23.1 Installing Air-Cooled & Water-Cooled Condensers

Florida HVAC Contractor License Class A/B

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Exam Overview

1.1 Current Exam Facts & License Classes 1.2 Exam Format, Open-Book Rules & Pearson VUE 1.3 Eligibility, Experience Paths & Financial Responsibility

2 Establishing the Contracting Business

2.1 Business Organizational Structure 2.2 Business Plan, Marketplace & License Scope 2.3 Professionals, Fixed Assets & Bonding

3 Insurance for Florida HVAC Contractors

3.1 Obtaining Insurance (GL, Workers' Compensation & Bonds) 3.2 Coverages, Limits & Policy Language 3.3 Maintaining Insurance & CILB Certificate-Holder Rules

4 Overhead, Staffing & Markets

4.1 Developing the Business, Staffing & Markets 4.2 Determining Business Overhead (FICA, FUTA, SUTA, Workers' Comp, Rent & Utilities) 4.3 Determining Outsourced Services

5 Bids, Proposals & Estimating

5.1 Preparing Bids and Proposals 5.2 AIA Documents, Offers & Contract Components 5.3 Labor Productivity, Overhead & Project Costing

6 Purchasing, Invoices, Draws & Safety Programs

6.1 Purchasing Materials, UCC & Inventory (FIFO) 6.2 Invoices, Draw Requests & Percentage of Completion 6.3 Developing a Safety Program (OSHA, SDS & Drug Testing)

7 Managing Contracts

7.1 Contract Law, Scope & Completion Schedules 7.2 Florida Lien Law Inside Contracting 7.3 Mediation, Arbitration, Tort Law & Risk

8 Managing Trade Operations

8.1 Scheduling Trade Operations (CPM, RFI & Submittals) 8.2 OSHA Records, Document Retainage & Penalties 8.3 Takeoffs, Equipment Lease vs Purchase & Inventory

9 Accounting I: Receivables, Payables & Cash

9.1 Managing Accounts Receivable 9.2 Managing Accounts Payable & Discounts 9.3 Cash Flow, Banking & Financial Ratios

10 Accounting II: Taxes, Job Cost & Payroll

10.1 Filing Tax Forms & Returns 10.2 Tracking Job Costs 10.3 Payroll, Employment Taxes & Garnishments

11 Managing Human Resources

11.1 Hiring, I-9, Background Checks & Discrimination 11.2 HR Policies, OSHA & Drug-Test Chain of Custody 11.3 Evaluating Employees

12 Florida Contractor Law: Chapter 489 & 61G4

12.1 Chapter 489: Certified vs Registered & Qualifying Agents 12.2 61G4 Board Rules, Advertising & Discipline 12.3 Qualifying Agent Duties, Supervision & Additional Entities

13 Florida Construction Lien Law (Chapter 713)

13.1 Construction Lien Overview & Claimants 13.2 Notices to Owner, Time Limits & Perfecting Liens 13.3 Payment Bonds, Waivers & Claims of Lien

14 Financial Responsibility, CE & Federal Rules

14.1 Financial Responsibility & the 660 FICO Rule 14.2 Continuing Education & Biennial Renewal 14.3 Federal Employment, Immigration, OSHA & Environmental Rules

15 Plans, Specs & Equipment Selection

15.1 Reading Plans, Specifications, Symbols & Scales 15.2 Recommending Plan Changes & Equipment Types 15.3 EER, SEER, ARI Listings & Cost Effectiveness

16 Energy Codes, Loads & Thermal Resistance

16.1 Florida Energy Codes, R-Values & U-Factors 16.2 Determining HVAC Heating & Cooling Loads 16.3 Applying Energy Conservation, Fan Curves & Pump Curves

17 HVAC System & Duct Design

17.1 Designing HVAC Systems (Psychrometrics, Enthalpy & Airflow) 17.2 Designing Duct Systems & Insulation 17.3 Selecting Equipment, Location & Codes

18 Piping, Pumps, Boilers, Controls & Rigging Design

18.1 Pipe Sizing, Valves, Fittings, Sealants & Layout 18.2 Control Requirements, Fan Motors, CFM & Compressor Capacity 18.3 Pumps, Boilers, Steam, Fuel & Pipe Insulation 18.4 Grease Ducts, Live Loads, Rigging & Mechanical Equipment

