Study guide

18.3 Predetermined Time Systems, Work Sampling, and Learning Curves

FE Industrial and Systems Study Guide Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Exam Overview, CBT Strategy & Handbook Navigation

1.1 FE Industrial Exam Structure, CBT Logistics, and Pacing 1.2 Using the NCEES FE Reference Handbook and Approved Calculators

2 Chapter 2: Mathematics for Industrial Engineers

2.1 Analytic Geometry, Coordinate Systems, and Trigonometry 2.2 Calculus: Differential, Integral, and Series Approximations 2.3 Linear Algebra: Matrix Operations, Systems of Equations, and Vectors

3 Chapter 3: Engineering Sciences Core

3.1 Thermodynamics Fundamentals and Fluid Flow Principles 3.2 Statics, Dynamics, and Mechanics of Materials Core 3.3 Electrical Circuits, DC/AC Analysis, and Power in Industrial Systems

4 Chapter 4: Ethics and Professional Practice

4.1 NCEES Model Rules of Professional Conduct and Technical Society Ethics 4.2 Engineering Licensure, Public Welfare, and Professional Liability 4.3 Engineering Contracts, Intellectual Property, and Conflicts of Interest

5 Chapter 5: Engineering Economics

5.1 Time Value of Money, Discount Factors, and Equivalence 5.2 Evaluating Alternatives: Present Worth, Equivalent Annual Cost, and IRR 5.3 Incremental Rate of Return, Replacement Analysis, and Break-Even 5.4 Depreciation Methods, MACRS, Income Taxes, and Inflation

6 Chapter 6: Probability Foundations & Distributions

6.1 Basic Probability Concepts, Conditional Probability, and Bayes' Theorem 6.2 Discrete Probability Distributions 6.3 Continuous Probability Distributions

7 Chapter 7: Statistical Inference, Regression & Design of Experiments

7.1 Sampling Distributions, Central Limit Theorem, and Confidence Intervals 7.2 Hypothesis Testing: Means, Proportions, and Variances 7.3 Linear Regression, Correlation Analysis, and Design of Experiments (ANOVA)

8 Chapter 8: Data, Logic, Modeling & Linear Programming

8.1 Optimization Modeling: Decision Variables, Objectives, and Constraints 8.2 Linear Programming: Graphical Solutions and Simplex Fundamentals 8.3 Duality, Sensitivity Analysis, and Integer Linear Programming 8.4 Data, Logic Development, and Analytics

9 Chapter 9: Stochastic Models & Simulation

9.1 Queuing Theory: Little's Law, M/M/1, and Multi-Server Systems 9.2 Discrete-Time Markov Chains: Transition Matrices and Steady-State Probabilities 9.3 Discrete-Event Simulation Principles and Monte Carlo Modeling

10 Chapter 10: Engineering Management, Project Planning & Performance Measurement

10.1 Organizational Structure, Leadership, and Worker Motivation Theories 10.2 Project Management: WBS, Critical Path Method (CPM), PERT, and Crashing 10.3 Earned Value Management (EVM), Decision Trees, and Risk Preference 10.4 Performance Measurement: Productivity, KPIs, Wage Systems, and the Balanced Scorecard

11 Chapter 11: Manufacturing & Production Systems

11.1 Manufacturing Processes, Material Processing, and Tolerancing 11.2 Assembly Line Balancing, Takt Time, Cycle Time, and Throughput 11.3 Sustainable Manufacturing, Waste Minimization, and Life-Cycle Assessment

12 Chapter 12: Production Planning, Inventory Control & Sequencing

12.1 Demand Forecasting Methods and Forecast Error Tracking 12.2 Aggregate Planning, Master Production Scheduling (MPS), and MRP 12.3 Deterministic Inventory Models: EOQ, EPQ, and Safety Stock 12.4 Job Sequencing, Dispatching Rules, and Flow Shop Scheduling

13 Chapter 13: Lean Systems & Theory of Constraints

13.1 Lean Foundations: Value Stream Mapping, Seven Wastes, and 5S 13.2 Pull Systems, Kanban, Just-In-Time (JIT), and SMED Setup Reduction 13.3 Theory of Constraints: Bottleneck Identification and Drum-Buffer-Rope

14 Chapter 14: Facilities Planning & Material Handling

14.1 Facility Location Analysis: Qualitative Factor Rating and Centroid Method 14.2 Facility Layout Design and Flow Analysis 14.3 Material Handling Equipment, Warehousing, and AS/RS

15 Chapter 15: Supply Chain Design & Logistics

15.1 Supply Chain Network Architecture and Transportation Modes 15.2 Distribution Strategies, Cross-Docking, and Vehicle Routing 15.3 The Bullwhip Effect, Risk Pooling, and Supply Chain Coordination

16 Chapter 16: Human Factors & Cognitive Ergonomics

16.1 Cognitive Engineering, Human-Machine Interface, Displays, and Controls 16.2 Anthropometric Principles, Percentile Design, and Biomechanical Posture 16.3 Environmental Ergonomics: Industrial Noise, Lighting, and Heat Stress

17 Chapter 17: Physical Ergonomics & Workplace Safety

17.1 Physical Ergonomics: The NIOSH Manual Lifting Equation 17.2 Cumulative Trauma Disorders and Postural Assessment 17.3 Workplace Safety: OSHA Standards, Hazard Analysis, and Control Hierarchy

18 Chapter 18: Work Design & Measurement

18.1 Methods Engineering, Process Charting, and Principles of Motion Economy 18.2 Direct Stopwatch Time Study: Observed Time, Performance Rating, and Allowances 18.3 Predetermined Time Systems, Work Sampling, and Learning Curves

19 Chapter 19: Quality Management, Six Sigma & Analytical Tools

19.1 Quality Philosophies, Total Quality Management, and Cost of Quality 19.2 Six Sigma DMAIC Methodology and Quality Function Deployment 19.3 The Seven Basic Quality Tools, Root Cause Analysis, and Taguchi Loss Function

