Study guide
13.2 Pull Systems, Kanban, Just-In-Time (JIT), and SMED Setup Reduction
FE Industrial and Systems Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Exam Overview, CBT Strategy & Handbook Navigation
1.1 FE Industrial Exam Structure, CBT Logistics, and Pacing 1.2 Using the NCEES FE Reference Handbook and Approved Calculators
2 Chapter 2: Mathematics for Industrial Engineers
2.1 Analytic Geometry, Coordinate Systems, and Trigonometry 2.2 Calculus: Differential, Integral, and Series Approximations 2.3 Linear Algebra: Matrix Operations, Systems of Equations, and Vectors
3 Chapter 3: Engineering Sciences Core
3.1 Thermodynamics Fundamentals and Fluid Flow Principles 3.2 Statics, Dynamics, and Mechanics of Materials Core 3.3 Electrical Circuits, DC/AC Analysis, and Power in Industrial Systems
4 Chapter 4: Ethics and Professional Practice
4.1 NCEES Model Rules of Professional Conduct and Technical Society Ethics 4.2 Engineering Licensure, Public Welfare, and Professional Liability 4.3 Engineering Contracts, Intellectual Property, and Conflicts of Interest
5 Chapter 5: Engineering Economics
5.1 Time Value of Money, Discount Factors, and Equivalence 5.2 Evaluating Alternatives: Present Worth, Equivalent Annual Cost, and IRR 5.3 Incremental Rate of Return, Replacement Analysis, and Break-Even 5.4 Depreciation Methods, MACRS, Income Taxes, and Inflation
6 Chapter 6: Probability Foundations & Distributions
6.1 Basic Probability Concepts, Conditional Probability, and Bayes' Theorem 6.2 Discrete Probability Distributions 6.3 Continuous Probability Distributions
7 Chapter 7: Statistical Inference, Regression & Design of Experiments
7.1 Sampling Distributions, Central Limit Theorem, and Confidence Intervals 7.2 Hypothesis Testing: Means, Proportions, and Variances 7.3 Linear Regression, Correlation Analysis, and Design of Experiments (ANOVA)
8 Chapter 8: Data, Logic, Modeling & Linear Programming
8.1 Optimization Modeling: Decision Variables, Objectives, and Constraints 8.2 Linear Programming: Graphical Solutions and Simplex Fundamentals 8.3 Duality, Sensitivity Analysis, and Integer Linear Programming 8.4 Data, Logic Development, and Analytics
9 Chapter 9: Stochastic Models & Simulation
9.1 Queuing Theory: Little's Law, M/M/1, and Multi-Server Systems 9.2 Discrete-Time Markov Chains: Transition Matrices and Steady-State Probabilities 9.3 Discrete-Event Simulation Principles and Monte Carlo Modeling
10 Chapter 10: Engineering Management, Project Planning & Performance Measurement
10.1 Organizational Structure, Leadership, and Worker Motivation Theories 10.2 Project Management: WBS, Critical Path Method (CPM), PERT, and Crashing 10.3 Earned Value Management (EVM), Decision Trees, and Risk Preference 10.4 Performance Measurement: Productivity, KPIs, Wage Systems, and the Balanced Scorecard
11 Chapter 11: Manufacturing & Production Systems
11.1 Manufacturing Processes, Material Processing, and Tolerancing 11.2 Assembly Line Balancing, Takt Time, Cycle Time, and Throughput 11.3 Sustainable Manufacturing, Waste Minimization, and Life-Cycle Assessment
12 Chapter 12: Production Planning, Inventory Control & Sequencing
12.1 Demand Forecasting Methods and Forecast Error Tracking 12.2 Aggregate Planning, Master Production Scheduling (MPS), and MRP 12.3 Deterministic Inventory Models: EOQ, EPQ, and Safety Stock 12.4 Job Sequencing, Dispatching Rules, and Flow Shop Scheduling
13 Chapter 13: Lean Systems & Theory of Constraints
13.1 Lean Foundations: Value Stream Mapping, Seven Wastes, and 5S 13.2 Pull Systems, Kanban, Just-In-Time (JIT), and SMED Setup Reduction 13.3 Theory of Constraints: Bottleneck Identification and Drum-Buffer-Rope
14 Chapter 14: Facilities Planning & Material Handling
14.1 Facility Location Analysis: Qualitative Factor Rating and Centroid Method 14.2 Facility Layout Design and Flow Analysis 14.3 Material Handling Equipment, Warehousing, and AS/RS
15 Chapter 15: Supply Chain Design & Logistics
15.1 Supply Chain Network Architecture and Transportation Modes 15.2 Distribution Strategies, Cross-Docking, and Vehicle Routing 15.3 The Bullwhip Effect, Risk Pooling, and Supply Chain Coordination
