Study guide
29.1 Pressure-Enthalpy Diagrams & Operating Pressures
Florida HVAC Contractor License Class A/B
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 Current Exam Facts & License Classes 1.2 Exam Format, Open-Book Rules & Pearson VUE 1.3 Eligibility, Experience Paths & Financial Responsibility
2 Establishing the Contracting Business
2.1 Business Organizational Structure 2.2 Business Plan, Marketplace & License Scope 2.3 Professionals, Fixed Assets & Bonding
3 Insurance for Florida HVAC Contractors
3.1 Obtaining Insurance (GL, Workers' Compensation & Bonds) 3.2 Coverages, Limits & Policy Language 3.3 Maintaining Insurance & CILB Certificate-Holder Rules
4 Overhead, Staffing & Markets
4.1 Developing the Business, Staffing & Markets 4.2 Determining Business Overhead (FICA, FUTA, SUTA, Workers' Comp, Rent & Utilities) 4.3 Determining Outsourced Services
5 Bids, Proposals & Estimating
5.1 Preparing Bids and Proposals 5.2 AIA Documents, Offers & Contract Components 5.3 Labor Productivity, Overhead & Project Costing
6 Purchasing, Invoices, Draws & Safety Programs
6.1 Purchasing Materials, UCC & Inventory (FIFO) 6.2 Invoices, Draw Requests & Percentage of Completion 6.3 Developing a Safety Program (OSHA, SDS & Drug Testing)
7 Managing Contracts
7.1 Contract Law, Scope & Completion Schedules 7.2 Florida Lien Law Inside Contracting 7.3 Mediation, Arbitration, Tort Law & Risk
8 Managing Trade Operations
8.1 Scheduling Trade Operations (CPM, RFI & Submittals) 8.2 OSHA Records, Document Retainage & Penalties 8.3 Takeoffs, Equipment Lease vs Purchase & Inventory
9 Accounting I: Receivables, Payables & Cash
9.1 Managing Accounts Receivable 9.2 Managing Accounts Payable & Discounts 9.3 Cash Flow, Banking & Financial Ratios
10 Accounting II: Taxes, Job Cost & Payroll
10.1 Filing Tax Forms & Returns 10.2 Tracking Job Costs 10.3 Payroll, Employment Taxes & Garnishments
11 Managing Human Resources
11.1 Hiring, I-9, Background Checks & Discrimination 11.2 HR Policies, OSHA & Drug-Test Chain of Custody 11.3 Evaluating Employees
12 Florida Contractor Law: Chapter 489 & 61G4
12.1 Chapter 489: Certified vs Registered & Qualifying Agents 12.2 61G4 Board Rules, Advertising & Discipline 12.3 Qualifying Agent Duties, Supervision & Additional Entities
13 Florida Construction Lien Law (Chapter 713)
13.1 Construction Lien Overview & Claimants 13.2 Notices to Owner, Time Limits & Perfecting Liens 13.3 Payment Bonds, Waivers & Claims of Lien
14 Financial Responsibility, CE & Federal Rules
14.1 Financial Responsibility & the 660 FICO Rule 14.2 Continuing Education & Biennial Renewal 14.3 Federal Employment, Immigration, OSHA & Environmental Rules
15 Plans, Specs & Equipment Selection
15.1 Reading Plans, Specifications, Symbols & Scales 15.2 Recommending Plan Changes & Equipment Types 15.3 EER, SEER, ARI Listings & Cost Effectiveness
16 Energy Codes, Loads & Thermal Resistance
16.1 Florida Energy Codes, R-Values & U-Factors 16.2 Determining HVAC Heating & Cooling Loads 16.3 Applying Energy Conservation, Fan Curves & Pump Curves
17 HVAC System & Duct Design
17.1 Designing HVAC Systems (Psychrometrics, Enthalpy & Airflow) 17.2 Designing Duct Systems & Insulation 17.3 Selecting Equipment, Location & Codes
18 Piping, Pumps, Boilers, Controls & Rigging Design
18.1 Pipe Sizing, Valves, Fittings, Sealants & Layout 18.2 Control Requirements, Fan Motors, CFM & Compressor Capacity 18.3 Pumps, Boilers, Steam, Fuel & Pipe Insulation 18.4 Grease Ducts, Live Loads, Rigging & Mechanical Equipment
19 Sheet Metal Duct Fabrication
19.1 Fabricating Rectangular & Round Ducts 19.2 Seams, Locks, Taping, Mastics & Liners 19.3 Fittings, Outlets & Grilles 19.4 Kitchen Hoods, Exhausts & Drain Pans
20 Split, Package & Heat Pump Installation