20 Chapter 20: Statistical Process Control

20.1 Statistical Process Control Principles, Variation, and Run Rules 20.2 Variable Control Charts: X-bar & R, X-bar & S, and Individual-Moving Range 20.3 Attribute Control Charts: Defectives (p, np) and Defects (c, u)

21 Chapter 21: Process Capability & Acceptance Sampling

21.1 Process Capability Indices and Defect Levels 21.2 Acceptance Sampling Concepts and Operating Characteristic Curves 21.3 Sampling Risks, AQL, LTPD, and Standard Sampling Plans

22 Chapter 22: Systems Engineering & Life-Cycle Management

22.1 The Systems Engineering V-Model, Stakeholder Requirements, and Functional Architecture 22.2 Configuration Management, Interface Control, and Verification & Validation 22.3 Life-Cycle Costing, Maintainability, and System Availability

23 Chapter 23: Reliability Engineering & Risk Analysis

23.1 Reliability Mathematics, Hazard Rates, and the Bathtub Curve 23.2 System Reliability Configurations: Series, Parallel, and k-out-of-n Systems 23.3 Failure Modes and Effects Analysis and Fault Tree Analysis

18.3 Predetermined Time Systems, Work Sampling, and Learning Curves

Key Takeaways Explain This Topic AI

Predetermined Motion Time Systems (PMTS) synthesize standard times from tabulated micro-motion data, enabling standard setting prior to production without stopwatch observation or subjective pace rating.

The Time Measurement Unit (TMU) is the foundational MTM time unit: 1 TMU = 0.00001 hour = 0.0006 minute = 0.036 second (1 second = 27.78 TMU; 1 hour = 100,000 TMU).

BasicMOST models manual tasks using General Move (A B G A B P A), Controlled Move (A B G M X I A), and Tool Use sequences, calculating total TMU by multiplying the sum of sequence index values by 10.

Work sampling determines activity proportions via instantaneous random observations, calculating required sample size using N = (z^2 * p * (1 - p)) / e^2 and tracking stability with p-chart control limits.

Wright's log-linear learning curve model (Y_x = K * x^b, where b = ln(s) / ln(2)) dictates that doubling cumulative output reduces unit time by a constant percentage (1 - s); slope exponent b is always negative.

Last updated: September 2026

Work measurement extends beyond direct stopwatch timing. When operations are not yet physically installed on the shop floor, or when timing long non-repetitive cycles via stopwatch is economically infeasible, industrial engineers utilize Predetermined Motion Time Systems (PMTS) , Work Sampling , and Learning Curve Models . These three complementary methodologies enable establishing standard times in advance of manufacturing, auditing system-wide machine/operator utilization, and forecasting productivity gains across high-volume production programs. On the FE exam, these topics are tested through precise unit conversions, sample size calculations, sequence model evaluations, and log-linear regressions.

1. Predetermined Motion Time Systems (PMTS) Foundations

A Predetermined Motion Time System (PMTS) establishes labor standards by analyzing basic human motions (reaching, moving, grasping, positioning) and retrieving established normal times from empirical research tables. Synthesized from millions of frames of high-speed industrial motion pictures, PMTS relies on the premise that standard manual motions require consistent durations under identical physical conditions. Direct Time Study vs. PMTS

Direct Stopwatch Study: PMTS (MTM / MOST):

  • [ Physical Work on Floor ] [ Engineering Blueprint / CAD ]
  • │ │
  • ▼ ▼
  • [ Stopwatch Observation ] [ Decompose into Micro-motions ]
  • │ │
  • ▼ ▼
  • [ Subjective Pace Rating ] [ Lookup Standard Table Times ]
  • │ │
  • ▼ ▼
  • [ Apply Allowances = Standard Time ] [ Sum Tabular TMUs = Standard Time ]
  • Advantages and Limitations of PMTS

Engineering Dimension Advantages of PMTS Limitations of PMTS

Timing Environment Standards can be determined prior to production during product design, cell layout, and tooling quotation. Cannot evaluate machine-controlled process times (chemical curing, CNC cuts, cooling).

Rating Subjectivity Completely eliminates subjective shop-floor performance rating; times are pre-rated to a true 100% normal benchmark. Requires high analyst training and rigorous motion-coding certification.

Methods Improvement Forces micro-level methods analysis; highlights inefficient Therbligs (reaches, turns) during coding. Tedious and economically impractical for highly irregular, non-repetitive job shop work.

Labor Relations Eliminates stopwatch friction and perceived operator surveillance on the shop floor. Requires detailed standard operating procedure compliance; operator variation may cause disputes.

2. Methods-Time Measurement (MTM) and the TMU

Developed in 1948 by Maynard, Stegemerten, and Schwab, Methods-Time Measurement (MTM) is the most internationally recognized PMTS. Its primary variants include MTM-1 (high-precision micro-motion level), MTM-2 (aggregated motion blocks for cycle times > 1 minute > 1\text{ minute} > 1 minute ), and MTM-UAS (universal analyzing system for batch production).

The Time Measurement Unit (TMU)

To avoid awkward fractions of hours, minutes, or seconds, MTM introduced the Time Measurement Unit (TMU) , defined as one hundred-thousandth of an hour: 1 TMU = 0.00001 hour = 10 − 5 hour 1\text{ TMU} = 0.00001\text{ hour} = 10^{-5}\text{ hour} 1 TMU = 0.00001 hour = 1 0 − 5 hour

