1.2 Exam Format, Open-Book Rules & Pearson VUE

Florida HVAC Contractor License Class A/B

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Exam Overview

1.1 Current Exam Facts & License Classes 1.2 Exam Format, Open-Book Rules & Pearson VUE 1.3 Eligibility, Experience Paths & Financial Responsibility

2 Establishing the Contracting Business

2.1 Business Organizational Structure 2.2 Business Plan, Marketplace & License Scope 2.3 Professionals, Fixed Assets & Bonding

3 Insurance for Florida HVAC Contractors

3.1 Obtaining Insurance (GL, Workers' Compensation & Bonds) 3.2 Coverages, Limits & Policy Language 3.3 Maintaining Insurance & CILB Certificate-Holder Rules

4 Overhead, Staffing & Markets

4.1 Developing the Business, Staffing & Markets 4.2 Determining Business Overhead (FICA, FUTA, SUTA, Workers' Comp, Rent & Utilities) 4.3 Determining Outsourced Services

5 Bids, Proposals & Estimating

5.1 Preparing Bids and Proposals 5.2 AIA Documents, Offers & Contract Components 5.3 Labor Productivity, Overhead & Project Costing

6 Purchasing, Invoices, Draws & Safety Programs

6.1 Purchasing Materials, UCC & Inventory (FIFO) 6.2 Invoices, Draw Requests & Percentage of Completion 6.3 Developing a Safety Program (OSHA, SDS & Drug Testing)

7 Managing Contracts

7.1 Contract Law, Scope & Completion Schedules 7.2 Florida Lien Law Inside Contracting 7.3 Mediation, Arbitration, Tort Law & Risk

8 Managing Trade Operations

8.1 Scheduling Trade Operations (CPM, RFI & Submittals) 8.2 OSHA Records, Document Retainage & Penalties 8.3 Takeoffs, Equipment Lease vs Purchase & Inventory

9 Accounting I: Receivables, Payables & Cash

9.1 Managing Accounts Receivable 9.2 Managing Accounts Payable & Discounts 9.3 Cash Flow, Banking & Financial Ratios

10 Accounting II: Taxes, Job Cost & Payroll

10.1 Filing Tax Forms & Returns 10.2 Tracking Job Costs 10.3 Payroll, Employment Taxes & Garnishments

11 Managing Human Resources

11.1 Hiring, I-9, Background Checks & Discrimination 11.2 HR Policies, OSHA & Drug-Test Chain of Custody 11.3 Evaluating Employees

12 Florida Contractor Law: Chapter 489 & 61G4

12.1 Chapter 489: Certified vs Registered & Qualifying Agents 12.2 61G4 Board Rules, Advertising & Discipline 12.3 Qualifying Agent Duties, Supervision & Additional Entities

13 Florida Construction Lien Law (Chapter 713)

13.1 Construction Lien Overview & Claimants 13.2 Notices to Owner, Time Limits & Perfecting Liens 13.3 Payment Bonds, Waivers & Claims of Lien

14 Financial Responsibility, CE & Federal Rules

14.1 Financial Responsibility & the 660 FICO Rule 14.2 Continuing Education & Biennial Renewal 14.3 Federal Employment, Immigration, OSHA & Environmental Rules

15 Plans, Specs & Equipment Selection

15.1 Reading Plans, Specifications, Symbols & Scales 15.2 Recommending Plan Changes & Equipment Types 15.3 EER, SEER, ARI Listings & Cost Effectiveness

16 Energy Codes, Loads & Thermal Resistance

16.1 Florida Energy Codes, R-Values & U-Factors 16.2 Determining HVAC Heating & Cooling Loads 16.3 Applying Energy Conservation, Fan Curves & Pump Curves

17 HVAC System & Duct Design

17.1 Designing HVAC Systems (Psychrometrics, Enthalpy & Airflow) 17.2 Designing Duct Systems & Insulation 17.3 Selecting Equipment, Location & Codes

18 Piping, Pumps, Boilers, Controls & Rigging Design

18.1 Pipe Sizing, Valves, Fittings, Sealants & Layout 18.2 Control Requirements, Fan Motors, CFM & Compressor Capacity 18.3 Pumps, Boilers, Steam, Fuel & Pipe Insulation 18.4 Grease Ducts, Live Loads, Rigging & Mechanical Equipment

19 Sheet Metal Duct Fabrication

19.1 Fabricating Rectangular & Round Ducts 19.2 Seams, Locks, Taping, Mastics & Liners 19.3 Fittings, Outlets & Grilles 19.4 Kitchen Hoods, Exhausts & Drain Pans