16 Chapter 16: Human Factors & Cognitive Ergonomics
16.1 Cognitive Engineering, Human-Machine Interface, Displays, and Controls 16.2 Anthropometric Principles, Percentile Design, and Biomechanical Posture 16.3 Environmental Ergonomics: Industrial Noise, Lighting, and Heat Stress
17 Chapter 17: Physical Ergonomics & Workplace Safety
17.1 Physical Ergonomics: The NIOSH Manual Lifting Equation 17.2 Cumulative Trauma Disorders and Postural Assessment 17.3 Workplace Safety: OSHA Standards, Hazard Analysis, and Control Hierarchy
18 Chapter 18: Work Design & Measurement
18.1 Methods Engineering, Process Charting, and Principles of Motion Economy 18.2 Direct Stopwatch Time Study: Observed Time, Performance Rating, and Allowances 18.3 Predetermined Time Systems, Work Sampling, and Learning Curves
19 Chapter 19: Quality Management, Six Sigma & Analytical Tools
19.1 Quality Philosophies, Total Quality Management, and Cost of Quality 19.2 Six Sigma DMAIC Methodology and Quality Function Deployment 19.3 The Seven Basic Quality Tools, Root Cause Analysis, and Taguchi Loss Function
20 Chapter 20: Statistical Process Control
20.1 Statistical Process Control Principles, Variation, and Run Rules 20.2 Variable Control Charts: X-bar & R, X-bar & S, and Individual-Moving Range 20.3 Attribute Control Charts: Defectives (p, np) and Defects (c, u)
21 Chapter 21: Process Capability & Acceptance Sampling
21.1 Process Capability Indices and Defect Levels 21.2 Acceptance Sampling Concepts and Operating Characteristic Curves 21.3 Sampling Risks, AQL, LTPD, and Standard Sampling Plans
22 Chapter 22: Systems Engineering & Life-Cycle Management
22.1 The Systems Engineering V-Model, Stakeholder Requirements, and Functional Architecture 22.2 Configuration Management, Interface Control, and Verification & Validation 22.3 Life-Cycle Costing, Maintainability, and System Availability
23 Chapter 23: Reliability Engineering & Risk Analysis
23.1 Reliability Mathematics, Hazard Rates, and the Bathtub Curve 23.2 System Reliability Configurations: Series, Parallel, and k-out-of-n Systems 23.3 Failure Modes and Effects Analysis and Fault Tree Analysis
13.2 Pull Systems, Kanban, Just-In-Time (JIT), and SMED Setup Reduction
Key Takeaways Explain This Topic AI
Push production (MRP) schedules work releases based on future forecasts, generating high WIP and queue delays; Pull production (JIT) authorizes fabrication and material transfer strictly in response to downstream consumption.
Kanban cards bound the maximum allowable inventory in a pull loop; the number of cards is calculated using k = ceil(D * L * (1 + α) / C), where D is demand rate, L is lead time, α is safety factor, and C is container capacity.
Single-Minute Exchange of Die (SMED) reduces changeover time by segregating internal setup (operations performed only when the machine is stopped) from external setup (operations performed while the machine is running), converting internal steps to external, and streamlining remaining operations.
Cellular manufacturing groups dissimilar machines into U-shaped cells to process Part Families identified by Group Technology; U-shaped layouts maximize operator cross-training, minimize transit distances, and permit flexible capacity scaling.
Poka-Yoke mistake-proofing prevents defects using control mechanisms (which physically halt the line or prevent improper component insertion) or warning mechanisms (which alert operators with lights or audio alarms).
Last updated: September 2026
Traditional manufacturing systems operate on a Push logic: a centralized Master Production Schedule pushes production orders onto the shop floor according to predetermined forecasts, routing batches into inventory queues regardless of whether the downstream workstation is ready to process them. In contrast, Lean manufacturing utilizes Pull logic governed by Just-In-Time (JIT) principles: parts are produced and moved only when authorized by an explicit signal from a downstream customer workstation.