Mandatory Conversion Equivalents

On the FE exam, rapid and error-free conversion between TMUs, hours, minutes, and seconds is essential: 1 TMU = 0.0006 minutes = 6 × 10 − 4 minutes 1\text{ TMU} = 0.0006\text{ minutes} = 6 \times 10^{-4}\text{ minutes} 1 TMU = 0.0006 minutes = 6 × 1 0 − 4 minutes 1 TMU = 0.036 seconds 1\text{ TMU} = 0.036\text{ seconds} 1 TMU = 0.036 seconds 1 hour = 100 , 000 TMU 1\text{ hour} = 100,000\text{ TMU} 1 hour = 100 , 000 TMU 1 minute = 1 0.0006 = 1 , 666.67 TMU 1\text{ minute} = \frac{1}{0.0006} = 1,666.67\text{ TMU} 1 minute = 0.0006 1 ​ = 1 , 666.67 TMU 1 second = 1 0.036 = 27.78 TMU 1\text{ second} = \frac{1}{0.036} = 27.78\text{ TMU} 1 second = 0.036 1 ​ = 27.78 TMU TMU Conversion Quick Reference

  • ┌───────────────────────────────────────┐
  • │ 1.00000 Hour │
  • ├───────────────────────────────────────┤
  • │ 100,000 TMU │
  • ├───────────────────┬───────────────────┤
  • │ 60 Minutes │ 3,600 Seconds │
  • ├───────────────────┼───────────────────┤
  • │ 1 min = 1,666.7 TMU│ 1 sec = 27.78 TMU │
  • │ 1 TMU = 0.0006 min│ 1 TMU = 0.036 sec │
  • └───────────────────┴───────────────────┘
  • MTM-1 Motion Taxonomy

MTM-1 deconstructs tasks into basic motion codes. For example, motion code R 12 C R12C R 12 C represents:

  • R R R = Reach motion
  • 12 12 12 = Distance of 12 inches

C C C = Case C condition (reaching to an object jumbled in a container with other objects; requires search and select, demanding 14.2 TMU compared to Case A at 9.6 TMU).

Core MTM-1 motion categories include: Reach ( R R R ), Move ( M M M ), Turn ( T T T ), Apply Pressure ( A P AP A P ), Grasp ( G G G ), Position ( P P P ), Release ( R L RL R L ), Disengage ( D D D ), Eye Travel ( E T ET ET ), and Body Motions (Walk W W W , Bend B B B , Kneel K K K ).

3. Maynard Operation Sequence Technique (MOST)

Developed by Kjell Zandin in 1980, MOST is an advanced, high-level PMTS roughly 40 times faster to apply than detailed MTM-1. MOST observes that object displacements follow structured, repetitive activity patterns.

Index Numbers and TMU Calculation

In MOST, motion variables are assigned standardized Index Numbers from a fixed geometric progression: Index Scale: 0 , 1 , 3 , 6 , 10 , 16 , 24 , 32 , 42 , 54 \text{Index Scale: } 0, \, 1, \, 3, \, 6, \, 10, \, 16, \, 24, \, 32, \, 42, \, 54 Index Scale: 0 , 1 , 3 , 6 , 10 , 16 , 24 , 32 , 42 , 54

The Multiplier Rule : To determine total Time Measurement Units (TMU) from any MOST sequence model, sum all index numbers in the sequence and multiply by 10 :

Total TMU = 10 × ∑ ( Index Numbers ) \text{Total TMU} = 10 \times \sum (\text{Index Numbers}) Total TMU = 10 × ∑ ( Index Numbers )

The Three BasicMOST Sequence Models BasicMOST Sequence Models

1. General Move (Unconstrained Spatial Displacement):

  • [ A B G ] [ A B P ] [ A ]
  • Get Object Put Object Return

2. Controlled Move (Constrained Physical Path - Slide/Rotate):

  • [ A B G ] [ M X I ] [ A ]
  • Get Object Move Process Return

3. Tool Use (Hand Tools / Gauges / Fasteners):

  • [ A B G ] [ A B P ] [ Tool Action ] [ A B P ] [ A ]
  • Get Tool Put Tool Work with Tool Put Away Tool Return

General Move Sequence ( A B G A B P A A\ B\ G\ A\ B\ P\ A A B G A B P A ) :

Used when an object moves freely through the air under unconstrained manual control:

A A A = Action Distance (reach or move: A 0 ≤ 2 in. A_0 \le 2\text{ in.} A 0 ​ ≤ 2 in. ; A 1 = within reach A_1 = \text{within reach} A 1 ​ = within reach ; A 3 = 1 − 2 steps A_3 = 1-2\text{ steps} A 3 ​ = 1 − 2 steps ; A 6 = 3 − 4 steps A_6 = 3-4\text{ steps} A 6 ​ = 3 − 4 steps )

B B B = Body Motion ( B 0 = none B_0 = \text{none} B 0 ​ = none ; B 3 = bend and arise 50 % B_3 = \text{bend and arise } 50\% B 3 ​ = bend and arise 50% ; B 6 = bend and arise fully B_6 = \text{bend and arise fully} B 6 ​ = bend and arise fully )

G G G = Gain Control ( G 1 = light/simple grasp G_1 = \text{light/simple grasp} G 1 ​ = light/simple grasp ; G 3 = interlocked/heavy/blind grasp G_3 = \text{interlocked/heavy/blind grasp} G 3 ​ = interlocked/heavy/blind grasp )

P P P = Place ( P 0 = toss/drop P_0 = \text{toss/drop} P 0 ​ = toss/drop ; P 1 = lay aside/loose fit P_1 = \text{lay aside/loose fit} P 1 ​ = lay aside/loose fit ; P 3 = adjust/tight fit P_3 = \text{adjust/tight fit} P 3 ​ = adjust/tight fit ; P 6 = careful alignment P_6 = \text{careful alignment} P 6 ​ = careful alignment )

Subphases : A B G A\ B\ G A B G (Retrieve object) → \to → A B P A\ B\ P A B P (Place object) → \to → A A A (Return to workstation).

