Study guide
29.2 Air Volumes, Enthalpy, Wet-Bulb & Dry-Bulb
Florida HVAC Contractor License Class A/B
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 Current Exam Facts & License Classes 1.2 Exam Format, Open-Book Rules & Pearson VUE 1.3 Eligibility, Experience Paths & Financial Responsibility
2 Establishing the Contracting Business
2.1 Business Organizational Structure 2.2 Business Plan, Marketplace & License Scope 2.3 Professionals, Fixed Assets & Bonding
3 Insurance for Florida HVAC Contractors
3.1 Obtaining Insurance (GL, Workers' Compensation & Bonds) 3.2 Coverages, Limits & Policy Language 3.3 Maintaining Insurance & CILB Certificate-Holder Rules
4 Overhead, Staffing & Markets
4.1 Developing the Business, Staffing & Markets 4.2 Determining Business Overhead (FICA, FUTA, SUTA, Workers' Comp, Rent & Utilities) 4.3 Determining Outsourced Services
5 Bids, Proposals & Estimating
5.1 Preparing Bids and Proposals 5.2 AIA Documents, Offers & Contract Components 5.3 Labor Productivity, Overhead & Project Costing
6 Purchasing, Invoices, Draws & Safety Programs
6.1 Purchasing Materials, UCC & Inventory (FIFO) 6.2 Invoices, Draw Requests & Percentage of Completion 6.3 Developing a Safety Program (OSHA, SDS & Drug Testing)
7 Managing Contracts
7.1 Contract Law, Scope & Completion Schedules 7.2 Florida Lien Law Inside Contracting 7.3 Mediation, Arbitration, Tort Law & Risk
8 Managing Trade Operations
8.1 Scheduling Trade Operations (CPM, RFI & Submittals) 8.2 OSHA Records, Document Retainage & Penalties 8.3 Takeoffs, Equipment Lease vs Purchase & Inventory
9 Accounting I: Receivables, Payables & Cash
9.1 Managing Accounts Receivable 9.2 Managing Accounts Payable & Discounts 9.3 Cash Flow, Banking & Financial Ratios
10 Accounting II: Taxes, Job Cost & Payroll
10.1 Filing Tax Forms & Returns 10.2 Tracking Job Costs 10.3 Payroll, Employment Taxes & Garnishments
11 Managing Human Resources
11.1 Hiring, I-9, Background Checks & Discrimination 11.2 HR Policies, OSHA & Drug-Test Chain of Custody 11.3 Evaluating Employees
12 Florida Contractor Law: Chapter 489 & 61G4
12.1 Chapter 489: Certified vs Registered & Qualifying Agents 12.2 61G4 Board Rules, Advertising & Discipline 12.3 Qualifying Agent Duties, Supervision & Additional Entities
13 Florida Construction Lien Law (Chapter 713)
13.1 Construction Lien Overview & Claimants 13.2 Notices to Owner, Time Limits & Perfecting Liens 13.3 Payment Bonds, Waivers & Claims of Lien
14 Financial Responsibility, CE & Federal Rules
14.1 Financial Responsibility & the 660 FICO Rule 14.2 Continuing Education & Biennial Renewal 14.3 Federal Employment, Immigration, OSHA & Environmental Rules
15 Plans, Specs & Equipment Selection
15.1 Reading Plans, Specifications, Symbols & Scales 15.2 Recommending Plan Changes & Equipment Types 15.3 EER, SEER, ARI Listings & Cost Effectiveness
16 Energy Codes, Loads & Thermal Resistance
16.1 Florida Energy Codes, R-Values & U-Factors 16.2 Determining HVAC Heating & Cooling Loads 16.3 Applying Energy Conservation, Fan Curves & Pump Curves
17 HVAC System & Duct Design
17.1 Designing HVAC Systems (Psychrometrics, Enthalpy & Airflow) 17.2 Designing Duct Systems & Insulation 17.3 Selecting Equipment, Location & Codes
18 Piping, Pumps, Boilers, Controls & Rigging Design
