Study guide

17.2 Designing Duct Systems & Insulation

Florida HVAC Contractor License Class A/B

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Exam Overview

1.1 Current Exam Facts & License Classes 1.2 Exam Format, Open-Book Rules & Pearson VUE 1.3 Eligibility, Experience Paths & Financial Responsibility

2 Establishing the Contracting Business

2.1 Business Organizational Structure 2.2 Business Plan, Marketplace & License Scope 2.3 Professionals, Fixed Assets & Bonding

3 Insurance for Florida HVAC Contractors

3.1 Obtaining Insurance (GL, Workers' Compensation & Bonds) 3.2 Coverages, Limits & Policy Language 3.3 Maintaining Insurance & CILB Certificate-Holder Rules

4 Overhead, Staffing & Markets

4.1 Developing the Business, Staffing & Markets 4.2 Determining Business Overhead (FICA, FUTA, SUTA, Workers' Comp, Rent & Utilities) 4.3 Determining Outsourced Services

5 Bids, Proposals & Estimating

5.1 Preparing Bids and Proposals 5.2 AIA Documents, Offers & Contract Components 5.3 Labor Productivity, Overhead & Project Costing

6 Purchasing, Invoices, Draws & Safety Programs

6.1 Purchasing Materials, UCC & Inventory (FIFO) 6.2 Invoices, Draw Requests & Percentage of Completion 6.3 Developing a Safety Program (OSHA, SDS & Drug Testing)

7 Managing Contracts

7.1 Contract Law, Scope & Completion Schedules 7.2 Florida Lien Law Inside Contracting 7.3 Mediation, Arbitration, Tort Law & Risk

8 Managing Trade Operations

8.1 Scheduling Trade Operations (CPM, RFI & Submittals) 8.2 OSHA Records, Document Retainage & Penalties 8.3 Takeoffs, Equipment Lease vs Purchase & Inventory

9 Accounting I: Receivables, Payables & Cash

9.1 Managing Accounts Receivable 9.2 Managing Accounts Payable & Discounts 9.3 Cash Flow, Banking & Financial Ratios

10 Accounting II: Taxes, Job Cost & Payroll

10.1 Filing Tax Forms & Returns 10.2 Tracking Job Costs 10.3 Payroll, Employment Taxes & Garnishments

11 Managing Human Resources

11.1 Hiring, I-9, Background Checks & Discrimination 11.2 HR Policies, OSHA & Drug-Test Chain of Custody 11.3 Evaluating Employees

12 Florida Contractor Law: Chapter 489 & 61G4

12.1 Chapter 489: Certified vs Registered & Qualifying Agents 12.2 61G4 Board Rules, Advertising & Discipline 12.3 Qualifying Agent Duties, Supervision & Additional Entities

13 Florida Construction Lien Law (Chapter 713)

13.1 Construction Lien Overview & Claimants 13.2 Notices to Owner, Time Limits & Perfecting Liens 13.3 Payment Bonds, Waivers & Claims of Lien

14 Financial Responsibility, CE & Federal Rules

14.1 Financial Responsibility & the 660 FICO Rule 14.2 Continuing Education & Biennial Renewal 14.3 Federal Employment, Immigration, OSHA & Environmental Rules

15 Plans, Specs & Equipment Selection

15.1 Reading Plans, Specifications, Symbols & Scales 15.2 Recommending Plan Changes & Equipment Types 15.3 EER, SEER, ARI Listings & Cost Effectiveness

16 Energy Codes, Loads & Thermal Resistance

16.1 Florida Energy Codes, R-Values & U-Factors 16.2 Determining HVAC Heating & Cooling Loads 16.3 Applying Energy Conservation, Fan Curves & Pump Curves

17 HVAC System & Duct Design

17.1 Designing HVAC Systems (Psychrometrics, Enthalpy & Airflow) 17.2 Designing Duct Systems & Insulation 17.3 Selecting Equipment, Location & Codes