Controlled Move Sequence ( A B G M X I A A\ B\ G\ M\ X\ I\ A A B G M X I A ) :

Used when an object is constrained along a fixed physical track (sliding, cranking, pushing a lever, pivoting a toggle):

M M M = Move Controlled (push/pull distance: M 1 ≤ 12 in. M_1 \le 12\text{ in.} M 1 ​ ≤ 12 in. ; M 3 > 12 in. M_3 > 12\text{ in.} M 3 ​ > 12 in. )

X X X = Process Time (machine-controlled time duration)

I I I = Alignment (aligning with visual index marks: I 1 = single point I_1 = \text{single point} I 1 ​ = single point ; I 3 = two points I_3 = \text{two points} I 3 ​ = two points )

Tool Use Sequence ( A B G A B P [ Tool Action ] A B P A A\ B\ G\ A\ B\ P\ [\text{Tool Action}]\ A\ B\ P\ A A B G A B P [ Tool Action ] A B P A ) :

Used when handling hand tools. Tool Action parameters include:

  • F F F = Fasten (threading bolts)
  • L L L = Loosen (unthreading nuts)
  • C C C = Cut (snips, knife)
  • S S S = Surface Adjust (sandpaper, deburring file)
  • M M M = Measure (calipers, micrometer)
  • R R R = Record (writing on clipboard)
  • T T T = Think (visual inspection, decision pause)
  • 4. Work Sampling (Tippett's Ratio-Delay Study)

Invented by British statistician L.H.C. Tippett in 1934, Work Sampling is a statistical measurement technique that estimates the proportion of time operators or machines spend in various defined activity categories (e.g., active cutting, setting up, idle, waiting for material) through a large number of instantaneous, randomly scheduled observations.

Statistical Foundation

Work sampling relies on the Binomial Distribution . If an event occurs with true probability p p p , the probability that x x x observations out of N N N random observations capture the event follows the binomial distribution. When sample size N N N is sufficiently large ( N p ≥ 5 N p \ge 5 Np ≥ 5 and N ( 1 − p ) ≥ 5 N(1 - p) \ge 5 N ( 1 − p ) ≥ 5 ), the sampling distribution of the sample proportion p ^ = x / N \hat{p} = x / N p ^ ​ = x / N is normally distributed with mean μ p ^ = p \mu_{\hat{p}} = p μ p ^ ​ ​ = p and standard error σ p ^ \sigma_{\hat{p}} σ p ^ ​ ​ : σ p ^ = p ( 1 − p ) N \sigma_{\hat{p}} = \sqrt{\frac{p(1 - p)}{N}} σ p ^ ​ ​ = N p ( 1 − p ) ​ ​

Sample Size Determination ( N N N )

To determine the total number of random observations N N N required to estimate true proportion p p p within an absolute error tolerance e e e at confidence level ( 1 − α ) (1 - \alpha) ( 1 − α ) : ≠ = z α / 2 ⋅ σ p ^ = z α / 2 p ( 1 − p ) N ⟹ N = z α / 2 2 ⋅ p ( 1 − p ) e 2 \ne = z_{\alpha/2} \cdot \sigma_{\hat{p}} = z_{\alpha/2} \sqrt{\frac{p(1 - p)}{N}} \quad \implies \quad N = \frac{z_{\alpha/2}^2 \cdot p(1 - p)}{e^2}  = = z α /2 ​ ⋅ σ p ^ ​ ​ = z α /2 ​ N p ( 1 − p ) ​ ​ ⟹ N = e 2 z α /2 2 ​ ⋅ p ( 1 − p ) ​

Where:

N N N = required total random observations

z α / 2 z_{\alpha/2} z α /2 ​ = critical value of standard normal distribution ( 1.96 1.96 1.96 for 95 % 95\% 95% confidence)

p p p = estimated true proportion of the activity (if completely unknown, use conservative p = 0.50 p = 0.50 p = 0.50 , which maximizes the variance p ( 1 − p ) = 0.25 p(1 - p) = 0.25 p ( 1 − p ) = 0.25 and yields the maximum sample size)

e e e = allowable absolute margin of error (e.g., ± 2 % = 0.02 \pm 2\% = 0.02 ± 2% = 0.02 ; ± 3 % = 0.03 \pm 3\% = 0.03 ± 3% = 0.03 )

Relative Error Formulation : If the allowable error is specified as a relative percentage of p p p ( e = k ⋅ p e = k \cdot p e = k ⋅ p , e.g., ± 5 % \pm 5\% ± 5% of p p p ): N = z α / 2 2 ⋅ ( 1 − p ) k 2 ⋅ p N = \frac{z_{\alpha/2}^2 \cdot (1 - p)}{k^2 \cdot p} N = k 2 ⋅ p z α /2 2 ​ ⋅ ( 1 − p ) ​

Random Observation Scheduling and Bias Prevention

Random Timing : Observations must occur at truly random calendar instants generated via pseudo-random number algorithms to prevent cyclical alignment with periodic operator breaks, shift changes, or machine cycles.

Instantaneous Observation : The analyst must record the exact state observed at the very instant the workstation enters visual sight. Looking away and re-checking introduces severe observational bias.

Control Limits (p-Charts) : To ensure work patterns remain statistically stable across the study window, daily observation proportions ( p i p_i p i ​ ) are plotted on a p p p -control chart with limits based on daily sample size n daily n_{\text{daily}} n daily ​ : U C L / L C L = p ˉ ± 3 p ˉ ( 1 − p ˉ ) n daily UCL / LCL = \bar{p} \pm 3 \sqrt{\frac{\bar{p}(1 - \bar{p})}{n_{\text{daily}}}} U C L / L C L = p ˉ ​ ± 3 n daily ​ p ˉ ​ ( 1 − p ˉ ​ ) ​ ​ Points falling outside control limits indicate non-random systemic anomalies (e.g., severe power outage, major material stockout) and must be investigated.