20 Split, Package & Heat Pump Installation

20.1 Installing Split & Package Air Conditioners 20.2 Installing Split & Package Heat Pumps 20.3 Air-Cooled vs Water-Cooled Systems

21 Large Systems, Chillers & Towers

21.1 Installing by Tonnage & Class A vs Class B Limits 21.2 Chilled Water, Water Towers & Secondary Coolant 21.3 Centrifugal, Absorption & Ammonia Systems

22 Refrigeration, Coolers, Ventilation & Controls Install

22.1 Low, Medium & Ultra-Low Temperature Systems & EPA Rules 22.2 Walk-In & Reach-In Coolers 22.3 Ventilation, Exhaust, Makeup Air, Grease Ducts & Kitchen Exhaust 22.4 Geothermal, Pneumatic & DDC Controls, TAB & Smoke Tests

23 Condensers, Compressors & Air Handlers

23.1 Installing Air-Cooled & Water-Cooled Condensers 23.2 Hermetic, Semi-Hermetic & Centrifugal Compressors 23.3 Air Handlers, Evaporators, Heat Exchangers, Receivers & Heat Strips

24 Duct, Fans, Filters & Terminals

24.1 Installing Sheet Metal, Fiberglass & Flexible Duct 24.2 Fans, Blowers, Motors, Grilles, Registers & Fire Dampers 24.3 Filters, Flues, Warm-Air, Gas & Fuel-Oil Appliances

25 Refrigerant Piping & Joining

25.1 Refrigerant Piping, Copper Tubing & Pipe Sizing 25.2 Brazing, Welding, Flaring, Swaging & Soldering 25.3 Steel Pipe, Plastic Pipe, Threading & Oxy-Acetylene 25.4 Hangers, Supports, Horizontally Supported Piping & Pressure Testing

26 Metering Devices & Line Components

26.1 TXVs, Capillary Tubes, Reversing Valves & Metering Devices 26.2 Liquid, Suction & Heat-Pump Dryers, Filters & Oil Traps 26.3 Receivers, Heat Strips, Gas/Oil Appliances & Related Accessories

27 Controls Installation

27.1 Pressure, Temperature, Humidity & Bellows Controls 27.2 Thermostats, Humidistats, Pneumatic & Solid-State Controls 27.3 Transformers, Capacitors, Contactors, Relays & Safety Disconnects 27.4 Defrost Components, Starters, Solenoids & Limit Switches

28 Motors, Wiring & Electrical Installation

28.1 Wiring Single-Phase & Three-Phase Equipment 28.2 Motor Types, Protection, Controllers, Belts & Pulleys 28.3 Geothermal Loops, Surge Protectors, Phase Monitors & Plastic Pipe

29 Diagnostic Analysis: Refrigeration

29.1 Pressure-Enthalpy Diagrams & Operating Pressures 29.2 Air Volumes, Enthalpy, Wet-Bulb & Dry-Bulb 29.3 Leak Detection & Refrigeration Test Instruments

30 Diagnostic Analysis: Electrical & Instruments

30.1 Current Draw, Voltage, Power & Motor Terminals 30.2 Testing Relays, Capacitors, Starters, Transformers & Defrost Stats 30.3 Using Amprobes, Velometers, Pitot Tubes, Manometers & Gauges

31 Recovery, Repair & Calibration

31.1 Nitrogen & Gas Regulators, Recovery & Retrofit 31.2 Repairing Hermetic, Semi-Hermetic, Centrifugal Compressors & Blowers 31.3 Calibrating Thermostats, Pressure Switches & Pneumatic Controls 31.4 Superheat, Safety Cutouts, Defrost Clocks & Freezer Controls

32 Mechanical Service & Cleaning

32.1 Belts, Pulleys, Motor Rotation & Seized Compressors 32.2 Crankcase & Evaporator Pressure Regulators & Unloaders 32.3 Cleaning Towers, Condensers, Foreign Matter & Condensate Drains

33 Jobsite Safety & Equipment

33.1 PPE: Hearing, Head, Eye, Face & Respiratory Protection 33.2 Lockout/Tagout, Warning Signs, Toxic Materials & Ventilation 33.3 Rigging, Hoists, Cranes, Forklifts, Backhoes & Excavation 33.4 Ladders, Scaffolds, Tools & Air Compressors

34 Energy Management

34.1 Envelope, Duct Pressure & Blower-Door Testing 34.2 Efficient Equipment, Zoning, ERVs, Wi-Fi Thermostats & Green Buildings 34.3 Energy Forms, R/U Factors, Window Heat Gain & Florida Load Calcs

35 Indoor Air Quality

35.1 Ventilation, Filtration, Humidity, UV & Air Cleaners 35.2 Contaminants, Source Control, TAB & Human Health Effects

1.2 Exam Format, Open-Book Rules & Pearson VUE

Key Takeaways Explain This Topic AI

Register first with Professional Testing, Inc. (PTI) at floridaexam.com (407-264-0562); after approval, schedule daily CBT with Pearson VUE at 888-204-6230 (typically wait 10–14 business days before calling).