18 Piping, Pumps, Boilers, Controls & Rigging Design

18.1 Pipe Sizing, Valves, Fittings, Sealants & Layout 18.2 Control Requirements, Fan Motors, CFM & Compressor Capacity 18.3 Pumps, Boilers, Steam, Fuel & Pipe Insulation 18.4 Grease Ducts, Live Loads, Rigging & Mechanical Equipment

19 Sheet Metal Duct Fabrication

19.1 Fabricating Rectangular & Round Ducts 19.2 Seams, Locks, Taping, Mastics & Liners 19.3 Fittings, Outlets & Grilles 19.4 Kitchen Hoods, Exhausts & Drain Pans

20 Split, Package & Heat Pump Installation

20.1 Installing Split & Package Air Conditioners 20.2 Installing Split & Package Heat Pumps 20.3 Air-Cooled vs Water-Cooled Systems

21 Large Systems, Chillers & Towers

21.1 Installing by Tonnage & Class A vs Class B Limits 21.2 Chilled Water, Water Towers & Secondary Coolant 21.3 Centrifugal, Absorption & Ammonia Systems

22 Refrigeration, Coolers, Ventilation & Controls Install

22.1 Low, Medium & Ultra-Low Temperature Systems & EPA Rules 22.2 Walk-In & Reach-In Coolers 22.3 Ventilation, Exhaust, Makeup Air, Grease Ducts & Kitchen Exhaust 22.4 Geothermal, Pneumatic & DDC Controls, TAB & Smoke Tests

23 Condensers, Compressors & Air Handlers

23.1 Installing Air-Cooled & Water-Cooled Condensers 23.2 Hermetic, Semi-Hermetic & Centrifugal Compressors 23.3 Air Handlers, Evaporators, Heat Exchangers, Receivers & Heat Strips

24 Duct, Fans, Filters & Terminals

24.1 Installing Sheet Metal, Fiberglass & Flexible Duct 24.2 Fans, Blowers, Motors, Grilles, Registers & Fire Dampers 24.3 Filters, Flues, Warm-Air, Gas & Fuel-Oil Appliances

25 Refrigerant Piping & Joining

25.1 Refrigerant Piping, Copper Tubing & Pipe Sizing 25.2 Brazing, Welding, Flaring, Swaging & Soldering 25.3 Steel Pipe, Plastic Pipe, Threading & Oxy-Acetylene 25.4 Hangers, Supports, Horizontally Supported Piping & Pressure Testing

26 Metering Devices & Line Components

26.1 TXVs, Capillary Tubes, Reversing Valves & Metering Devices 26.2 Liquid, Suction & Heat-Pump Dryers, Filters & Oil Traps 26.3 Receivers, Heat Strips, Gas/Oil Appliances & Related Accessories

27 Controls Installation

27.1 Pressure, Temperature, Humidity & Bellows Controls 27.2 Thermostats, Humidistats, Pneumatic & Solid-State Controls 27.3 Transformers, Capacitors, Contactors, Relays & Safety Disconnects 27.4 Defrost Components, Starters, Solenoids & Limit Switches

28 Motors, Wiring & Electrical Installation

28.1 Wiring Single-Phase & Three-Phase Equipment 28.2 Motor Types, Protection, Controllers, Belts & Pulleys 28.3 Geothermal Loops, Surge Protectors, Phase Monitors & Plastic Pipe

29 Diagnostic Analysis: Refrigeration

29.1 Pressure-Enthalpy Diagrams & Operating Pressures 29.2 Air Volumes, Enthalpy, Wet-Bulb & Dry-Bulb 29.3 Leak Detection & Refrigeration Test Instruments

30 Diagnostic Analysis: Electrical & Instruments

30.1 Current Draw, Voltage, Power & Motor Terminals 30.2 Testing Relays, Capacitors, Starters, Transformers & Defrost Stats 30.3 Using Amprobes, Velometers, Pitot Tubes, Manometers & Gauges

31 Recovery, Repair & Calibration

31.1 Nitrogen & Gas Regulators, Recovery & Retrofit 31.2 Repairing Hermetic, Semi-Hermetic, Centrifugal Compressors & Blowers 31.3 Calibrating Thermostats, Pressure Switches & Pneumatic Controls 31.4 Superheat, Safety Cutouts, Defrost Clocks & Freezer Controls