5. Learning Curve Models: Wright's vs. Crawford's

First quantified by T.P. Wright in 1936 during aircraft production, the Learning Curve Phenomenon (or progress curve) establishes that as cumulative production quantity doubles, direct labor hours required per unit decrease at a constant, predictable percentage rate. The Log-Linear Learning Curve

  • Direct Labor Hours (Y_x) Linear Log-Log Transformation
  • ▲ ▲ ln(Y_x)
  • │ │
  • K │─┐ ln(K)─┐
  • │ \ │ \ Slope = b = ln(s) / ln(2)
  • │ \ │ \ (b is always negative)
  • │ \_ │ \
  • │ \___ │ \
  • │ \_______ │ \
  • └──────────────────────► Cumulative Units └─────────► ln(x)
  • 0 1 2 4 8 16 (x) 0
  • The Learning Rate Percentage ( s s s )

The parameter s s s ( 0 < s < 1 0 < s < 1 0 < s < 1 ) represents the learning rate percentage . A learning rate of s = 0.80 s = 0.80 s = 0.80 (an 80 % 80\% 80% curve) means that every time cumulative production volume doubles ( 1 → 2 1 \to 2 1 → 2 , 2 → 4 2 \to 4 2 → 4 , 4 → 8 4 \to 8 4 → 8 , 8 → 16 8 \to 16 8 → 16 ), direct labor hours required drop to 80 % 80\% 80% of their previous level (a 20 % 20\% 20% reduction in unit time).

Wright's Log-Linear Model (Cumulative Unit Time Model)

Wright's formulation models the direct labor hours required to produce unit number x x x ( Y x Y_x Y x ​ ): Y x = K ⋅ x b Y_x = K \cdot x^b Y x ​ = K ⋅ x b

Taking natural logarithms yields a linear equation: ln ⁡ ( Y x ) = ln ⁡ ( K ) + b ⋅ ln ⁡ ( x ) \ln(Y_x) = \ln(K) + b \cdot \ln(x) ln ( Y x ​ ) = ln ( K ) + b ⋅ ln ( x )

Where:

  • x x x = cumulative unit number ( x = 1 , 2 , 3 , … x = 1, 2, 3, \dots x = 1 , 2 , 3 , … )
  • Y x Y_x Y x ​ = time (or cost) required to fabricate unit x x x
  • K K K = time (or cost) required to fabricate the first unit ( x = 1 x = 1 x = 1 )

b b b = learning curve slope exponent: b = ln ⁡ ( s ) ln ⁡ ( 2 ) = log ⁡ 10 ( s ) log ⁡ 10 ( 2 ) b = \frac{\ln(s)}{\ln(2)} = \frac{\log_{10}(s)}{\log_{10}(2)} b = ln ( 2 ) ln ( s ) ​ = lo g 10 ​ ( 2 ) lo g 10 ​ ( s ) ​ (Note: Because 0 < s < 1 0 < s < 1 0 < s < 1 , ln ⁡ ( s ) \ln(s) ln ( s ) is negative, meaning b b b is strictly negative).

Standard Industrial Learning Exponents ( b b b )

Learning Rate ( s s s ) Slope Exponent ( b = ln ⁡ ( s ) / ln ⁡ ( 2 ) b = \ln(s)/\ln(2) b = ln ( s ) / ln ( 2 ) ) Unit 2 ( s 1 ⋅ K s^1 \cdot K s 1 ⋅ K ) Unit 4 ( s 2 ⋅ K s^2 \cdot K s 2 ⋅ K ) Unit 8 ( s 3 ⋅ K s^3 \cdot K s 3 ⋅ K ) Unit 16 ( s 4 ⋅ K s^4 \cdot K s 4 ⋅ K )

70% ( 0.70 0.70 0.70 ) − 0.5146 -0.5146 − 0.5146 0.700 ⋅ K 0.700 \cdot K 0.700 ⋅ K 0.490 ⋅ K 0.490 \cdot K 0.490 ⋅ K 0.343 ⋅ K 0.343 \cdot K 0.343 ⋅ K 0.240 ⋅ K 0.240 \cdot K 0.240 ⋅ K

75% ( 0.75 0.75 0.75 ) − 0.4150 -0.4150 − 0.4150 0.750 ⋅ K 0.750 \cdot K 0.750 ⋅ K 0.563 ⋅ K 0.563 \cdot K 0.563 ⋅ K 0.422 ⋅ K 0.422 \cdot K 0.422 ⋅ K 0.316 ⋅ K 0.316 \cdot K 0.316 ⋅ K

80% ( 0.80 0.80 0.80 ) − 0.3219 -0.3219 − 0.3219 0.800 ⋅ K 0.800 \cdot K 0.800 ⋅ K 0.640 ⋅ K 0.640 \cdot K 0.640 ⋅ K 0.512 ⋅ K 0.512 \cdot K 0.512 ⋅ K 0.410 ⋅ K 0.410 \cdot K 0.410 ⋅ K

85% ( 0.85 0.85 0.85 ) − 0.2345 -0.2345 − 0.2345 0.850 ⋅ K 0.850 \cdot K 0.850 ⋅ K 0.723 ⋅ K 0.723 \cdot K 0.723 ⋅ K 0.614 ⋅ K 0.614 \cdot K 0.614 ⋅ K 0.522 ⋅ K 0.522 \cdot K 0.522 ⋅ K

90% ( 0.90 0.90 0.90 ) − 0.1520 -0.1520 − 0.1520 0.900 ⋅ K 0.900 \cdot K 0.900 ⋅ K 0.810 ⋅ K 0.810 \cdot K 0.810 ⋅ K 0.729 ⋅ K 0.729 \cdot K 0.729 ⋅ K 0.656 ⋅ K 0.656 \cdot K 0.656 ⋅ K

95% ( 0.95 0.95 0.95 ) − 0.0740 -0.0740 − 0.0740 0.950 ⋅ K 0.950 \cdot K 0.950 ⋅ K 0.903 ⋅ K 0.903 \cdot K 0.903 ⋅ K 0.857 ⋅ K 0.857 \cdot K 0.857 ⋅ K 0.815 ⋅ K 0.815 \cdot K 0.815 ⋅ K

Cumulative Total Time ( T n T_n T n ​ ) and Cumulative Average Time ( Y ˉ n \bar{Y}_n Y ˉ n ​ )