Class A Trade Knowledge is 130 scored questions in 7.5 hours; Class B is 80 scored in 5 hours; Business & Finance is 120 scored in 6.5 hours; passing is 70% with no rounding (84 of 120 on B&F).

Open-book rules on the 2026 Air A CBT Reference List: references must stay bound; moveable Post-it Flags are not allowed; handwritten or typewritten notes are not allowed; pen underlining and highlighter are allowed; do not write in books during the sitting.

Bring an architect's scale including 1/4" and 1/8" to Trade Knowledge; 2026 listed trade editions include FBC Mechanical 2023, FBC Energy Conservation 2023, OSHA 29 CFR 1926 (July 1, 2025), Contractors Manual 2025, SMACNA, and NFPA 90A 2015 / 90B 2024 / 96 2021.

Exam fees are not published as a single official dollar amount on DBPR's Examinations at a Glance chart — confirm the current PTI and Pearson VUE amounts at registration; do not rely on third-party price quotes.

Last updated: August 2026

How the two sittings are delivered

Quick Answer: Apply and pay through Professional Testing, Inc. (PTI) at floridaexam.com (phone 407-264-0562 ). After PTI processes the file, schedule the computer-based test with Pearson VUE at 888-204-6230 . HVAC Trade Knowledge and Business & Finance are Daily CBT , open book, multiple choice. Passing is 70% with no rounding . Confirm current fees at registration — DBPR does not publish a single official exam-fee dollar amount on the Examinations at a Glance chart.

You are not walking into a CILB meeting with a blue book. PTI is the Board's examination contractor. Pearson VUE is the test-center network. Mixing those roles is a common first-week mistake: calling Pearson VUE before PTI has approved you wastes a phone tree. PTI's own registration notice tells computer-based candidates to wait 10 to 14 business days after submitting the application before calling Pearson VUE.

Plumbing Trade Knowledge is still a paper-and-pencil Orlando event on the construction calendar. Air Conditioning A, Air Conditioning B, and Business & Finance are not. They are daily CBT. You pick a date, time, and Florida Pearson VUE site after approval. Examinations are offered in Spanish if you request Spanish on the application.

What “open book” actually allows

The official Air A Contractors Trade Knowledge Exam Reference List, valid January 2026 – December 2026 , is the controlling document for what may enter the room for Class A trade (Class B has its own matching list; Business & Finance has a separate B&F list). Core rules from that list and the Candidate Information Booklet:

Answers are based on the editions listed . Some items also draw on field experience and trade practice.

You may bring an earlier or later edition at your own risk . Only one copy of each reference is allowed.

Original edition materials only, except references the list specifically marks as available as PDF.

All reference materials and PDF copies must be bound and remain bound . Bound means permanently bound (stitching or glue) or securely fastened by fasteners that penetrate all papers . Bound PDFs may use ring binders, brads, plastic snap binders, spiralbound notebooks, or screw posts — not staples . Writing tablets and electronic tablets are not allowed.

Underlining with pen and highlighter is allowed. Handwritten and typewritten notes are not . Existing handwritten notes must be blackened out or removed so they are not legible. Moveable tabs (Post-it Flags) are not allowed. You may not make marks in the references during the administration.

Highlighter and permanent (non-moveable) indexing that does not add notes are how open-book candidates survive a 7.5-hour sitting. Loose printouts, sticky flags, and a spiral of handwritten “cheat sheets” are how candidates get stopped at the proctor's table.

Allowed in the room (if on the current official list) Not allowed

Bound listed-edition books; listed bound PDFs (ring/brad/spiral/screw post, not staples) Unbound stacks, stapled PDFs, electronic tablets

Pen underlining and highlighter already in the book Handwritten or typewritten notes; writing in books during the exam

  • Permanent (non-moveable) tabs that do not add notes Post-it Flags and other moveable tabs
  • Architect's scale including 1/4" and 1/8" (Trade Knowledge) A scale you “meant to buy” after you sit
  • One copy of each listed title Extra unmarked copies of the same title

All candidates must bring an architect's scale including 1/4" and 1/8" for Trade Knowledge. That sentence is printed at the bottom of the official 2026 Air A list. Plan-reading and duct-layout items assume you can read 1/4" = 1'-0" and 1/8" = 1'-0" drawings. Showing up with only a tape measure is not a substitute.