32 Mechanical Service & Cleaning

32.1 Belts, Pulleys, Motor Rotation & Seized Compressors 32.2 Crankcase & Evaporator Pressure Regulators & Unloaders 32.3 Cleaning Towers, Condensers, Foreign Matter & Condensate Drains

33 Jobsite Safety & Equipment

33.1 PPE: Hearing, Head, Eye, Face & Respiratory Protection 33.2 Lockout/Tagout, Warning Signs, Toxic Materials & Ventilation 33.3 Rigging, Hoists, Cranes, Forklifts, Backhoes & Excavation 33.4 Ladders, Scaffolds, Tools & Air Compressors

34 Energy Management

34.1 Envelope, Duct Pressure & Blower-Door Testing 34.2 Efficient Equipment, Zoning, ERVs, Wi-Fi Thermostats & Green Buildings 34.3 Energy Forms, R/U Factors, Window Heat Gain & Florida Load Calcs

35 Indoor Air Quality

35.1 Ventilation, Filtration, Humidity, UV & Air Cleaners 35.2 Contaminants, Source Control, TAB & Human Health Effects

17.2 Designing Duct Systems & Insulation

Key Takeaways Explain This Topic AI

The Trane Ductulator, 1976 or later, is an allowed 2026 Air Conditioning CBT tool; align cfm with a friction rate (often 0.08 to 0.10 in. w.g. per 100 ft as a low-pressure start) and read diameter or width×height plus velocity.

Equal friction sizes every section at the same friction rate per 100 feet of equivalent length; static regain uses a downstream velocity drop so velocity pressure VP = (V/4005)² converts back to static pressure on long high-velocity trunks.

SMACNA HVAC Duct Construction Standards, Metal and Flexible, 4th Edition (2020) sets pressure class (½ through 10 in. w.g.), gauge, reinforcement, and seal class; aspect ratio is the long side divided by the short side and is kept near 4:1 or less for metal and friction economy.

Fitting losses are converted to equivalent length and added to measured centerline length before the friction rate is applied; device drops (coil, filter, grille, fire damper) come off blower external static first.

FBC Energy Conservation 2023 Section R403.3 requires attic supply and return ducts 3 inches in diameter and larger to be insulated to R-8, ducts to be sealed, and building framing cavities not to be used as ducts or plenums.

Last updated: August 2026

17.2 Designing Duct Systems & Insulation

The same Trade Area A cluster that asked you for CFM now asks you to design the duct that carries it, and to insulate that duct so a 130°F Florida attic does not steal the ΔT from Section 17.1. Fabrication — Pittsburgh locks, liners, kitchen hoods — is Trade Area B in Chapter 19. This section is sizing, layout method, friction, equivalent length, aspect ratio, and insulation .

Quick Answer: Size ducts with the Trane Ductulator (1976 or later) — it is an allowed exam tool — at a chosen friction rate, then add equivalent length of fittings and keep rectangular aspect ratio from running wild. Equal friction holds a constant friction rate per 100 feet; static regain uses a velocity drop to turn velocity pressure back into static pressure. Insulate attic supply and return to R-8 (3 inches diameter and up) under FBC Energy Conservation 2023.

Tools the CBT actually allows

The 2026 Air Conditioning reference list names the Trane Ductulator, 1976 or later . Pearson VUE and PTI treat it as a permitted Trade Knowledge tool along with the architect's scale. A Ductulator is a circular slide rule with round-duct and rectangular-duct faces. You align cfm with a friction rate (inches of water column per 100 feet of duct) and read diameter (or width and height) and velocity (fpm). A 1976-or-later wheel is listed; a 1975 wheel is not the listed edition. A phone app is not the listed tool either.

