7.2 Capital Budgeting: Present Worth, Annual Worth, IRR, and B/C Ratio
FE Other Disciplines Fundamentals of Engineering
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Strategy
About the FE Other Disciplines Exam How to Use This Study Guide
2 Chapter 1: Mathematics
1.1 Analytic Geometry, Trigonometry, and Vector Operations 1.2 Differential and Integral Calculus 1.3 Ordinary Differential Equations and Laplace Transforms 1.4 Linear Algebra, Matrices, and Systems of Equations 1.5 Numerical Methods, Root-Finding, and Numerical Integration
3 Chapter 2: Probability and Statistics
2.1 Probability Distributions, PMFs, and PDFs 2.2 Expected Value, Mean, Variance, and Descriptive Statistics 2.3 Estimation, Confidence Intervals, and Sample Sizes 2.4 Hypothesis Testing, Goodness of Fit, and Linear Regression
4 Chapter 3: Chemistry
3.1 Stoichiometry, Chemical Reactions, and Solutions 3.2 Chemical Equilibrium, Acids/Bases, and Ideal Gas Laws 3.3 Oxidation-Reduction, Electrochemistry, and Corrosion Basics
5 Chapter 4: Instrumentation and Controls
4.1 Sensors, Transducers, and Signal Conditioning 4.2 Data Sampling, Accuracy/Precision, and A/D Conversion 4.3 Logic Diagrams, Boolean Algebra, and Control Logic
6 Chapter 5: Engineering Ethics and Societal Impacts
5.1 NCEES Model Rules of Professional Conduct and Codes of Ethics 5.2 Public Protection, Licensure Boards, and Professional Liability 5.3 Societal Impacts: Sustainability, Life-Cycle Analysis, and Public Safety
7 Chapter 6: Safety, Health, and Environment
6.1 OSHA Regulations, Industrial Hygiene, and PPE 6.2 Hazard Assessment, Risk Management, and Environmental Rules 6.3 Gas Detection and Monitoring 6.4 Electrical Safety 6.5 Confined Space Entry and Ventilation Rates
8 Chapter 7: Engineering Economics
7.1 Time Value of Money, Interest Formulas, and Cash Flow Diagrams 7.2 Capital Budgeting: Present Worth, Annual Worth, IRR, and B/C Ratio 7.3 Depreciation Methods, Income Taxes, and Breakeven Analysis 7.4 Cost Analysis, Uncertainty, Expected Value, and Decision Trees
9 Chapter 8: Statics
8.1 Statics Equilibrium, Free-Body Diagrams, and Force Systems 8.2 Distributed Loads, Resultants, and Equivalent Force-Couple Systems 8.3 Internal Forces in Rigid Bodies: Trusses, Frames, Machines, and Friction 8.4 Three-Dimensional Equilibrium, Cables, and Pulley Systems 8.5 Area Properties: Centroids, Moments of Inertia, and Radius of Gyration 8.6 Weight, Mass, and Force Units: slug, lbm, lbf, and g_c
10 Chapter 9: Dynamics
9.1 Kinematics of Particles and Rigid Bodies 9.2 Newton's Second Law for Particles and Rigid Bodies 9.3 Angular Motion, Torque, and Mass Moment of Inertia 9.4 Work-Energy Principle, Power, and Efficiency 9.5 Impulse-Momentum, Impact, and Coefficient of Restitution 9.6 Dynamic Friction and Vibrations: Natural Frequency and Damping
11 Chapter 10: Strength of Materials
10.1 Stress Types, Axial Stress-Strain, and Thermal Deformation 10.2 Torsion of Circular Shafts, Polar Moment, and Angle of Twist 10.3 Shear and Moment Diagrams 10.4 Flexural Bending Stress and Transverse Shear Stress 10.5 Stress Transformations, Principal Stresses, and Mohr's Circle 10.6 Beam Deflections and Combined Axial/Bending Loading 10.7 Column Buckling (Euler Formula) and Yield/Failure Criteria
12 Chapter 11: Materials
11.1 Crystal Structure, Phase Diagrams, and Material Processing 11.2 Mechanical Properties, Fatigue, Fracture, and Corrosion 11.3 Thermal Properties of Materials 11.4 Electrical and Chemical Properties of Materials 11.5 Material Selection for Engineering Design
