Study guide

8.3 Vertical Curves, Slopes, and Grades

NCEES Fundamentals of Surveying FS

Track your progress as you read

Finished sections get a check mark.

1 Orientation: NCEES FS Exam Registration and Scoring

1.1 Official FS Identity and Licensure Purpose 1.2 CBT Delivery, Appointment Timing, and Breaks 1.3 Registration, Fees, Board Approval, and Scheduling 1.4 Reference Handbook, Calculator, and Exam Interface Habits 1.5 Scoring, Pass/Fail Results, and Diagnostics 1.6 First Study Plan From Official Content Areas

2 Surveying Processes, Instrumentation, Control, and Field Workflows

2.1 Instrumentation Selection, Setup, and Observation Quality 2.2 GNSS/GPS Survey Modes, Datums, and Field Checks 2.3 Control Surveys, Networks, Traverses, and Benchmarks 2.4 Topographic Surveys, Feature Coding, and Field Records 2.5 Construction, As-Built, and Land Development Workflows 2.6 Cadastral Field Workflows and Record Keeping

3 Mapping Processes: CAD, GIS, Photogrammetry, UAS, and LiDAR

3.1 Map Purpose, Scale, Symbols, and Generalization 3.2 Topographic Mapping, Contours, and Digital Terrain Models 3.3 CAD, BIM, and Plan Production Workflows 3.4 GIS Data Models, Coordinate Systems, and Attribute Quality 3.5 Photogrammetry, UAS, and Image Processing 3.6 LiDAR, Remote Sensing, and Mapping Quality Control

4 Boundary Law: Public Records, Deeds, and Evidence

4.1 Boundary Law Sources and the Surveyor's Role 4.2 Public Records Research and Indexing 4.3 Deeds, Conveyances, and Description Elements 4.4 Evidence Weighting: Monuments, Measurements, and Occupation 4.5 Chain of Title, Senior Rights, and Record Conflicts 4.6 Ownership Rights, Minerals, Encumbrances, and Survey Reporting

5 Boundary Law: Easements, PLSS, Water Law, and Conveyances

5.1 Common-Law Principles and Unwritten Rights 5.2 Easements, Licenses, and Rights-of-Way 5.3 Conveyances, Sequential and Simultaneous Rights 5.4 Metes and Bounds Descriptions and Monuments 5.5 PLSS Sections, Townships, and Restoration 5.6 Water Law: Riparian, Littoral, and Moving Boundaries 5.7 Encumbrances, Title Limitations, and Survey Reporting

6 Surveying Principles: Geodesy, Datums, Projections, and SPCS

6.1 Basic Surveying, Route Surveying, and Field Geometry 6.2 Geodesy, Earth Models, and Coordinate Systems 6.3 Horizontal and Vertical Datums 6.4 Map Projections, Convergence, and SPCS 6.5 Coordinate Transformations and Grid-Ground Reductions 6.6 Control Networks, Observation Reductions, and Quality

7 Survey Computations: Bearings, Traverses, Leveling, and COGO

7.1 Bearings, Azimuths, and Direction Conversions 7.2 Coordinate Geometry, Latitudes, and Departures 7.3 Traverse Closure, Error, and Relative Precision 7.4 Traverse Adjustment: Compass Rule and Transit Rule 7.5 Differential Leveling, Height of Instrument, and Closure 7.6 Trigonometric Leveling, Reciprocal Observations, and Spreadsheets

8 Survey Computations: Curves, Volumes, Least Squares, and Computer Applications

8.1 Horizontal Circular Curve Elements 8.2 Curve Staking, Deflections, Offsets, and Coordinate Points 8.3 Vertical Curves, Slopes, and Grades 8.4 Area Computations: Coordinate and Field Methods 8.5 Earthwork Volumes, Contours, and Mass Diagrams 8.6 Least Squares, Residuals, and Error Propagation 8.7 Computer Applications, Calculator, and Spreadsheet Quality Control

9 Applied Mathematics, Statistics, Measurement Science, and Error

9.1 Trigonometry and Right-Triangle Field Reductions 9.2 Analytical Geometry, Coordinate Systems, and Vectors 9.3 Calculus, Change Rates, and Area-Volume Reasoning 9.4 Linear Algebra, Adjustments, and Least-Squares Foundations 9.5 Probability, Statistics, and the Normal Distribution 9.6 Measurement Error, Propagation, Positional Accuracy, and Units

10 Business Concepts, Projects, Safety, Contracts, Ethics, and Communication

10.1 Project Planning, Scope, and Work Breakdown 10.2 Resource Management, Scheduling, and Cost Estimating 10.3 Safety, Risk Management, and Site Liability 10.4 Contracts, Liability, and Change Management 10.5 Supervision, Quality Control, and Records 10.6 Ethics, Communication, and Conflict Resolution

11 Integrated FS Domain Review, Handbook Pacing, and Diagnostics

11.1 Build an Integrated Domain Map 11.2 Reference Handbook Search Workflow 11.3 Approved Calculator Habits 11.4 Pace the 5 Hours 20 Minutes of Exam Time 11.5 Use Diagnostics After a Failed Attempt 11.6 Avoid Common Wrong-Answer Patterns

12 Full FS Scenarios, Final Readiness, and Post-Exam Next Steps

12.1 Mixed Boundary and COGO Scenario 12.2 Geodesy, Mapping, and Field Scenario 12.3 Business, Safety, and Ethics Scenario 12.4 Final Readiness Plan 12.5 Exam-Day Checklist 12.6 Post-Exam Next Steps After Pass or Fail

8.3 Vertical Curves, Slopes, and Grades

Key Takeaways Explain This Topic AI

Grade is rise over run expressed as percent; the algebraic grade difference is A = g2 − g1 (signs included).

