18.2 Direct Stopwatch Time Study: Observed Time, Performance Rating, and Allowances
FE Industrial and Systems Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Exam Overview, CBT Strategy & Handbook Navigation
1.1 FE Industrial Exam Structure, CBT Logistics, and Pacing 1.2 Using the NCEES FE Reference Handbook and Approved Calculators
2 Chapter 2: Mathematics for Industrial Engineers
2.1 Analytic Geometry, Coordinate Systems, and Trigonometry 2.2 Calculus: Differential, Integral, and Series Approximations 2.3 Linear Algebra: Matrix Operations, Systems of Equations, and Vectors
3 Chapter 3: Engineering Sciences Core
3.1 Thermodynamics Fundamentals and Fluid Flow Principles 3.2 Statics, Dynamics, and Mechanics of Materials Core 3.3 Electrical Circuits, DC/AC Analysis, and Power in Industrial Systems
4 Chapter 4: Ethics and Professional Practice
4.1 NCEES Model Rules of Professional Conduct and Technical Society Ethics 4.2 Engineering Licensure, Public Welfare, and Professional Liability 4.3 Engineering Contracts, Intellectual Property, and Conflicts of Interest
5 Chapter 5: Engineering Economics
5.1 Time Value of Money, Discount Factors, and Equivalence 5.2 Evaluating Alternatives: Present Worth, Equivalent Annual Cost, and IRR 5.3 Incremental Rate of Return, Replacement Analysis, and Break-Even 5.4 Depreciation Methods, MACRS, Income Taxes, and Inflation
6 Chapter 6: Probability Foundations & Distributions
6.1 Basic Probability Concepts, Conditional Probability, and Bayes' Theorem 6.2 Discrete Probability Distributions 6.3 Continuous Probability Distributions
7 Chapter 7: Statistical Inference, Regression & Design of Experiments
7.1 Sampling Distributions, Central Limit Theorem, and Confidence Intervals 7.2 Hypothesis Testing: Means, Proportions, and Variances 7.3 Linear Regression, Correlation Analysis, and Design of Experiments (ANOVA)
8 Chapter 8: Data, Logic, Modeling & Linear Programming
8.1 Optimization Modeling: Decision Variables, Objectives, and Constraints 8.2 Linear Programming: Graphical Solutions and Simplex Fundamentals 8.3 Duality, Sensitivity Analysis, and Integer Linear Programming 8.4 Data, Logic Development, and Analytics
9 Chapter 9: Stochastic Models & Simulation
9.1 Queuing Theory: Little's Law, M/M/1, and Multi-Server Systems 9.2 Discrete-Time Markov Chains: Transition Matrices and Steady-State Probabilities 9.3 Discrete-Event Simulation Principles and Monte Carlo Modeling
10 Chapter 10: Engineering Management, Project Planning & Performance Measurement
10.1 Organizational Structure, Leadership, and Worker Motivation Theories 10.2 Project Management: WBS, Critical Path Method (CPM), PERT, and Crashing 10.3 Earned Value Management (EVM), Decision Trees, and Risk Preference 10.4 Performance Measurement: Productivity, KPIs, Wage Systems, and the Balanced Scorecard
11 Chapter 11: Manufacturing & Production Systems
11.1 Manufacturing Processes, Material Processing, and Tolerancing 11.2 Assembly Line Balancing, Takt Time, Cycle Time, and Throughput 11.3 Sustainable Manufacturing, Waste Minimization, and Life-Cycle Assessment
12 Chapter 12: Production Planning, Inventory Control & Sequencing
12.1 Demand Forecasting Methods and Forecast Error Tracking 12.2 Aggregate Planning, Master Production Scheduling (MPS), and MRP 12.3 Deterministic Inventory Models: EOQ, EPQ, and Safety Stock 12.4 Job Sequencing, Dispatching Rules, and Flow Shop Scheduling
13 Chapter 13: Lean Systems & Theory of Constraints
13.1 Lean Foundations: Value Stream Mapping, Seven Wastes, and 5S 13.2 Pull Systems, Kanban, Just-In-Time (JIT), and SMED Setup Reduction 13.3 Theory of Constraints: Bottleneck Identification and Drum-Buffer-Rope
14 Chapter 14: Facilities Planning & Material Handling
14.1 Facility Location Analysis: Qualitative Factor Rating and Centroid Method 14.2 Facility Layout Design and Flow Analysis 14.3 Material Handling Equipment, Warehousing, and AS/RS
15 Chapter 15: Supply Chain Design & Logistics
15.1 Supply Chain Network Architecture and Transportation Modes 15.2 Distribution Strategies, Cross-Docking, and Vehicle Routing 15.3 The Bullwhip Effect, Risk Pooling, and Supply Chain Coordination
