sources to minimize total ton-miles.
Weight-Gaining (Market-Oriented) Processes : When finished products become heavier, bulkier, more fragile, or more perishable than input ingredients (e.g., commercial bakeries, soft drink bottling, structural steel fabrication), shipping finished products is significantly more expensive than transporting inputs. Facilities must be located near customer consumption centers .
2. Qualitative Factor Rating Method
Because location decisions involve conflicting qualitative attributes (e.g., labor union relations, community quality of life) alongside quantitative costs (e.g., land purchase price, utility tariffs), industrial engineers employ the Factor Rating Method . This multi-criteria decision technique normalizes disparate evaluation metrics into a single composite score.
Mathematical Formulation
Identify m m m critical success factors ( j = 1 , 2 , … , m j = 1, 2, \dots, m j = 1 , 2 , … , m ) encompassing all relevant operational, financial, and environmental criteria.
Assign an importance weight w j w_j w j to each factor such that the weights sum to unity: ∑ j = 1 m w j = 1.0 ( or 100 % ) \sum_{j=1}^m w_j = 1.0 \quad (\text{or } 100\%) j = 1 ∑ m w j = 1.0 ( or 100% )
Establish a standard rating scale (typically 1 1 1 to 10 10 10 or 1 1 1 to 100 100 100 ) where higher scores indicate superior performance.
Score each candidate location i i i on factor j j j , denoted as s i j s_{ij} s ij .
Calculate the composite weighted score S i S_i S i for each candidate location: S i = ∑ j = 1 m w j s i j S_i = \sum_{j=1}^m w_j s_{ij} S i = j = 1 ∑ m w j s ij
Select the candidate location with the maximum composite score: max i { S i } \max_i \{S_i\} max i { S i } .
3. The Center-of-Gravity (Centroid) Method
The Center-of-Gravity (Centroid) Method is a mathematical technique used to locate a single intermediate facility (such as a central distribution center or consolidation warehouse) that minimizes total transportation cost between a set of existing geographically dispersed supply origins and customer demand destinations.
Theoretical Formulation
Let ( x i , y i ) (x_i, y_i) ( x i , y i ) denote the Cartesian grid coordinates of existing facility i i i (for i = 1 , 2 , … , n i = 1, 2, \dots, n i = 1 , 2 , … , n ). Let V i V_i V i represent the shipment volume or tonnage moving between existing facility i i i and the proposed central facility, and let c i c_i c i represent the freight transportation cost per unit volume per unit distance.
The combined weighting factor w i w_i w i for facility i i i is defined as: w i = V i × c i w_i = V_i \times c_i w i = V i × c i
If transportation rates per unit distance are uniform across all routes ( c i = c c_i = c c i = c ), the freight rate cancels out, and the volume V i V_i V i serves directly as the weight ( w i = V i w_i = V_i w i = V i ).
The optimal centroid coordinates ( x ∗ , y ∗ ) (x^*, y^*) ( x ∗ , y ∗ ) are determined by: x ∗ = ∑ i = 1 n w i x i ∑ i = 1 n w i = ∑ i = 1 n ( V i c i x i ) ∑ i = 1 n ( V i c i ) x^* = \frac{\sum_{i=1}^n w_i x_i}{\sum_{i=1}^n w_i} = \frac{\sum_{i=1}^n (V_i c_i x_i)}{\sum_{i=1}^n (V_i c_i)} x ∗ = ∑ i = 1 n w i ∑ i = 1 n w i x i = ∑ i = 1 n ( V i c i ) ∑ i = 1 n ( V i c i x i ) y ∗ = ∑ i = 1 n w i y i ∑ i = 1 n w i = ∑ i = 1 n ( V i c i y i ) ∑ i = 1 n ( V i c i ) y^* = \frac{\sum_{i=1}^n w_i y_i}{\sum_{i=1}^n w_i} = \frac{\sum_{i=1}^n (V_i c_i y_i)}{\sum_{i=1}^n (V_i c_i)} y ∗ = ∑ i = 1 n w i ∑ i = 1 n w i y i = ∑ i = 1 n ( V i c i ) ∑ i = 1 n ( V i c i y i ) Centroid Mechanics (Center-of-Gravity Analogy)
- (x3, y3) [w3 = 300 tons]
- o
- \
- \ (x*, y*) [Optimal Hub]
- \ *
- \ / \
- \ / \
- o / o (x2, y2) [w2 = 600 tons]
- (x1, y1) [w1 = 400 tons]
The centroid pulls toward nodes with the highest relative volume-distance weights.