20.1 Installing Split & Package Air Conditioners 20.2 Installing Split & Package Heat Pumps 20.3 Air-Cooled vs Water-Cooled Systems
21 Large Systems, Chillers & Towers
21.1 Installing by Tonnage & Class A vs Class B Limits 21.2 Chilled Water, Water Towers & Secondary Coolant 21.3 Centrifugal, Absorption & Ammonia Systems
22 Refrigeration, Coolers, Ventilation & Controls Install
22.1 Low, Medium & Ultra-Low Temperature Systems & EPA Rules 22.2 Walk-In & Reach-In Coolers 22.3 Ventilation, Exhaust, Makeup Air, Grease Ducts & Kitchen Exhaust 22.4 Geothermal, Pneumatic & DDC Controls, TAB & Smoke Tests
23 Condensers, Compressors & Air Handlers
23.1 Installing Air-Cooled & Water-Cooled Condensers 23.2 Hermetic, Semi-Hermetic & Centrifugal Compressors 23.3 Air Handlers, Evaporators, Heat Exchangers, Receivers & Heat Strips
24 Duct, Fans, Filters & Terminals
24.1 Installing Sheet Metal, Fiberglass & Flexible Duct 24.2 Fans, Blowers, Motors, Grilles, Registers & Fire Dampers 24.3 Filters, Flues, Warm-Air, Gas & Fuel-Oil Appliances
25 Refrigerant Piping & Joining
25.1 Refrigerant Piping, Copper Tubing & Pipe Sizing 25.2 Brazing, Welding, Flaring, Swaging & Soldering 25.3 Steel Pipe, Plastic Pipe, Threading & Oxy-Acetylene 25.4 Hangers, Supports, Horizontally Supported Piping & Pressure Testing
26 Metering Devices & Line Components
26.1 TXVs, Capillary Tubes, Reversing Valves & Metering Devices 26.2 Liquid, Suction & Heat-Pump Dryers, Filters & Oil Traps 26.3 Receivers, Heat Strips, Gas/Oil Appliances & Related Accessories
27 Controls Installation
27.1 Pressure, Temperature, Humidity & Bellows Controls 27.2 Thermostats, Humidistats, Pneumatic & Solid-State Controls 27.3 Transformers, Capacitors, Contactors, Relays & Safety Disconnects 27.4 Defrost Components, Starters, Solenoids & Limit Switches
28 Motors, Wiring & Electrical Installation
28.1 Wiring Single-Phase & Three-Phase Equipment 28.2 Motor Types, Protection, Controllers, Belts & Pulleys 28.3 Geothermal Loops, Surge Protectors, Phase Monitors & Plastic Pipe
29 Diagnostic Analysis: Refrigeration
29.1 Pressure-Enthalpy Diagrams & Operating Pressures 29.2 Air Volumes, Enthalpy, Wet-Bulb & Dry-Bulb 29.3 Leak Detection & Refrigeration Test Instruments
30 Diagnostic Analysis: Electrical & Instruments
30.1 Current Draw, Voltage, Power & Motor Terminals 30.2 Testing Relays, Capacitors, Starters, Transformers & Defrost Stats 30.3 Using Amprobes, Velometers, Pitot Tubes, Manometers & Gauges
31 Recovery, Repair & Calibration
31.1 Nitrogen & Gas Regulators, Recovery & Retrofit 31.2 Repairing Hermetic, Semi-Hermetic, Centrifugal Compressors & Blowers 31.3 Calibrating Thermostats, Pressure Switches & Pneumatic Controls 31.4 Superheat, Safety Cutouts, Defrost Clocks & Freezer Controls
32 Mechanical Service & Cleaning
32.1 Belts, Pulleys, Motor Rotation & Seized Compressors 32.2 Crankcase & Evaporator Pressure Regulators & Unloaders 32.3 Cleaning Towers, Condensers, Foreign Matter & Condensate Drains
33 Jobsite Safety & Equipment
33.1 PPE: Hearing, Head, Eye, Face & Respiratory Protection 33.2 Lockout/Tagout, Warning Signs, Toxic Materials & Ventilation 33.3 Rigging, Hoists, Cranes, Forklifts, Backhoes & Excavation 33.4 Ladders, Scaffolds, Tools & Air Compressors
34 Energy Management
34.1 Envelope, Duct Pressure & Blower-Door Testing 34.2 Efficient Equipment, Zoning, ERVs, Wi-Fi Thermostats & Green Buildings 34.3 Energy Forms, R/U Factors, Window Heat Gain & Florida Load Calcs
35 Indoor Air Quality
35.1 Ventilation, Filtration, Humidity, UV & Air Cleaners 35.2 Contaminants, Source Control, TAB & Human Health Effects
29.1 Pressure-Enthalpy Diagrams & Operating Pressures
Key Takeaways Explain This Topic AI
Superheat = suction-line temperature minus saturated suction temperature (SST from the P-T chart). Subcooling = saturated condensing temperature (SCT) minus liquid-line temperature.