13 Chapter 12: Fluid Mechanics
12.1 Fluid Properties, Hydrostatic Pressure, and Manometry 12.2 Dimensionless Numbers and Flow Regimes 12.3 Continuity Equation, Bernoulli Equation, and Energy Equation 12.4 Impulse-Momentum Equation and Forces on Control Volumes 12.5 Flow in Pipes, Friction Factors (Moody Diagram), and Head Losses 12.6 Turbomachinery: Pumps, Turbines, Fans, and Compressors 12.7 Open-Channel Flow, Manning's Equation, and Drag 12.8 Fluid Transport Systems and Flow Measurement 12.9 Ideal Gas Law, Gas Mixtures, and the Real Gas Law
14 Chapter 13: Basic Electrical Engineering
13.1 Electrical Fundamentals, Ohm's Law, and DC Circuits 13.2 AC Circuits, Phasors, Impedance, and Three-Phase Power 13.3 Magnetic Fields, Induction, Transformers, and Motor Efficiency 13.4 Electrical Measuring Devices: Voltmeter, Ammeter, and Wattmeter
15 Chapter 14: Thermodynamics and Heat Transfer
14.1 First & Second Laws of Thermodynamics and Pure Substance Properties 14.2 Thermodynamic Processes and Property Diagrams (T-s, P-h, P-v) 14.3 Heat Transfer: Conduction, Convection, and Radiation 14.4 Ideal Gas Processes and Power/Refrigeration Cycles 14.5 Mass and Energy Balances on Control Volumes 14.6 Combustion and Combustion Products 14.7 Psychrometrics: Relative Humidity, Wet-Bulb Temperature, and the Psychrometric Chart
7.2 Capital Budgeting: Present Worth, Annual Worth, IRR, and B/C Ratio
Key Takeaways Explain This Topic AI
Present Worth (PW) analysis requires comparing mutually exclusive alternatives over an equal study period; when service lives differ, the Least Common Multiple (LCM) of lives or a fixed study period must be used.
Annual Worth (AW) analysis computes net equivalent uniform annual cash flows over one life cycle without requiring LCM adjustments for unequal service lives, with Capital Recovery cost calculated as CR = (P - S)(A/P, i, n) + S * i.
Internal Rate of Return (IRR) is the discount rate i* that sets net present worth to zero; when choosing between mutually exclusive options, incremental IRR analysis (Delta IRR) must be performed.
Benefit-Cost (B/C) ratio evaluates public sector projects by comparing net present benefits to net present costs at MARR; an option is acceptable if B/C >= 1.0, and incremental B/C analysis is required for selection.
Capitalized Cost represents the present worth of a project with an infinite service life, computed as P = A / i for perpetual recurring annual costs.
Last updated: August 2026
7.2 Capital Budgeting: Present Worth, Annual Worth, IRR, and B/C Ratio
Methodology Overview: Capital budgeting evaluates and ranks alternative engineering investments to ensure capital is deployed efficiently. Choosing the correct decision criterion—Present Worth, Annual Worth, Internal Rate of Return, or Benefit-Cost ratio—depends on project ownership (private vs. public), service life constraints, and capital availability.
- Present Worth (PW) and Annual Worth (AW) Analysis
- Present Worth (PW) Method
Present Worth (PW) converts all cash inflows and outflows throughout a project's service life into an equivalent single dollar sum at t = 0 t=0 t = 0 using the Minimum Attractive Rate of Return (MARR): P W ( i ) = − P 0 + ∑ t = 1 n C F t ( 1 + i ) − t + S n ( 1 + i ) − n PW(i) = -P_0 + \sum_{t=1}^n CF_t (1+i)^{-t} + S_n (1+i)^{-n} P W ( i ) = − P 0 + t = 1 ∑ n C F t ( 1 + i ) − t + S n ( 1 + i ) − n
Where P 0 P_0 P 0 is initial capital investment, C F t CF_t C F t is net annual cash flow at year t t t , S n S_n S n is net salvage value at year n n n , and i = MARR i = \text{MARR} i = MARR .