19 Sheet Metal Duct Fabrication

19.1 Fabricating Rectangular & Round Ducts 19.2 Seams, Locks, Taping, Mastics & Liners 19.3 Fittings, Outlets & Grilles 19.4 Kitchen Hoods, Exhausts & Drain Pans

20 Split, Package & Heat Pump Installation

20.1 Installing Split & Package Air Conditioners 20.2 Installing Split & Package Heat Pumps 20.3 Air-Cooled vs Water-Cooled Systems

21 Large Systems, Chillers & Towers

21.1 Installing by Tonnage & Class A vs Class B Limits 21.2 Chilled Water, Water Towers & Secondary Coolant 21.3 Centrifugal, Absorption & Ammonia Systems

22 Refrigeration, Coolers, Ventilation & Controls Install

22.1 Low, Medium & Ultra-Low Temperature Systems & EPA Rules 22.2 Walk-In & Reach-In Coolers 22.3 Ventilation, Exhaust, Makeup Air, Grease Ducts & Kitchen Exhaust 22.4 Geothermal, Pneumatic & DDC Controls, TAB & Smoke Tests

23 Condensers, Compressors & Air Handlers

23.1 Installing Air-Cooled & Water-Cooled Condensers 23.2 Hermetic, Semi-Hermetic & Centrifugal Compressors 23.3 Air Handlers, Evaporators, Heat Exchangers, Receivers & Heat Strips

24 Duct, Fans, Filters & Terminals

24.1 Installing Sheet Metal, Fiberglass & Flexible Duct 24.2 Fans, Blowers, Motors, Grilles, Registers & Fire Dampers 24.3 Filters, Flues, Warm-Air, Gas & Fuel-Oil Appliances

25 Refrigerant Piping & Joining

25.1 Refrigerant Piping, Copper Tubing & Pipe Sizing 25.2 Brazing, Welding, Flaring, Swaging & Soldering 25.3 Steel Pipe, Plastic Pipe, Threading & Oxy-Acetylene 25.4 Hangers, Supports, Horizontally Supported Piping & Pressure Testing

26 Metering Devices & Line Components

26.1 TXVs, Capillary Tubes, Reversing Valves & Metering Devices 26.2 Liquid, Suction & Heat-Pump Dryers, Filters & Oil Traps 26.3 Receivers, Heat Strips, Gas/Oil Appliances & Related Accessories

27 Controls Installation

27.1 Pressure, Temperature, Humidity & Bellows Controls 27.2 Thermostats, Humidistats, Pneumatic & Solid-State Controls 27.3 Transformers, Capacitors, Contactors, Relays & Safety Disconnects 27.4 Defrost Components, Starters, Solenoids & Limit Switches

28 Motors, Wiring & Electrical Installation

28.1 Wiring Single-Phase & Three-Phase Equipment 28.2 Motor Types, Protection, Controllers, Belts & Pulleys 28.3 Geothermal Loops, Surge Protectors, Phase Monitors & Plastic Pipe

29 Diagnostic Analysis: Refrigeration

29.1 Pressure-Enthalpy Diagrams & Operating Pressures 29.2 Air Volumes, Enthalpy, Wet-Bulb & Dry-Bulb 29.3 Leak Detection & Refrigeration Test Instruments

30 Diagnostic Analysis: Electrical & Instruments

30.1 Current Draw, Voltage, Power & Motor Terminals 30.2 Testing Relays, Capacitors, Starters, Transformers & Defrost Stats 30.3 Using Amprobes, Velometers, Pitot Tubes, Manometers & Gauges

31 Recovery, Repair & Calibration

31.1 Nitrogen & Gas Regulators, Recovery & Retrofit 31.2 Repairing Hermetic, Semi-Hermetic, Centrifugal Compressors & Blowers 31.3 Calibrating Thermostats, Pressure Switches & Pneumatic Controls 31.4 Superheat, Safety Cutouts, Defrost Clocks & Freezer Controls

