Study guide
5.3 Conveyances, Sequential and Simultaneous Rights
NCEES Fundamentals of Surveying FS
Track your progress as you read
Finished sections get a check mark.
1 Orientation: NCEES FS Exam Registration and Scoring
1.1 Official FS Identity and Licensure Purpose 1.2 CBT Delivery, Appointment Timing, and Breaks 1.3 Registration, Fees, Board Approval, and Scheduling 1.4 Reference Handbook, Calculator, and Exam Interface Habits 1.5 Scoring, Pass/Fail Results, and Diagnostics 1.6 First Study Plan From Official Content Areas
2 Surveying Processes, Instrumentation, Control, and Field Workflows
2.1 Instrumentation Selection, Setup, and Observation Quality 2.2 GNSS/GPS Survey Modes, Datums, and Field Checks 2.3 Control Surveys, Networks, Traverses, and Benchmarks 2.4 Topographic Surveys, Feature Coding, and Field Records 2.5 Construction, As-Built, and Land Development Workflows 2.6 Cadastral Field Workflows and Record Keeping
3 Mapping Processes: CAD, GIS, Photogrammetry, UAS, and LiDAR
3.1 Map Purpose, Scale, Symbols, and Generalization 3.2 Topographic Mapping, Contours, and Digital Terrain Models 3.3 CAD, BIM, and Plan Production Workflows 3.4 GIS Data Models, Coordinate Systems, and Attribute Quality 3.5 Photogrammetry, UAS, and Image Processing 3.6 LiDAR, Remote Sensing, and Mapping Quality Control
4 Boundary Law: Public Records, Deeds, and Evidence
4.1 Boundary Law Sources and the Surveyor's Role 4.2 Public Records Research and Indexing 4.3 Deeds, Conveyances, and Description Elements 4.4 Evidence Weighting: Monuments, Measurements, and Occupation 4.5 Chain of Title, Senior Rights, and Record Conflicts 4.6 Ownership Rights, Minerals, Encumbrances, and Survey Reporting
5 Boundary Law: Easements, PLSS, Water Law, and Conveyances
5.1 Common-Law Principles and Unwritten Rights 5.2 Easements, Licenses, and Rights-of-Way 5.3 Conveyances, Sequential and Simultaneous Rights 5.4 Metes and Bounds Descriptions and Monuments 5.5 PLSS Sections, Townships, and Restoration 5.6 Water Law: Riparian, Littoral, and Moving Boundaries 5.7 Encumbrances, Title Limitations, and Survey Reporting
6 Surveying Principles: Geodesy, Datums, Projections, and SPCS
6.1 Basic Surveying, Route Surveying, and Field Geometry 6.2 Geodesy, Earth Models, and Coordinate Systems 6.3 Horizontal and Vertical Datums 6.4 Map Projections, Convergence, and SPCS 6.5 Coordinate Transformations and Grid-Ground Reductions 6.6 Control Networks, Observation Reductions, and Quality
7 Survey Computations: Bearings, Traverses, Leveling, and COGO
7.1 Bearings, Azimuths, and Direction Conversions 7.2 Coordinate Geometry, Latitudes, and Departures 7.3 Traverse Closure, Error, and Relative Precision 7.4 Traverse Adjustment: Compass Rule and Transit Rule 7.5 Differential Leveling, Height of Instrument, and Closure 7.6 Trigonometric Leveling, Reciprocal Observations, and Spreadsheets
8 Survey Computations: Curves, Volumes, Least Squares, and Computer Applications
8.1 Horizontal Circular Curve Elements 8.2 Curve Staking, Deflections, Offsets, and Coordinate Points 8.3 Vertical Curves, Slopes, and Grades 8.4 Area Computations: Coordinate and Field Methods 8.5 Earthwork Volumes, Contours, and Mass Diagrams 8.6 Least Squares, Residuals, and Error Propagation 8.7 Computer Applications, Calculator, and Spreadsheet Quality Control
9 Applied Mathematics, Statistics, Measurement Science, and Error
9.1 Trigonometry and Right-Triangle Field Reductions 9.2 Analytical Geometry, Coordinate Systems, and Vectors 9.3 Calculus, Change Rates, and Area-Volume Reasoning 9.4 Linear Algebra, Adjustments, and Least-Squares Foundations 9.5 Probability, Statistics, and the Normal Distribution 9.6 Measurement Error, Propagation, Positional Accuracy, and Units
10 Business Concepts, Projects, Safety, Contracts, Ethics, and Communication
10.1 Project Planning, Scope, and Work Breakdown 10.2 Resource Management, Scheduling, and Cost Estimating 10.3 Safety, Risk Management, and Site Liability 10.4 Contracts, Liability, and Change Management 10.5 Supervision, Quality Control, and Records 10.6 Ethics, Communication, and Conflict Resolution
11 Integrated FS Domain Review, Handbook Pacing, and Diagnostics
11.1 Build an Integrated Domain Map 11.2 Reference Handbook Search Workflow 11.3 Approved Calculator Habits 11.4 Pace the 5 Hours 20 Minutes of Exam Time 11.5 Use Diagnostics After a Failed Attempt 11.6 Avoid Common Wrong-Answer Patterns
12 Full FS Scenarios, Final Readiness, and Post-Exam Next Steps
12.1 Mixed Boundary and COGO Scenario 12.2 Geodesy, Mapping, and Field Scenario 12.3 Business, Safety, and Ethics Scenario 12.4 Final Readiness Plan 12.5 Exam-Day Checklist 12.6 Post-Exam Next Steps After Pass or Fail
5.3 Conveyances, Sequential and Simultaneous Rights
Key Takeaways Explain This Topic AI
Conveyance analysis starts with the instrument: parties, granting clause, description, reservations, exceptions, and recording context.