Important Mathematical Distinction : The centroid formula provides the exact spatial point that minimizes the sum of squared Euclidean distances weighted by volume: min ∑ w i [ ( x − x i ) 2 + ( y − y i ) 2 ] \min \sum w_i [(x - x_i)^2 + (y - y_i)^2] min ∑ w i [( x − x i ) 2 + ( y − y i ) 2 ] . In physical freight logistics, the true cost objective minimizes the sum of unsquared Euclidean distances : min ∑ w i ( x − x i ) 2 + ( y − y i ) 2 \min \sum w_i \sqrt{(x - x_i)^2 + (y - y_i)^2} min ∑ w i ( x − x i ) 2 + ( y − y i ) 2 (the classical Weber / Fermat problem, solved via the iterative Weiszfeld algorithm). On the FE exam, NCEES specifically tests the centroid formulas shown above as the standard closed-form center-of-gravity method.
4. Distance Metrics in Location Analysis
Facility location models depend directly on the mathematical metric used to quantify the distance d ( A , B ) d(A, B) d ( A , B ) between coordinates ( x A , y A ) (x_A, y_A) ( x A , y A ) and ( x B , y B ) (x_B, y_B) ( x B , y B ) :
Distance Metric Mathematical Formula Physical Application in Industrial Engineering
Euclidean Distance ( L 2 L_2 L 2 Norm) d E = ( x A − x B ) 2 + ( y A − y B ) 2 d_E = \sqrt{(x_A - x_B)^2 + (y_A - y_B)^2} d E = ( x A − x B ) 2 + ( y A − y B ) 2 Straight-line, unconstrained travel (air freight, long-distance pipelines, open ocean routing). Underestimates urban driving distances.
Rectilinear Distance ( L 1 L_1 L 1 Norm / Manhattan) d R = ∣ x A − x B ∣ + ∣ y A − y B ∣ d_R = \vert x_A - x_B\vert+ \vert y_A - y_B\vert d R = ∣ x A − x B ∣ + ∣ y A − y B ∣ Orthogonal grid travel where diagonal movement is physically blocked (city street networks, factory aisles, automated conveyor grids).
Chebyshev Distance ( L ∞ L_\infty L ∞ Norm) d ∞ = max ( ∣ x A − x B ∣ , ∣ y A − y B ∣ ) d_\infty = \max(\vert x_A - x_B\vert, \vert y_A - y_B\vert) d ∞ = max ( ∣ x A − x B ∣ , ∣ y A − y B ∣ ) Simultaneous, independent two-axis motion where both drives operate concurrently at identical speeds (e.g., AS/RS crane travel).
Network Distance d net = min paths ∑ e u v d_{\text{net}} = \min_{\text{paths}} \sum e_{uv} d net = min paths ∑ e uv Shortest path along actual physical transportation infrastructure (interstates, railway tracks) using graph algorithms (Dijkstra's).