An equal-tangent parabolic vertical curve has its PVI midway in station between PVC and PVT.

Curve elevation y = elev_PVC + g1·x + (A/200L)·x², with x in feet from the PVC and g1, g2 in percent.

The high or low point falls at x = −g1·L/A measured from the PVC, where the curve grade is zero.

K = L/A is the horizontal length per 1% of grade change and is the design parameter tied to sight distance.

Last updated: June 2026

Grades and the Equal-Tangent Parabola

Slopes and grades appear in the FS Survey Computations area in both pure-math and field-layout contexts. Grade (g) is rise over horizontal run, almost always written as a percent: a line rising 6.0 ft over 300 ft has g = (6.0/300)×100 = +2.0% . Uphill in the direction of stationing is positive; downhill is negative — sign control is the heart of vertical-curve problems.

A vertical curve smoothly joins an incoming grade g1 to an outgoing grade g2 . The standard is a parabola , chosen because its rate of grade change is constant, giving a constant vertical acceleration. The curve runs from the PVC (point of vertical curvature) through the PVI (point of vertical intersection of the two tangent grades) to the PVT (point of vertical tangency). An equal-tangent curve has the PVI exactly midway in station between PVC and PVT, so the PVC is L/2 before the PVI and the PVT is L/2 after it (L = total curve length, measured horizontally).

  • Term Meaning
  • g1, g2 Incoming, outgoing grades (percent, signed)
  • A Algebraic grade difference, g2 − g1
  • L Horizontal curve length (stations or feet)
  • K L/A, length per 1% grade change
  • PVC / PVI / PVT Begin / intersection / end of curve

A crest curve has the road grade decreasing (A negative); a sag curve has it increasing (A positive).

Elevation Along the Curve

The elevation of any point on an equal-tangent parabolic curve, measured by horizontal distance x in feet from the PVC , is:

y = elev_PVC + g1·x + (A / 200L)·x²

where g1 and A are in percent and L is in feet. The term g1·x is the elevation the back tangent would have at x; the (A/200L)x² term is the parabolic offset of the curve from that tangent. (The 200 arises from dividing the percent grades by 100 and the average-grade-change factor of 2.)

Worked example

A crest curve has g1 = +3.00%, g2 = −2.00%, L = 600 ft, with the PVC at station 30+00 and elevation 248.00 ft. Then A = g2 − g1 = −2.00 − 3.00 = −5.00% .

Elevation at station 33+00 (x = 300 ft from PVC):

  • Tangent term: g1·x = (3.00/100)(300) = +9.00 ft
  • Parabola term: (A/200L)x² = (−5.00 / (200·600))(300²) = (−5.00/120000)(90000) = −3.75 ft
  • y = 248.00 + 9.00 − 3.75 = 253.25 ft

The rate of grade change is r = A/L = −5.00/600 = −0.00833% per ft, constant along the parabola — a defining property the exam may test directly.

High and Low Points and K Value

On a crest curve the high point (and on a sag curve the low point ) is where the curve grade equals zero. Setting the derivative of the elevation equation to zero gives the turning-point station , measured from the PVC:

x_turn = −g1·L / A (equivalently x_turn = g1·K, with K = L/A)

For the example (g1 = +3.00, A = −5.00, L = 600): x_turn = −(3.00)(600)/(−5.00) = 360 ft from the PVC → station 33+60. The high-point elevation is found by substituting x = 360 ft into the elevation equation. Note the turning point exists on the curve only when g1 and g2 have opposite signs; if both grades are the same sign there is no interior high or low point.

The K value , K = L/A, is the horizontal length needed per 1% of grade change. A K of 100 means 100 ft of curve for each 1% of A. K directly links curve geometry to stopping sight distance in highway design: longer K means a flatter, safer crest or sag. Designers select a minimum K from AASHTO tables for the design speed, then set L = K·A.

Common traps

Forgetting that A = g2 − g1 carries signs (a +3% to −2% transition gives A = −5%, not +1%).

Using x in stations when the formula expects feet (or vice versa) — keep units consistent.

Assuming the high point is at mid-curve; it only lands at L/2 when g1 = −g2.

PVI, Tangent-Offset, and Profile Checks

A second, equivalent way to think about the parabola is the tangent-offset view, which the FS handbook also presents. The vertical offset e from the tangent at the PVI (the midpoint of an equal-tangent curve) is the maximum offset, equal to:

e = A·L / 800 (with A in percent, L in feet)

and the offset at any distance x from the PVC scales as the square of the fractional distance: offset = e·(x/(L/2))² along the first half. For the earlier crest curve (A = −5.00%, L = 600 ft), e = (−5.00)(600)/800 = −3.75 ft — the curve lies 3.75 ft below the tangent intersection at mid-curve, matching the elevation computation.

Elevation of the PVI and PVT

The PVI elevation is found by projecting the back tangent: elev_PVI = elev_PVC + g1·(L/2). The PVT elevation is elev_PVI + g2·(L/2), or equivalently elev_PVC + g1·(L/2) + g2·(L/2). These give independent endpoints to check a full profile.

  • Quantity Formula
  • Mid-curve offset e A·L/800
  • PVI elevation elev_PVC + g1·(L/2)
  • PVT elevation elev_PVI + g2·(L/2)
  • Turning-point station x = −g1·L/A from PVC
  • Why surveyors compute these

Vertical curve elevations feed construction stakeout of finished grade, drainage checks (a sag low point is where water collects, so its elevation sets inlet placement), and clearance verification on crests. A surveyor laying out a profile computes elevations at each 50-ft or 25-ft station, not just the endpoints, so fluency with y = elev_PVC + g1·x + (A/200L)x² across a whole station list is the practical skill the exam samples with a single representative point.