32 Mechanical Service & Cleaning

32.1 Belts, Pulleys, Motor Rotation & Seized Compressors 32.2 Crankcase & Evaporator Pressure Regulators & Unloaders 32.3 Cleaning Towers, Condensers, Foreign Matter & Condensate Drains

33 Jobsite Safety & Equipment

33.1 PPE: Hearing, Head, Eye, Face & Respiratory Protection 33.2 Lockout/Tagout, Warning Signs, Toxic Materials & Ventilation 33.3 Rigging, Hoists, Cranes, Forklifts, Backhoes & Excavation 33.4 Ladders, Scaffolds, Tools & Air Compressors

34 Energy Management

34.1 Envelope, Duct Pressure & Blower-Door Testing 34.2 Efficient Equipment, Zoning, ERVs, Wi-Fi Thermostats & Green Buildings 34.3 Energy Forms, R/U Factors, Window Heat Gain & Florida Load Calcs

35 Indoor Air Quality

35.1 Ventilation, Filtration, Humidity, UV & Air Cleaners 35.2 Contaminants, Source Control, TAB & Human Health Effects

23.1 Installing Air-Cooled & Water-Cooled Condensers

Key Takeaways Explain This Topic AI

Air-cooled condensers reject heat to outdoor air. Set them on an FBC Mechanical 304.10 pad (3 inches above grade, or suspended 6 inches) and restrain them for 301.15 wind; HVHZ (Miami-Dade/Broward) adds product-approval anchorage, it does not waive the pad.

Water-cooled condensers reject heat to condenser water. Heat of rejection is about 15,000 Btu/h per ton, so condenser flow is about 3 gpm per ton at a 10°F range: GPM = Btu/h ÷ (500 × ΔT). The 2.4 gpm/ton figure is evaporator flow, not condenser flow.

Refrigerant piping is metal (ACR copper on comfort-cooling circuits). Listed PVC/CPVC belongs on condenser-water or tower piping only — never on the refrigerant circuit.

Secondary coolant is the water, brine, or glycol that carries heat outside the refrigerant circuit; the refrigerant stays in the condenser or evaporator barrel.

Class B still installs these condensers only through 25 tons of cooling and 500,000 Btu of heating in any one system (F.S. 489.105(3)(g)). A 30-ton water-cooled package or a 40-ton remote air-cooled condenser on one circuit is Class A.

Last updated: August 2026

23.1 Installing Air-Cooled & Water-Cooled Condensers

Trade Area D ( Equipment Component Installation ) is 14 percent of both Class A and Class B . The first numbered cluster is the condenser as a component : air-cooled condensers , then water-cooled condensers including water towers , secondary coolant , metal and plastic pipe , fittings , and refrigerants . Chapter 20 taught air-cooled versus water-cooled systems . Chapter 21 taught chilled-water plants and towers as Trade C install. This section is the Trade D job of setting the heat-rejection vessel , piping it with the right material, and keeping Florida wind, pads, and flood honest. The 2026 Air Conditioning CBT books are Refrigeration & Air Conditioning Technology , 9th Edition (2021), Florida Building Code — Mechanical, 2023 (including Section 908 ), and Pipefitters Handbook , 3rd Edition (1967) for the water side.

Quick Answer: An air-cooled condenser dumps heat to outdoor air and lives on a 304.10 pad with 301.15 wind anchors. A water-cooled condenser dumps heat to water at about 3 gpm per ton for a 10°F range because heat of rejection is about 15,000 Btu/h per ton , not 12,000. Refrigerant piping is metal . PVC is condenser- water pipe, never the circuit. Class B still stops at 25 tons / 500,000 Btu in any one system .

Why the condenser is its own install item

The condenser is where the refrigeration cycle rejects heat. Starve it of air or water and discharge pressure rises, capacity falls, and the high-pressure control trips. Trade D scores whether you can install that component : orientation, listing clearances, piping materials, tower connection, and refrigerant compatibility — not whether you can spell SEER2.

Class A (F.S. 489.105(3)(f) ) is unlimited in capacity. Class B ( 489.105(3)(g) ) is 25 tons cooling and 500,000 Btu heating in any one system . A 40-ton remote air-cooled condenser on one refrigerant circuit is a Class A component even if someone calls the box “just a coil on the roof.” Two independent 20-ton circuits with two condensers can be Class B. Count the connected system , the same way Chapter 21 counted chillers.

