Study guide

21.2 Chilled Water, Water Towers & Secondary Coolant

Florida HVAC Contractor License Class A/B

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Exam Overview

1.1 Current Exam Facts & License Classes 1.2 Exam Format, Open-Book Rules & Pearson VUE 1.3 Eligibility, Experience Paths & Financial Responsibility

2 Establishing the Contracting Business

2.1 Business Organizational Structure 2.2 Business Plan, Marketplace & License Scope 2.3 Professionals, Fixed Assets & Bonding

3 Insurance for Florida HVAC Contractors

3.1 Obtaining Insurance (GL, Workers' Compensation & Bonds) 3.2 Coverages, Limits & Policy Language 3.3 Maintaining Insurance & CILB Certificate-Holder Rules

4 Overhead, Staffing & Markets

4.1 Developing the Business, Staffing & Markets 4.2 Determining Business Overhead (FICA, FUTA, SUTA, Workers' Comp, Rent & Utilities) 4.3 Determining Outsourced Services

5 Bids, Proposals & Estimating

5.1 Preparing Bids and Proposals 5.2 AIA Documents, Offers & Contract Components 5.3 Labor Productivity, Overhead & Project Costing

6 Purchasing, Invoices, Draws & Safety Programs

6.1 Purchasing Materials, UCC & Inventory (FIFO) 6.2 Invoices, Draw Requests & Percentage of Completion 6.3 Developing a Safety Program (OSHA, SDS & Drug Testing)

7 Managing Contracts

7.1 Contract Law, Scope & Completion Schedules 7.2 Florida Lien Law Inside Contracting 7.3 Mediation, Arbitration, Tort Law & Risk

8 Managing Trade Operations

8.1 Scheduling Trade Operations (CPM, RFI & Submittals) 8.2 OSHA Records, Document Retainage & Penalties 8.3 Takeoffs, Equipment Lease vs Purchase & Inventory

9 Accounting I: Receivables, Payables & Cash

9.1 Managing Accounts Receivable 9.2 Managing Accounts Payable & Discounts 9.3 Cash Flow, Banking & Financial Ratios

10 Accounting II: Taxes, Job Cost & Payroll

10.1 Filing Tax Forms & Returns 10.2 Tracking Job Costs 10.3 Payroll, Employment Taxes & Garnishments

11 Managing Human Resources

11.1 Hiring, I-9, Background Checks & Discrimination 11.2 HR Policies, OSHA & Drug-Test Chain of Custody 11.3 Evaluating Employees

12 Florida Contractor Law: Chapter 489 & 61G4

12.1 Chapter 489: Certified vs Registered & Qualifying Agents 12.2 61G4 Board Rules, Advertising & Discipline 12.3 Qualifying Agent Duties, Supervision & Additional Entities

13 Florida Construction Lien Law (Chapter 713)

13.1 Construction Lien Overview & Claimants 13.2 Notices to Owner, Time Limits & Perfecting Liens 13.3 Payment Bonds, Waivers & Claims of Lien

14 Financial Responsibility, CE & Federal Rules

14.1 Financial Responsibility & the 660 FICO Rule 14.2 Continuing Education & Biennial Renewal 14.3 Federal Employment, Immigration, OSHA & Environmental Rules

15 Plans, Specs & Equipment Selection

15.1 Reading Plans, Specifications, Symbols & Scales 15.2 Recommending Plan Changes & Equipment Types 15.3 EER, SEER, ARI Listings & Cost Effectiveness

16 Energy Codes, Loads & Thermal Resistance

16.1 Florida Energy Codes, R-Values & U-Factors 16.2 Determining HVAC Heating & Cooling Loads 16.3 Applying Energy Conservation, Fan Curves & Pump Curves

17 HVAC System & Duct Design

17.1 Designing HVAC Systems (Psychrometrics, Enthalpy & Airflow) 17.2 Designing Duct Systems & Insulation 17.3 Selecting Equipment, Location & Codes

18 Piping, Pumps, Boilers, Controls & Rigging Design

18.1 Pipe Sizing, Valves, Fittings, Sealants & Layout 18.2 Control Requirements, Fan Motors, CFM & Compressor Capacity 18.3 Pumps, Boilers, Steam, Fuel & Pipe Insulation 18.4 Grease Ducts, Live Loads, Rigging & Mechanical Equipment

19 Sheet Metal Duct Fabrication

19.1 Fabricating Rectangular & Round Ducts 19.2 Seams, Locks, Taping, Mastics & Liners 19.3 Fittings, Outlets & Grilles 19.4 Kitchen Hoods, Exhausts & Drain Pans

20 Split, Package & Heat Pump Installation

20.1 Installing Split & Package Air Conditioners 20.2 Installing Split & Package Heat Pumps 20.3 Air-Cooled vs Water-Cooled Systems