You still need a friction rate to aim at. Common low-pressure starting points are 0.08 to 0.10 in. w.g. per 100 ft . That is a starting point, not a code section. Residential work that follows ACCA Manual D (taught in Energy Efficient Building Construction in Florida 2024) first finds available static pressure — blower external static minus coil, filter, and terminal losses — then:

Friction rate = available static pressure (in. w.g.) total equivalent length / 100 \text{Friction rate} = \dfrac{\text{available static pressure (in. w.g.)}}{\text{total equivalent length}/100} Friction rate = total equivalent length /100 available static pressure (in. w.g.) ​

If available static is 0.20 in. w.g. and total equivalent length is 250 ft, friction rate = 0.20 / 2.5 = 0.08 in. / 100 ft . Then the Ductulator sizes every section at that rate ( equal friction ). If you skip equivalent length and size as if the trunk were 40 feet of straight pipe, the fan will not hit the CFM from Section 17.1.

SMACNA HVAC Duct Construction Standards, Metal and Flexible, 4th Edition, 2020 is the construction book on the same list. It does not replace the Ductulator. It tells you, once the size exists, which pressure class (½, 1, 2, 3, 4, 6, or 10 in. w.g.), gauge, reinforcement, joint, and hanger table apply. A 16×12 trunk on 2-inch pressure class is a different construction table from a 16×12 return on ½-inch class. Seal Class A seals transverse joints, longitudinal seams, and duct-wall penetrations; it is the energy-code-minded class. FBC Energy R403.3 requires ducts and air handlers to be sealed ; building framing cavities are not ducts or plenums.

Friction loss, velocity, and equivalent length

Air in a duct loses total pressure to friction on straight runs and to dynamic losses in fittings. Designers bundle those dynamic losses as equivalent length (EL) : a 90-degree elbow “equals” so many feet of straight duct of the same size. Add EL of fittings to measured centerline length, then apply the friction rate.

  • Piece What you put in the takeoff Typical exam trap
  • Straight duct Measured centerline length Scaling an NTS schematic as if it were a floor plan

Elbow, tee, wye, transition, takeoff Equivalent length from SMACNA/ASHRAE fitting data or the Ductulator notes Counting a mitered 90° as zero extra because it looks short on the plan

Flexible duct Stretched length, not the compressed bag length; extra EL for sag and coils Hanging a 25-foot bag in 12 feet of attic

Fire damper, coil, filter, grille Device pressure drop in in. w.g., subtracted from blower ESP before friction rate is calculated Hiding a dirty-filter drop inside the duct friction rate

Velocity is the noise and erosion check. On the Ductulator, 1,000 cfm through 10-inch round at about 0.10 in./100 ft runs near 1,400–1,500 fpm — acceptable for a short commercial trunk, loud for a bedroom branch. Residential branches often sit 600–900 fpm ; low-pressure commercial mains 1,000–1,800 fpm ; true high-velocity systems 2,500 fpm and up , which is where static regain earns its keep. If the wheel gives you a size that is quiet but needs 0.25 in./100 ft, you do not have the static to spend.

Round duct has the least perimeter for a given area, so the least metal and the least friction. Rectangular equivalent on the Ductulator converts a width × height to an equivalent round diameter so you can use the same friction chart. Do not treat a 16×8 as “the same as 12-inch round” without the wheel or an equivalent-diameter relation.

Aspect ratio

Aspect ratio (AR) is the long side divided by the short side of a rectangular duct. A 24×8 duct has AR = 3.0 . A 36×8 duct has AR = 4.5 . SMACNA construction tables get heavier — more gauge, more reinforcement, more joints — as the larger dimension and the pressure class grow. A pancake duct also has more surface area, more friction, and more insulation square footage for the same cfm. Shop practice and SMACNA economy talk keep AR at about 4:1 or less unless the joist bay truly forbids it. An 8-inch-deep Florida truss bay is not a license to run 48×8 (AR = 6) across a whole house when two 18×8 runs or a round pair would carry the air.

Equal friction versus static regain (qualitative)

You will not be asked to run a full static-regain spreadsheet on CBT. You will be asked which method you are looking at.