16 Chapter 16: Human Factors & Cognitive Ergonomics
16.1 Cognitive Engineering, Human-Machine Interface, Displays, and Controls 16.2 Anthropometric Principles, Percentile Design, and Biomechanical Posture 16.3 Environmental Ergonomics: Industrial Noise, Lighting, and Heat Stress
17 Chapter 17: Physical Ergonomics & Workplace Safety
17.1 Physical Ergonomics: The NIOSH Manual Lifting Equation 17.2 Cumulative Trauma Disorders and Postural Assessment 17.3 Workplace Safety: OSHA Standards, Hazard Analysis, and Control Hierarchy
18 Chapter 18: Work Design & Measurement
18.1 Methods Engineering, Process Charting, and Principles of Motion Economy 18.2 Direct Stopwatch Time Study: Observed Time, Performance Rating, and Allowances 18.3 Predetermined Time Systems, Work Sampling, and Learning Curves
19 Chapter 19: Quality Management, Six Sigma & Analytical Tools
19.1 Quality Philosophies, Total Quality Management, and Cost of Quality 19.2 Six Sigma DMAIC Methodology and Quality Function Deployment 19.3 The Seven Basic Quality Tools, Root Cause Analysis, and Taguchi Loss Function
20 Chapter 20: Statistical Process Control
20.1 Statistical Process Control Principles, Variation, and Run Rules 20.2 Variable Control Charts: X-bar & R, X-bar & S, and Individual-Moving Range 20.3 Attribute Control Charts: Defectives (p, np) and Defects (c, u)
21 Chapter 21: Process Capability & Acceptance Sampling
21.1 Process Capability Indices and Defect Levels 21.2 Acceptance Sampling Concepts and Operating Characteristic Curves 21.3 Sampling Risks, AQL, LTPD, and Standard Sampling Plans
22 Chapter 22: Systems Engineering & Life-Cycle Management
22.1 The Systems Engineering V-Model, Stakeholder Requirements, and Functional Architecture 22.2 Configuration Management, Interface Control, and Verification & Validation 22.3 Life-Cycle Costing, Maintainability, and System Availability
23 Chapter 23: Reliability Engineering & Risk Analysis
23.1 Reliability Mathematics, Hazard Rates, and the Bathtub Curve 23.2 System Reliability Configurations: Series, Parallel, and k-out-of-n Systems 23.3 Failure Modes and Effects Analysis and Fault Tree Analysis
18.2 Direct Stopwatch Time Study: Observed Time, Performance Rating, and Allowances
Key Takeaways Explain This Topic AI
Stopwatch time study breaks work into short, homogeneous, clearly bounded elements (0.04 to 0.50 min), distinguishing manual operator-controlled elements from machine-controlled elements.
Continuous timing records cumulative elapsed time at each break point, providing an unalterable audit trail preferred in labor standards, whereas snapback timing reads elemental time directly at the cost of cumulative reset error.
Statistically required sample size is calculated using n = ((z_{alpha/2} * s) / (k * x_bar))^2, balancing observation expense against desired statistical confidence and relative precision.
Normal Time adjusts Observed Time by the operator's Performance Rating (NT = OT * (PR / 100)); machine-controlled elements are never pace rated (PR = 100%).
Standard Time depends critically on the allowance basis: Basis 1 applies allowance to Normal Time (ST = NT * (1 + A_NT)), whereas Basis 2 applies allowance to Total Shift Time (ST = NT / (1 - A_shift)), with Basis 2 always yielding a larger standard time for equal allowance percentages.
Last updated: September 2026
Direct stopwatch time study, formulated by Frederick Winslow Taylor in 1881, remains the foundational work measurement technique in modern industrial operations. It establishes the Standard Time required for a qualified, thoroughly trained operator, working at a normal pace under standard conditions, to complete a specified task. Setting rigorous standard times is vital for production scheduling, assembly line balancing, manufacturing capacity planning, wage incentive systems, and standard product costing. On the FE exam, mastery of stopwatch mechanics, statistical sample size sizing, pace rating dynamics, and allowance mathematical formulations is mandatory.