Typical sea-level P-T chart values (not exam keys): R-22 at 40°F is about 68–70 psig and at 120°F about 260 psig; R-410A at 40°F is about 118 psig and at 120°F about 418 psig. R-410A runs roughly 50–60 percent higher pressure than R-22 at the same saturation temperature.
On a P-h diagram the evaporator and condenser are nearly constant-pressure (horizontal); expansion is isenthalpic (vertical, h4 = h3); compression raises both pressure and enthalpy. Refrigerating effect is h1 − h4 Btu/lb.
High superheat with low subcooling and depressed suction and head is the classic undercharge. High superheat with high subcooling is a liquid-line or drier restriction. Low superheat is overcharge, overfeeding, or a low evaporator load (including low airflow).
Trade Area E (Maintenance Analysis) is 9 percent of Class A and 10 percent of Class B. Class B still diagnoses only through 25 tons cooling and 500,000 Btu heating in any one system (F.S. 489.105).
Last updated: August 2026
29.1 Pressure-Enthalpy Diagrams & Operating Pressures
Trade Area E ( Maintenance Analysis ) is 9 percent of Class A and 10 percent of Class B . After you can hang the machine (Chapters 20–28), the CILB outline asks you to analyze it: pressure-enthalpy diagrams for refrigerants , operating pressures , and the superheat/subcooling arithmetic that turns two gauges and two thermometers into a diagnosis. The 2026 Air Conditioning CBT book that carries this cluster is Refrigeration & Air Conditioning Technology , 9th Edition (2021). Florida Building Code — Mechanical, 2023 Chapter 11 still names design pressure, relief, and the nitrogen test you already ran in Section 25.4. F.S. 489.105 still fences Class B at 25 tons cooling and 500,000 Btu heating in any one system — a 40-ton rooftop has the same P-h shape, but Class B does not contract that box.
Quick Answer: Plot the cycle on a P-h diagram : evaporator and condenser nearly horizontal , expansion vertical ( h 4 = h 3 h_4 = h_3 h 4 = h 3 ), compressor up and to the right. Superheat = suction-line °F − SST . Subcooling = SCT − liquid-line °F. Typical P-T chart (not an exam key): R-22 about 68–70 psig at 40°F and 260 psig at 120°F ; R-410A about 118 psig at 40°F and 418 psig at 120°F . High SH + low SC = undercharge. High SH + high SC = restriction.
Why the diagram is a diagnostic tool, not wallpaper
Chapter 17 used the P-h chart to design refrigerating effect. Trade E uses it to see what the running machine is actually doing . A manifold set without a P-T chart is two numbers with no temperature. A thermometer without a saturation temperature is a weather report. Pearson VUE will hand you a suction pressure, a liquid-line temperature, and a refrigerant name and ask whether the coil is starved, flooded, or sitting on a restriction.
Class A diagnoses without a statutory capacity cap. Class B uses the same gauges through 25 tons / 500,000 Btu per system . The Class B outline drops 25–100 ton, over-100 ton, and centrifugal install clusters; it does not drop the idea that a 40-ton circuit still has a condensing pressure. You still owe the theory.
Field gauges read psig . Many textbook P-h axes are psia ( psia = psig + 14.7 \text{psia} = \text{psig} + 14.7 psia = psig + 14.7 at sea level). Convert before you plot, or use a gauge-pressure P-T pocket chart for that refrigerant. Never put an R-22 manifold on an R-410A high side — 410A discharge on a 95°F Florida afternoon lives near 400 psig , and the hose and gauge must be rated for it.