Decision Standard for Independent Projects: Accept any project with P W ( MARR ) ≥ 0 PW(\text{MARR}) \ge 0 P W ( MARR ) ≥ 0 .
Decision Standard for Mutually Exclusive Projects: Select the single alternative with the largest positive Present Worth (for revenue options) or lowest negative Present Worth (for service/cost-only options).
The Equal Service Life Requirement & Least Common Multiple (LCM) Rule
Present Worth comparison is valid only if all alternatives are evaluated over equal study periods . If Alternative A has a 3-year life and Alternative B has a 6-year life:
A direct PW comparison over 3 years versus 6 years is mathematically invalid because Option B provides twice as many years of service.
Least Common Multiple (LCM) Rule: Repeat each alternative over a study period equal to the LCM of their individual service lives (e.g., LCM ( 3 , 6 ) = 6 \text{LCM}(3, 6) = 6 LCM ( 3 , 6 ) = 6 years). Option A is assumed to be replaced at t = 3 t=3 t = 3 with identical costs.
Annual Worth (AW) Method
Annual Worth (AW) converts all cash flows into an equivalent uniform annual series A A A over the asset's service life n n n : A W ( i ) = P W ( i ) × ( A / P , i , n ) AW(i) = PW(i) \times (A/P, i, n) A W ( i ) = P W ( i ) × ( A / P , i , n ) Or explicitly: A W ( i ) = − P 0 ( A / P , i , n ) + A net + S n ( A / F , i , n ) \text{Or explicitly: } AW(i) = -P_0(A/P, i, n) + A_{\text{net}} + S_n(A/F, i, n) Or explicitly: A W ( i ) = − P 0 ( A / P , i , n ) + A net + S n ( A / F , i , n )
Why AW is Preferred for Unequal Service Lives
Key Exam Rule: The Annual Worth of an alternative over one life cycle is identical to its Annual Worth over two, three, or k k k repeated life cycles (under the assumption of identical replacement costs). Therefore, Annual Worth analysis does NOT require the LCM rule and can compare options with different service lives directly over their respective single life spans.
- Capital Recovery Cost and Capitalized Cost
- Capital Recovery Cost (CR)
Capital Recovery Cost (CR) represents the equivalent uniform annual cost of purchasing and owning an asset over n n n years, taking into account initial cost P P P , salvage value S S S , and interest rate i i i . C R ( i ) = P ( A / P , i , n ) − S ( A / F , i , n ) CR(i) = P(A/P, i, n) - S(A/F, i, n) CR ( i ) = P ( A / P , i , n ) − S ( A / F , i , n )
By substituting ( A / F , i , n ) = ( A / P , i , n ) − i (A/F, i, n) = (A/P, i, n) - i ( A / F , i , n ) = ( A / P , i , n ) − i , the Capital Recovery formula simplifies to: C R ( i ) = ( P − S ) ( A / P , i , n ) + S ⋅ i CR(i) = (P - S)(A/P, i, n) + S \cdot i CR ( i ) = ( P − S ) ( A / P , i , n ) + S ⋅ i
Where ( P − S ) ( A / P , i , n ) (P - S)(A/P, i, n) ( P − S ) ( A / P , i , n ) is the annual recovery of depreciated capital, and S ⋅ i S \cdot i S ⋅ i is the annual interest earned on unrecovered salvage value.