Rectilinear Single-Facility Location: The Median Method
When travel occurs along orthogonal rectilinear aisles ( L 1 L_1 L 1 norm), the objective is: min x , y ∑ i = 1 n w i ( ∣ x − x i ∣ + ∣ y − y i ∣ ) = min x ∑ i = 1 n w i ∣ x − x i ∣ + min y ∑ i = 1 n w i ∣ y − y i ∣ \min_{x, y} \sum_{i=1}^n w_i \left( |x - x_i| + |y - y_i| \right) = \min_x \sum_{i=1}^n w_i |x - x_i| + \min_y \sum_{i=1}^n w_i |y - y_i| x , y min i = 1 ∑ n w i ( ∣ x − x i ∣ + ∣ y − y i ∣ ) = x min i = 1 ∑ n w i ∣ x − x i ∣ + y min i = 1 ∑ n w i ∣ y − y i ∣
Because the objective function decomposes into independent functions of x x x and y y y , the optimal location ( x ∗ , y ∗ ) (x^*, y^*) ( x ∗ , y ∗ ) is found by calculating the independent weighted medians along the x x x -axis and y y y -axis, respectively. The optimal coordinate x ∗ x^* x ∗ satisfies: ∑ i : x i < x ∗ w i ≤ 1 2 ∑ i = 1 n w i and ∑ i : x i ≤ x ∗ w i ≥ 1 2 ∑ i = 1 n w i \sum_{i: x_i < x^*} w_i \le \frac{1}{2} \sum_{i=1}^n w_i \quad \text{and} \quad \sum_{i: x_i \le x^*} w_i \ge \frac{1}{2} \sum_{i=1}^n w_i i : x i < x ∗ ∑ w i ≤ 2 1 i = 1 ∑ n w i and i : x i ≤ x ∗ ∑ w i ≥ 2 1 i = 1 ∑ n w i
This stands in sharp contrast to the center-of-gravity method, which computes the weighted mean .
5. Location Break-Even (Cost-Volume) Analysis
When multiple candidate locations exhibit different structures of fixed and variable operating costs, industrial engineers employ Location Break-Even Analysis to identify which site yields the lowest total cost over specified annual production volume ranges.
Cost Function Formulation
For each candidate facility location k k k : T C k ( Q ) = F C k + V C k × Q TC_k(Q) = FC_k + VC_k \times Q T C k ( Q ) = F C k + V C k × Q
where:
T C k TC_k T C k = Total annual operating cost for location k k k ($/year)
F C k FC_k F C k = Fixed annual costs (land lease, facility depreciation, property taxes, base administrative overhead) ($/year)
V C k VC_k V C k = Variable operating cost per unit produced (direct labor, materials, utilities, per-unit outbound shipping) ($/unit)
- Q Q Q = Annual production or shipment volume (units/year) Cost-Volume Trade-Off Across Three Candidate Sites
- Total Cost ($)
- ^
- │ / Location A (Lowest FC, Highest VC)
- │ /
- │ / / Location B (Moderate FC & VC)
- │ / /
- │ / / / Location C (Highest FC, Lowest VC)
- │ / / /
- │ / x /
- │ / / \ /
- │ / / x
- │ / / / \
- FC_C ─── / / / ── Optimal: Site C
- │ / / /
- FC_B ─── / x─── Optimal: Site B
- │ / /
- FC_A ────────────x─── Optimal: Site A
- └─────────────┼─────┼────────────> Volume Q (units/year)
- Q1* Q2*
- Determining Crossover Points
The crossover (indifference) volume between location A A A and location B B B occurs where their total cost curves intersect: T C A ( Q ) = T C B ( Q ) ⟹ F C A + V C A ⋅ Q = F C B + V C B ⋅ Q TC_A(Q) = TC_B(Q) \implies FC_A + VC_A \cdot Q = FC_B + VC_B \cdot Q T C A ( Q ) = T C B ( Q ) ⟹ F C A + V C A ⋅ Q = F C B + V C B ⋅ Q Q A B ∗ = F C B − F C A V C A − V C B Q_{AB}^* = \frac{FC_B - FC_A}{VC_A - VC_B} Q A B ∗ = V C A − V C B F C B − F C A
If expected annual volume Q < Q A B ∗ Q < Q_{AB}^* Q < Q A B ∗ , the facility with the lower fixed cost dominates.