Air-cooled condensers — coil, fan, pad, and Florida wind

An air-cooled condenser is a finned coil plus one or more fans. Hot discharge vapor enters; outdoor air carries the heat away; liquid leaves, often through a subcooling pass. Construction details that change the install:

Airflow path. Entering air must be outdoor air, not the unit’s own discharge. Listing side, top, and discharge clearances are part of the listing, not landscaping suggestions. A 12-inch side yard when the IOM says 24 inches recirculates hot air, raises condensing temperature, and is an install defect on a 95°F Florida afternoon.

Pad and elevation. FBC Mechanical 304.10: equipment at grade on a level concrete slab or other approved material extending not less than 3 inches above adjoining grade, or suspended not less than 6 inches . Pavers, loose gravel, and a rotting wood crate are not 304.10. Roof sets use a listed curb or dunnage that carries operating weight plus service live load.

Wind. 301.15: appliances and supports resist FBC Building wind pressures. Listed straps, clips, through-bolts, and hurricane kits are the method. HVHZ (Miami-Dade and Broward) adds product-approval discipline; the rest of Florida still does not get an unanchored condensing unit on a pad. A tropical-storm gust does not care that the cabinet “is heavy.”

Flood. 301.16: elevation in flood hazard areas follows the flood provisions — a slab at grade in a VE zone is not a clever shortcut.

Remote condensers. Vertical lift, liquid drain, and equalizers follow the manufacturer. Trap oil in a cold vertical riser and you starve the compressor. Nitrogen-purge brazing belongs to Chapter 25; the Trade D point is that the remote coil is still a condenser and still 301.15.

Air-cooled machines do not need condenser-water pumps or 908 blowdown. They do still need evaporator 307 condensate indoors. Do not invent a condenser-fan drain.

Worked pad/wind check. A Jacksonville (Duval, Climate Zone 2A , not HVHZ) 5-ton condensing unit: slab 3 inches above grade, listed hold-downs into the concrete, manufacturer 24-inch discharge clearance off a stucco wall. The same cabinet in Miami-Dade (HVHZ, Zone 1A) still needs the 3-inch slab and HVHZ-approved anchorage. Moving the unit 80 miles south does not relax 304.10; it tightens the wind paperwork.

Water-cooled condensers — barrels, towers, secondary coolant, pipe

A water-cooled condenser transfers refrigerant heat into a water stream. Common vessels:

  • Construction Typical use What the installer must not confuse
  • Tube-in-tube / coaxial Small packaged water-cooled units Water usually in the inner tube; clean the water side

Shell-and-tube Commercial condensers and chiller barrels Water in the tubes (brushable); refrigerant in the shell on a typical condenser

Shell-and-coil Smaller commercial The coil is not cooling-tower fill

Evaporative condenser Refrigerant in a coil, water sprayed, air drawn through An FBC 908 appliance — tower and condenser together

Air-cooled (contrast) Splits, RTUs, remote coils No condenser water; still 301.15 / 304.10

Secondary coolant is the water, brine, or glycol that moves heat outside the refrigerant circuit. On a water-cooled condenser the condenser water is that coolant on the heat-rejection side. Chilled water is the coolant on the load side (Chapter 21). The refrigerant stays in the machine. Do not call tower water “refrigerant,” and do not run R-410A in PVC.

Heat of rejection is evaporator cooling plus compressor work . One refrigeration ton is 12,000 Btu/h at the evaporator. At a textbook electric-machine COP near 4 , compressor work is about 3,000 Btu/h per ton , so the condenser must reject about 15,000 Btu/h per ton . Condenser-water flow:

GPM = Btu/h 500 × Δ T \text{GPM} = \dfrac{\text{Btu/h}}{500 \times \Delta T} GPM = 500 × Δ T Btu/h ​

At a 10°F range :

15,000 ÷ ( 500 × 10 ) = 3.0 gpm per ton 15{,}000 \div (500 \times 10) = 3.0\ \text{gpm per ton} 15 , 000 ÷ ( 500 × 10 ) = 3.0 gpm per ton

Chilled-water (evaporator) flow at 10°F ΔT remains about 2.4 gpm per ton (12,000 ÷ 5,000). Mixing those two numbers undersizes the condenser loop by 20 percent . Chapter 20 used 2.4 as a cooling-ton planning number on small packages; Trade D’s water-cooled condenser question wants the heat-of-rejection flow.