18.1 Pipe Sizing, Valves, Fittings, Sealants & Layout 18.2 Control Requirements, Fan Motors, CFM & Compressor Capacity 18.3 Pumps, Boilers, Steam, Fuel & Pipe Insulation 18.4 Grease Ducts, Live Loads, Rigging & Mechanical Equipment
19 Sheet Metal Duct Fabrication
19.1 Fabricating Rectangular & Round Ducts 19.2 Seams, Locks, Taping, Mastics & Liners 19.3 Fittings, Outlets & Grilles 19.4 Kitchen Hoods, Exhausts & Drain Pans
20 Split, Package & Heat Pump Installation
20.1 Installing Split & Package Air Conditioners 20.2 Installing Split & Package Heat Pumps 20.3 Air-Cooled vs Water-Cooled Systems
21 Large Systems, Chillers & Towers
21.1 Installing by Tonnage & Class A vs Class B Limits 21.2 Chilled Water, Water Towers & Secondary Coolant 21.3 Centrifugal, Absorption & Ammonia Systems
22 Refrigeration, Coolers, Ventilation & Controls Install
22.1 Low, Medium & Ultra-Low Temperature Systems & EPA Rules 22.2 Walk-In & Reach-In Coolers 22.3 Ventilation, Exhaust, Makeup Air, Grease Ducts & Kitchen Exhaust 22.4 Geothermal, Pneumatic & DDC Controls, TAB & Smoke Tests
23 Condensers, Compressors & Air Handlers
23.1 Installing Air-Cooled & Water-Cooled Condensers 23.2 Hermetic, Semi-Hermetic & Centrifugal Compressors 23.3 Air Handlers, Evaporators, Heat Exchangers, Receivers & Heat Strips
24 Duct, Fans, Filters & Terminals
24.1 Installing Sheet Metal, Fiberglass & Flexible Duct 24.2 Fans, Blowers, Motors, Grilles, Registers & Fire Dampers 24.3 Filters, Flues, Warm-Air, Gas & Fuel-Oil Appliances
25 Refrigerant Piping & Joining
25.1 Refrigerant Piping, Copper Tubing & Pipe Sizing 25.2 Brazing, Welding, Flaring, Swaging & Soldering 25.3 Steel Pipe, Plastic Pipe, Threading & Oxy-Acetylene 25.4 Hangers, Supports, Horizontally Supported Piping & Pressure Testing
26 Metering Devices & Line Components
26.1 TXVs, Capillary Tubes, Reversing Valves & Metering Devices 26.2 Liquid, Suction & Heat-Pump Dryers, Filters & Oil Traps 26.3 Receivers, Heat Strips, Gas/Oil Appliances & Related Accessories
27 Controls Installation
27.1 Pressure, Temperature, Humidity & Bellows Controls 27.2 Thermostats, Humidistats, Pneumatic & Solid-State Controls 27.3 Transformers, Capacitors, Contactors, Relays & Safety Disconnects 27.4 Defrost Components, Starters, Solenoids & Limit Switches
28 Motors, Wiring & Electrical Installation
28.1 Wiring Single-Phase & Three-Phase Equipment 28.2 Motor Types, Protection, Controllers, Belts & Pulleys 28.3 Geothermal Loops, Surge Protectors, Phase Monitors & Plastic Pipe
29 Diagnostic Analysis: Refrigeration
29.1 Pressure-Enthalpy Diagrams & Operating Pressures 29.2 Air Volumes, Enthalpy, Wet-Bulb & Dry-Bulb 29.3 Leak Detection & Refrigeration Test Instruments
30 Diagnostic Analysis: Electrical & Instruments
30.1 Current Draw, Voltage, Power & Motor Terminals 30.2 Testing Relays, Capacitors, Starters, Transformers & Defrost Stats 30.3 Using Amprobes, Velometers, Pitot Tubes, Manometers & Gauges
31 Recovery, Repair & Calibration
31.1 Nitrogen & Gas Regulators, Recovery & Retrofit 31.2 Repairing Hermetic, Semi-Hermetic, Centrifugal Compressors & Blowers 31.3 Calibrating Thermostats, Pressure Switches & Pneumatic Controls 31.4 Superheat, Safety Cutouts, Defrost Clocks & Freezer Controls
32 Mechanical Service & Cleaning