Exact Total Labor Time for First n n n Units : T n = ∑ x = 1 n Y x = ∑ x = 1 n K ⋅ x b T_n = \sum_{x=1}^n Y_x = \sum_{x=1}^n K \cdot x^b T n ​ = x = 1 ∑ n ​ Y x ​ = x = 1 ∑ n ​ K ⋅ x b

Continuous Calculus Approximation (for large n n n ) : T n ≈ ∫ 0 n K ⋅ x b d x = [ K b + 1 x b + 1 ] 0 n = K b + 1 n b + 1 T_n \approx \int_0^n K \cdot x^b \, dx = \left[ \frac{K}{b + 1} x^{b+1} \right]_0^n = \frac{K}{b + 1} n^{b+1} T n ​ ≈ ∫ 0 n ​ K ⋅ x b d x = [ b + 1 K ​ x b + 1 ] 0 n ​ = b + 1 K ​ n b + 1

Cumulative Average Time per Unit ( Y ˉ n \bar{Y}_n Y ˉ n ​ ) : Y ˉ n = T n n ≈ K b + 1 n b \bar{Y}_n = \frac{T_n}{n} \approx \frac{K}{b + 1} n^b Y ˉ n ​ = n T n ​ ​ ≈ b + 1 K ​ n b

Crawford's Cumulative Average Model

In Crawford's model (popularized in defense procurement), the log-linear equation models the cumulative average time directly: Y ˉ x = K ⋅ x b \bar{Y}_x = K \cdot x^b Y ˉ x ​ = K ⋅ x b . Total time is T x = x ⋅ Y ˉ x = K ⋅ x b + 1 T_x = x \cdot \bar{Y}_x = K \cdot x^{b+1} T x ​ = x ⋅ Y ˉ x ​ = K ⋅ x b + 1 . Individual unit time is computed by successive differences: Y x = T x − T x − 1 Y_x = T_x - T_{x-1} Y x ​ = T x ​ − T x − 1 ​ . On the FE exam, Wright's unit model ( Y x = K x b Y_x = K x^b Y x ​ = K x b ) is the standard formulation unless Crawford is explicitly named.

  • 6. Step-by-Step Worked Engineering Calculations
  • Worked Example 18.3.1: Work Sampling Sample Size & Control Limits

Problem : An industrial engineer conducts a work sampling study in a sheet-metal fabrication shop to determine the percentage of time a robotic plasma cutter is down due to torch nozzle slag fouling. Preliminary maintenance records suggest nozzle fouling accounts for approximately 12 % 12\% 12% of operating time ( p = 0.12 p = 0.12 p = 0.12 ).

Calculate the required total number of random observations ( N N N ) to estimate true downtime proportion within an absolute precision limit of ± 2.5 % \pm 2.5\% ± 2.5% ( e = 0.025 e = 0.025 e = 0.025 ) at a 95 % 95\% 95% confidence level ( z = 1.96 z = 1.96 z = 1.96 ).

Over a 10-day study, exactly n daily = 70 observations n_{\text{daily}} = 70\text{ observations} n daily ​ = 70 observations are recorded each day. Calculate the upper and lower control limits ( U C L UCL U C L and L C L LCL L C L ) for daily monitoring.

On Day 4, the observer records 16 nozzle fouling events ( p 4 = 16 / 70 = 0.2286 p_4 = 16 / 70 = 0.2286 p 4 ​ = 16/70 = 0.2286 ). Determine whether Day 4 was in statistical control.

Solution :

Step 1: Calculate Required Total Sample Size ( N N N ) N = z α / 2 2 ⋅ p ( 1 − p ) e 2 N = \frac{z_{\alpha/2}^2 \cdot p(1 - p)}{e^2} N = e 2 z α /2 2 ​ ⋅ p ( 1 − p ) ​

Calculate numerator: z 2 = ( 1.96 ) 2 = 3.8416 z^2 = (1.96)^2 = 3.8416 z 2 = ( 1.96 ) 2 = 3.8416 p ( 1 − p ) = 0.12 × ( 1 − 0.12 ) = 0.12 × 0.88 = 0.1056 p(1 - p) = 0.12 \times (1 - 0.12) = 0.12 \times 0.88 = 0.1056 p ( 1 − p ) = 0.12 × ( 1 − 0.12 ) = 0.12 × 0.88 = 0.1056 Numerator = 3.8416 × 0.1056 = 0.405673 \text{Numerator} = 3.8416 \times 0.1056 = 0.405673 Numerator = 3.8416 × 0.1056 = 0.405673

Calculate denominator: e 2 = ( 0.025 ) 2 = 0.000625 e^2 = (0.025)^2 = 0.000625 e 2 = ( 0.025 ) 2 = 0.000625

Compute N N N : N = 0.405673 0.000625 = 649.08 ≈ 650 observations N = \frac{0.405673}{0.000625} = 649.08 \approx 650\text{ observations} N = 0.000625 0.405673 ​ = 649.08 ≈ 650 observations