Summary of Capital Budgeting Decision Criteria
Evaluation Method Metric Decision Standard (Revenue Options) Unequal Life Life-Cycle Handling
Present Worth (PW) Equivalent single sum at t = 0 t=0 t = 0 Choose alternative with largest positive P W ( MARR ) PW(\text{MARR}) P W ( MARR ) Must use Least Common Multiple (LCM) study period
Annual Worth (AW) Equivalent uniform annual series A A A Choose alternative with largest positive A W ( MARR ) AW(\text{MARR}) A W ( MARR ) Evaluated directly over single life cycle (no LCM)
Internal Rate of Return (IRR) Discount rate i ∗ i^* i ∗ where P W ( i ∗ ) = 0 PW(i^*)=0 P W ( i ∗ ) = 0 Select higher-cost option if Δ i ∗ ≥ MARR \Delta i^* \ge \text{MARR} Δ i ∗ ≥ MARR Requires incremental Δ IRR \Delta \text{IRR} Δ IRR evaluation
Benefit-Cost (B/C) Ratio of public benefits to costs Accept if B / C ≥ 1.0 B/C \ge 1.0 B / C ≥ 1.0 Requires incremental Δ B / Δ C ≥ 1.0 \Delta B / \Delta C \ge 1.0 Δ B /Δ C ≥ 1.0
Capitalized Cost Present worth for perpetual life ( n → ∞ n \to \infty n → ∞ ) P cap = A / i P_{\text{cap}} = A / i P cap = A / i Used for perpetual public infrastructure
Capitalized Cost ( n → ∞ n \to \infty n → ∞ )
Capitalized Cost is the present worth of an asset or facility designed to provide service in perpetuity ( n = ∞ n = \infty n = ∞ ), such as dams, bridges, canals, or municipal water mains.
For a perpetual annual expenditure A A A occurring every year indefinitely at interest rate i i i : P cap = A i P_{\text{cap}} = \frac{A}{i} P cap = i A
If an asset has an initial cost P 0 P_0 P 0 , perpetual annual O&M cost A A A , and a periodic replacement cost A repl A_{\text{repl}} A repl occurring every k k k years indefinitely: P cap = P 0 + A i + A repl ( 1 + i ) k − 1 P_{\text{cap}} = P_0 + \frac{A}{i} + \frac{A_{\text{repl}}}{(1+i)^k - 1} P cap = P 0 + i A + ( 1 + i ) k − 1 A repl
Where A repl ( 1 + i ) k − 1 \frac{A_{\text{repl}}}{(1+i)^k - 1} ( 1 + i ) k − 1 A repl converts the k k k -year periodic expenditure into a capitalized present worth.
Internal Rate of Return (IRR) Analysis
The Internal Rate of Return (IRR) is the break-even discount rate i ∗ i^* i ∗ at which the present worth of cash inflows equals the present worth of cash outflows ( P W ( i ∗ ) = 0 PW(i^*) = 0 P W ( i ∗ ) = 0 ). P W ( i ∗ ) = − P 0 + ∑ t = 1 n C F t ( 1 + i ∗ ) t + S n ( 1 + i ∗ ) n = 0 PW(i^*) = -P_0 + \sum_{t=1}^n \frac{CF_t}{(1+i^*)^t} + \frac{S_n}{(1+i^*)^n} = 0 P W ( i ∗ ) = − P 0 + t = 1 ∑ n ( 1 + i ∗ ) t C F t + ( 1 + i ∗ ) n S n = 0
Linear Interpolation Formula for IRR
When solving for i ∗ i^* i ∗ manually without a financial calculator, evaluate P W ( i ) PW(i) P W ( i ) at two trial discount rates i 1 i_1 i 1 (yielding P W 1 > 0 PW_1 > 0 P W 1 > 0 ) and i 2 i_2 i 2 (yielding P W 2 < 0 PW_2 < 0 P W 2 < 0 ): ∋ ∗ ≈ i 1 + ( i 2 − i 1 ) [ P W 1 P W 1 − P W 2 ] \ni^* \approx i_1 + (i_2 - i_1) \left[ \frac{PW_1}{PW_1 - PW_2} \right] ∋ ∗ ≈ i 1 + ( i 2 − i 1 ) [ P W 1 − P W 2 P W 1 ]
Incremental IRR Analysis ( Δ IRR \Delta \text{IRR} Δ IRR ) for Mutually Exclusive Options
Exam Trap Warning: Choosing the alternative with the highest individual IRR among mutually exclusive options can produce wrong decisions because individual IRR ignores the scale of initial investment .
To compare mutually exclusive alternatives using IRR, perform Incremental Analysis :
Rank options in order of increasing initial capital investment ( P 0 P_0 P 0 ).