- 1. Push vs. Pull Production Systems Push System (Forecast-Driven / MRP)
- [Supplier] ──Push──► [Workstation 1] ──Push──► [Workstation 2] ──Push──► [Finished Goods]
- ▲ ▲ ▲
- └────── Central Master Production Schedule ────────┘ (Dispatched by schedule)
- Pull System (Demand-Driven / Kanban)
- [Supplier] ◄──Pull── [Workstation 1] ◄──Pull── [Workstation 2] ◄──Pull── [Customer Demand]
- ──Parts──► ──Parts──► ──Parts──►
- (Visual signal triggers upstream production & movement)
Operating Characteristic Push System (MRP / Batch) Pull System (Lean / Kanban)
Work Authorization Central computerized schedule based on forecasted demand. Downstream physical consumption signal (Kanban card or empty bin).
WIP Control Unbounded; WIP fluctuates wildly based on schedule deviations and bottlenecks. Strictly capped; maximum system WIP equals the number of circulating Kanbans multiplied by container capacity ( W I P max = k ⋅ C WIP_{\max} = k \cdot C W I P m a x = k ⋅ C ).
Production Lead Time Long; dominated by queue times between functional departments. Short; parts move in small containers or one-piece flow.
Defect Detection Delayed; scrap may sit undetected in massive inventory queues for weeks. Immediate; defects stop the pull signal, forcing rapid root-cause resolution.
Sensitivity to Variability Absorbed by massive buffer inventories at high carrying cost. Exposed immediately; reveals hidden machine breakdowns, setup delays, or scrap.
2. Kanban Signaling Systems
A Kanban (Japanese for "signboard" or "visual card") is an authorization device that regulates the flow of materials in a pull production system. Without a Kanban card, no part may be produced, transferred, or stored.
Major Types of Kanban
Production Kanban (P-Kanban) : Authorizes an upstream work center to manufacture a specific batch of parts to replenish a consumed container.
Withdrawal / Conveyance Kanban (C-Kanban / W-Kanban) : Authorizes material handlers to transfer a standardized container of parts from an upstream storage buffer (supermarket) to a downstream point-of-use workstation.
Two-Bin System : A simplified mechanical pull mechanism where two identical bins of fasteners or hardware sit at a workstation. The operator draws components exclusively from Bin 1. When Bin 1 is empty, it is sent to the central storeroom as a replenishment signal; Bin 2 provides sufficient inventory to cover the replenishment lead time ( L L L ). Dual-Card Kanban Loop Mechanics
- Downstream Assembly Supermarket Buffer Upstream Work Center
- ┌───────────────────┐ ┌───────────────────┐ ┌───────────────────┐
- │ 1. Operator pulls │ │ 2. C-Kanban card │ │ 4. P-Kanban card │
- │ parts from tote│ │ authorizes tote│ │ triggers batch │
- │ and detaches │──────────────►│ retrieval from ├─────────────►│ fabrication at │
- │ C-Kanban card. │ │ supermarket. │ │ machine. │
- └───────────────────┘ └───────────────────┘ └───────────────────┘
- ▲ │ │
- │ ▼ ▼
- └───────────────────────────────────┴──────────────────────────────────┘
- 3. Tote replenished & returned to Point of Use
- The NCEES Kanban Sizing Formula
To ensure that production is not starved while preventing excess inventory, the number of Kanban cards (or circulating containers) k k k is calculated using the formula: k = ⌈ D ⋅ L ⋅ ( 1 + α ) C ⌉ k = \left\lceil \frac{D \cdot L \cdot (1 + \alpha)}{C} \right\rceil k = ⌈ C D ⋅ L ⋅ ( 1 + α ) ⌉
where:
k k k = number of Kanban card sets / containers (always rounded up to the next integer via the ceiling function ⌈ … ⌉ \lceil \dots \rceil ⌈ … ⌉ )
D D D = average demand rate per unit time (e.g., parts/hour, units/day)
L L L = replenishment lead time per container, expressed in identical time units as D D D (sum of waiting, transit, setup, processing, and inspection durations)
α \alpha α = safety factor / policy buffer ( 0 ≤ α ≤ 1 0 \le \alpha \le 1 0 ≤ α ≤ 1 , reflecting process variability and demand volatility; e.g., α = 0.20 \alpha = 0.20 α = 0.20 provides a 20% safety margin)
C C C = container capacity (the fixed number of parts held in each standardized tote/bin)
Maximum WIP Inventory : The absolute maximum inventory that can accumulate between two workstations is strictly bounded: W I P max = k × C WIP_{\max} = k \times C W I P m a x = k × C Reducing lead time L L L or reducing container size C C C drives WIP down toward one-piece flow.