- 1. Direct Stopwatch Time Study Methodology
- A stopwatch study follows a standardized, eight-step engineering procedure: Stopwatch Time Study Procedure
- 1. Standardize Method ──► Ensure standard tooling, feeds, and workplace layout
- │
- ▼
- 2. Select Operator ──► Qualified, representative, working at average pace
- │
- ▼
- 3. Break Down Elements ──► 0.04 to 0.50 min, distinct visual/auditory break points
- │
- ▼
- 4. Record Observed Times ──► Continuous or snapback timing across n cycles
- │
- ▼
- 5. Pace Rate Operator ──► Assign Performance Rating (PR) to each manual element
- │
- ▼
- 6. Compute Normal Time ──► NT = OT * (PR / 100) * frequency
- │
- ▼
- 7. Apply PF&D Allowances ──► Personal, Fatigue, and Delay adjustments
- │
- ▼
- 8. Determine Standard Time ──► ST = NT * (1 + A_NT) or ST = NT / (1 - A_shift)
- 2. Timing Methods: Continuous vs. Snapback
Two distinct recording methods are utilized during direct stopwatch observation: Continuous vs. Snapback Timing
Continuous Timing:
- Watch runs: 0.00 ──────► 0.32 ──────────► 1.15 ────────────► 1.58 (min)
- Breakpoints: Point 1 Point 2 Point 3
- Recorded: R1 = 0.32 R2 = 1.15 R3 = 1.58
- Subtracted: t1 = 0.32 t2 = 0.83 t3 = 0.43
Snapback Timing:
Watch runs: 0.00 ──► 0.32 | 0.00 ──► 0.83 | 0.00 ──► 0.43 (min)
Reset: Snap! Snap! Snap!
Recorded: t1 = 0.32 t2 = 0.83 t3 = 0.43
Timing Parameter Continuous Timing (Accumulative) Snapback Timing (Repetitive)
Mechanism Watch runs continuously. Observer records the cumulative elapsed clock reading ( R i R_i R i ) at each break point without stopping or resetting the hands. Observer reads the dial at the break point and simultaneously snaps the stem to reset the hand back to zero, directly recording elemental time ( t i t_i t i ).
Clerical Effort High. Requires post-study subtractions ( t i = R i − R i − 1 t_i = R_i - R_{i-1} t i = R i − R i − 1 ) for every recorded element across all cycles. Zero post-study subtractions. Individual element times are recorded directly on the observation board.
Data Integrity Complete, unbroken chronological accounting of the entire shift. Foreign elements and operator delays are preserved; total time recorded must match wall-clock time. Fails to account for unrecorded delays; temptation exists for observers to omit brief delays or round numbers.
Timing Errors Zero cumulative mechanical error. Arithmetic subtractions resolve to exact cumulative time. Incurs a slight negative reset error on mechanical watches (time lost during hand flyback), though negligible on electronic digital boards.
Labor Trust Highest. Contractually and legally mandated in unionized collective bargaining agreements due to its complete audit trail. Lower. Perceived by shop-floor labor as prone to observer manipulation, omission, or bias.
3. Work Element Breakdown Principles
Dividing a job into discrete work elements is essential because:
Operators do not perform at a uniform pace across an entire cycle (an operator may move quickly during light manual transfers but slowly during delicate alignments).
It enables segregating operator-controlled manual elements from machine-controlled elements.
It facilitates building Standard Data systems for future synthetic time setting.
Rules for Element Definition
Homogeneity : Group related motions into homogeneous tasks. Never combine a manual handling element with a machine-controlled cut.
Element Duration : Elements must not be so short that human reaction time introduces observational error ( > 0.04 minutes > 0.04\text{ minutes} > 0.04 minutes or 2.4 seconds 2.4\text{ seconds} 2.4 seconds ), nor so long that performance rating varies significantly across the element ( < 0.50 minutes < 0.50\text{ minutes} < 0.50 minutes or 30 seconds 30\text{ seconds} 30 seconds ). A target elemental length is typically 0.10 to 0.30 minutes 0.10\text{ to }0.30\text{ minutes} 0.10 to 0.30 minutes .
Distinct Break Points : The transition between elements must feature an unmistakable visual or auditory break point (e.g., "part clinks in tote," "press clutch clicks," "operator releases drill handle" ).
Cyclical vs. Irregular (Periodic) Elements :
Cyclical Elements : Occur once every production cycle (occurrence frequency f = 1 / 1 = 1.0 f = 1/1 = 1.0 f = 1/1 = 1.0 ).
Irregular Elements : Occur periodically once every N N N cycles (e.g., retrieving a tote of blanks every 25 parts, f = 1 / 25 = 0.04 f = 1/25 = 0.04 f = 1/25 = 0.04 ; sharpening a cutting tool every 50 parts, f = 1 / 50 = 0.02 f = 1/50 = 0.02 f = 1/50 = 0.02 ).
Foreign Elements : Unscheduled occurrences (e.g., dropped part, tangled wire, supervisor interruption, brief conveyor stall). The analyst must record the foreign event, note its duration, and either discard it as an non-representative outlier or apportion it into the unavoidable delay category.
4. Statistical Sample Size Determination
Because time study is an empirical sampling process, the observed mean ( x ˉ ) (\bar{x}) ( x ˉ ) is an estimate of the true population mean ( μ ) (\mu) ( μ ) . To ensure the calculated standard time meets legal, industrial, and contractual standards, the analyst must compute the required number of cycles ( n n n ).