If expected annual volume Q > Q A B ∗ Q > Q_{AB}^* Q > Q A B ∗ , the facility with the lower variable cost dominates.
- 6. Step-by-Step Worked Engineering Calculations
- Worked Example 14.1.1: Multi-Criteria Factor Rating Evaluation
Problem : An advanced electronics manufacturer must select a site for a new semiconductor packaging facility. The site selection team has identified four critical factors, established their relative percentage weights, and scored three candidate cities on a 1-to-100 scale. Evaluate the candidate sites and determine the optimal location.
- Evaluation Factor Weight ( w j w_j w j ) City A Score City B Score City C Score
- Labor Availability & Technical Skills 0.35 0.35 0.35 70 70 70 85 85 85 90 90 90
- Transportation & Air Cargo Access 0.25 0.25 0.25 80 80 80 75 75 75 60 60 60
- State & Local Tax Incentives 0.20 0.20 0.20 90 90 90 60 60 60 80 80 80
- Cleanroom Utility Reliability (Power/Water) 0.20 0.20 0.20 65 65 65 80 80 80 85 85 85
Solution :
Step 1: Verify Weight Normalization ∑ w j = 0.35 + 0.25 + 0.20 + 0.20 = 1.00 ✓ \sum w_j = 0.35 + 0.25 + 0.20 + 0.20 = 1.00 \quad \checkmark ∑ w j = 0.35 + 0.25 + 0.20 + 0.20 = 1.00 ✓
Step 2: Calculate Composite Weighted Score for City A S A = ( 0.35 ) ( 70 ) + ( 0.25 ) ( 80 ) + ( 0.20 ) ( 90 ) + ( 0.20 ) ( 65 ) S_A = (0.35)(70) + (0.25)(80) + (0.20)(90) + (0.20)(65) S A = ( 0.35 ) ( 70 ) + ( 0.25 ) ( 80 ) + ( 0.20 ) ( 90 ) + ( 0.20 ) ( 65 ) S A = 24.50 + 20.00 + 18.00 + 13.00 = 75.50 S_A = 24.50 + 20.00 + 18.00 + 13.00 = 75.50 S A = 24.50 + 20.00 + 18.00 + 13.00 = 75.50
Step 3: Calculate Composite Weighted Score for City B S B = ( 0.35 ) ( 85 ) + ( 0.25 ) ( 75 ) + ( 0.20 ) ( 60 ) + ( 0.20 ) ( 80 ) S_B = (0.35)(85) + (0.25)(75) + (0.20)(60) + (0.20)(80) S B = ( 0.35 ) ( 85 ) + ( 0.25 ) ( 75 ) + ( 0.20 ) ( 60 ) + ( 0.20 ) ( 80 ) S B = 29.75 + 18.75 + 12.00 + 16.00 = 76.50 S_B = 29.75 + 18.75 + 12.00 + 16.00 = 76.50 S B = 29.75 + 18.75 + 12.00 + 16.00 = 76.50
Step 4: Calculate Composite Weighted Score for City C S C = ( 0.35 ) ( 90 ) + ( 0.25 ) ( 60 ) + ( 0.20 ) ( 80 ) + ( 0.20 ) ( 85 ) S_C = (0.35)(90) + (0.25)(60) + (0.20)(80) + (0.20)(85) S C = ( 0.35 ) ( 90 ) + ( 0.25 ) ( 60 ) + ( 0.20 ) ( 80 ) + ( 0.20 ) ( 85 ) S C = 31.50 + 15.00 + 16.00 + 17.00 = 79.50 S_C = 31.50 + 15.00 + 16.00 + 17.00 = 79.50 S C = 31.50 + 15.00 + 16.00 + 17.00 = 79.50
Conclusion : City C yields the highest composite score ( S C = 79.50 S_C = 79.50 S C = 79.50 ) and is the recommended facility location.
