Study guide
27.4 Defrost Components, Starters, Solenoids & Limit Switches
Florida HVAC Contractor License Class A/B
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 Current Exam Facts & License Classes 1.2 Exam Format, Open-Book Rules & Pearson VUE 1.3 Eligibility, Experience Paths & Financial Responsibility
2 Establishing the Contracting Business
2.1 Business Organizational Structure 2.2 Business Plan, Marketplace & License Scope 2.3 Professionals, Fixed Assets & Bonding
3 Insurance for Florida HVAC Contractors
3.1 Obtaining Insurance (GL, Workers' Compensation & Bonds) 3.2 Coverages, Limits & Policy Language 3.3 Maintaining Insurance & CILB Certificate-Holder Rules
4 Overhead, Staffing & Markets
4.1 Developing the Business, Staffing & Markets 4.2 Determining Business Overhead (FICA, FUTA, SUTA, Workers' Comp, Rent & Utilities) 4.3 Determining Outsourced Services
5 Bids, Proposals & Estimating
5.1 Preparing Bids and Proposals 5.2 AIA Documents, Offers & Contract Components 5.3 Labor Productivity, Overhead & Project Costing
6 Purchasing, Invoices, Draws & Safety Programs
6.1 Purchasing Materials, UCC & Inventory (FIFO) 6.2 Invoices, Draw Requests & Percentage of Completion 6.3 Developing a Safety Program (OSHA, SDS & Drug Testing)
7 Managing Contracts
7.1 Contract Law, Scope & Completion Schedules 7.2 Florida Lien Law Inside Contracting 7.3 Mediation, Arbitration, Tort Law & Risk
8 Managing Trade Operations
8.1 Scheduling Trade Operations (CPM, RFI & Submittals) 8.2 OSHA Records, Document Retainage & Penalties 8.3 Takeoffs, Equipment Lease vs Purchase & Inventory
9 Accounting I: Receivables, Payables & Cash
9.1 Managing Accounts Receivable 9.2 Managing Accounts Payable & Discounts 9.3 Cash Flow, Banking & Financial Ratios
10 Accounting II: Taxes, Job Cost & Payroll
10.1 Filing Tax Forms & Returns 10.2 Tracking Job Costs 10.3 Payroll, Employment Taxes & Garnishments
11 Managing Human Resources
11.1 Hiring, I-9, Background Checks & Discrimination 11.2 HR Policies, OSHA & Drug-Test Chain of Custody 11.3 Evaluating Employees
12 Florida Contractor Law: Chapter 489 & 61G4
12.1 Chapter 489: Certified vs Registered & Qualifying Agents 12.2 61G4 Board Rules, Advertising & Discipline 12.3 Qualifying Agent Duties, Supervision & Additional Entities
13 Florida Construction Lien Law (Chapter 713)
13.1 Construction Lien Overview & Claimants 13.2 Notices to Owner, Time Limits & Perfecting Liens 13.3 Payment Bonds, Waivers & Claims of Lien
14 Financial Responsibility, CE & Federal Rules
14.1 Financial Responsibility & the 660 FICO Rule 14.2 Continuing Education & Biennial Renewal 14.3 Federal Employment, Immigration, OSHA & Environmental Rules
15 Plans, Specs & Equipment Selection
15.1 Reading Plans, Specifications, Symbols & Scales 15.2 Recommending Plan Changes & Equipment Types 15.3 EER, SEER, ARI Listings & Cost Effectiveness
16 Energy Codes, Loads & Thermal Resistance
16.1 Florida Energy Codes, R-Values & U-Factors 16.2 Determining HVAC Heating & Cooling Loads 16.3 Applying Energy Conservation, Fan Curves & Pump Curves
17 HVAC System & Duct Design
17.1 Designing HVAC Systems (Psychrometrics, Enthalpy & Airflow) 17.2 Designing Duct Systems & Insulation 17.3 Selecting Equipment, Location & Codes
18 Piping, Pumps, Boilers, Controls & Rigging Design