Check the current Candidate Information Booklet for the approved calculator (typically a handheld, cordless, silent, non-printing model with a numeric, non-alphabetic keyboard) and for other permitted aids such as pencils, page magnifiers, and bookends. When the booklet and the reference list disagree, follow the document that governs the item — the reference list for books, the CIB for personal equipment.

2026 listed trade editions you must not “upgrade” on your own

The January–December 2026 Air A list includes, among others:

  • R12 Air Conditioning and Refrigeration Troubleshooting Handbook, 2nd Edition, 2003
  • R46 OSHA 29 CFR 1926, July 1, 2025
  • R50 Contractors Manual, 2025 (includes Circular E 2025)
  • R82 Pipefitters Handbook, 3rd Edition, 1967
  • NFPA 90A Installation of Air Conditioning and Ventilating Systems, 2015
  • NFPA 90B Installation of Warm Air Heating and Air Conditioning Systems, 2024
  • NFPA 96 Ventilation Control and Fire Protection of Commercial Cooking Operations, 2021
  • SMACNA Fibrous Glass Duct Construction Standards, 8th Edition, 2021 ( bound PDF allowed)
  • SMACNA HVAC Duct Construction Standards — Metal and Flexible, 4th Edition, 2020 ( bound PDF allowed)
  • SMACNA Energy Systems Analysis and Management, 2nd Edition, 2014
  • Refrigeration & Air Conditioning Technology, 9th Edition, 2021
  • Trane Ductulator, 1976 or later
  • Energy Efficient Building Construction in Florida, 2024
  • Florida Building Code – Mechanical, 2023
  • Florida Building Code – Energy Conservation, 2023

Do not treat a 9th Edition / 2026 Florida Building Code as the exam edition unless DBPR's current list says so — the 2026 list does not . Business & Finance has its own list (Florida Statutes Chapter 455, 2025, with a bound PDF allowed; Builder's Guide to Accounting, 2001; Contractors Manual 2025 in use beginning February 1, 2026; AIA A201-2017, A401-2017, A701-2018). Always download the current PDF lists from MyFloridaLicense before you pack the crate.

Scoring, retakes, and what you walk out with

The Candidate Information Booklet states that all questions are equally weighted, scores are percentages, the minimum passing score is seventy percent (70%) , and scores are not rounded . You receive an official photo-bearing exam result report immediately after you finish. Verify the report before you leave the center.

Worked passing lines:

Business & Finance: 84 / 120 = 70.00% . 83/120 = 69.17% — fail.

Class A trade: 91 / 130 = 70.00% . 90/130 ≈ 69.23% — fail.

Class B trade: 56 / 80 = 70.00% . 55/80 = 68.75% — fail.

Fail one part and you retake that part; you do not automatically retake the part you already passed. Passing a part is not a license. DBPR's exam checklist is explicit: a passing grade alone does not qualify you for licensure. Confirm the current score-validity window with DBPR/PTI when you apply — this guide will not invent a year count that the Examinations at a Glance chart does not print.

Fees: Third-party schools quote PTI and Pearson VUE dollar amounts that change. The official Examinations at a Glance PDF does not list a fee. Confirm the current PTI registration amount and the Pearson VUE administration amount when you register . Do not memorize a blog's "$295" figure.

Florida scenario: the Orlando sitting that almost did not start

James books a Thursday Class A trade appointment at a Pearson VUE center near Orlando International. He packed the crate on Wednesday night. Two problems are sitting in that crate. First, his Florida Building Code – Mechanical is the brand-new 9th Edition his supply house sold as “the 2026 code.” The official Air A list valid January 2026 – December 2026 still names FBC Mechanical 2023 and FBC Energy Conservation 2023 . The list allows a later edition only at his own risk — every keyed answer was written to the 2023 tables. Second, he flagged SMACNA duct tables with Post-it Flags . Moveable tabs are not allowed . He did do two things right: the SMACNA fibrous-glass and metal/flex PDFs are in ring binders (the list permits a bound PDF of those two titles), and he has an architect's scale with 1/4" and 1/8" . The proctor pulls the Post-its. James keeps the 2023 Mechanical volume he also brought as a backup, sits the 7.5-hour CBT, and needs 91 of 130. Open book is not “any book you own.” It is the listed bound edition , marked the allowed way, plus the scale the list requires.

Traps: (1) Calling Pearson VUE the day you hit submit on floridaexam.com. (2) Bringing the Service Pool 60-question mindset to a 120-question B&F sitting. (3) Handwritten indexes. (4) Assuming highlighter is banned — it is allowed; notes are not. (5) Leaving the architect's scale in the truck.

Loading diagram... PTI Approval to Pearson VUE Testing Flow