Worked Example 14.1.2: Center-of-Gravity Distribution Center Location
Problem : A nationwide retail logistics provider is planning to construct a central distribution hub to supply four major regional fulfillment centers. The grid coordinates (in kilometers) and monthly outbound shipment demands (in metric tons) for each fulfillment center are shown below. Shipping rates are uniform at $0.15 per ton-kilometer across the entire network. Determine the optimal center-of-gravity coordinates ( x ∗ , y ∗ ) (x^*, y^*) ( x ∗ , y ∗ ) for the new distribution hub.
- Fulfillment Center x i x_i x i (km) y i y_i y i (km) Monthly Volume V i V_i V i (tons)
- 1. Atlanta Hub 30 30 30 20 20 20 400 400 400
- 2. Charlotte Hub 80 80 80 40 40 40 600 600 600
- 3. Nashville Hub 20 20 20 60 60 60 300 300 300
- 4. Orlando Hub 50 50 50 10 10 10 700 700 700
Solution :
Step 1: Compute Total Network Weight Because the shipping rate c c c is constant across all links, w i = V i w_i = V_i w i = V i : ∑ i = 1 4 w i = 400 + 600 + 300 + 700 = 2 , 000 tons \sum_{i=1}^4 w_i = 400 + 600 + 300 + 700 = 2,000\text{ tons} i = 1 ∑ 4 w i = 400 + 600 + 300 + 700 = 2 , 000 tons
Step 2: Calculate Weighted x x x -Coordinate Sum ∑ i = 1 4 w i x i = ( 400 ) ( 30 ) + ( 600 ) ( 80 ) + ( 300 ) ( 20 ) + ( 700 ) ( 50 ) \sum_{i=1}^4 w_i x_i = (400)(30) + (600)(80) + (300)(20) + (700)(50) i = 1 ∑ 4 w i x i = ( 400 ) ( 30 ) + ( 600 ) ( 80 ) + ( 300 ) ( 20 ) + ( 700 ) ( 50 ) ∑ i = 1 4 w i x i = 12 , 000 + 48 , 000 + 6 , 000 + 35 , 000 = 101 , 000 ton-km \sum_{i=1}^4 w_i x_i = 12,000 + 48,000 + 6,000 + 35,000 = 101,000\text{ ton-km} i = 1 ∑ 4 w i x i = 12 , 000 + 48 , 000 + 6 , 000 + 35 , 000 = 101 , 000 ton-km
Step 3: Calculate Weighted y y y -Coordinate Sum ∑ i = 1 4 w i y i = ( 400 ) ( 20 ) + ( 600 ) ( 40 ) + ( 300 ) ( 60 ) + ( 700 ) ( 10 ) \sum_{i=1}^4 w_i y_i = (400)(20) + (600)(40) + (300)(60) + (700)(10) i = 1 ∑ 4 w i y i = ( 400 ) ( 20 ) + ( 600 ) ( 40 ) + ( 300 ) ( 60 ) + ( 700 ) ( 10 ) ∑ i = 1 4 w i y i = 8 , 000 + 24 , 000 + 18 , 000 + 7 , 000 = 57 , 000 ton-km \sum_{i=1}^4 w_i y_i = 8,000 + 24,000 + 18,000 + 7,000 = 57,000\text{ ton-km} i = 1 ∑ 4 w i y i = 8 , 000 + 24 , 000 + 18 , 000 + 7 , 000 = 57 , 000 ton-km
Step 4: Determine Optimal Centroid Coordinates x ∗ = 101 , 000 2 , 000 = 50.50 km x^* = \frac{101,000}{2,000} = 50.50\text{ km} x ∗ = 2 , 000 101 , 000 = 50.50 km y ∗ = 57 , 000 2 , 000 = 28.50 km y^* = \frac{57,000}{2,000} = 28.50\text{ km} y ∗ = 2 , 000 57 , 000 = 28.50 km
Conclusion : The optimal center-of-gravity location for the central distribution hub is ( x ∗ = 50.5 km , y ∗ = 28.5 km ) (x^* = 50.5\text{ km}, y^* = 28.5\text{ km}) ( x ∗ = 50.5 km , y ∗ = 28.5 km ) .