18.1 Pipe Sizing, Valves, Fittings, Sealants & Layout 18.2 Control Requirements, Fan Motors, CFM & Compressor Capacity 18.3 Pumps, Boilers, Steam, Fuel & Pipe Insulation 18.4 Grease Ducts, Live Loads, Rigging & Mechanical Equipment
19 Sheet Metal Duct Fabrication
19.1 Fabricating Rectangular & Round Ducts 19.2 Seams, Locks, Taping, Mastics & Liners 19.3 Fittings, Outlets & Grilles 19.4 Kitchen Hoods, Exhausts & Drain Pans
20 Split, Package & Heat Pump Installation
20.1 Installing Split & Package Air Conditioners 20.2 Installing Split & Package Heat Pumps 20.3 Air-Cooled vs Water-Cooled Systems
21 Large Systems, Chillers & Towers
21.1 Installing by Tonnage & Class A vs Class B Limits 21.2 Chilled Water, Water Towers & Secondary Coolant 21.3 Centrifugal, Absorption & Ammonia Systems
22 Refrigeration, Coolers, Ventilation & Controls Install
22.1 Low, Medium & Ultra-Low Temperature Systems & EPA Rules 22.2 Walk-In & Reach-In Coolers 22.3 Ventilation, Exhaust, Makeup Air, Grease Ducts & Kitchen Exhaust 22.4 Geothermal, Pneumatic & DDC Controls, TAB & Smoke Tests
23 Condensers, Compressors & Air Handlers
23.1 Installing Air-Cooled & Water-Cooled Condensers 23.2 Hermetic, Semi-Hermetic & Centrifugal Compressors 23.3 Air Handlers, Evaporators, Heat Exchangers, Receivers & Heat Strips
24 Duct, Fans, Filters & Terminals
24.1 Installing Sheet Metal, Fiberglass & Flexible Duct 24.2 Fans, Blowers, Motors, Grilles, Registers & Fire Dampers 24.3 Filters, Flues, Warm-Air, Gas & Fuel-Oil Appliances
25 Refrigerant Piping & Joining
25.1 Refrigerant Piping, Copper Tubing & Pipe Sizing 25.2 Brazing, Welding, Flaring, Swaging & Soldering 25.3 Steel Pipe, Plastic Pipe, Threading & Oxy-Acetylene 25.4 Hangers, Supports, Horizontally Supported Piping & Pressure Testing
26 Metering Devices & Line Components
26.1 TXVs, Capillary Tubes, Reversing Valves & Metering Devices 26.2 Liquid, Suction & Heat-Pump Dryers, Filters & Oil Traps 26.3 Receivers, Heat Strips, Gas/Oil Appliances & Related Accessories
27 Controls Installation
27.1 Pressure, Temperature, Humidity & Bellows Controls 27.2 Thermostats, Humidistats, Pneumatic & Solid-State Controls 27.3 Transformers, Capacitors, Contactors, Relays & Safety Disconnects 27.4 Defrost Components, Starters, Solenoids & Limit Switches
28 Motors, Wiring & Electrical Installation
28.1 Wiring Single-Phase & Three-Phase Equipment 28.2 Motor Types, Protection, Controllers, Belts & Pulleys 28.3 Geothermal Loops, Surge Protectors, Phase Monitors & Plastic Pipe
29 Diagnostic Analysis: Refrigeration
29.1 Pressure-Enthalpy Diagrams & Operating Pressures 29.2 Air Volumes, Enthalpy, Wet-Bulb & Dry-Bulb 29.3 Leak Detection & Refrigeration Test Instruments
30 Diagnostic Analysis: Electrical & Instruments
30.1 Current Draw, Voltage, Power & Motor Terminals 30.2 Testing Relays, Capacitors, Starters, Transformers & Defrost Stats 30.3 Using Amprobes, Velometers, Pitot Tubes, Manometers & Gauges
31 Recovery, Repair & Calibration
31.1 Nitrogen & Gas Regulators, Recovery & Retrofit 31.2 Repairing Hermetic, Semi-Hermetic, Centrifugal Compressors & Blowers 31.3 Calibrating Thermostats, Pressure Switches & Pneumatic Controls 31.4 Superheat, Safety Cutouts, Defrost Clocks & Freezer Controls
32 Mechanical Service & Cleaning
