Study guide

5.5 PLSS Sections, Townships, and Restoration

NCEES Fundamentals of Surveying FS

Track your progress as you read

Finished sections get a check mark.

1 Orientation: NCEES FS Exam Registration and Scoring

1.1 Official FS Identity and Licensure Purpose 1.2 CBT Delivery, Appointment Timing, and Breaks 1.3 Registration, Fees, Board Approval, and Scheduling 1.4 Reference Handbook, Calculator, and Exam Interface Habits 1.5 Scoring, Pass/Fail Results, and Diagnostics 1.6 First Study Plan From Official Content Areas

2 Surveying Processes, Instrumentation, Control, and Field Workflows

2.1 Instrumentation Selection, Setup, and Observation Quality 2.2 GNSS/GPS Survey Modes, Datums, and Field Checks 2.3 Control Surveys, Networks, Traverses, and Benchmarks 2.4 Topographic Surveys, Feature Coding, and Field Records 2.5 Construction, As-Built, and Land Development Workflows 2.6 Cadastral Field Workflows and Record Keeping

3 Mapping Processes: CAD, GIS, Photogrammetry, UAS, and LiDAR

3.1 Map Purpose, Scale, Symbols, and Generalization 3.2 Topographic Mapping, Contours, and Digital Terrain Models 3.3 CAD, BIM, and Plan Production Workflows 3.4 GIS Data Models, Coordinate Systems, and Attribute Quality 3.5 Photogrammetry, UAS, and Image Processing 3.6 LiDAR, Remote Sensing, and Mapping Quality Control

4 Boundary Law: Public Records, Deeds, and Evidence

4.1 Boundary Law Sources and the Surveyor's Role 4.2 Public Records Research and Indexing 4.3 Deeds, Conveyances, and Description Elements 4.4 Evidence Weighting: Monuments, Measurements, and Occupation 4.5 Chain of Title, Senior Rights, and Record Conflicts 4.6 Ownership Rights, Minerals, Encumbrances, and Survey Reporting

5 Boundary Law: Easements, PLSS, Water Law, and Conveyances

5.1 Common-Law Principles and Unwritten Rights 5.2 Easements, Licenses, and Rights-of-Way 5.3 Conveyances, Sequential and Simultaneous Rights 5.4 Metes and Bounds Descriptions and Monuments 5.5 PLSS Sections, Townships, and Restoration 5.6 Water Law: Riparian, Littoral, and Moving Boundaries 5.7 Encumbrances, Title Limitations, and Survey Reporting

6 Surveying Principles: Geodesy, Datums, Projections, and SPCS

6.1 Basic Surveying, Route Surveying, and Field Geometry 6.2 Geodesy, Earth Models, and Coordinate Systems 6.3 Horizontal and Vertical Datums 6.4 Map Projections, Convergence, and SPCS 6.5 Coordinate Transformations and Grid-Ground Reductions 6.6 Control Networks, Observation Reductions, and Quality

7 Survey Computations: Bearings, Traverses, Leveling, and COGO

7.1 Bearings, Azimuths, and Direction Conversions 7.2 Coordinate Geometry, Latitudes, and Departures 7.3 Traverse Closure, Error, and Relative Precision 7.4 Traverse Adjustment: Compass Rule and Transit Rule 7.5 Differential Leveling, Height of Instrument, and Closure 7.6 Trigonometric Leveling, Reciprocal Observations, and Spreadsheets

8 Survey Computations: Curves, Volumes, Least Squares, and Computer Applications

8.1 Horizontal Circular Curve Elements 8.2 Curve Staking, Deflections, Offsets, and Coordinate Points 8.3 Vertical Curves, Slopes, and Grades 8.4 Area Computations: Coordinate and Field Methods 8.5 Earthwork Volumes, Contours, and Mass Diagrams 8.6 Least Squares, Residuals, and Error Propagation 8.7 Computer Applications, Calculator, and Spreadsheet Quality Control

9 Applied Mathematics, Statistics, Measurement Science, and Error

9.1 Trigonometry and Right-Triangle Field Reductions 9.2 Analytical Geometry, Coordinate Systems, and Vectors 9.3 Calculus, Change Rates, and Area-Volume Reasoning 9.4 Linear Algebra, Adjustments, and Least-Squares Foundations 9.5 Probability, Statistics, and the Normal Distribution 9.6 Measurement Error, Propagation, Positional Accuracy, and Units

10 Business Concepts, Projects, Safety, Contracts, Ethics, and Communication

10.1 Project Planning, Scope, and Work Breakdown 10.2 Resource Management, Scheduling, and Cost Estimating 10.3 Safety, Risk Management, and Site Liability 10.4 Contracts, Liability, and Change Management 10.5 Supervision, Quality Control, and Records 10.6 Ethics, Communication, and Conflict Resolution

11 Integrated FS Domain Review, Handbook Pacing, and Diagnostics

11.1 Build an Integrated Domain Map 11.2 Reference Handbook Search Workflow 11.3 Approved Calculator Habits 11.4 Pace the 5 Hours 20 Minutes of Exam Time 11.5 Use Diagnostics After a Failed Attempt 11.6 Avoid Common Wrong-Answer Patterns

12 Full FS Scenarios, Final Readiness, and Post-Exam Next Steps

12.1 Mixed Boundary and COGO Scenario 12.2 Geodesy, Mapping, and Field Scenario 12.3 Business, Safety, and Ethics Scenario 12.4 Final Readiness Plan 12.5 Exam-Day Checklist 12.6 Post-Exam Next Steps After Pass or Fail

5.5 PLSS Sections, Townships, and Restoration

Key Takeaways Explain This Topic AI

A township is nominally 6 miles by 6 miles and contains 36 sections; a normal section is 1 square mile = 640 acres, numbered in a boustrophedon (serpentine) pattern starting with Section 1 in the NE corner.