Plotting compressor, condenser, metering device, evaporator
A simple vapor-compression cycle on the pressure-enthalpy (P-h or Mollier) diagram is four state points:
Point Where you measure Process to the next point What “good” looks like
1 Evaporator outlet / compressor inlet Suction pressure + suction-line temperature Compression (1→2): pressure and enthalpy rise Vapor superheated ; no liquid at the compressor
2 Compressor discharge Discharge pressure + discharge-line temperature Desuperheat + condense + subcool (2→3) Hot vapor cools to saturation, then to liquid
3 Condenser / liquid-line outlet Liquid (high-side) pressure + liquid-line temperature Expansion (3→4): constant enthalpy Subcooled liquid; h 4 = h 3 h_4 = h_3 h 4 = h 3
4 Metering-device outlet / evaporator inlet Same pressure as point 1 (minus a little line drop) Evaporation (4→1): nearly constant pressure Two-phase mixture boils; then a little superheat
Evaporator (4→1) is a nearly horizontal line at evaporating pressure P e P_e P e through the dome, then a short run to the right of the saturated-vapor curve — that extra enthalpy is superheat . Refrigerating effect is h 1 − h 4 h_1 - h_4 h 1 − h 4 Btu/lb of refrigerant. Condenser (2→3) is a nearly horizontal line at condensing pressure P c P_c P c : desuperheat, condensing, then a short run to the left of the saturated-liquid curve — subcooling . Metering (3→4) is vertical (isenthalpic). A TXV, piston, or cap tube does not change enthalpy; it drops pressure so point 4 sits in the two-phase region. Compressor (1→2) is the only process that adds enthalpy (shaft work).
Dirty condenser, recirculated discharge air in a Florida screen well, or a 95°F outdoor on a black roof raises P c P_c P c . The 2–3 line moves up . Compressor work h 2 − h 1 h_2 - h_1 h 2 − h 1 grows, refrigerating effect shrinks, and COP falls. A starved evaporator drops P e P_e P e ; the 4–1 line moves down , mass flow falls, and the compressor runs hot because compression ratio rose.
- Superheat and subcooling — formulas with worked numbers
- Superheat (SH)
SH = T suction line − T SST \text{SH} = T_{\text{suction line}} - T_{\text{SST}} SH = T suction line − T SST
Read suction pressure . Convert to saturated suction temperature (SST) on the P-T chart for that refrigerant . Subtract from the actual suction-line temperature at the evaporator outlet (TXV bulb location, on the pipe metal, insulated from attic air).
- Subcooling (SC)
- SC = T SCT − T liquid line \text{SC} = T_{\text{SCT}} - T_{\text{liquid line}} SC = T SCT − T liquid line
Read liquid-line (or high-side) pressure . Convert to saturated condensing temperature (SCT) . Subtract the actual liquid-line temperature leaving the condenser.
Worked superheat (R-410A). Suction 118 psig . A typical P-T chart (not an exam key) lists R-410A at 40°F ≈ 118–119 psig , so SST ≈ 40°F . Clamp probe on the suction line leaving the A-coil reads 52°F .
SH = 52 − 40 = 12 ° F \text{SH} = 52 - 40 = 12°F SH = 52 − 40 = 12° F
That is a normal air-conditioning TXV target (often 8–12°F ; follow the listing). 0–2°F is flooding. 20–25°F is a starved coil.
Worked superheat (R-22). Suction 70 psig . Typical chart: R-22 at 40°F ≈ 68.5 psig , so SST ≈ 41°F . Suction line 53°F . SH = 53 − 41 = 12°F .
Worked subcooling (R-410A). Liquid-line pressure 418 psig . Typical chart: R-410A at 120°F ≈ 418–419 psig , so SCT ≈ 120°F . Liquid line leaving the condensing unit reads 110°F .
SC = 120 − 110 = 10 ° F \text{SC} = 120 - 110 = 10°F SC = 120 − 110 = 10° F
A typical TXV charging target is about 8–15°F subcooling on the manufacturer’s chart (often near 10°F ). Near 0°F with bubbles in a sight glass is missing liquid (undercharge or a condenser that cannot condense). 20°F+ with a flooded evaporator is often overcharge .
Worked refrigerating effect (typical R-22 chart enthalpies, ASHRAE-style −40°F reference). Evaporator 40°F , 10°F superheat; condenser 100°F , 10°F subcooling. Saturated vapor at 40°F is about 108.2 Btu/lb ; add vapor specific heat (~0.16 Btu/lb·°F) × 10°F → h 1 ≈ 109.8 h_1 \approx 109.8 h 1 ≈ 109.8 Btu/lb. Saturated liquid at 100°F is about 39.3 Btu/lb ; subtract liquid specific heat (~0.30) × 10°F → h 3 ≈ 36.3 h_3 \approx 36.3 h 3 ≈ 36.3 Btu/lb. Expansion is isenthalpic, so h 4 = 36.3 h_4 = 36.3 h 4 = 36.3 . Refrigerating effect h 1 − h 4 ≈ 73.5 h_1 - h_4 \approx 73.5 h 1 − h 4 ≈ 73.5 Btu/lb. Those enthalpies are typical chart values for teaching the plot , not numbers to memorize as CILB keys. On CBT you read (h) off the diagram you are given.