3. Single-Minute Exchange of Die (SMED)
Developed by industrial engineer Shigeo Shingo at Toyota, Single-Minute Exchange of Die (SMED) is a systematic methodology for reducing machine changeover and tooling setup times to less than 10 minutes (single digits of minutes).
Why Setup Reduction is Essential to Lean Flow
Under classical economic order quantity (EOQ) logic, large setup times mandate large production batches to amortize high fixed changeover costs ( Q ∗ = 2 D S / H Q^* = \sqrt{2DS/H} Q ∗ = 2 D S / H ). However, large batches create massive inventory piles, extended lead times, and scheduling inflexibility. Shingo demonstrated that setup time is not a fixed constraint, but an engineered variable. By slashing setup time toward zero, economical batch sizes collapse toward one-piece flow without incurring financial cost penalties: As S → 0 , Q ∗ = 2 D S H → 1 \text{As } S \to 0, \quad Q^* = \sqrt{\frac{2DS}{H}} \to 1 As S → 0 , Q ∗ = H 2 D S → 1
The Three Sequential Stages of SMED The SMED Implementation Hierarchy
- [ Baseline Setup ] ──► Total Changeover Time (e.g., 90 minutes)
- │
- ▼
- Stage 1: Segregate Internal vs. External Operations
- │ - Identify steps done while machine runs
- │ - Result: 90 min down to 50 min internal
- ▼
- Stage 2: Convert Internal Operations to External Operations
- │ - Pre-heat dies, pre-stage tooling, standardize die shut heights
- │ - Result: 50 min down to 20 min internal
- ▼
- Stage 3: Streamline All Remaining Operations
- │ - One-turn clamps, hydraulic fasteners, parallel operators
- ▼
- [ Target State ] ──► Single-Minute Setup (< 10 minutes)
Stage 1: Segregate Internal from External Setup :
Internal Setup : Operations that can only be performed while the machine is completely stopped (e.g., physically removing the old stamping die, mounting the new die onto the platen, connecting hydraulic lines).
External Setup : Operations that can be performed while the machine is actively running and producing good parts on the prior job (e.g., retrieving the new die from storage, pre-heating the die, staging raw material coils, retrieving torque wrenches, reading work orders).
Initial Gain : Simply moving external operations outside the downtime window typically slashes machine stoppage by 30% to 50% immediately with zero capital expenditure.
Stage 2: Convert Internal Setup to External Setup :
Re-engineer the process so that operations previously requiring machine downtime are executed externally. Examples include: pre-heating molding dies off-line on an auxiliary hot-plate; utilizing standardized intermediate plates or pre-setter fixtures so tool alignment occurs on a setup bench while the machine runs; establishing fixed mechanical stops to eliminate in-machine trial-and-error measurement cuts.
Stage 3: Streamline All Remaining Operations :
Optimize all remaining internal and external tasks. Replace threaded bolts with quick-acting fasteners (pear-drop holes, U-slotted washers, quarter-turn cam clamps, pneumatic/hydraulic clamps); eliminate adjustments by standardizing die shut heights; implement two-technician parallel choreographies using standardized setup work combination sheets.
4. Cellular Manufacturing and Group Technology (GT)
Cellular Manufacturing is an application of Group Technology (GT) , an engineering philosophy that identifies and exploits underlying physical and process similarities among parts.
Part Families and Composite Parts
Part Family : A collection of parts that share similar geometric dimensions and shapes, or require similar manufacturing processing steps, machines, and tooling.
Composite Part Concept : A hypothetical, all-inclusive master part containing every geometric design feature and operational step present across an entire part family. A manufacturing cell engineered to fabricate the composite part can manufacture any individual part in that family with minimal or zero changeover adjustment.