32.1 Belts, Pulleys, Motor Rotation & Seized Compressors 32.2 Crankcase & Evaporator Pressure Regulators & Unloaders 32.3 Cleaning Towers, Condensers, Foreign Matter & Condensate Drains
33 Jobsite Safety & Equipment
33.1 PPE: Hearing, Head, Eye, Face & Respiratory Protection 33.2 Lockout/Tagout, Warning Signs, Toxic Materials & Ventilation 33.3 Rigging, Hoists, Cranes, Forklifts, Backhoes & Excavation 33.4 Ladders, Scaffolds, Tools & Air Compressors
34 Energy Management
34.1 Envelope, Duct Pressure & Blower-Door Testing 34.2 Efficient Equipment, Zoning, ERVs, Wi-Fi Thermostats & Green Buildings 34.3 Energy Forms, R/U Factors, Window Heat Gain & Florida Load Calcs
35 Indoor Air Quality
35.1 Ventilation, Filtration, Humidity, UV & Air Cleaners 35.2 Contaminants, Source Control, TAB & Human Health Effects
27.4 Defrost Components, Starters, Solenoids & Limit Switches
Key Takeaways Explain This Topic AI
Defrost on air-source heat pumps and on commercial freezers uses a timer or demand board, defrost heaters (electric or hot gas), and a termination thermostat plus a fail-safe time. Strips that run during heat-pump defrost are allowed by FBC Energy R403.1.3; strips that run on every 2°F bump are not.
A magnetic starter is a contactor plus overload heaters (or electronic overloads). Three-phase motors need overload protection in each phase. Hermetic compressors also carry internal or external overload protectors (line-break or pilot-duty) that are not a substitute for the starter’s overloads on a semi-hermetic.
Solenoid coils must match voltage (24, 120, or 240 V). Liquid-line, hot-gas, and reversing-valve solenoids can often have the coil replaced without cutting the valve body out of the pipe.
Limit switches (high-limit, fan-limit, rollout, door interlocks) are safeties. Fan-limit combination controls on warm-air furnaces typically bring the blower on around 125–135°F and off around 90–100°F — use the listing, never jumper a limit.
Electronic air cleaners use a high-voltage ionizing section and a door interlock; they hang on HVAC control power but do not replace filtration listings. Class B still stops at 25 tons / 500,000 Btu; motor-controller theory still shows up on the Class B exam.
Last updated: August 2026
27.4 Defrost Components, Starters, Solenoids & Limit Switches
The last numbered controls cluster on Trade D is the hardware that starts, protects, defrosts, and proves the machine: defrost timers, heaters, and thermostats ; air-pressure switches ; electric humidistats (operating RH — Section 27.2); electronic air cleaners ; fan control switches ; hermetic overload protectors ; limit switches ; solenoid coils ; magnetic starters ; starting relays ; duty-motor protection ; and motor controllers . Chapter 20.2 already used heat-pump defrost as an energy-code strip exception. Chapter 22 used freezer defrost as a refrigeration install. This section is putting the parts in so the exam’s component list is not a pile of catalog names.
Quick Answer: Defrost is a timer or demand board, a heater (electric or hot gas), and a termination thermostat plus fail-safe . Magnetic starters = contactor + overloads (all three legs on three-phase). Solenoid coils match voltage and can often be changed without cutting pipe. Limits and hermetic overloads are safeties — do not jumper . Electronic air cleaners need a door interlock . Class B still stops at 25 tons / 500,000 Btu .