The NCEES Sample Size Formula
Assuming observed elemental times follow a normal distribution, the required number of observations n n n to achieve an estimate within a specified relative precision limit k k k at a confidence level of ( 1 − α ) (1 - \alpha) ( 1 − α ) is: n = ( z α / 2 ⋅ s k ⋅ x ˉ ) 2 n = \left( \frac{z_{\alpha/2} \cdot s}{k \cdot \bar{x}} \right)^2 n = ( k ⋅ x ˉ z α /2 ⋅ s ) 2
Where:
n n n = required total number of timed cycles (always rounded up to the nearest integer)
z α / 2 z_{\alpha/2} z α /2 = two-tailed critical value of the standard normal distribution:
- For 90 % 90\% 90% confidence: z 0.05 = 1.645 z_{0.05} = 1.645 z 0.05 = 1.645
- For 95 % 95\% 95% confidence: z 0.025 = 1.960 z_{0.025} = 1.960 z 0.025 = 1.960
- For 99 % 99\% 99% confidence: z 0.005 = 2.576 z_{0.005} = 2.576 z 0.005 = 2.576
s s s = sample standard deviation of the preliminary observed times from a pilot sample of size n ′ n' n ′ : s = ∑ i = 1 n ′ ( x i − x ˉ ) 2 n ′ − 1 s = \sqrt{\frac{\sum_{i=1}^{n'} (x_i - \bar{x})^2}{n' - 1}} s = n ′ − 1 ∑ i = 1 n ′ ( x i − x ˉ ) 2
x ˉ \bar{x} x ˉ = sample arithmetic mean of the preliminary observed times
k k k = allowable relative precision limit / error tolerance, expressed as a decimal (e.g., ± 5 % = 0.05 \pm 5\% = 0.05 ± 5% = 0.05 ; ± 10 % = 0.10 \pm 10\% = 0.10 ± 10% = 0.10 )
Small Pilot Sample Formulation ( n ′ < 30 n' < 30 n ′ < 30 ) : If the preliminary pilot study is small ( n ′ < 30 n' < 30 n ′ < 30 ), the Student's t t t -distribution replaces the standard normal critical value: n = ( t α / 2 , n ′ − 1 ⋅ s k ⋅ x ˉ ) 2 n = \left( \frac{t_{\alpha/2, \, n'-1} \cdot s}{k \cdot \bar{x}} \right)^2 n = ( k ⋅ x ˉ t α /2 , n ′ − 1 ⋅ s ) 2 If the resulting n > n ′ n > n' n > n ′ , additional cycles must be recorded until the cumulative sample size satisfies the criterion.
5. Performance Rating (Pace Rating) & Normal Time
Performance Rating (or pace rating) is the process whereby an experienced time study analyst evaluates an operator's actual working pace relative to the concept of Standard Performance (100% normal pace) .
Standard Performance Benchmarks
Standard normal performance ( 100 % 100\% 100% ) represents the pace achievable by a qualified, thoroughly motivated operator working sustainably without cumulative physiological fatigue over an 8-hour shift. Classical industrial engineering benchmarks include:
Walking unburdened on smooth, level ground at 3.0 miles per hour ( 4.4 ft/s 4.4\text{ ft/s} 4.4 ft/s or 88 ft/min 88\text{ ft/min} 88 ft/min ).
Dealing a standard 52-card deck into four separate piles (representing bridge hands placed in the corners of a 1-foot square) in 0.50 minutes ( 30 seconds 30\text{ seconds} 30 seconds ).
Assembling 30 small cylindrical pins into a standard pegboard in 0.435 minutes .
Rating Systems
Speed Rating : The observer compares the operator's speed of motion directly against the mental 100% benchmark and records a single rating percentage (e.g., 85 % 85\% 85% , 100 % 100\% 100% , 115 % 115\% 115% , 125 % 125\% 125% ).
Westinghouse System of Rating : Evaluates four independent performance attributes using standardized empirical score tables:
Skill : Proficiency in following method (+0.15 for Superskill to -0.22 for Poor).
Effort : Will to work (+0.13 for Excessive to -0.17 for Poor).
Conditions : Environmental heat, lighting, noise (+0.06 for Ideal to -0.07 for Poor).
Consistency : Variation between cycle times (+0.04 for Perfect to -0.04 for Poor).
The algebraic sum of the four adjustments is added to 1.00 1.00 1.00 to compute the net rating factor.