The Rank Order Clustering (ROC) Algorithm
Industrial engineers use King's Rank Order Clustering (ROC) algorithm to analyze a binary machine-part incidence matrix and reorganize disconnected equipment into dedicated manufacturing cells.
Incidence Matrix Definition : An m × n m \times n m × n binary matrix where rows represent machines ( i = 1 , … , m i = 1, \dots, m i = 1 , … , m ), columns represent parts ( j = 1 , … , n j = 1, \dots, n j = 1 , … , n ), and cell entry a i j = 1 a_{ij} = 1 a ij = 1 if part j j j requires processing on machine i i i , and a i j = 0 a_{ij} = 0 a ij = 0 otherwise.
Algorithmic Steps :
Row Weighting : Assign binary weights 2 n − j 2^{n-j} 2 n − j to each column j j j (from left to right, decreasing power of 2). Compute the decimal equivalent value for each row: Row Weight i = ∑ j = 1 n a i j ⋅ 2 n − j \text{Row Weight}_i = \sum_{j=1}^n a_{ij} \cdot 2^{n-j} Row Weight i = ∑ j = 1 n a ij ⋅ 2 n − j . Sort rows in descending order of their decimal weights.
Column Weighting : Assign binary weights 2 m − i 2^{m-i} 2 m − i to each row i i i (from top to bottom). Compute the decimal equivalent value for each column: Column Weight j = ∑ i = 1 m a i j ⋅ 2 m − i \text{Column Weight}_j = \sum_{i=1}^m a_{ij} \cdot 2^{m-i} Column Weight j = ∑ i = 1 m a ij ⋅ 2 m − i . Sort columns in descending order of their decimal weights.
Convergence Check : Repeat alternating row and column sorting until the ordering no longer changes. The resulting matrix reveals distinct block-diagonal clusters , each defining a self-contained manufacturing cell.
Exceptional Elements : Any isolated 1 1 1 s located outside the primary diagonal blocks indicate inter-cell transfers (parts that require processing on a machine outside their designated home cell), requiring duplicate tooling or routing redesign.
U-Shaped Manufacturing Cell Layouts
In cellular layouts, workstations are arranged in a U-shape rather than a linear straight line: U-Shaped Manufacturing Cell Architecture
- Raw Material Infeed
- │
- ▼
- ┌───────────────────┐
- │ Machine 1 (Cut) │
- └─────────┬─────────┘
- │
- ┌───────────────────┐ │ ┌───────────────────┐
- │ Machine 6 (Pack) │ │ │ Machine 2 (Mill) │
- └─────────▲─────────┘ │ └─────────┬─────────┘
- │ │ │
- │ Operator Patrol │
- │ Path │
- │ │ │
- ┌─────────┴─────────┐ │ ┌─────────▼─────────┐
- │ Machine 5 (Test) │ │ │ Machine 3 (Drill) │
- └─────────▲─────────┘ │ └─────────┬─────────┘
- │ │ │
- │ ┌─────────┴─────────┐ │
- └───────┤ Machine 4 (Debur)├───────┘
- └───────────────────┘
- │
- ▼
- Finished Goods Outflow
Close Proximity of Start and End : The raw material entry point and finished goods exit point are adjacent, allowing a single operator to load raw stock and unload finished parts simultaneously.
Minimized Travel Distance : Eliminates long walks down linear conveyor belts.
Flexible Capacity Rebalancing : By cross-training operators, management can dynamically scale cell staffing based on demand: one multi-skilled operator can patrol all six machines during slow demand periods; two operators split the cell during medium demand; three operators man adjacent stations during peak demand, maintaining perfect takt synchronization.
5. Poka-Yoke (Mistake-Proofing)
Conceived by Shigeo Shingo , Poka-Yoke (Japanese for "avoiding inadvertent errors") is the design of devices, mechanisms, and fixtures that make it impossible for an operator to make a mistake or guarantee that defects cannot proceed downstream.
Philosophical Foundation : Human beings are inherently fallible, but operational errors need not cause defective products. Quality must be built into the process rather than inspected into the finished lot.
Classification by Mechanism :
Control / Shutdown Mechanism : The device physically stops the machine, blocks operation, or prevents part insertion if an abnormal condition occurs. Examples: asymmetric locating pins on an assembly jig that physically prevent inserting a printed circuit board upside down; an automated interlock switch that cuts power to a stamping press if the operator's hands breach an infrared light curtain.