21 Large Systems, Chillers & Towers

21.1 Installing by Tonnage & Class A vs Class B Limits 21.2 Chilled Water, Water Towers & Secondary Coolant 21.3 Centrifugal, Absorption & Ammonia Systems

22 Refrigeration, Coolers, Ventilation & Controls Install

22.1 Low, Medium & Ultra-Low Temperature Systems & EPA Rules 22.2 Walk-In & Reach-In Coolers 22.3 Ventilation, Exhaust, Makeup Air, Grease Ducts & Kitchen Exhaust 22.4 Geothermal, Pneumatic & DDC Controls, TAB & Smoke Tests

23 Condensers, Compressors & Air Handlers

23.1 Installing Air-Cooled & Water-Cooled Condensers 23.2 Hermetic, Semi-Hermetic & Centrifugal Compressors 23.3 Air Handlers, Evaporators, Heat Exchangers, Receivers & Heat Strips

24 Duct, Fans, Filters & Terminals

24.1 Installing Sheet Metal, Fiberglass & Flexible Duct 24.2 Fans, Blowers, Motors, Grilles, Registers & Fire Dampers 24.3 Filters, Flues, Warm-Air, Gas & Fuel-Oil Appliances

25 Refrigerant Piping & Joining

25.1 Refrigerant Piping, Copper Tubing & Pipe Sizing 25.2 Brazing, Welding, Flaring, Swaging & Soldering 25.3 Steel Pipe, Plastic Pipe, Threading & Oxy-Acetylene 25.4 Hangers, Supports, Horizontally Supported Piping & Pressure Testing

26 Metering Devices & Line Components

26.1 TXVs, Capillary Tubes, Reversing Valves & Metering Devices 26.2 Liquid, Suction & Heat-Pump Dryers, Filters & Oil Traps 26.3 Receivers, Heat Strips, Gas/Oil Appliances & Related Accessories

27 Controls Installation

27.1 Pressure, Temperature, Humidity & Bellows Controls 27.2 Thermostats, Humidistats, Pneumatic & Solid-State Controls 27.3 Transformers, Capacitors, Contactors, Relays & Safety Disconnects 27.4 Defrost Components, Starters, Solenoids & Limit Switches

28 Motors, Wiring & Electrical Installation

28.1 Wiring Single-Phase & Three-Phase Equipment 28.2 Motor Types, Protection, Controllers, Belts & Pulleys 28.3 Geothermal Loops, Surge Protectors, Phase Monitors & Plastic Pipe

29 Diagnostic Analysis: Refrigeration

29.1 Pressure-Enthalpy Diagrams & Operating Pressures 29.2 Air Volumes, Enthalpy, Wet-Bulb & Dry-Bulb 29.3 Leak Detection & Refrigeration Test Instruments

30 Diagnostic Analysis: Electrical & Instruments

30.1 Current Draw, Voltage, Power & Motor Terminals 30.2 Testing Relays, Capacitors, Starters, Transformers & Defrost Stats 30.3 Using Amprobes, Velometers, Pitot Tubes, Manometers & Gauges

31 Recovery, Repair & Calibration

31.1 Nitrogen & Gas Regulators, Recovery & Retrofit 31.2 Repairing Hermetic, Semi-Hermetic, Centrifugal Compressors & Blowers 31.3 Calibrating Thermostats, Pressure Switches & Pneumatic Controls 31.4 Superheat, Safety Cutouts, Defrost Clocks & Freezer Controls

32 Mechanical Service & Cleaning

32.1 Belts, Pulleys, Motor Rotation & Seized Compressors 32.2 Crankcase & Evaporator Pressure Regulators & Unloaders 32.3 Cleaning Towers, Condensers, Foreign Matter & Condensate Drains

33 Jobsite Safety & Equipment

33.1 PPE: Hearing, Head, Eye, Face & Respiratory Protection 33.2 Lockout/Tagout, Warning Signs, Toxic Materials & Ventilation 33.3 Rigging, Hoists, Cranes, Forklifts, Backhoes & Excavation 33.4 Ladders, Scaffolds, Tools & Air Compressors

34 Energy Management

34.1 Envelope, Duct Pressure & Blower-Door Testing 34.2 Efficient Equipment, Zoning, ERVs, Wi-Fi Thermostats & Green Buildings 34.3 Energy Forms, R/U Factors, Window Heat Gain & Florida Load Calcs

35 Indoor Air Quality

35.1 Ventilation, Filtration, Humidity, UV & Air Cleaners 35.2 Contaminants, Source Control, TAB & Human Health Effects

21.2 Chilled Water, Water Towers & Secondary Coolant

Key Takeaways Explain This Topic AI

Secondary coolant is the water, brine, or glycol that moves heat from the load to the refrigeration machine; the refrigerant stays in the chiller.