Verify each option individually against do-nothing ( I R R ≥ MARR IRR \ge \text{MARR} I RR ≥ MARR ). drop unviable options.
Compute the incremental cash flow between the higher-cost option ( B B B ) and lower-cost option ( A A A ): Δ C F t = C F t , B − C F t , A \Delta CF_t = CF_{t,B} - CF_{t,A} Δ C F t = C F t , B − C F t , A .
Calculate the incremental rate of return Δ i ∗ \Delta i^* Δ i ∗ such that P W Δ ( Δ i ∗ ) = 0 PW_{\Delta}(\Delta i^*) = 0 P W Δ ( Δ i ∗ ) = 0 .
Decision Rule: If Δ i ∗ ≥ MARR \Delta i^* \ge \text{MARR} Δ i ∗ ≥ MARR , select the higher-cost alternative ( B B B ). If Δ i ∗ < MARR \Delta i^* < \text{MARR} Δ i ∗ < MARR , select the lower-cost alternative ( A A A ).
Benefit-Cost (B/C) Ratio Analysis
Public sector infrastructure projects (such as highways, flood barriers, public parks, and transit systems) are evaluated using Benefit-Cost (B/C) ratio analysis rather than commercial profit metrics.
Definitions of Terms
Benefits ( B B B ): Quantifiable advantage realized by the general public.
Disbenefits ( D D D ): Quantifiable disadvantages or costs incurred by the public (e.g., loss of property value, environmental damage).
Costs ( C C C ): Expenditures incurred by the government entity (initial capital cost I I I and net annual maintenance/operating costs O & M O\&M O & M ).
Conventional B/C Ratio Formula
All terms are expressed as equivalent Present Worths ( P W PW P W ) or Equivalent Uniform Annual Worths ( A W AW A W ) evaluated at the public discount rate: Conventional B / C = P W ( B ) − P W ( D ) P W ( I ) + P W ( O & M ) − P W ( S ) \text{Conventional } B/C = \frac{PW(B) - PW(D)}{PW(I) + PW(O\&M) - PW(S)} Conventional B / C = P W ( I ) + P W ( O & M ) − P W ( S ) P W ( B ) − P W ( D )
Modified B/C Ratio Formula
In the modified B/C formulation, recurring maintenance costs ( O & M O\&M O & M ) are subtracted from public benefits in the numerator rather than added to government costs in the denominator: Modified B / C = P W ( B ) − P W ( D ) − P W ( O & M ) P W ( I ) − P W ( S ) \text{Modified } B/C = \frac{PW(B) - PW(D) - PW(O\&M)}{PW(I) - PW(S)} Modified B / C = P W ( I ) − P W ( S ) P W ( B ) − P W ( D ) − P W ( O & M )
Decision Rule (Single Option): If B / C ≥ 1.0 B/C \ge 1.0 B / C ≥ 1.0 , the project is economically justified.
Incremental B/C Rule (Mutually Exclusive Options): Calculate incremental benefits and costs between higher-cost alternative B B B and lower-cost alternative A A A : Δ B / Δ C = P W ( B B ) − P W ( B A ) P W ( C B ) − P W ( C A ) \Delta B / \Delta C = \frac{PW(B_B) - PW(B_A)}{PW(C_B) - PW(C_A)} Δ B /Δ C = P W ( C B ) − P W ( C A ) P W ( B B ) − P W ( B A ) . Select Option B if Δ B / Δ C ≥ 1.0 \Delta B / \Delta C \ge 1.0 Δ B /Δ C ≥ 1.0 .
- Payback Period Analysis
- Simple Payback Period
The Simple Payback Period ( n p n_p n p ) is the number of years required for cumulative un-discounted net cash inflows to equal the initial capital investment P 0 P_0 P 0 : P 0 = ∑ t = 1 n p C F t P_0 = \sum_{t=1}^{n_p} CF_t P 0 = t = 1 ∑ n p C F t
If annual net cash inflows are constant ( A A A ): n p = P 0 A n_p = \frac{P_0}{A} n p = A P 0
Limitation: Simple payback ignores the time value of money and all cash flows occurring after n p n_p n p .