Equal friction. Every section is sized for the same friction rate (in. w.g. per 100 ft of equivalent length). Simple. The Ductulator was born for it. Downstream, leftover static at far branches is whatever remains, so you balance with dampers. This is the default method for low-pressure residential and light commercial systems — Florida Class B bread-and-butter.

Static regain. As the duct enlarges and velocity falls, velocity pressure converts back to static pressure . Velocity pressure in I-P units is

V P = ( V 4005 ) 2 VP = \left(\dfrac{V}{4005}\right)^2 V P = ( 4005 V ​ ) 2 in. w.g.,

with (V) in fpm. Dropping from 2,400 fpm (VP ≈ 0.36 in.) to 1,200 fpm (VP ≈ 0.09 in.) theoretically regains about 0.27 in. of static if the transition is efficient; a real fitting regains a fraction of that. Designers use that regain to keep branch static more uniform on long, high-velocity trunks (large commercial, high-pressure risers). Class A candidates see this on big air handlers; Class B still needs the idea so a 20-ton strip-center trunk is not equal-friction-ed at 3,000 fpm.

Velocity reduction is a cousin: you step velocity down at each takeoff without formally computing regain. T-method optimizes life-cycle duct cost; it is theory, not a Pearson VUE everyday tool.

Insulation and Florida energy rules

A perfectly sized duct in a Florida attic delivers the wrong ΔT if it is uninsulated. FBC Energy Conservation 2023 Section R403.3 , and the same attic practice in Energy Efficient Building Construction in Florida 2024, wants supply and return ducts in attics insulated to R-8 where the duct is 3 inches in diameter and larger , and a lower R ( R-6 ) for the small-diameter exception. Ducts in other unconditioned spaces are typically R-6 (R-4.2 when under 3 inches). Ducts entirely in conditioned space do not take that attic R-8 rule. Insulation needs an adequate vapor retarder on the warm-humid side so attic moisture does not sweat through the jacket onto ceiling drywall.

FBC Mechanical Chapter 6 and Section 604 cover materials, installation, and vapor retarders for duct insulation. Flex duct must be listed, fully extended , supported at the manufacturer's spacing without kinking, and not used as a long cheap substitute for a designed trunk. Compressed flex raises friction dramatically; the Ductulator's round-duct reading is no longer true. Seal the ducts. Test when the energy form requires a leakage test. Do not pan joists as a return. A return-air chase that is also a garage or attic plenum dumps latent load and pollutants into the coil.

NFPA 90A (2015) and 90B (2024) still govern fire and smoke dampers and some residential warm-air limits; a fire damper's pressure drop is a device loss, not an equivalent-length footnote you may ignore. Kitchen grease duct is NFPA 96 (2021) and Chapter 18, not a SMACNA comfort-duct friction chart.

Florida HVAC scenario

A Class B qualifier in Orange County takes a 1,000 cfm air handler from Section 17.1 and “sizes” the supply with 8-inch flex because that is what fits between trusses. The Ductulator at 0.08 in./100 ft wants about 10-inch round (or a rectangular equivalent near 14×8, AR = 1.75) for 1,000 cfm at a reasonable velocity. Eight-inch round at 1,000 cfm is roughly 2,300 fpm and a friction rate the small residential blower does not have. The attic run is 45 feet plus three mitered elbows the estimator ignored — easily 60–90 feet of extra equivalent length. Insulation is leftover R-4.2 blanket on a 10-inch metal trunk. Three failures: size and velocity , equivalent length , and R-8 attic insulation . SMACNA 4th 2020 still wants a pressure class and seal class that match the blower; FBC Energy still wants the R-8 and the seal. The Ductulator was sitting in the truck — and it is the one duct-sizing tool the 2026 CBT list told the candidate to bring.

Traps: (1) Leaving the Ductulator at home because a phone app “is the same.” (2) Equal-friction at 0.08 in./100 ft on a 300-foot high-velocity main that needed static regain. (3) Aspect ratio 8:1 pancakes “because of the joists.” (4) Counting flex at bag length. (5) Insulating attic ducts to wall-cavity R-4.2.

Loading diagram... Equal-friction versus static-regain duct sizing