Defrost timers, heaters, thermostats, and air-pressure switches
When an outdoor heat-pump coil or a freezer evaporator is the evaporator , moisture freezes on it. Time-temperature defrost runs a clock plus a coil sensor : after a set run time, if the coil is cold enough, the control shifts into defrost . Demand defrost looks at coil temperature versus outdoor air, or at pressure / delta-T, and defrosts only when the coil is actually frosted . During heat-pump defrost the reversing valve moves toward cooling , the outdoor fan often stops , and auxiliary heat strips usually come on to temper the supply air. That strip operation during defrost is allowed by FBC Energy R403.1.3 . Running strips whenever the owner bumps the setpoint 2°F on a 65°F Tampa afternoon is not .
Commercial freezer / cooler defrost (walk-ins from Chapter 22) uses electric heaters in the coil, hot-gas solenoids, or off-cycle (cooler, not freezer) defrost. The defrost thermostat (termination) opens the heater when the coil is clear — commonly in a 50–70°F coil-temperature band on electric defrost (use the listing). A fail-safe time on the clock ends defrost even if the thermostat never opens , so a heater cannot bake a box all weekend. Drain heaters keep the condensate pan from re-freezing. Wire the termination stat in series with the heaters , not around them.
Air-pressure switches prove fan flow before electric heaters or a burner may run, or they open on a dirty-filter pressure drop. A heat-pump or furnace that runs strips with the blower dead is a fire. Some defrost boards also look at a pressure switch as a frost proxy. These are air bellows or diaphragms, not refrigerant HP/LP.
Fan control switches, electronic air cleaners, electric humidistats
A fan control on a warm-air furnace is often combined with the high-limit in one fan-limit control. Typical mechanical numbers, always overridden by the listing, bring the blower on around 125–135°F plenum temperature and off around 90–100°F so the heat exchanger dumps before the fan stops. Electronic fan controls use a timer or a board. G on the thermostat still commands the blower in cooling and in ‘fan on.’ A sail switch or pressure-proving switch is the commercial cousin. Do not set a fan-on so high that the high-limit trips first; that is a limit used as a fan switch.
Electronic air cleaners (EACs) ionize particles on a high-voltage grid (often on the order of thousands of volts inside the cell) and collect them on plates. Install upstream of the coil per the listing, leave service clearance , and land the door interlock so the high-voltage supply dies when the access door opens. The 24-volt or 120-volt power pack is still HVAC control / dedicated HVAC circuit work inside 489.105. An EAC does not replace a listed filter, does not waive FBC Mechanical filtration, and does not make a Class B contractor into an electrician on a new lighting homerun. Wash cells per the IOM; wet cells with the power on are a shock and a warped-plate complaint.
Electric humidistats in this bullet list are the same RH switches as Section 27.2, often staged with reheat or an EAC/IAQ package. They remain operating controls.
Hermetic overload protectors, limit switches, solenoid coils
A hermetic overload protector lives inside the compressor (buried in the windings) or on the shell (a Klixon -style disc). Line-break overloads open the run circuit; pilot-duty overloads open the contactor coil only. Internal overloads can take minutes to hours to reset after a high-pressure or loss-of-charge event — ‘the compressor is open’ on an ohm check between common and run/start, then closed after it cools, is a classic exam read. External overloads must sit where the listing put them, with the correct current stamp. They protect the motor , not the refrigeration circuit; you still need HP/LP and oil failure on machines that use those safeties.
Limit switches are temperature or position safeties : furnace high-limit , rollout , auxiliary limit in the blower, heat-strip high-limit / firestat (Section 20.2), door interlocks , and end-of-travel limits on dampers. Automatic-reset primary limits recycle; manual-reset secondaries (or fusible links) require a person. Never jumper a limit ‘until the part comes in.’ That is how attics burn and how CILB complaints start.
A solenoid coil is the electromagnetic half of a solenoid valve : liquid-line pumpdown, hot-gas defrost, reheat , reversing-valve pilot, humidifier water. Match the voltage stamped on the coil ( 24, 120, or 240 V are the usual three). Inrush is higher than holding; a undersized transformer (Section 27.3) will drop a 24-volt liquid-line solenoid every time the contactor pulls in. Many coils slide off the stem without cutting the valve out of the refrigerant circuit — replace the coil , not the valve, when the winding is open and the body still seats. A 24-volt coil on a 120-volt hot-gas valve is a puff of smoke, not a ‘stronger coil.’