Discounted Payback Period
The Discounted Payback Period accounts for the time value of money by finding n p n_p n p such that: P 0 = ∑ t = 1 n p C F t ( 1 + i ) − t = A ( P / A , i , n p ) P_0 = \sum_{t=1}^{n_p} CF_t (1+i)^{-t} = A (P/A, i, n_p) P 0 = t = 1 ∑ n p C F t ( 1 + i ) − t = A ( P / A , i , n p )
- Worked Capital Budgeting Examples
- Worked Example 1: Annual Worth Comparison (Unequal Service Lives)
Problem: An engineering firm compares two industrial pumps at MARR = 10%:
Pump A: Initial cost P = $ 30 , 000 P = \text{\textdollar}30,000 P = $ 30 , 000 , annual O&M = $ 5 , 000 = \text{\textdollar}5,000 = $ 5 , 000 , life n = 3 n = 3 n = 3 years, salvage value S = $ 4 , 000 S = \text{\textdollar}4,000 S = $ 4 , 000 .
Pump B: Initial cost P = $ 55 , 000 P = \text{\textdollar}55,000 P = $ 55 , 000 , annual O&M = $ 3 , 000 = \text{\textdollar}3,000 = $ 3 , 000 , life n = 6 n = 6 n = 6 years, salvage value S = $ 7 , 000 S = \text{\textdollar}7,000 S = $ 7 , 000 .
Determine which pump should be selected based on Equivalent Uniform Annual Cost (EUAC).
Solution:
Calculate EUAC for Pump A ( n = 3 n=3 n = 3 ): ( A / P , 10 % , 3 ) = 0.10 ( 1.10 ) 3 ( 1.10 ) 3 − 1 = 0.1331 0.331 ≈ 0.40211 (A/P, 10\%, 3) = \frac{0.10(1.10)^3}{(1.10)^3 - 1} = \frac{0.1331}{0.331} \approx 0.40211 ( A / P , 10% , 3 ) = ( 1.10 ) 3 − 1 0.10 ( 1.10 ) 3 = 0.331 0.1331 ≈ 0.40211 ( A / F , 10 % , 3 ) = 0.10 ( 1.10 ) 3 − 1 = 0.10 0.331 ≈ 0.30211 (A/F, 10\%, 3) = \frac{0.10}{(1.10)^3 - 1} = \frac{0.10}{0.331} \approx 0.30211 ( A / F , 10% , 3 ) = ( 1.10 ) 3 − 1 0.10 = 0.331 0.10 ≈ 0.30211 EUAC A = P A ( A / P , 10 % , 3 ) + O&M A − S A ( A / F , 10 % , 3 ) \text{EUAC}_A = P_A(A/P, 10\%, 3) + \text{O\&M}_A - S_A(A/F, 10\%, 3) EUAC A = P A ( A / P , 10% , 3 ) + O&M A − S A ( A / F , 10% , 3 ) EUAC A = 30 , 000 ( 0.40211 ) + 5 , 000 − 4 , 000 ( 0.30211 ) = 12 , 063.30 + 5 , 000 − 1 , 208.44 = 15 , 854.86 dollars \text{EUAC}_A = 30,000(0.40211) + 5,000 - 4,000(0.30211) = 12,063.30 + 5,000 - 1,208.44 = 15,854.86 \text{ dollars} EUAC A = 30 , 000 ( 0.40211 ) + 5 , 000 − 4 , 000 ( 0.30211 ) = 12 , 063.30 + 5 , 000 − 1 , 208.44 = 15 , 854.86 dollars