Normal Time ( N T NT NT ) Calculation
Normal Time is the time an average operator working at 100 % 100\% 100% pace would require to complete the element. For any manual element j j j : N T j = O T ‾ j × ( P R j 100 ) × f j NT_j = \overline{OT}_j \times \left( \frac{PR_j}{100} \right) \times f_j N T j = OT j × ( 100 P R j ) × f j
Where:
- O T ‾ j \overline{OT}_j OT j = mean observed elapsed time for element j j j
- P R j PR_j P R j = performance rating percentage assigned to element j j j
f j f_j f j = occurrence frequency per finished cycle (e.g., f = 1.0 f = 1.0 f = 1.0 for cyclical elements; f = 0.05 f = 0.05 f = 0.05 for an element occurring once every 20 units)
The total Normal Time for the entire job is the sum across all m m m elements: N T job = ∑ j = 1 m N T j NT_{\text{job}} = \sum_{j=1}^m NT_j N T job = j = 1 ∑ m N T j
6. Personal, Fatigue, and Delay (PF&D) Allowances
A human operator cannot maintain normal working pace for an entire 480-minute shift without biological and operational interruptions. To establish a realistic, humane standard, industrial engineers add PF&D Allowances : The PF&D Allowance Structure
- Total Shift (480 minutes)
- ┌───────────────────────────────────────────────┬──────────────┐
- │ Productive Working Time (NT) │ Allowances │
- └───────────────────────────────────────────────┴──────────────┘
- │
- ┌─────────────────────────────────────────────┴────────┐
- ▼ ▼ ▼
- Personal Needs (P) Fatigue (F) Unavoidable Delays (D)
- Restroom, water, comfort Basic: 4-5% Minor tool jams, machine
- Typically 5% (~24 min/day) Variable: 0-25% maintenance, instructions
- (Heat, posture, load) Typically 2-5%
Personal Needs ( P P P ) : Time necessary to maintain personal hygiene, visit the restroom, and drink water. Standard industrial practice universally assigns 5 % 5\% 5% (approximately 24 minutes 24\text{ minutes} 24 minutes in an 8-hour shift).
Basic Fatigue ( F F F ) : Energy expenditure recovery. Basic fatigue for seated light assembly in an air-conditioned room is 4 % to 5 % 4\%\text{ to }5\% 4% to 5% . Variable fatigue increments are added based on physical and environmental severity:
Awkward Posture : Bending, crouching, overhead reaching ( + 2 % to + 7 % +2\%\text{ to }+7\% + 2% to + 7% ).
Muscular Load : Heavy lifting or repetitive pushing ( + 1 % to + 15 % +1\%\text{ to }+15\% + 1% to + 15% ).
Atmospheric Conditions : High thermal heat index or humidity ( + 2 % to + 15 % +2\%\text{ to }+15\% + 2% to + 15% ).
Visual & Mental Strain : Fine microscopic alignment ( + 2 % to + 5 % +2\%\text{ to }+5\% + 2% to + 5% ).
Unavoidable Delays ( D D D ) : Minor, unpredictable operational interruptions outside the operator's control (e.g., brief supervisor instructions, material handler delivery delays, power fluctuations). Typically 2 % to 5 % 2\%\text{ to }5\% 2% to 5% .
7. Standard Time Formulations: The Two Allowance Bases
CRITICAL EXAM ALERT : The single most common error on the FE Industrial exam is applying the incorrect allowance formula. The NCEES Reference Handbook recognizes two distinct mathematical bases for calculating Standard Time ( S T ST ST ) from Normal Time ( N T NT NT ): Allowance Formulations Comparison
Basis 1: Allowance on Normal Time (A_NT) Basis 2: Allowance on Shift Time (A_shift)
- ┌───────────────┬───────────────┐ ┌───────────────────────────────┬──────────────┐
- │ Normal Time │ Allowance (A) │ │ Normal Time (Productive) │Allowance (A) │
- └───────────────┴───────────────┘ └───────────────────────────────┴──────────────┘
- ◄──────── Standard Time ────────► ◄──────────────── Total Shift ─────────────────►
- ST = NT * (1 + A_NT) ST = NT / (1 - A_shift)
- Method 1: Allowance Based on Normal Time ( A N T A_{NT} A NT )