32.1 Belts, Pulleys, Motor Rotation & Seized Compressors 32.2 Crankcase & Evaporator Pressure Regulators & Unloaders 32.3 Cleaning Towers, Condensers, Foreign Matter & Condensate Drains
33 Jobsite Safety & Equipment
33.1 PPE: Hearing, Head, Eye, Face & Respiratory Protection 33.2 Lockout/Tagout, Warning Signs, Toxic Materials & Ventilation 33.3 Rigging, Hoists, Cranes, Forklifts, Backhoes & Excavation 33.4 Ladders, Scaffolds, Tools & Air Compressors
34 Energy Management
34.1 Envelope, Duct Pressure & Blower-Door Testing 34.2 Efficient Equipment, Zoning, ERVs, Wi-Fi Thermostats & Green Buildings 34.3 Energy Forms, R/U Factors, Window Heat Gain & Florida Load Calcs
35 Indoor Air Quality
35.1 Ventilation, Filtration, Humidity, UV & Air Cleaners 35.2 Contaminants, Source Control, TAB & Human Health Effects
29.2 Air Volumes, Enthalpy, Wet-Bulb & Dry-Bulb
Key Takeaways Explain This Topic AI
Typical comfort-cooling airflow is about 400 cfm per ton (often a 350–450 band on expanded data). A 5-ton coil that is actually delivering 2,000 cfm is in family; 1,200 cfm is a low-air problem, not a refrigerant problem to charge through.
CFM = FPM × free area (ft²). A velometer or pitot traverse gives velocity; a flow hood reads cfm at the grille. For standard air, pitot velocity is V ≈ 4005 × √VP with VP in inches of water.
Total cooling Qt = 4.5 × CFM × Δh (enthalpy in Btu/lb of dry air). Sensible cooling is 1.08 × CFM × ΔT. Dry-bulb is the ordinary thermometer; wet-bulb is the wetted-wick reading that locates enthalpy on the chart.
Working (design) pressure is the nameplate/piping rating; FBC Mechanical 1110 tests field refrigerant pipe at not less than the lower of design or relief. Operating pressure is what the gauges show while the machine runs — they are not the same number.
Non-pressure tanks (open cooling-tower basins, atmospheric condensate receivers, open expansion tanks) are vented to atmosphere. They are not diagnosed with a refrigerant manifold and are not ASME unfired pressure vessels (Class A scope for boilers/unfired vessels; Class B does not install those).
Last updated: August 2026
29.2 Air Volumes, Enthalpy, Wet-Bulb & Dry-Bulb
The same Trade E Maintenance Analysis cluster (Class A 9 percent , Class B 10 percent ) now asks for the air side of the diagnosis and two pressure-vessel distinctions the outline lists with it: air volumes (velometer, pitot tube, manometer, flow hood), enthalpy changes , wet-bulb and dry-bulb , working pressure in pipes , and non-pressure tanks . Chapter 17 designed CFM with 1.08 × Δ T 1.08 \times \Delta T 1.08 × Δ T . This section measures whether that air is actually moving and whether the coil is actually changing enthalpy. Refrigeration & Air Conditioning Technology , 9th Edition (2021) is the instrument book. FBC Mechanical 2023 still owns design pressure and tanks. Class B still stops at 25 tons / 500,000 Btu per system .
Quick Answer: Typical comfort-cooling air is about 400 cfm/ton . CFM = FPM × area . Read velocity with a velometer or pitot + manometer ; read grille cfm with a flow hood . Dry-bulb and wet-bulb locate enthalpy ; Q t = 4.5 × CFM × Δ h Q_t = 4.5 \times \text{CFM} \times \Delta h Q t = 4.5 × CFM × Δ h . Working pressure is the pipe/vessel rating . Non-pressure tanks are atmospheric .