Warning / Signaling Mechanism : The device detects an anomaly and triggers an alert (buzzing alarm, flashing strobe, chime), but does not mechanically stop the operation. Examples: a beeping alarm if a torque wrench fails to reach specified torque; a sensor flashing yellow if an operator reaches into the wrong parts bin.
Regulatory Rule : Control mechanisms are far superior to warning mechanisms because they eliminate human judgment and enforce absolute zero-defect compliance.
- 6. Step-by-Step Worked Engineering Calculations
- Worked Example 13.2.1: Kanban Card Sizing and WIP Analysis
Problem : An automotive subassembly line operates 16 hours per day (two 8-hour shifts). Demand for a specific brake bracket is 1,200 units per day. The replenishment lead time between the stamping department and the subassembly line averages 3.2 hours. Each standard tote holds 40 brackets. Plant engineering mandates a safety factor of 15% ( α = 0.15 \alpha = 0.15 α = 0.15 ) to account for transit congestion and die change delays.
Calculate the hourly demand rate ( D D D ).
Determine the required number of Kanban containers ( k k k ).
Calculate the maximum allowable WIP inventory of brake brackets in this pull loop.
If an industrial engineering Kaizen event successfully applies SMED to reduce replenishment lead time to 1.2 hours, recalculate the required number of Kanbans and determine the percentage reduction in maximum WIP inventory.
Solution :
Step 1: Calculate Hourly Demand Rate D = 1 , 200 units/day 16 operating hours/day = 75.0 units/hour D = \frac{1,200\text{ units/day}}{16\text{ operating hours/day}} = 75.0\text{ units/hour} D = 16 operating hours/day 1 , 200 units/day = 75.0 units/hour
Step 2: Determine Baseline Kanban Containers ( k k k ) Using the Kanban sizing formula: k = ⌈ D ⋅ L ⋅ ( 1 + α ) C ⌉ k = \left\lceil \frac{D \cdot L \cdot (1 + \alpha)}{C} \right\rceil k = ⌈ C D ⋅ L ⋅ ( 1 + α ) ⌉
Lead time demand: D ⋅ L = 75.0 units/hour × 3.2 hours = 240.0 units D \cdot L = 75.0\text{ units/hour} \times 3.2\text{ hours} = 240.0\text{ units} D ⋅ L = 75.0 units/hour × 3.2 hours = 240.0 units
Demand with safety buffer: 240.0 × ( 1 + 0.15 ) = 240.0 × 1.15 = 276.0 units 240.0 \times (1 + 0.15) = 240.0 \times 1.15 = 276.0\text{ units} 240.0 × ( 1 + 0.15 ) = 240.0 × 1.15 = 276.0 units
Divide by container capacity C = 40 C = 40 C = 40 : 276.0 40 = 6.90 \frac{276.0}{40} = 6.90 40 276.0 = 6.90
Applying the ceiling function: k 1 = ⌈ 6.90 ⌉ = 7 Kanban containers k_1 = \lceil 6.90 \rceil = 7\text{ Kanban containers} k 1 = ⌈ 6.90 ⌉ = 7 Kanban containers
Step 3: Calculate Baseline Maximum WIP W I P max , 1 = k 1 × C = 7 × 40 = 280 units WIP_{\max, 1} = k_1 \times C = 7 \times 40 = 280\text{ units} W I P m a x , 1 = k 1 × C = 7 × 40 = 280 units
Step 4: Recalculate Post-SMED Kanban Sizing ( L = 1.2 hours L = 1.2\text{ hours} L = 1.2 hours )
New lead time demand with buffer: 75.0 × 1.2 × 1.15 = 90.0 × 1.15 = 103.5 units 75.0 \times 1.2 \times 1.15 = 90.0 \times 1.15 = 103.5\text{ units} 75.0 × 1.2 × 1.15 = 90.0 × 1.15 = 103.5 units
Divide by container capacity C = 40 C = 40 C = 40 : 103.5 40 = 2.5875 \frac{103.5}{40} = 2.5875 40 103.5 = 2.5875
Applying the ceiling function: k 2 = ⌈ 2.5875 ⌉ = 3 Kanban containers k_2 = \lceil 2.5875 \rceil = 3\text{ Kanban containers} k 2 = ⌈ 2.5875 ⌉ = 3 Kanban containers
New maximum WIP inventory: W I P max , 2 = 3 × 40 = 120 units WIP_{\max, 2} = 3 \times 40 = 120\text{ units} W I P m a x , 2 = 3 × 40 = 120 units
Percentage reduction in WIP: Δ W I P = 280 − 120 280 × 100 % = 160 280 × 100 % = 57.14 % \Delta WIP = \frac{280 - 120}{280} \times 100\% = \frac{160}{280} \times 100\% = 57.14\% Δ W I P = 280 280 − 120 × 100% = 280 160 × 100% = 57.14%
Takeaway : Reducing lead time via SMED eliminated 4 circulating containers, driving a 57.1% reduction in shop-floor WIP .