Here, the allowance percentage is expressed as a direct markup added onto the productive Normal Time. Standard Time is computed as: S T = N T × ( 1 + A N T ) ST = NT \times (1 + A_{NT}) ST = NT × ( 1 + A NT )
Example : If N T = 5.0 minutes NT = 5.0\text{ minutes} NT = 5.0 minutes and allowance is 15 % 15\% 15% of normal time ( A N T = 0.15 A_{NT} = 0.15 A NT = 0.15 ): S T = 5.0 × ( 1 + 0.15 ) = 5.75 minutes ST = 5.0 \times (1 + 0.15) = 5.75\text{ minutes} ST = 5.0 × ( 1 + 0.15 ) = 5.75 minutes
Method 2: Allowance Based on Total Shift / Working Day ( A shift A_{\text{shift}} A shift )
Here, allowances are allocated as a fixed percentage of the total working day (e.g., 60 minutes 60\text{ minutes} 60 minutes of total allowance in a 480 minute 480\text{ minute} 480 minute shift = 12.5 % = 12.5\% = 12.5% ). In this framework, the working shift is partitioned into productive normal time and non-productive allowance time: Shift Time = Productive Time + Allowance Time \text{Shift Time} = \text{Productive Time} + \text{Allowance Time} Shift Time = Productive Time + Allowance Time S T ⋅ ( 1 − A shift ) = N T ⟹ S T = N T 1 − A shift ST \cdot (1 - A_{\text{shift}}) = NT \quad \implies \quad ST = \frac{NT}{1 - A_{\text{shift}}} ST ⋅ ( 1 − A shift ) = NT ⟹ ST = 1 − A shift NT
Example : If N T = 5.0 minutes NT = 5.0\text{ minutes} NT = 5.0 minutes and allowance is 15 % 15\% 15% of the working shift ( A shift = 0.15 A_{\text{shift}} = 0.15 A shift = 0.15 ): S T = 5.0 1 − 0.15 = 5.0 0.85 = 5.882 minutes ST = \frac{5.0}{1 - 0.15} = \frac{5.0}{0.85} = 5.882\text{ minutes} ST = 1 − 0.15 5.0 = 0.85 5.0 = 5.882 minutes
Mathematical Equivalence and Conversion
Notice that for the same nominal percentage ( 15 % 15\% 15% ), Method 2 yields a larger Standard Time than Method 1 ( 5.88 min 5.88\text{ min} 5.88 min vs. 5.75 min 5.75\text{ min} 5.75 min ). To convert between the two allowance bases: A N T = A shift 1 − A shift ⟺ A shift = A N T 1 + A N T A_{NT} = \frac{A_{\text{shift}}}{1 - A_{\text{shift}}} \quad \iff \quad A_{\text{shift}} = \frac{A_{NT}}{1 + A_{NT}} A NT = 1 − A shift A shift ⟺ A shift = 1 + A NT A NT
Specified Allowance ( A A A ) Method 1: S T = N T × ( 1 + A ) ST = NT \times (1 + A) ST = NT × ( 1 + A ) Method 2: S T = N T / ( 1 − A ) ST = NT / (1 - A) ST = NT / ( 1 − A ) Ratio (Method 2 / Method 1)
10% ( 0.10 0.10 0.10 ) 1.100 × N T 1.100 \times NT 1.100 × NT 1.111 × N T 1.111 \times NT 1.111 × NT 1.010 1.010 1.010 (+1.0%)
15% ( 0.15 0.15 0.15 ) 1.150 × N T 1.150 \times NT 1.150 × NT 1.176 × N T 1.176 \times NT 1.176 × NT 1.023 1.023 1.023 (+2.3%)
20% ( 0.20 0.20 0.20 ) 1.200 × N T 1.200 \times NT 1.200 × NT 1.250 × N T 1.250 \times NT 1.250 × NT 1.042 1.042 1.042 (+4.2%)
25% ( 0.25 0.25 0.25 ) 1.250 × N T 1.250 \times NT 1.250 × NT 1.333 × N T 1.333 \times NT 1.333 × NT 1.066 1.066 1.066 (+6.6%)
8. Machine-Controlled vs. Operator-Controlled Elements
When a production operation includes automated equipment (e.g., CNC milling, robotic welding, plastic injection cure), elements must be categorized based on control:
Operator-Controlled (Manual) Elements : The elapsed duration depends entirely on the operator's speed, effort, and dexterity. Performance rating MUST be applied ( P R ≠ 100 % PR \ne 100\% PR = 100% ).
Machine-Controlled Elements : The process duration is governed by machine kinematics, feeds, speeds, or thermodynamic cycles. The operator cannot accelerate the cut. Therefore, machine-controlled elements are NEVER pace-rated ( P R = 100 % PR = 100\% PR = 100% or pace rating is omitted).
Applying Allowances to Machine Time : While manual fatigue allowances do not apply to machine automatic run time, personal needs ( 5 % 5\% 5% ) and unavoidable machine delay allowances ( 2 − 3 % 2-3\% 2 − 3% ) apply to the entire cycle duration.