Why air volume is a refrigeration diagnosis
Low airflow looks like a refrigerant problem if you only read superheat. A dirty filter, a wet coil, a backward blower, or a crushed flex run drops evaporator load . Superheat falls , the coil ices , suction drops , and someone adds charge. Trade E scores whether you measure cfm before you open a cylinder. High airflow that bypasses the coil (missing filter rack, open return) raises superheat and cuts dehumidification — another Florida no-cool that is not a TXV.
About 400 cfm per ton is the typical comfort-cooling check on a DX coil (a manufacturer’s expanded-data point often lands in a 350–450 cfm/ton band). It is not a Florida code-required design formula — design still uses CFM = sensible Btu/h ÷ (1.08 × ΔT) (Chapter 17) and the coil’s rated cfm. On a service call, a 3-ton air handler that should be near 1,200 cfm and is delivering 700 is a blower/duct/filter problem. A 5-ton that should be near 2,000 cfm and is at 2,050 with a 20°F ΔT is in family; then you go to P-h.
Worked 400 cfm/ton check. Nameplate 4 tons . Expected air ≈ 4 × 400 = 1,600 4 \times 400 = 1{,}600 4 × 400 = 1 , 600 cfm. A flow hood on all supplies totals 1,120 cfm ( 280 cfm/ton ). Do not add 410A. Pull the 90-day filter, check the 230-volt blower tap, and measure external static. Class B is legal on 4 tons. The same math on a 30-ton VAV box is Class A contracting if it is one system.
Instruments — velometer, pitot, manometer, flow hood
Instrument What it reads How you turn it into cfm
Velometer (vane anemometer) Air speed , feet per minute (fpm) Traverse the duct or grille; average FPM × free area (ft²)
Pitot-static tube Total and static pressure; velocity pressure VP = TP − SP V ≈ 4005 VP V \approx 4005 \sqrt{\text{VP}} V ≈ 4005 VP fpm for standard air (VP in inches of water); then × area
Manometer (U-tube, digital, or Magnehelic) Pressure difference , inches of water column (in. w.c.) Hooked to the pitot, to a coil ΔP, or to duct static
Flow hood (capture hood) Direct cfm at a supply or return opening Best for registers; still needs a tight seal to the grille
Velometer traverse. Do not take one center reading and call it average. A duct traverse uses a grid (often 6 or more points in a small trunk, more in a large one). Average the velocities.
Worked velometer. A 16 × 20 inch supply grille, manufacturer free-area factor 0.70 , nine-point average 650 fpm .
Gross area = ( 16 / 12 ) × ( 20 / 12 ) = 2.22 (16/12) \times (20/12) = 2.22 ( 16/12 ) × ( 20/12 ) = 2.22 ft². Free area = 2.22 × 0.70 = 1.55 2.22 \times 0.70 = 1.55 2.22 × 0.70 = 1.55 ft².
CFM = 650 × 1.55 ≈ 1,008 cfm \text{CFM} = 650 \times 1.55 \approx 1{,}008\ \text{cfm} CFM = 650 × 1.55 ≈ 1 , 008 cfm
Using gross area without the free-area factor invents 1,443 cfm and you walk away from a low-air coil.
Worked pitot. A pitot in a 12 × 12 inch internal duct (1.0 ft²) reads VP = 0.16 in. w.c. on the manometer.
V = 4005 × 0.16 = 4005 × 0.40 = 1,602 fpm V = 4005 \times \sqrt{0.16} = 4005 \times 0.40 = 1{,}602\ \text{fpm} V = 4005 × 0.16 = 4005 × 0.40 = 1 , 602 fpm
CFM = 1,602 × 1.0 = 1,602 cfm \text{CFM} = 1{,}602 \times 1.0 = 1{,}602\ \text{cfm} CFM = 1 , 602 × 1.0 = 1 , 602 cfm
The 4005 constant is for standard air (~0.075 lb/ft³). Hot attic air is lighter; a precise TAB uses density correction. On CBT, 4005 × √VP is the expected move. Point the pitot into the flow; a backwards tube reads junk. The manometer must be zeroed and on the in. w.c. scale, not psig.