Step 2: Calculate Daily p p p -Chart Control Limits With p ˉ = 0.12 \bar{p} = 0.12 p ˉ ​ = 0.12 and n daily = 70 n_{\text{daily}} = 70 n daily ​ = 70 : σ p = p ˉ ( 1 − p ˉ ) n daily = 0.12 × 0.88 70 = 0.1056 70 = 0.0015086 ≈ 0.03884 \sigma_{p} = \sqrt{\frac{\bar{p}(1 - \bar{p})}{n_{\text{daily}}}} = \sqrt{\frac{0.12 \times 0.88}{70}} = \sqrt{\frac{0.1056}{70}} = \sqrt{0.0015086} \approx 0.03884 σ p ​ = n daily ​ p ˉ ​ ( 1 − p ˉ ​ ) ​ ​ = 70 0.12 × 0.88 ​ ​ = 70 0.1056 ​ ​ = 0.0015086 ​ ≈ 0.03884 U C L = p ˉ + 3 σ p = 0.12 + 3 ( 0.03884 ) = 0.12 + 0.1165 = 0.2365 (or 23.65 % ) UCL = \bar{p} + 3 \sigma_p = 0.12 + 3(0.03884) = 0.12 + 0.1165 = 0.2365\text{ (or } 23.65\%\text{)} U C L = p ˉ ​ + 3 σ p ​ = 0.12 + 3 ( 0.03884 ) = 0.12 + 0.1165 = 0.2365 (or 23.65% ) L C L = p ˉ − 3 σ p = 0.12 − 3 ( 0.03884 ) = 0.12 − 0.1165 = 0.0035 (or 0.35 % ) LCL = \bar{p} - 3 \sigma_p = 0.12 - 3(0.03884) = 0.12 - 0.1165 = 0.0035\text{ (or } 0.35\%\text{)} L C L = p ˉ ​ − 3 σ p ​ = 0.12 − 3 ( 0.03884 ) = 0.12 − 0.1165 = 0.0035 (or 0.35% )

Step 3: Evaluate Day 4 Statistical Control On Day 4, sample proportion was p 4 = 16 / 70 = 0.2286 p_4 = 16 / 70 = 0.2286 p 4 ​ = 16/70 = 0.2286 ( 22.86 % 22.86\% 22.86% ).

Comparing against control limits: L C L ( 0.0035 ) ≤ p 4 ( 0.2286 ) ≤ U C L ( 0.2365 ) LCL (0.0035) \le p_4 (0.2286) \le UCL (0.2365) L C L ( 0.0035 ) ≤ p 4 ​ ( 0.2286 ) ≤ U C L ( 0.2365 )

Engineering Conclusion : Day 4 falls just beneath the Upper Control Limit ( 0.2286 < 0.2365 0.2286 < 0.2365 0.2286 < 0.2365 ). The operation was technically in statistical control , reflecting extreme random variation rather than an assignable structural failure.

Worked Example 18.3.2: Wright's Learning Curve Cost Modeling

Problem : An aerospace defense contractor is preparing a competitive bid to manufacture 16 unmanned aerial vehicle (UAV) composite wing assemblies. Production data from fabricating prototype Unit 1 indicates a direct labor requirement of K = 400 hours K = 400\text{ hours} K = 400 hours . Based on historical composite fabrication data, an 80 % 80\% 80% learning curve ( s = 0.80 s = 0.80 s = 0.80 ) applies.

Determine the learning curve slope parameter b b b .

Calculate the projected direct labor hours required to manufacture Unit 2, Unit 4, Unit 8, and Unit 16 using the doubling property.

Calculate the projected labor hours required to fabricate Unit 5.

Estimate the total cumulative direct labor hours ( T 16 T_{16} T 16 ​ ) required to manufacture all 16 units using the integration approximation.

If direct labor is billed at $ 75.00 / hour \text{\textdollar}75.00/\text{hour} $ 75.00/ hour , calculate the estimated total labor cost for the 16-unit contract.

Solution :

Step 1: Calculate Learning Curve Slope Exponent ( b b b ) b = ln ⁡ ( s ) ln ⁡ ( 2 ) = ln ⁡ ( 0.80 ) ln ⁡ ( 2 ) = − 0.22314355 0.69314718 ≈ − 0.321928 b = \frac{\ln(s)}{\ln(2)} = \frac{\ln(0.80)}{\ln(2)} = \frac{-0.22314355}{0.69314718} \approx -0.321928 b = ln ( 2 ) ln ( s ) ​ = ln ( 2 ) ln ( 0.80 ) ​ = 0.69314718 − 0.22314355 ​ ≈ − 0.321928

Step 2: Projected Labor Hours via Doubling Property Because volume doubles, unit time drops by 20 % 20\% 20% ( s = 0.80 s = 0.80 s = 0.80 ):

Unit 1: Y 1 = K = 400.0 hours Y_1 = K = 400.0\text{ hours} Y 1 ​ = K = 400.0 hours

Unit 2: Y 2 = 400.0 × 0.80 = 320.0 hours Y_2 = 400.0 \times 0.80 = 320.0\text{ hours} Y 2 ​ = 400.0 × 0.80 = 320.0 hours

Unit 4: Y 4 = 320.0 × 0.80 = 256.0 hours Y_4 = 320.0 \times 0.80 = 256.0\text{ hours} Y 4 ​ = 320.0 × 0.80 = 256.0 hours

Unit 8: Y 8 = 256.0 × 0.80 = 204.8 hours Y_8 = 256.0 \times 0.80 = 204.8\text{ hours} Y 8 ​ = 256.0 × 0.80 = 204.8 hours

Unit 16: Y 16 = 204.8 × 0.80 = 163.84 hours Y_{16} = 204.8 \times 0.80 = 163.84\text{ hours} Y 16 ​ = 204.8 × 0.80 = 163.84 hours

Step 3: Projected Labor Hours for Unit 5 Using Wright's equation Y x = K ⋅ x b Y_x = K \cdot x^b Y x ​ = K ⋅ x b : Y 5 = 400.0 × ( 5 ) − 0.321928 Y_5 = 400.0 \times (5)^{-0.321928} Y 5 ​ = 400.0 × ( 5 ) − 0.321928 ln ⁡ ( Y 5 ) = ln ⁡ ( 400 ) + ( − 0.321928 ) × ln ⁡ ( 5 ) = 5.99146 − 0.321928 × 1.609438 = 5.99146 − 0.518123 = 5.47334 \ln(Y_5) = \ln(400) + (-0.321928) \times \ln(5) = 5.99146 - 0.321928 \times 1.609438 = 5.99146 - 0.518123 = 5.47334 ln ( Y 5 ​ ) = ln ( 400 ) + ( − 0.321928 ) × ln ( 5 ) = 5.99146 − 0.321928 × 1.609438 = 5.99146 − 0.518123 = 5.47334 Y 5 = e 5.47334 ≈ 238.25 hours Y_5 = e^{5.47334} \approx 238.25\text{ hours} Y 5 ​ = e 5.47334 ≈ 238.25 hours

(Sanity check: Y 5 = 238.25 hr Y_5 = 238.25\text{ hr} Y 5 ​ = 238.25 hr is logically bounded between Y 4 = 256.0 hr Y_4 = 256.0\text{ hr} Y 4 ​ = 256.0 hr and Y 8 = 204.8 hr Y_8 = 204.8\text{ hr} Y 8 ​ = 204.8 hr ).