Sequential conveyances from a common grantor require senior-rights analysis — the earlier valid grant is satisfied first, and the junior grant bears the shortage or excess.
Simultaneous conveyances (subdivision lots created together by one plat) have no seniority among the lots; shortage or excess is prorated (apportioned) among them.
A reservation creates or keeps a right for the grantor out of the land conveyed; an exception withholds something already excluded from the grant.
Last updated: June 2026
Conveyance Logic for Boundary Questions
A conveyance is the transfer of an interest in real property. FS questions describe a grantor who sells one parcel, then another, or who creates several lots by recording a plat. The boundary problem is usually about what was conveyed first, what remained afterward, and how a shortage or excess in the parent tract should be allocated. You do not memorize deed forms, but you must read instruments carefully and track the order of events.
A deed includes parties (grantor and grantee), words of grant (the granting clause), a legal description, reservations or exceptions, and execution (signatures, acknowledgment, and delivery). Recall the basic vocabulary the exam assumes: the grantor transfers, the grantee receives, and the deed is effective on delivery and acceptance , with recording providing notice to third parties. The habendum clause ("to have and to hold") defines the estate's extent. For boundary analysis the description and the timing matter most.
A deed may convey all land within a metes-and-bounds description except an existing road right-of-way, may reserve a utility easement for the grantor, and may reference a recorded plat, a prior deed, or a monument. Each phrase changes what the surveyor locates and how conflicts resolve.
Senior and Junior Rights
- Concept Meaning Boundary effect
- Senior right Earlier valid conveyance from a common grantor Satisfied in full first; gets its called dimension
- Junior right Later conveyance from the same remaining title Takes what is left; bears shortage or excess
Reservation Grantor creates/keeps a right out of the land conveyed Burdens the granted parcel for the grantor's retained land
- Exception Property or right excluded from the grant Never passes to the grantee
- Simultaneous conveyance Parcels created at one time, often by plat No seniority; shortage/excess prorated
Sequential conveyances are a core exam pattern. Suppose a grantor owns a tract and first conveys the west 100 feet to Buyer A, then later conveys the east 100 feet to Buyer B, but the parent tract is only 195 feet wide. The senior grant (Buyer A) is satisfied first and receives its full 100 feet; the junior grant (Buyer B) takes the remainder and absorbs the 5-foot shortage. The principle is "first in time, first in right" — respect the order of grants. The exact legal treatment depends on jurisdiction and on whether each deed is clearly locatable, but the survey logic follows seniority.
Simultaneous Conveyances and Proration
Simultaneous conveyances behave oppositely. If a subdivision plat creates ten lots in a block at one instant and the block measures short, no lot is senior to another within that same simultaneous creation. The shortage (or excess) is prorated — apportioned among the lots in proportion to their record dimensions — unless an original monument or the controlling plat dictates otherwise. The FS exam loves to contrast this with sequential deeds: senior-rights analysis is strongest when parcels were conveyed in sequence , and proration governs when they were created together .
A quick decision rule:
Sequential deeds from a common grantor → apply seniority; junior bears the difference.
Lots from one plat (simultaneous) → no seniority; prorate the difference.
Original monuments found → monuments control over proration; hold the found corners and distribute only the remainder.
Reservation vs. Exception
These two are routinely confused. , reserving an access easement over the conveyed parcel. " A reservation typically yields a fresh interest (often an easement) back to the grantor; an exception simply removes acreage or a right from what passes. A practical test: ask whether the clause creates a right that did not exist before (reservation) or merely carves out something already separate (exception). The distinction changes both the acreage conveyed and the rights the grantee receives.
Also watch the difference between a call and a recital . A call is operative description language that the surveyor must honor; a recital ("being the same land conveyed in Book 12, Page 305") points to the chain of title and helps resolve ambiguity but does not itself enlarge or shrink the grant. When a description and a recital disagree, the operative description generally governs unless it is itself ambiguous.
A Disciplined Workflow
Start from a source deed and move both directions in the chain of title. Trace the parent tract, list each out-conveyance in order, label each description senior or junior, and compare record calls to field evidence. Recording statutes (race, notice, race-notice) are state specific , so do not import a universal priority rule unless the question supplies it. If a conflict appears, show the competing lines and explain the basis for the surveyor's opinion.
Do not allocate a shortage by guesswork, do not assume every later deed is equally valid once the grantor has already conveyed part of the tract, and do not ignore a reservation merely because it is inconvenient to locate. Read the deed, place it in the chain, identify the estate or right conveyed, then apply the evidence rules.
Senior-rights quick recap
The first parcel conveyed out of a larger tract holds senior rights; later (junior) parcels take what remains.
A shortage or overage is absorbed by the junior parcel , not prorated, when the conveyances were sequential.
Simultaneously created parcels (e.g., lots in one recorded subdivision plat) share any excess or deficiency by proration.