A flow hood is the fast register tool. Add the supplies and compare to return; a large mismatch is duct leakage (Trade H blower-door/duct tests go deeper). Do not use a flow hood as a refrigerant scale.
Wet-bulb, dry-bulb, and enthalpy change
Dry-bulb (DB) is the ordinary airstream thermometer. Wet-bulb (WB) is a thermometer with a wetted wick in moving air — it approaches the adiabatic-saturation temperature. A sling or digital psychrometer that is not aspirated reads a fake WB. Enthalpy (h) is total heat, Btu per pound of dry air . On the sea-level psychrometric chart, enthalpy lines run nearly with wet-bulb. Two independent properties (commonly DB and WB) locate the state; then you read (h).
Approximate moist-air enthalpy is h ≈ 0.24 t D B + W ( 1061 + 0.445 t D B ) h \approx 0.24\,t_{DB} + W(1061 + 0.445\,t_{DB}) h ≈ 0.24 t D B + W ( 1061 + 0.445 t D B ) , with (W) in lb moisture per lb dry air. On the exam you will usually read (h) at the DB/WB intersection rather than derive (W).
Load Standard-air equation Diagnostic use
Sensible Q s Q_s Q s 1.08 × CFM × Δ T D B 1.08 \times \text{CFM} \times \Delta T_{DB} 1.08 × CFM × Δ T D B Supply-to-return dry-bulb split
Total Q t Q_t Q t 4.5 × CFM × Δ h 4.5 \times \text{CFM} \times \Delta h 4.5 × CFM × Δ h Capacity check across the coil
Latent Q l Q_l Q l 0.68 × CFM × Δ grains 0.68 \times \text{CFM} \times \Delta\text{grains} 0.68 × CFM × Δ grains Whether the coil is wringing Florida air
The 4.5 factor is 60 × 0.075 60 \times 0.075 60 × 0.075 . AHRI indoor coil air is often near 80°F DB / 67°F WB , enthalpy about 31.5 Btu/lb . Leaving air on a healthy DX coil is often near saturation (WB ≈ DB), enthalpy in the low-20s Btu/lb.
Worked capacity. Measured 1,600 cfm . Return 80/67 , h i n ≈ 31.5 h_{in} \approx 31.5 h in ≈ 31.5 Btu/lb. Supply 58/57 , h o u t ≈ 24.5 h_{out} \approx 24.5 h o u t ≈ 24.5 Btu/lb. Δ h = 7.0 \Delta h = 7.0 Δ h = 7.0 Btu/lb.
Q t = 4.5 × 1,600 × 7.0 = 50,400 Btu/h ≈ 4.2 tons Q_t = 4.5 \times 1{,}600 \times 7.0 = 50{,}400\ \text{Btu/h} \approx 4.2\ \text{tons} Q t = 4.5 × 1 , 600 × 7.0 = 50 , 400 Btu/h ≈ 4.2 tons
On a 4-ton nameplate that is in family once you allow for rating conditions. If the same 1,600 cfm only drops enthalpy 4.0 Btu/lb, Q t = 28,800 Q_t = 28{,}800 Q t = 28 , 800 Btu/h — 2.4 tons on a 4-ton box. Now the P-h diagnosis in 29.1 earns its keep (undercharge, restriction, bad compressor valves, or a reversing valve leaking through).
Worked split that lies. Return 75°F DB, supply 55°F DB looks like a pretty 20°F drop. WB only fell 2°F and the house is still clammy: high sensible-heat ratio , short-cycling, or bypass. Florida latent load is not optional. A coil leaving at 55°F DB and 54°F WB is actually dehumidifying; a coil leaving at 55°F DB and 52°F WB with a 70°F wet return is not the same process.