Magnetic starters, starting relays, duty-motor protection, motor controllers
A magnetic starter is a contactor plus overload protection in one listed assembly, often with an HOA (hand-off-auto) and a holding circuit . Three-phase motors need overload sensing in each phase so a single-phasing event still trips. Overload heaters (melting-alloy or bimetal) are selected from the motor FLA and the starter table — not from breaker size, not from ‘the next size up so it stops nuisance tripping.’ Electronic overload modules use the same FLA dial. The starter coil is still downstream of the Section 27.1 safeties.
Starting relays (current and potential) from Section 27.3 belong here when the outline says starting relays as a component: they take the start winding out at speed. Hard-start kits (potential relay + start capacitor) on a hermetic that already has a run capacitor are a listed accessory, not a substitute for a failed dual run capacitor and not a substitute for a low-voltage problem.
Duty-motor protection is the match between motor duty (continuous, intermittent, air-over) and the protector. A continuous-duty condenser fan in a Florida sun needs a motor rated for that duty and ambient , plus overloads or an integral protector. An air-over motor that you box in without airflow will take out the protector and then the winding. Motor controllers are the listed means of starting and stopping: across-the-line (full voltage — the usual HVAC starter), part-winding , star-delta , soft start , or a VFD . VFDs on condenser fans and blowers are still HVAC equipment for control wiring; the line-side power stays inside the 489.105 fence. Class B candidates still need this theory on a 30-ton RTU starter even though Class B cannot install that 30-ton system.
- Device Function Install note Exam trap
- Defrost timer / demand board Starts defrost Fail-safe time must end defrost Calling defrost ‘broken cooling’
- Defrost heater / hot-gas solenoid Melts ice Termination stat in series with electric heat Heater jumpered on
- Air-pressure / fan switch Proves airflow Required before strips or burner Sail switch taped closed
- Electronic air cleaner High-voltage collection Door interlock kills HV Wet cells, no interlock
Hermetic overload Motor temperature/current Line-break vs pilot-duty; may be slow to reset Replacing a good compressor that is only open-hot
- Limit / firestat High temperature Manual-reset secondary Jumpered limit
- Solenoid coil Opens/closes a valve Voltage match; coil often replaceable 24 V coil on 120 V valve
- Magnetic starter Contactor + overloads All three legs; heaters from FLA Oversized heaters ‘to stop trips’
- Florida HVAC scenario
A certified Class B firm in Miami-Dade (HVHZ, Climate Zone 1A ) services a walk-in freezer (legal as a refrigeration system under the 25-ton cap) and a 3-ton heat pump next door. On the freezer the helper wires a new defrost clock but parallels the termination thermostat so the heaters can ‘always finish.’ Fail-safe time is the only thing that will ever end defrost; the coil cooks, and the product thaws from the heater , not from a failed compressor. On the heat pump the helper jumpers the high-limit on a 5 kW strip kit because the fan-limit was set too high and the limit opened, then tapes the EAC door interlock so the cells can be ‘inspected while on.’ Four independent failures: defrost termination bypassed , limit jumpered , fan control mis-set , EAC interlock defeated . The same campus wants a 30-ton RTU with a magnetic starter and a VFD on the supply fan. Class B still has to size overload heaters from FLA and explain HOA and across-the-line starting on the exam; Class B does not contract that 30-ton system (F.S. 489.105(3)(g)). A new 460-volt feeder to that starter is still an electrical contractor .
Traps: (1) Jumping defrost termination, limits, or EAC door switches. (2) Wrong solenoid coil voltage. (3) Oversized starter heaters. (4) Treating a hot internal overload as a dead compressor. (5) Strips on every thermostat bump instead of during defrost per R403.1.3. (6) Class B installing a 30-ton starter as if the controller size were the license limit.