- 9. Step-by-Step Worked Engineering Calculations
- Worked Example 18.2.1: Multi-Element Time Study and Allowance Base Sensitivity
Problem : An industrial engineer conducts a direct continuous stopwatch study on a semi-automated machining operation. An 8-hour shift contains 480 minutes 480\text{ minutes} 480 minutes . The observed elemental times, performance ratings, and occurrence frequencies across 20 cycles are summarized in the table below:
Element No. Description Element Type Mean Observed Time ( O T ‾ \overline{OT} OT ) Performance Rating ( P R PR PR ) Frequency ( f f f )
1 Pick raw casting and clamp in hydraulic chuck Manual 0.45 minutes 0.45\text{ minutes} 0.45 minutes 115 % 115\% 115% 1.0 1.0 1.0 (every cycle)
2 Automated CNC facing and bore cut Machine 2.20 minutes 2.20\text{ minutes} 2.20 minutes N/A ( 100 % 100\% 100% ) 1.0 1.0 1.0 (every cycle)
3 Unload part, deburr edges, place in tote Manual 0.65 minutes 0.65\text{ minutes} 0.65 minutes 110 % 110\% 110% 1.0 1.0 1.0 (every cycle)
4 Inspect bore with go/no-go plug gauge Manual 0.50 minutes 0.50\text{ minutes} 0.50 minutes 105 % 105\% 105% 0.20 0.20 0.20 (1 in 5 parts)
5 Clear chip accumulation from machine bed Manual 0.80 minutes 0.80\text{ minutes} 0.80 minutes 100 % 100\% 100% 0.05 0.05 0.05 (1 in 20 parts)
Plant policy mandates a total PF&D allowance of 16 % 16\% 16% ( P = 5 % P = 5\% P = 5% , F = 6 % F = 6\% F = 6% , D = 5 % D = 5\% D = 5% ).
Calculate the Normal Time ( N T NT NT ) for each of the five work elements.
Compute the total Job Normal Time ( N T job NT_{\text{job}} N T job ).
Calculate the Standard Time ( S T ST ST ) using Basis 1: Allowance based on Normal Time ( A N T = 0.16 A_{NT} = 0.16 A NT = 0.16 ).
Calculate the Standard Time ( S T ST ST ) using Basis 2: Allowance based on Total Shift ( A shift = 0.16 A_{\text{shift}} = 0.16 A shift = 0.16 ).
Determine the expected daily production output (parts per 8-hour shift) under both standard time methods.
Solution :
Step 1: Calculate Elemental Normal Times ( N T i = O T ‾ i × ( P R i / 100 ) × f i NT_i = \overline{OT}_i \times (PR_i / 100) \times f_i N T i = OT i × ( P R i /100 ) × f i )
Element 1 (Manual load): N T 1 = 0.45 × 1.15 × 1.0 = 0.5175 minutes NT_1 = 0.45 \times 1.15 \times 1.0 = 0.5175\text{ minutes} N T 1 = 0.45 × 1.15 × 1.0 = 0.5175 minutes
Element 2 (CNC Machining - Machine Controlled, P R = 100 % PR = 100\% PR = 100% ): N T 2 = 2.20 × 1.00 × 1.0 = 2.2000 minutes NT_2 = 2.20 \times 1.00 \times 1.0 = 2.2000\text{ minutes} N T 2 = 2.20 × 1.00 × 1.0 = 2.2000 minutes
Element 3 (Manual unload and deburr): N T 3 = 0.65 × 1.10 × 1.0 = 0.7150 minutes NT_3 = 0.65 \times 1.10 \times 1.0 = 0.7150\text{ minutes} N T 3 = 0.65 × 1.10 × 1.0 = 0.7150 minutes
Element 4 (Manual gauge - periodic f = 0.20 f = 0.20 f = 0.20 ): N T 4 = 0.50 × 1.05 × 0.20 = 0.1050 minutes NT_4 = 0.50 \times 1.05 \times 0.20 = 0.1050\text{ minutes} N T 4 = 0.50 × 1.05 × 0.20 = 0.1050 minutes
Element 5 (Manual chip clean - periodic f = 0.05 f = 0.05 f = 0.05 ): N T 5 = 0.80 × 1.00 × 0.05 = 0.0400 minutes NT_5 = 0.80 \times 1.00 \times 0.05 = 0.0400\text{ minutes} N T 5 = 0.80 × 1.00 × 0.05 = 0.0400 minutes
Step 2: Calculate Total Job Normal Time ( N T job NT_{\text{job}} N T job ) N T job = N T 1 + N T 2 + N T 3 + N T 4 + N T 5 NT_{\text{job}} = NT_1 + NT_2 + NT_3 + NT_4 + NT_5 N T job = N T 1 + N T 2 + N T 3 + N T 4 + N T 5 N T job = 0.5175 + 2.2000 + 0.7150 + 0.1050 + 0.0400 = 3.5775 minutes ≈ 3.58 minutes NT_{\text{job}} = 0.5175 + 2.2000 + 0.7150 + 0.1050 + 0.0400 = 3.5775\text{ minutes} \approx 3.58\text{ minutes} N T job = 0.5175 + 2.2000 + 0.7150 + 0.1050 + 0.0400 = 3.5775 minutes ≈ 3.58 minutes