Worked Example 13.2.2: Rank Order Clustering for Cellular Design
Problem : A machine shop manufactures four distinct components (P1, P2, P3, P4) across four machine tools (M1 = Lathe, M2 = Shaper, M3 = Drill, M4 = Mill). The initial machine-part incidence matrix is provided below: P1 P2 P3 P4 M1 1 0 1 0 M2 0 1 0 1 M3 1 0 1 0 M4 0 1 0 1 \begin{array}{c|cccc} & \text{P1} & \text{P2} & \text{P3} & \text{P4} \\ \hline \text{M1} & 1 & 0 & 1 & 0 \\ \text{M2} & 0 & 1 & 0 & 1 \\ \text{M3} & 1 & 0 & 1 & 0 \\ \text{M4} & 0 & 1 & 0 & 1 \end{array} M1 M2 M3 M4 P1 1 0 1 0 P2 0 1 0 1 P3 1 0 1 0 P4 0 1 0 1
Reorganize the matrix using Rank Order Clustering to identify distinct manufacturing cells.
Solution :
Step 1: Calculate Row Decimal Weights and Sort Rows Assign binary column weights 2 4 − j 2^{4-j} 2 4 − j , meaning Column 1 weight = 2 3 = 8 = 2^3 = 8 = 2 3 = 8 , Column 2 weight = 2 2 = 4 = 2^2 = 4 = 2 2 = 4 , Column 3 weight = 2 1 = 2 = 2^1 = 2 = 2 1 = 2 , Column 4 weight = 2 0 = 1 = 2^0 = 1 = 2 0 = 1 .
Row M1: ( 1 × 8 ) + ( 0 × 4 ) + ( 1 × 2 ) + ( 0 × 1 ) = 8 + 2 = 10 (1 \times 8) + (0 \times 4) + (1 \times 2) + (0 \times 1) = 8 + 2 = 10 ( 1 × 8 ) + ( 0 × 4 ) + ( 1 × 2 ) + ( 0 × 1 ) = 8 + 2 = 10
Row M2: ( 0 × 8 ) + ( 1 × 4 ) + ( 0 × 2 ) + ( 1 × 1 ) = 4 + 1 = 5 (0 \times 8) + (1 \times 4) + (0 \times 2) + (1 \times 1) = 4 + 1 = 5 ( 0 × 8 ) + ( 1 × 4 ) + ( 0 × 2 ) + ( 1 × 1 ) = 4 + 1 = 5
Row M3: ( 1 × 8 ) + ( 0 × 4 ) + ( 1 × 2 ) + ( 0 × 1 ) = 8 + 2 = 10 (1 \times 8) + (0 \times 4) + (1 \times 2) + (0 \times 1) = 8 + 2 = 10 ( 1 × 8 ) + ( 0 × 4 ) + ( 1 × 2 ) + ( 0 × 1 ) = 8 + 2 = 10
Row M4: ( 0 × 8 ) + ( 1 × 4 ) + ( 0 × 2 ) + ( 1 × 1 ) = 4 + 1 = 5 (0 \times 8) + (1 \times 4) + (0 \times 2) + (1 \times 1) = 4 + 1 = 5 ( 0 × 8 ) + ( 1 × 4 ) + ( 0 × 2 ) + ( 1 × 1 ) = 4 + 1 = 5
Row ordering : M1 (10), M3 (10), M2 (5), M4 (5). (Already partially grouped).