Step 4: Cumulative Total Hours ( T 16 T_{16} T 16 ​ ) via Integration Approximation T n ≈ K b + 1 n b + 1 T_n \approx \frac{K}{b + 1} n^{b+1} T n ​ ≈ b + 1 K ​ n b + 1

Calculate exponent: b + 1 = − 0.321928 + 1.0 = 0.678072 b + 1 = -0.321928 + 1.0 = 0.678072 b + 1 = − 0.321928 + 1.0 = 0.678072

Calculate coefficient: K b + 1 = 400.0 0.678072 ≈ 589.9079 \frac{K}{b + 1} = \frac{400.0}{0.678072} \approx 589.9079 b + 1 K ​ = 0.678072 400.0 ​ ≈ 589.9079

Evaluate n b + 1 n^{b+1} n b + 1 at n = 16 n = 16 n = 16 : 16 0.678072 = e 0.678072 × ln ⁡ ( 16 ) = e 0.678072 × 2.772589 = e 1.880015 ≈ 6.5536 16^{0.678072} = e^{0.678072 \times \ln(16)} = e^{0.678072 \times 2.772589} = e^{1.880015} \approx 6.5536 1 6 0.678072 = e 0.678072 × l n ( 16 ) = e 0.678072 × 2.772589 = e 1.880015 ≈ 6.5536

Compute T 16 T_{16} T 16 ​ : T 16 ≈ 589.9079 × 6.5536 ≈ 3 , 866.0 total labor hours T_{16} \approx 589.9079 \times 6.5536 \approx 3,866.0\text{ total labor hours} T 16 ​ ≈ 589.9079 × 6.5536 ≈ 3 , 866.0 total labor hours (Summing the 16 discrete unit hours exactly gives ∑ x = 1 16 400 x − 0.321928 = 3 , 568.1 hr \sum_{x=1}^{16} 400 x^{-0.321928} = 3,568.1\text{ hr} ∑ x = 1 16 ​ 400 x − 0.321928 = 3 , 568.1 hr . The integral overestimates by about 8.4 % 8.4\% 8.4% because it integrates from x = 0 x = 0 x = 0 , where the unit-time curve K x b K x^{b} K x b is unbounded. For contract bidding, prefer the exact discrete sum; use the integral only as a fast sanity bound.)

Step 5: Estimated Contract Labor Cost Total Labor Cost = 3 , 866.0 hours × $ 75.00 / hour = $ 289 , 950 \text{Total Labor Cost} = 3,866.0\text{ hours} \times \$75.00/\text{hour} = \$289,950 Total Labor Cost = 3 , 866.0 hours × $75.00/ hour = $289 , 950

(Based on the exact discrete summation, the defensible bid figure is 3 , 568.1 × $ 75.00 = $ 267 , 608 3,568.1 \times \text{\textdollar}75.00 = \text{\textdollar}267,608 3 , 568.1 × $ 75.00 = $ 267 , 608 ).

7. NCEES Reference Handbook Tips & Realistic Exam Traps

TMU Unit Conversions : Forgetting the difference between minutes and seconds when converting TMUs is an ubiquitous trap:

  • 1 TMU = 0.036 SECONDS 1\text{ TMU} = 0.036\text{ SECONDS} 1 TMU = 0.036 SECONDS
  • 1 TMU = 0.0006 MINUTES 1\text{ TMU} = 0.0006\text{ MINUTES} 1 TMU = 0.0006 MINUTES

To convert TMU to minutes: min = TMU × 0.0006 \text{min} = \text{TMU} \times 0.0006 min = TMU × 0.0006 (or TMU / 1666.7 \text{TMU} / 1666.7 TMU /1666.7 ).

To convert TMU to seconds: sec = TMU × 0.036 \text{sec} = \text{TMU} \times 0.036 sec = TMU × 0.036 (or TMU / 27.78 \text{TMU} / 27.78 TMU /27.78 ).

BasicMOST 10x Multiplier : When evaluating MOST sequences, students frequently sum the index numbers ( 1 + 0 + 1 + 1 + 0 + 3 + 0 = 6 1 + 0 + 1 + 1 + 0 + 3 + 0 = 6 1 + 0 + 1 + 1 + 0 + 3 + 0 = 6 ) and mistakenly report 6 TMU. Always multiply by 10 → 60 TMU \to 60\text{ TMU} → 60 TMU !

Learning Curve Exponent Sign : In Y x = K ⋅ x b Y_x = K \cdot x^b Y x ​ = K ⋅ x b , the exponent b = ln ⁡ ( s ) / ln ⁡ ( 2 ) b = \ln(s)/\ln(2) b = ln ( s ) / ln ( 2 ) is always negative . If you forget the negative sign and calculate b = + 0.3219 b = +0.3219 b = + 0.3219 , unit times will explode upward ( Y 4 = 625 hr Y_4 = 625\text{ hr} Y 4 ​ = 625 hr instead of 256 hr 256\text{ hr} 256 hr ).

Work Sampling Absolute vs. Relative Precision : Read the problem carefully:

If absolute error is given ( "estimate proportion within ± 2 % \pm 2\% ± 2% " ): e = 0.02 e = 0.02 e = 0.02 , use N = z 2 p ( 1 − p ) / e 2 N = z^2 p(1-p)/e^2 N = z 2 p ( 1 − p ) / e 2 .