Charge a TXV system by subcooling (and verify SH). Charge a piston by superheat at the published outdoor condition. Charge a cap tube by weigh-in . Mixing those three methods is how a 3-ton Fort Myers split slugs a compressor.
Typical operating pressures — R-410A vs R-22 (P-T chart, not exam keys)
Use a published P-T chart in the reference stack. The round numbers below are typical saturation pressures at sea level so you can see that 410A is not “22 plus a little.” They are not secret exam answers and they shift with altitude, glide (on blends), and whether the chart is bubble or dew.
- Saturation temperature Typical R-22 (psig) Typical R-410A (psig)
- 40°F (common AC evaporator) ~68–70 ~118–119
- 45°F ~76 ~130–131
- 75°F (standing, equalized indoor) ~132 ~217–220
- 100°F ~196 ~317–318
- 110°F ~226 ~365
- 120°F (common AC condenser on a hot day) ~260 ~418–419
Running comfort cooling on a ~95°F Florida outdoor, indoor near 80°F DB / 67°F WB , a healthy split often shows:
R-22: suction on the order of 60–80 psig , discharge on the order of 200–280 psig (condensing 15–30°F above outdoor).
R-410A: suction on the order of 115–140 psig , discharge on the order of 350–450 psig under the same idea.
Those running bands are typical , not nameplate. Always convert this machine’s gauges through this refrigerant’s chart, then compute SH and SC. A 410A system standing at 75°F that equalizes at 100 psig is not “a little low” — it is far below ~218 psig saturation and is undercharged, still in a partial vacuum, or on the wrong refrigerant.
R-454B / R-32 replacements are not R-410A on the chart. Use the cylinder and the manufacturer’s P-T table. R-22 gauges and recovery cylinders are the wrong pressure class for 410A.
High superheat vs low superheat — the diagnostic table
- Superheat Subcooling Suction / head vs typical First diagnosis
- High Low Both low Undercharge
High High Head normal-to-high, suction low Restriction (drier, kink, TXV screen, liquid-line kink) — liquid stacks in the condenser, evaporator starves
Low High Head high Overcharge
Low Low Suction low or hunting Low evaporator load : low airflow, dirty filter, iced coil, uninsulated attic return, or a TXV stuck open
SH OK, SC OK, high head — Head high, amps high Dirty condenser , recirculated outdoor air, overcharge if SC also high, noncondensables if SC looks odd and head stays high after a cool-down
High superheat means the vapor at the evaporator outlet is hotter than it should be — the coil ran out of liquid: undercharge or a restriction that will not feed. Low superheat means liquid is still boiling at the outlet — overcharge , a TXV overfeeding , or the air is not delivering enough heat ( low load / low CFM ). Do not add charge to a low-airflow coil because SH is low; you will slug the compressor when someone finally changes the filter.
Worked restriction vs undercharge. Both can show 24°F superheat. Measure subcooling. If SC is 2°F and the sight glass flashes, weigh the charge — undercharge . If SC is 22°F , the condenser is stacked with liquid and the evaporator is starving — find the restriction (often a plugged liquid-line drier after a burnout). Adding pounds to a restriction only raises head further.
Florida scenario
Palm Coast Comfort, certified Class B in Volusia, is called to a 3-ton R-410A split on a 95°F Daytona afternoon. Helper A reads 118 psig suction and 418 psig liquid, then “adds 410A until the suction is 70 like the old R-22 truck.” That 70 psig is an R-22 40°F number. On 410A, 70 psig is a deep freeze , not a 40°F coil — he just diagnosed the wrong chart. Helper B converts correctly: 118 psig ≈ 40°F SST , suction line 62°F , SH = 22°F ; liquid 418 psig ≈ 120°F SCT , liquid line 118°F , SC = 2°F . That is undercharge , not a TXV to replace. They weigh in the missing charge to the nameplate plus line-set allowance, SH falls to 11°F , SC rises to 10°F . Same afternoon, a 30-ton 410A RTU on the strip center shows the same pattern — Class B may know the plot but may not contract the 30-ton system under 489.105 .
Traps: (1) Using an R-22 “70 and 250” memory on R-410A. (2) Charging a TXV by superheat as if it were a piston. (3) Calling every high SH an undercharge without reading subcooling (restriction vs starve). (4) Adding charge to a low-SH coil that is really a dirty filter. (5) Plotting expansion as a pressure rise .