Step 3: Calculate Standard Time under Basis 1 ( A N T = 0.16 A_{NT} = 0.16 A NT = 0.16 ) S T 1 = N T job × ( 1 + A N T ) = 3.5775 × ( 1 + 0.16 ) = 3.5775 × 1.16 = 4.1499 minutes ≈ 4.15 minutes ST_1 = NT_{\text{job}} \times (1 + A_{NT}) = 3.5775 \times (1 + 0.16) = 3.5775 \times 1.16 = 4.1499\text{ minutes} \approx 4.15\text{ minutes} S T 1 = N T job × ( 1 + A NT ) = 3.5775 × ( 1 + 0.16 ) = 3.5775 × 1.16 = 4.1499 minutes ≈ 4.15 minutes
Step 4: Calculate Standard Time under Basis 2 ( A shift = 0.16 A_{\text{shift}} = 0.16 A shift = 0.16 ) S T 2 = N T job 1 − A shift = 3.5775 1 − 0.16 = 3.5775 0.84 = 4.2589 minutes ≈ 4.26 minutes ST_2 = \frac{NT_{\text{job}}}{1 - A_{\text{shift}}} = \frac{3.5775}{1 - 0.16} = \frac{3.5775}{0.84} = 4.2589\text{ minutes} \approx 4.26\text{ minutes} S T 2 = 1 − A shift N T job = 1 − 0.16 3.5775 = 0.84 3.5775 = 4.2589 minutes ≈ 4.26 minutes
Step 5: Compute Daily Shift Production Quotas Total available time in 8-hour shift = 480 minutes 480\text{ minutes} 480 minutes .
Under Basis 1 ( S T 1 = 4.1499 min ST_1 = 4.1499\text{ min} S T 1 = 4.1499 min ): Daily Output 1 = 480 minutes/shift 4.1499 minutes/part = 115.66 ≈ 115 parts/shift \text{Daily Output}_1 = \frac{480\text{ minutes/shift}}{4.1499\text{ minutes/part}} = 115.66 \approx 115\text{ parts/shift} Daily Output 1 = 4.1499 minutes/part 480 minutes/shift = 115.66 ≈ 115 parts/shift
Under Basis 2 ( S T 2 = 4.2589 min ST_2 = 4.2589\text{ min} S T 2 = 4.2589 min ): Daily Output 2 = 480 minutes/shift 4.2589 minutes/part = 112.70 ≈ 112 parts/shift \text{Daily Output}_2 = \frac{480\text{ minutes/shift}}{4.2589\text{ minutes/part}} = 112.70 \approx 112\text{ parts/shift} Daily Output 2 = 4.2589 minutes/part 480 minutes/shift = 112.70 ≈ 112 parts/shift
Engineering Impact : Confusing Basis 1 with Basis 2 results in a production quota discrepancy of 3 parts per operator per shift , illustrating why specifying the allowance denominator is vital in labor planning.
10. NCEES Reference Handbook Tips & Realistic Exam Traps
Pace Rating Machine Elements : If an exam problem states an operator was pace-rated at 125 % 125\% 125% and lists a machine cutting cycle of 3.00 minutes 3.00\text{ minutes} 3.00 minutes , DO NOT multiply 3.00 3.00 3.00 by 1.25 1.25 1.25 ! Machine cycle times are fixed by spindle drives and motors; multiplying machine time by pace rating yields an immediate distractor answer.
Periodic Element Frequency ( f f f ) : Always check whether an element occurs every cycle ( f = 1.0 f = 1.0 f = 1.0 ) or periodically. If an element occurs once every 10 parts, you must multiply its normal time by f = 0.10 f = 0.10 f = 0.10 . Omitting f f f inflates the standard time.
The Allowance Formula Trap : Always inspect the wording of the exam question:
If it says: "allowances are 15% of normal time" → \to → use S T = N T × ( 1 + A ) ST = NT \times (1 + A) ST = NT × ( 1 + A ) .
If it says: "allowances account for 15% of the total workday/shift" → \to → use S T = N T / ( 1 − A ) ST = NT / (1 - A) ST = NT / ( 1 − A ) .
If unspecified, look for clues or check both formulas against multiple-choice options, noting that N T / ( 1 − A ) NT / (1 - A) NT / ( 1 − A ) is always the larger number.
Sample Size ( n n n ) Unit Consistency : In n = ( ( z ⋅ s ) / ( k ⋅ x ˉ ) ) 2 n = ((z \cdot s) / (k \cdot \bar{x}))^2 n = (( z ⋅ s ) / ( k ⋅ x ˉ ) ) 2 , ensure that s s s and x ˉ \bar{x} x ˉ have identical units (minutes or seconds), and that k k k is a pure decimal ( 5 % → 0.05 5\% \to 0.05 5% → 0.05 ). Do not enter 5 5 5 for k k k !