Step 2: Calculate Column Decimal Weights and Sort Columns Assign binary row weights 2 4 − i 2^{4-i} 2 4 − i based on the row sequence [M1, M3, M2, M4]: Row M1 weight = 2 3 = 8 = 2^3 = 8 = 2 3 = 8 , Row M3 weight = 2 2 = 4 = 2^2 = 4 = 2 2 = 4 , Row M2 weight = 2 1 = 2 = 2^1 = 2 = 2 1 = 2 , Row M4 weight = 2 0 = 1 = 2^0 = 1 = 2 0 = 1 .
Column P1: ( 1 × 8 ) + ( 1 × 4 ) + ( 0 × 2 ) + ( 0 × 1 ) = 12 (1 \times 8) + (1 \times 4) + (0 \times 2) + (0 \times 1) = 12 ( 1 × 8 ) + ( 1 × 4 ) + ( 0 × 2 ) + ( 0 × 1 ) = 12
Column P2: ( 0 × 8 ) + ( 0 × 4 ) + ( 1 × 2 ) + ( 1 × 1 ) = 3 (0 \times 8) + (0 \times 4) + (1 \times 2) + (1 \times 1) = 3 ( 0 × 8 ) + ( 0 × 4 ) + ( 1 × 2 ) + ( 1 × 1 ) = 3
Column P3: ( 1 × 8 ) + ( 1 × 4 ) + ( 0 × 2 ) + ( 0 × 1 ) = 12 (1 \times 8) + (1 \times 4) + (0 \times 2) + (0 \times 1) = 12 ( 1 × 8 ) + ( 1 × 4 ) + ( 0 × 2 ) + ( 0 × 1 ) = 12
Column P4: ( 0 × 8 ) + ( 0 × 4 ) + ( 1 × 2 ) + ( 1 × 1 ) = 3 (0 \times 8) + (0 \times 4) + (1 \times 2) + (1 \times 1) = 3 ( 0 × 8 ) + ( 0 × 4 ) + ( 1 × 2 ) + ( 1 × 1 ) = 3
Column ordering : [P1, P3] (weight 12), [P2, P4] (weight 3).
Step 3: Construct the Block-Diagonal Matrix P1 P3 P2 P4 M1 1 1 0 0 M3 1 1 0 0 M2 0 0 1 1 M4 0 0 1 1 \begin{array}{c|cc|cc} & \text{P1} & \text{P3} & \text{P2} & \text{P4} \\ \hline \text{M1} & 1 & 1 & 0 & 0 \\ \text{M3} & 1 & 1 & 0 & 0 \\ \hline \text{M2} & 0 & 0 & 1 & 1 \\ \text{M4} & 0 & 0 & 1 & 1 \end{array} M1 M3 M2 M4 P1 1 1 0 0 P3 1 1 0 0 P2 0 0 1 1 P4 0 0 1 1
Result : The algorithm cleanly separates the system into two completely decoupled manufacturing cells with zero exceptional elements :
Cell 1 : Machines {M1, M3} processing Part Family {P1, P3}.
Cell 2 : Machines {M2, M4} processing Part Family {P2, P4}.
7. NCEES Reference Handbook Tips & Realistic Exam Traps
The Ceiling Function in Kanban Sizing : Never round down or use standard arithmetic rounding on Kanban sizing problems! If the formula yields k = 4.12 k = 4.12 k = 4.12 , rounding down to 4 containers will produce a systemic inventory shortage, causing line starvation during peak lead times. You must always round UP to k = 5 k = 5 k = 5 .
Internal vs. External Setup Traps : NCEES questions frequently describe an operator action during changeover and ask how to classify it under SMED. Remember: if the action CAN be executed safely while the machine is actively spinning, cutting, or stamping (e.g., retrieving tooling, pre-heating dies, staging coils), it is External . If and only if the spindle must be stopped to perform it (e.g., mounting bolts into the machine bed), it is Internal .
Control vs. Warning Poka-Yoke : A device that only sounds a horn or illuminates a light is a warning mechanism. To be a control poka-yoke, the device must physically prevent the mistake or automatically shut down the line.
Time Unit Consistency : In k = ⌈ D ⋅ L ⋅ ( 1 + α ) / C ⌉ k = \lceil D \cdot L \cdot (1 + \alpha) / C \rceil k = ⌈ D ⋅ L ⋅ ( 1 + α ) / C ⌉ , verify that the time dimensions of D D D and L L L match. If D D D is in units per day and L L L is in hours, divide D D D by operating hours per day, or convert L L L into days.