Study guide

4.3 Deeds, Conveyances, and Description Elements

NCEES Fundamentals of Surveying FS

Track your progress as you read

Finished sections get a check mark.

1 Orientation: NCEES FS Exam Registration and Scoring

1.1 Official FS Identity and Licensure Purpose 1.2 CBT Delivery, Appointment Timing, and Breaks 1.3 Registration, Fees, Board Approval, and Scheduling 1.4 Reference Handbook, Calculator, and Exam Interface Habits 1.5 Scoring, Pass/Fail Results, and Diagnostics 1.6 First Study Plan From Official Content Areas

2 Surveying Processes, Instrumentation, Control, and Field Workflows

2.1 Instrumentation Selection, Setup, and Observation Quality 2.2 GNSS/GPS Survey Modes, Datums, and Field Checks 2.3 Control Surveys, Networks, Traverses, and Benchmarks 2.4 Topographic Surveys, Feature Coding, and Field Records 2.5 Construction, As-Built, and Land Development Workflows 2.6 Cadastral Field Workflows and Record Keeping

3 Mapping Processes: CAD, GIS, Photogrammetry, UAS, and LiDAR

3.1 Map Purpose, Scale, Symbols, and Generalization 3.2 Topographic Mapping, Contours, and Digital Terrain Models 3.3 CAD, BIM, and Plan Production Workflows 3.4 GIS Data Models, Coordinate Systems, and Attribute Quality 3.5 Photogrammetry, UAS, and Image Processing 3.6 LiDAR, Remote Sensing, and Mapping Quality Control

4 Boundary Law: Public Records, Deeds, and Evidence

4.1 Boundary Law Sources and the Surveyor's Role 4.2 Public Records Research and Indexing 4.3 Deeds, Conveyances, and Description Elements 4.4 Evidence Weighting: Monuments, Measurements, and Occupation 4.5 Chain of Title, Senior Rights, and Record Conflicts 4.6 Ownership Rights, Minerals, Encumbrances, and Survey Reporting

5 Boundary Law: Easements, PLSS, Water Law, and Conveyances

5.1 Common-Law Principles and Unwritten Rights 5.2 Easements, Licenses, and Rights-of-Way 5.3 Conveyances, Sequential and Simultaneous Rights 5.4 Metes and Bounds Descriptions and Monuments 5.5 PLSS Sections, Townships, and Restoration 5.6 Water Law: Riparian, Littoral, and Moving Boundaries 5.7 Encumbrances, Title Limitations, and Survey Reporting

6 Surveying Principles: Geodesy, Datums, Projections, and SPCS

6.1 Basic Surveying, Route Surveying, and Field Geometry 6.2 Geodesy, Earth Models, and Coordinate Systems 6.3 Horizontal and Vertical Datums 6.4 Map Projections, Convergence, and SPCS 6.5 Coordinate Transformations and Grid-Ground Reductions 6.6 Control Networks, Observation Reductions, and Quality

7 Survey Computations: Bearings, Traverses, Leveling, and COGO

7.1 Bearings, Azimuths, and Direction Conversions 7.2 Coordinate Geometry, Latitudes, and Departures 7.3 Traverse Closure, Error, and Relative Precision 7.4 Traverse Adjustment: Compass Rule and Transit Rule 7.5 Differential Leveling, Height of Instrument, and Closure 7.6 Trigonometric Leveling, Reciprocal Observations, and Spreadsheets

8 Survey Computations: Curves, Volumes, Least Squares, and Computer Applications

8.1 Horizontal Circular Curve Elements 8.2 Curve Staking, Deflections, Offsets, and Coordinate Points 8.3 Vertical Curves, Slopes, and Grades 8.4 Area Computations: Coordinate and Field Methods 8.5 Earthwork Volumes, Contours, and Mass Diagrams 8.6 Least Squares, Residuals, and Error Propagation 8.7 Computer Applications, Calculator, and Spreadsheet Quality Control

9 Applied Mathematics, Statistics, Measurement Science, and Error

9.1 Trigonometry and Right-Triangle Field Reductions 9.2 Analytical Geometry, Coordinate Systems, and Vectors 9.3 Calculus, Change Rates, and Area-Volume Reasoning 9.4 Linear Algebra, Adjustments, and Least-Squares Foundations 9.5 Probability, Statistics, and the Normal Distribution 9.6 Measurement Error, Propagation, Positional Accuracy, and Units

10 Business Concepts, Projects, Safety, Contracts, Ethics, and Communication

10.1 Project Planning, Scope, and Work Breakdown 10.2 Resource Management, Scheduling, and Cost Estimating 10.3 Safety, Risk Management, and Site Liability 10.4 Contracts, Liability, and Change Management 10.5 Supervision, Quality Control, and Records 10.6 Ethics, Communication, and Conflict Resolution

11 Integrated FS Domain Review, Handbook Pacing, and Diagnostics

11.1 Build an Integrated Domain Map 11.2 Reference Handbook Search Workflow 11.3 Approved Calculator Habits 11.4 Pace the 5 Hours 20 Minutes of Exam Time 11.5 Use Diagnostics After a Failed Attempt 11.6 Avoid Common Wrong-Answer Patterns

12 Full FS Scenarios, Final Readiness, and Post-Exam Next Steps

12.1 Mixed Boundary and COGO Scenario 12.2 Geodesy, Mapping, and Field Scenario 12.3 Business, Safety, and Ethics Scenario 12.4 Final Readiness Plan 12.5 Exam-Day Checklist 12.6 Post-Exam Next Steps After Pass or Fail

4.3 Deeds, Conveyances, and Description Elements

Key Takeaways Explain This Topic AI

A valid deed requires a competent grantor, an identifiable grantee, words of conveyance, an adequate land description, the grantor's signature, and delivery and acceptance.