Because meridians converge, guide meridians and standard parallels (correction lines) are run every 24 miles, and the excess/deficiency is thrown into the north and west tiers of sections and lots.

Aliquot parts read smallest-to-largest: a quarter section is nominally 160 acres, a quarter-quarter 40 acres; government lots cover irregular and fractional sections.

Existent and obliterated corners are recovered from evidence; only a truly lost corner is restored by proportionate measurement — single proportion on a line, double proportion at a four-way interior corner.

Last updated: June 2026

Public Land Survey System Essentials

The Public Land Survey System (PLSS) is the rectangular survey framework covering most of the U.S. west of the original colonies. FS questions ask you to interpret a description such as "the NE 1/4 of the SW 1/4 of Section 12, Township 3 North, Range 4 West," to compute aliquot acreage, or to explain why a section is not exactly 640 acres. The focus is conceptual and applied, not memorizing the entire BLM manual.

PLSS surveys are referenced to a principal meridian (a north-south line) and a baseline (an east-west line). A township is nominally a 6-mile by 6-mile block, located by township number north or south of the baseline and range number east or west of the meridian. Each township is divided into 36 sections , numbered in a boustrophedon ("ox-turning," serpentine) pattern: Section 1 sits in the NE corner , numbering runs west to Section 6, drops down and runs east 7–12, and continues alternating to Section 36 in the SE corner .

  • PLSS term Meaning Nominal figure
  • Township 6 mi x 6 mi block 36 sq mi
  • Section One of 36 divisions 1 sq mi = 640 acres
  • Quarter section NE/NW/SE/SW 1/4 160 acres
  • Quarter-quarter e.g., NE 1/4 of SW 1/4 40 acres
  • Quarter corner Midpoint of a section line Set every 1/2 mile
  • Government lot Irregular/fractional parcel Variable

A normal section is 1 mile square and 640 acres , but real sections vary because of convergence, measurement limits, terrain, and original-survey adjustments. Nominal acreage is not treated as exact unless the facts support it.

Convergence, Correction Lines, and Aliquot Parts

Meridians converge toward the poles, so a perfect rectangular grid is impossible over large areas. To manage the distortion, guide meridians are run every 24 miles east and west of the principal meridian, and standard parallels (also called correction lines ) every 24 miles north and south of the baseline. The original surveys began in the SE corner of each township and made all sections a full mile square except those along the north and west sides , where the accumulated excess or deficiency was thrown.

That is why the north and west tiers carry the odd dimensions and most government lots — irregular parcels used where aliquot division is impractical or where a section borders water or a state line.

Aliquot descriptions read from the smallest part outward to the section . "The SW 1/4 of the NE 1/4" is not the same parcel as "the NE 1/4 of the SW 1/4." Work inward: locate the section, then the first fraction, then the next. A quarter section is nominally 160 acres, a quarter-quarter 40 acres, and smaller aliquot parts follow by halving and quartering. Quarter corners (set at the midpoint of each section line) and the center-of-section corner control the interior subdivision.

Existent, Obliterated, and Lost Corners

PLSS retracement restores original corners and lines, not an idealized grid. The corner classification is the single most tested PLSS concept:

  • Corner type Definition Recovery
  • Existent Position determinable from the original monument, accessories, notes, or testimony Accept it

Obliterated No trace of the monument remains, but its position is recoverable beyond reasonable doubt from collateral evidence Re-establish from evidence

Lost Position cannot be determined from any acceptable evidence Restore by proportionate measurement

The rule is to exhaust the search for existent or obliterated evidence (bearing trees, accessories, fences, testimony) before declaring a corner lost. Only a truly lost corner is mathematically restored.

Closing Corners, Standard Corners, and Meander Corners

The convergence machinery produces several special corner types the exam may name. A standard corner is set on a standard parallel (correction line) when the line north of it is first run; a closing corner is set later where a survey line from the south closes onto that already-established parallel. A closing corner therefore may not fall exactly opposite the standard corner — that offset is expected, not an error, and you do not move the original closing corner to "fix" it. Meander corners are set where a section line intersects a meanderable body of water, anchoring the meander line that approximates the shore.

Recognizing these labels keeps you from forcing the grid into a perfect rectangle.

Fractional sections and government lots arise along the north and west township tiers and along meandered water. A government lot is identified by number (Lot 1, Lot 2) with an acreage stated on the plat, because no clean aliquot fraction fits. When a description calls a government lot, use the plat acreage and the meander/section lines, not a presumed 40- or 160-acre block.

Proportionate Measurement

Single proportionate measurement restores a lost corner that lies on a single line between two existent corners — the excess or deficiency along that line is distributed proportionally between the controlling corners (a "two-way" proportion). Double proportionate measurement restores a lost interior corner controlled by four corners: the north and south corners fix the latitudinal (north-south) position, and the east and west corners fix the longitudinal (east-west) position.

The FS exam is far more likely to ask which method applies, and to insist that original evidence controls over ideal geometry — never move an original corner just to make a perfect square or force a section to exactly 640 acres.