Calculate EUAC for Pump B ( n = 6 n=6 n = 6 ): ( A / P , 10 % , 6 ) = 0.10 ( 1.10 ) 6 ( 1.10 ) 6 − 1 = 0.177156 0.771561 ≈ 0.22961 (A/P, 10\%, 6) = \frac{0.10(1.10)^6}{(1.10)^6 - 1} = \frac{0.177156}{0.771561} \approx 0.22961 ( A / P , 10% , 6 ) = ( 1.10 ) 6 − 1 0.10 ( 1.10 ) 6 = 0.771561 0.177156 ≈ 0.22961 ( A / F , 10 % , 6 ) = 0.10 ( 1.10 ) 6 − 1 = 0.10 0.771561 ≈ 0.12961 (A/F, 10\%, 6) = \frac{0.10}{(1.10)^6 - 1} = \frac{0.10}{0.771561} \approx 0.12961 ( A / F , 10% , 6 ) = ( 1.10 ) 6 − 1 0.10 = 0.771561 0.10 ≈ 0.12961 EUAC B = 55 , 000 ( 0.22961 ) + 3 , 000 − 7 , 000 ( 0.12961 ) = 12 , 628.55 + 3 , 000 − 907.27 = 14 , 721.28 dollars \text{EUAC}_B = 55,000(0.22961) + 3,000 - 7,000(0.12961) = 12,628.55 + 3,000 - 907.27 = 14,721.28 \text{ dollars} EUAC B = 55 , 000 ( 0.22961 ) + 3 , 000 − 7 , 000 ( 0.12961 ) = 12 , 628.55 + 3 , 000 − 907.27 = 14 , 721.28 dollars
Decision: Compare EUAC A = 15 , 854.86 dollars \text{EUAC}_A = 15,854.86 \text{ dollars} EUAC A = 15 , 854.86 dollars vs EUAC B = 14 , 721.28 dollars \text{EUAC}_B = 14,721.28 \text{ dollars} EUAC B = 14 , 721.28 dollars . Select Pump B because its annual equivalent cost is lower by $1,133.58 per year.
Worked Example 2: Capitalized Cost Calculation
Problem: A bridge project costs $5,000,000 initially. Annual maintenance costs $60,000 per year. In addition, major resurfacing costing $400,000 is required every 12 years in perpetuity. At an interest rate of 5% per year, calculate the total capitalized cost of the bridge.
Solution:
Formulate components: P cap = P 0 + P annual O&M + P periodic resurfacing P_{\text{cap}} = P_0 + P_{\text{annual O\&M}} + P_{\text{periodic resurfacing}} P cap = P 0 + P annual O&M + P periodic resurfacing P 0 = 5 , 000 , 000 dollars P_0 = 5,000,000 \text{ dollars} P 0 = 5 , 000 , 000 dollars P annual O&M = A i = 60 , 000 0.05 = 1 , 200 , 000 dollars P_{\text{annual O\&M}} = \frac{A}{i} = \frac{60,000}{0.05} = 1,200,000 \text{ dollars} P annual O&M = i A = 0.05 60 , 000 = 1 , 200 , 000 dollars
Capitalized cost of 12-year periodic resurfacing: P periodic = A repl ( 1 + i ) k − 1 = 400 , 000 ( 1.05 ) 12 − 1 P_{\text{periodic}} = \frac{A_{\text{repl}}}{(1+i)^k - 1} = \frac{400,000}{(1.05)^{12} - 1} P periodic = ( 1 + i ) k − 1 A repl = ( 1.05 ) 12 − 1 400 , 000 ( 1.05 ) 12 = 1.795856 (1.05)^{12} = 1.795856 ( 1.05 ) 12 = 1.795856 P periodic = 400 , 000 1.795856 − 1 = 400 , 000 0.795856 = 502 , 603.66 dollars P_{\text{periodic}} = \frac{400,000}{1.795856 - 1} = \frac{400,000}{0.795856} = 502,603.66 \text{ dollars} P periodic = 1.795856 − 1 400 , 000 = 0.795856 400 , 000 = 502 , 603.66 dollars
Total Capitalized Cost: P cap = 5 , 000 , 000 + 1 , 200 , 000 + 502 , 603.66 = 6 , 702 , 603.66 dollars P_{\text{cap}} = 5,000,000 + 1,200,000 + 502,603.66 = 6,702,603.66 \text{ dollars} P cap = 5 , 000 , 000 + 1 , 200 , 000 + 502 , 603.66 = 6 , 702 , 603.66 dollars