General warranty deeds give the broadest covenants; special warranty deeds warrant only against the grantor's own acts; quitclaim deeds convey only the grantor's present interest, if any, with no warranty.

Land descriptions take several forms: metes and bounds, lot and block (platted), aliquot parts (PLSS), strip/right-of-way, and reference (incorporating another instrument).

Recording is not an element of validity: a deed is effective between the parties upon delivery and acceptance, even if never recorded.

Ambiguous descriptions are read for the intent of the parties using the whole instrument, not by isolating a single word or figure.

Last updated: June 2026

The Deed and Its Essential Elements

A deed is a written instrument that conveys an interest in real property from a grantor (the party transferring) to a grantee (the party receiving). For boundary work, the deed matters because it carries the legal description that identifies the land. To be valid, a deed must contain certain essential elements :

A competent grantor (legal age, sound mind, authority to convey).

An identifiable grantee named with reasonable certainty.

Words of conveyance (the granting clause—e.g., "grant, bargain, and sell").

An adequate legal description of the land.

The grantor's signature (the grantee does not sign).

Delivery and acceptance —the deed takes effect only when delivered by the grantor and accepted by the grantee.

Note what is not required for validity. Consideration need only be recited (often nominally, "$10 and other valuable consideration"); actual payment is not essential. Acknowledgment (notarization) is usually required only to record the deed, not to make it valid between the parties. And recording is never an element of validity —a delivered, accepted deed is fully effective between grantor and grantee even if it is never recorded. Recording protects the grantee against later claimants by giving constructive notice.

Types of Deeds and Their Warranties

The type of deed tells you what the grantor promises about title—important context, though the surveyor maps the land regardless of warranty type.

Deed type Warranty given Typical use

General warranty Warrants title against all defects, even those arising before the grantor owned the land Arms-length sales; broadest protection

Special (limited) warranty Warrants only against defects created by or under the grantor Estates, foreclosures, commercial sales

Bargain and sale Implies the grantor holds title but gives no general warranty; may pass after-acquired title Tax and estate transfers

Quitclaim No warranty at all; conveys only the grantor's present interest, if any Clearing clouds, transfers between known parties

A frequent exam trap: a quitclaim deed conveys whatever interest the grantor actually has—which could be nothing. It is not a statement that the grantor owns the land, only a release of any interest the grantor may hold. The habendum clause ("to have and to hold") follows the granting clause and defines or limits the estate conveyed; it cannot enlarge an estate beyond what the granting clause grants.

Forms of Land Description

Surveyors must recognize how the land is described, because each form is read differently:

Metes and bounds — a perimeter traverse of bearings (courses) and distances tied to monuments and adjoiners, closing on the point of beginning.

Lot and block — references a recorded subdivision plat ("Lot 6, Block 2, Sunset Addition"); the plat supplies the dimensions and monuments.

Aliquot parts (PLSS) — divisions of the Public Land Survey System (e.g., "the NE 1/4 of the SW 1/4 of Section 14").

Strip / right-of-way — describes a band of given width along a centerline.

Reference description — incorporates another instrument by reference ("the same land conveyed in Deed Book 412, Page 88").

When a description is ambiguous or conflicting , the surveyor reads it to find the intent of the parties , considering the whole instrument rather than seizing on one isolated figure. An apparent error in one call does not void the deed if the intended land can still be located from the remaining evidence. This sets up the priority-of-calls rules that resolve direct conflicts among monuments, courses, distances, and area, covered in the next section.

Anatomy of a Deed and Reading Descriptions

A typical deed is organized into recognizable parts, and a surveyor should be able to name each and know which carries the land description:

  • Deed component Function
  • Premises / recitals Names the parties, date, and consideration
  • Granting clause The operative words of conveyance ("grant, bargain, sell")
  • Description Identifies the land—the surveyor's focus
  • Exceptions & reservations Carves out interests retained or previously conveyed
  • Habendum clause "To have and to hold"; defines/limits the estate
  • Execution Grantor's signature, acknowledgment, and date

Two terms are routinely confused on the exam. An exception withholds from the conveyance a part of the described land or an existing interest ("less and except the north 30 feet"), while a reservation creates a new right in the grantor's favor (such as a reserved easement) that did not exist before. Both reduce what the grantee effectively receives, but they operate differently.

When reading a metes-and-bounds description, the surveyor follows the courses and distances in sequence from the point of beginning (POB) , watching for calls to monuments and adjoiners that may control over the stated dimensions. A well-written description closes —the last course returns to the POB. If it does not close, or if a call is internally inconsistent, the surveyor flags the discrepancy and looks to the controlling evidence (typically monuments) rather than blindly trusting the numbers.

The guiding rule throughout is to give effect to the intent of the parties read from the four corners of the whole instrument, harmonizing every call where possible and discarding only a call that cannot be reconciled.