Working pressure in pipes vs non-pressure tanks
Operating pressure is the running (or standing) gauge reading from 29.1. Working pressure (design pressure, MAWP on a vessel nameplate) is the rating the pipe or vessel is built and listed to carry in service. FBC Mechanical 1110.5 pressure-tests field refrigerant piping at not less than the lower of design pressure or the relief setting — that design number is the working/design rating, not yesterday’s suction gauge. A healthy R-410A high side at 400 psig on a 95°F day is operating pressure. The condensing-unit nameplate high-side design (often in the 600 psig neighborhood on 410A — read the plate , do not memorize a fake CILB key) is working/design pressure. Relief must be set at or below that rating. If operating pressure is climbing toward relief, stop diagnosing with “add gas” and find the dirty condenser or noncondensables.
Hydronic and condenser-water pipe also have a working pressure (a 150 psi class main is not a 15 psi toy). Pump head of 30 psig on a tower loop is not R-410A. Do not hydro-test a 150 psi chilled-water coil at refrigerant test pressure, and do not nitrogen-bomb a water loop to 600 psi because the RTU next to it is 410A.
Non-pressure tanks are vessels open to atmosphere (or designed only as atmospheric storage): cooling-tower basins , open expansion tanks , atmospheric condensate receivers , some chemical feed pots. They have vent, overflow, and makeup , not a 400 psig relief. Diagnose them with level, overflow path, and FBC 908 tower rules (Chapter 23) — not with a refrigerant manifold. Do not hydro-test an open basin as if it were an ASME unfired pressure vessel . F.S. 489.105 : boilers and unfired pressure vessels are Class A statutory scope; Class B does not install them. Class B still has to recognize a closed hydronic expansion tank (bladder, precharge) versus an open tank, and still has to keep a tower basin from overflowing into a Miami return well.
Worked distinction. A Jacksonville Class A shop has (1) an R-410A liquid line at 418 psig operating , nameplate high-side design 610 psig , relief at that listing — working pressure is the 610 design, test per 1110 with nitrogen, never oxygen; (2) a condenser-water loop at 35 psig pump pressure in 150 psi pipe — different working pressure; (3) an open tower basin — non-pressure tank , check makeup and overflow, no manifold. Treating all three as “the pressure in the pipes” is how a helper puts 410A gauges on a basin and calls it a leak test.
Florida scenario
Gulf Breeze Mechanical, Class B in Hillsborough, has a 5-ton Tampa split that “doesn’t cool.” Suction is a little low and superheat is 4°F . The helper wants to recover two pounds. A flow-hood total is 1,150 cfm on a coil that should be near 2,000 (400 cfm/ton × 5). Return 80/67, supply 48°F and icing. That is low air , which lowers superheat — the 29.1 table, not a TXV. After a caked filter and a blower wheel packed with drywall dust, cfm is 1,980 , supply 57/56, Δ h ≈ 7.5 \Delta h \approx 7.5 Δ h ≈ 7.5 , Q t = 4.5 × 1,980 × 7.5 ≈ 66,825 Q_t = 4.5 \times 1{,}980 \times 7.5 \approx 66{,}825 Q t = 4.5 × 1 , 980 × 7.5 ≈ 66 , 825 Btu/h — about 5.6 tons at that condition. The same ticket notes an open plastic condensate tank the homeowner added in the garage: atmospheric, overflow to the slab, not a pressure vessel, and not a direct sanitary tie (FBC 307 / 489.105 condensate grant). Class B is legal on 5 tons.
Traps: (1) Charging by superheat when cfm is 280/ton. (2) One-point velometer reading × gross grille area. (3) Using 1.08 with total Btu/h on a capacity check that needs 4.5 × CFM × Δh . (4) Calling 400 cfm/ton a code-maximum. (5) Manifold-gauging a tower basin. (6) Treating operating psig as the pipe’s working-pressure rating.