Worked condenser flow. A 20-ton water-cooled package — legal Class B if it is one system under 500,000 Btu heat — at 10°F range:

GPM ≈ 20 × 3 = 60 gpm \text{GPM} \approx 20 \times 3 = 60\ \text{gpm} GPM ≈ 20 × 3 = 60 gpm

Using the evaporator 2.4 by habit gives 48 gpm and a tower or pump that cannot reject the compressor heat. A 40-ton barrel is about 120 gpm and is Class A .

Water towers (FBC 908 ): support, overflow and blowdown to an approved location, makeup, and placement so drift and discharge air do not enter intakes or the tower’s own inlet. Range is inlet minus outlet water (often 95/85°F , 10°F). Approach is leaving water minus entering wet-bulb . Leaving water cannot go below wet-bulb. Forced-draft pushes ; induced-draft pulls . Chapter 21 is the hydronic deep-dive; Trade D’s extra job is connecting the condenser barrel to that loop with the right pipe .

Metal pipe, plastic pipe, fittings, refrigerants

Refrigerant piping is metal : ACR copper on comfort-cooling HFC/HFO circuits, steel on ammonia (Class A industrial). Fittings on the refrigerant side are brazed , flared where listed, or manufacturer mechanical joints — not PVC solvent weld.

Condenser water and tower water may be copper, steel, or listed plastic (PVC/CPVC is common on open tower water at about 85–95°F). Grooved, threaded, and solvent-weld fittings follow the water spec, not the refrigerant spec. Plastic on the refrigerant circuit is an automatic wrong answer. Hot hydronic heating water is not automatically a PVC job either — temperature and listing matter. F.S. 489.105 still fences potable building water to plumbing contractors; condenser-water makeup with backflow is coordinated ( 301.11 points plumbing connections to the Florida Plumbing Code), not a license to rough the domestic riser.

Refrigerant selection at the condenser: high-side design pressure of the vessel and the relief must match the refrigerant. R-410A / R-454B high-side ratings are not R-22 ratings. Oil follows the refrigerant (POE with most HFCs). A water-cooled receiver-condenser still needs relief piped per Chapter 11 , not dumped into a return plenum.

Water-regulating valves on once-through or city-water condensers open on rising head pressure. Once-through potable water is wasteful and still needs backflow . Recirculating tower water is the usual plant.

Florida scenario

Gulf Breeze Mechanical, certified Class B in Hillsborough, bids two jobs the same week. Job 1 is a 5-ton air-cooled condensing unit on a Tampa slab: 3-inch pad, listed straps, 24-inch clearance, line set in ACR copper. That is Class B Trade D. Job 2 is a 30-ton water-cooled package with a roof tower, Schedule 80 PVC condenser-water mains, and a shell-and-tube condenser. Cooling is 30 tons in one system — over the Class B 25-ton cap — so the qualifier cannot contract it. What the Class B candidate still has to know is why that condenser loop is about 90 gpm at 10°F range (30 × 3), why the PVC is legal on the water and illegal if a helper solvents it onto a liquid line , why the tower is a 908 appliance with 301.15 wind, and why a salesman who sized the pump at 2.4 gpm/ton bought a 20 percent-short condenser circuit. The Class A shop that takes Job 2 still lands control wiring and dedicated HVAC-circuit work under 489.105; a new 460-volt feeder to the tower fan and condenser pump is an electrical contractor .

Traps: (1) Using 2.4 gpm/ton on the condenser . (2) PVC on refrigerant . (3) Unanchored Florida condensers. (4) Treating a 30-ton water-cooled package as Class B because “the tower is separate.” (5) Skipping listing clearances on air-cooled coils. (6) Calling tower water the refrigerant.

Heat per refrigeration ton at a typical electric-machine COP (Btu/h)

Loading diagram... Air-cooled vs water-cooled condenser: where the heat goes, and which pipe is legal