Worked Example 14.1.3: Three-Site Location Break-Even and Crossover Analysis
Problem : An industrial valve manufacturer is evaluating three candidate cities for a new automated foundry. The estimated fixed annual operating costs and per-unit variable manufacturing costs are:
Location 1 : Fixed Cost F C 1 = $ 200 , 000 / year FC_1 = \text{\textdollar}200,000/\text{year} F C 1 = $ 200 , 000/ year ; Variable Cost V C 1 = $ 60 / unit VC_1 = \text{\textdollar}60/\text{unit} V C 1 = $ 60/ unit
Location 2 : Fixed Cost F C 2 = $ 320 , 000 / year FC_2 = \text{\textdollar}320,000/\text{year} F C 2 = $ 320 , 000/ year ; Variable Cost V C 2 = $ 40 / unit VC_2 = \text{\textdollar}40/\text{unit} V C 2 = $ 40/ unit
Location 3 : Fixed Cost F C 3 = $ 500 , 000 / year FC_3 = \text{\textdollar}500,000/\text{year} F C 3 = $ 500 , 000/ year ; Variable Cost V C 3 = $ 25 / unit VC_3 = \text{\textdollar}25/\text{unit} V C 3 = $ 25/ unit
Calculate the crossover production volume between Location 1 and Location 2 ( Q 1 , 2 ∗ Q_{1,2}^* Q 1 , 2 ∗ ).
Calculate the crossover production volume between Location 2 and Location 3 ( Q 2 , 3 ∗ Q_{2,3}^* Q 2 , 3 ∗ ).
Determine the optimal location range for annual production volumes ranging from 0 0 0 to 25 , 000 25,000 25 , 000 units.
Solution :
Step 1: Compute Crossover Volume Q 1 , 2 ∗ Q_{1,2}^* Q 1 , 2 ∗ F C 1 + V C 1 ⋅ Q = F C 2 + V C 2 ⋅ Q FC_1 + VC_1 \cdot Q = FC_2 + VC_2 \cdot Q F C 1 + V C 1 ⋅ Q = F C 2 + V C 2 ⋅ Q 200 , 000 + 60 Q = 320 , 000 + 40 Q 200,000 + 60 Q = 320,000 + 40 Q 200 , 000 + 60 Q = 320 , 000 + 40 Q 20 Q = 120 , 000 ⟹ Q 1 , 2 ∗ = 6 , 000 units/year 20 Q = 120,000 \implies Q_{1,2}^* = 6,000\text{ units/year} 20 Q = 120 , 000 ⟹ Q 1 , 2 ∗ = 6 , 000 units/year
Step 2: Compute Crossover Volume Q 2 , 3 ∗ Q_{2,3}^* Q 2 , 3 ∗ F C 2 + V C 2 ⋅ Q = F C 3 + V C 3 ⋅ Q FC_2 + VC_2 \cdot Q = FC_3 + VC_3 \cdot Q F C 2 + V C 2 ⋅ Q = F C 3 + V C 3 ⋅ Q 320 , 000 + 40 Q = 500 , 000 + 25 Q 320,000 + 40 Q = 500,000 + 25 Q 320 , 000 + 40 Q = 500 , 000 + 25 Q 15 Q = 180 , 000 ⟹ Q 2 , 3 ∗ = 12 , 000 units/year 15 Q = 180,000 \implies Q_{2,3}^* = 12,000\text{ units/year} 15 Q = 180 , 000 ⟹ Q 2 , 3 ∗ = 12 , 000 units/year
Step 3: Establish Volume Decision Ranges
For 0 ≤ Q < 6 , 000 0 \le Q < 6,000 0 ≤ Q < 6 , 000 units/year : Location 1 provides the lowest total cost. (Example at Q = 4 , 000 Q = 4,000 Q = 4 , 000 : T C 1 = $ 440 , 000 TC_1 = \text{\textdollar}440,000 T C 1 = $ 440 , 000 , T C 2 = $ 480 , 000 TC_2 = \text{\textdollar}480,000 T C 2 = $ 480 , 000 , T C 3 = $ 600 , 000 TC_3 = \text{\textdollar}600,000 T C 3 = $ 600 , 000 ).
For 6 , 000 < Q < 12 , 000 6,000 < Q < 12,000 6 , 000 < Q < 12 , 000 units/year : Location 2 provides the lowest total cost. (Example at Q = 10 , 000 Q = 10,000 Q = 10 , 000 : T C 1 = $ 800 , 000 TC_1 = \text{\textdollar}800,000 T C 1 = $ 800 , 000 , T C 2 = $ 720 , 000 TC_2 = \text{\textdollar}720,000 T C 2 = $ 720 , 000 , T C 3 = $ 750 , 000 TC_3 = \text{\textdollar}750,000 T C 3 = $ 750 , 000 ).
For Q > 12 , 000 Q > 12,000 Q > 12 , 000 units/year : Location 3 provides the lowest total cost. (Example at Q = 16 , 000 Q = 16,000 Q = 16 , 000 : T C 1 = $ 1 , 160 , 000 TC_1 = \text{\textdollar}1,160,000 T C 1 = $ 1 , 160 , 000 , T C 2 = $ 960 , 000 TC_2 = \text{\textdollar}960,000 T C 2 = $ 960 , 000 , T C 3 = $ 900 , 000 TC_3 = \text{\textdollar}900,000 T C 3 = $ 900 , 000 ).
7. NCEES Reference Handbook Tips & Realistic Exam Traps
Centroid vs. Rectilinear Median Trap : Do not use the center-of-gravity formula when the problem states that travel is confined to an orthogonal city grid or factory aisle system. For rectilinear ( L 1 L_1 L 1 ) movement, the optimal single facility location is the independent median of the x x x and y y y coordinates, NOT the mean.
Unit Transportation Cost Omission : In center-of-gravity calculations, do not automatically set w i = V i w_i = V_i w i = V i . Check whether shipping rates per ton-mile ( c i c_i c i ) differ across sources and markets. If City 1 costs $ 0.30 / ton-km \text{\textdollar}0.30/\text{ton-km} $ 0.30/ ton-km and City 2 costs $ 0.10 / ton-km \text{\textdollar}0.10/\text{ton-km} $ 0.10/ ton-km , the weights are w 1 = 0.30 V 1 w_1 = 0.30 V_1 w 1 = 0.30 V 1 and w 2 = 0.10 V 2 w_2 = 0.10 V_2 w 2 = 0.10 V 2 . Omitting differing rates produces an incorrect centroid.
Crossover Feasibility Trap : When solving for multiple break-even crossovers, always plot or test the intermediate volume ranges. A site with moderate fixed and variable costs can occasionally be completely dominated (never optimal at any volume) if its crossover point with the high-fixed-cost site occurs at a lower volume than its crossover with the low-fixed-cost site.
Distance Metric Conversion : Remember that for any two points not on the exact same horizontal or vertical coordinate, Rectilinear distance is strictly greater than Euclidean distance: d R ≥ d E d_R \ge d_E d R ≥ d E . Specifically, the maximum discrepancy occurs along a 45-degree diagonal where d R = 2 ⋅ d E ≈ 1.414 ⋅ d E d_R = \sqrt{2} \cdot d_E \approx 1.414 \cdot d_E d R = 2 ⋅ d E ≈ 1.414 ⋅ d E (a 41.4% increase).