Chilled-water flow is GPM = Btu/h ÷ (500 × ΔT); at a typical 10°F ΔT that is about 2.4 gpm per ton (12,000 ÷ 5,000).

Condenser/tower water is about 3 gpm per ton at a 10°F range because heat rejection is roughly 15,000 Btu/h per ton, not 12,000.

Tower range is inlet water minus outlet water; approach is leaving water minus entering wet-bulb. Leaving water cannot go below the entering wet-bulb.

Automatic air vents sit at high points; an air separator (typically on the pump suction) is the dirt-and-air collector for the loop — neither is optional on a closed chilled-water system.

Last updated: August 2026

21.2 Chilled Water, Water Towers & Secondary Coolant

Trade C’s large-system cluster is not only “pick a bigger rooftop.” The Class A outline (and the theory Class B still needs) asks you to install secondary coolant systems, chilled-water loops with chillers/evaporators , release vents and air separators , and water towers — evaporative cooling, forced-draft and induced-draft fans, and secondary-coolant condensers . Refrigeration & Air Conditioning Technology , 9th Edition (2021), Pipefitters Handbook , 3rd Edition (1967), and FBC Mechanical 2023 are the books. The hydronic math is the same 500-constant used in Chapter 18; the new pieces are the two water loops , the tower , and the air-management devices that keep a 200-gpm circuit from air-locking.

Quick Answer: Secondary coolant (chilled water, brine, or glycol) carries the building load to the chiller evaporator. At a typical 10°F chilled-water ΔT, flow is about 2.4 gpm per ton . Tower range is water ΔT; approach is leaving water minus entering wet-bulb . Vents and an air separator belong on the loop, not as extras.

Secondary coolant versus refrigerant

A secondary coolant is a liquid that moves heat between the occupied load and the refrigeration machine. The refrigerant boils and condenses inside the chiller. Chilled water is the usual comfort-cooling secondary coolant. Brine or glycol blends are used when the leaving temperature is near or below freezing, or when a burst coil would damage a Florida process or a rooftop coil that sees 28°F nights in the Panhandle. Glycol has a lower specific heat and a different density than water — do not blindly use the 500 constant on a 40 percent propylene-glycol loop. Water at standard density is the 500 in

GPM = Btu/h 500 × Δ T \text{GPM} = \dfrac{\text{Btu/h}}{500 \times \Delta T} GPM = 500 × Δ T Btu/h ​

500 = 8.33 lb/gal × 60 min/h × 1 Btu/lb·°F. One ton is 12,000 Btu/h, so at a 10°F ΔT:

gpm/ton = 12,000 ÷ ( 500 × 10 ) = 2.4 \text{gpm/ton} = 12{,}000 \div (500 \times 10) = 2.4 gpm/ton = 12 , 000 ÷ ( 500 × 10 ) = 2.4

That is the planning number the outline expects: about 2.4 gpm per ton at 10°F . Stretching ΔT to 12°F drops flow to 2.0 gpm/ton; a 5°F ΔT doubles it to 4.8. The coil, control valve, and chiller evaporator must actually be rated at that flow. Inventing a 16°F ΔT on the balancing valve after the pipe is already 1-1/4 inch is not a method.

Worked evaporator flow. An 80-ton chiller at 10°F ΔT:

GPM = 80 × 2.4 = 192 gpm \text{GPM} = 80 \times 2.4 = 192\ \text{gpm} GPM = 80 × 2.4 = 192 gpm

or 80 × 12,000 ÷ 5,000 = 192 80 \times 12{,}000 \div 5{,}000 = 192 80 × 12 , 000 ÷ 5 , 000 = 192 gpm. If the schedule is 44°F leaving / 54°F return, that is a 10°F ΔT. A 100-ton plant at the same ΔT is 240 gpm . A 25-ton Class B-legal chiller is 60 gpm .

Chilled-water loops, evaporators, vents, and separators

The chiller evaporator is a heat exchanger: refrigerant boils on one side, secondary coolant is chilled on the other. Water-cooled machines also have a condenser barrel that rejects heat into condenser water. Air-cooled chillers reject that heat to outdoor air and skip the tower — still a secondary-coolant evaporator loop on the building side.

Primary-secondary piping is the usual large-building layout. A primary loop holds nearly constant (or manufacturer-required) flow through each evaporator. A secondary loop, often with a VFD, serves the air handlers. A decoupler (common pipe) connects them so primary and secondary flows can differ without starving the barrels. Variable-primary designs exist; they still need the minimum evaporator flow the listing states. Pumping the building through the evaporator with no bypass, then closing two-way valves until flow collapses, is how you freeze a barrel.

Air in a closed loop is not a character builder. It air-locks coils, rusts steel, and makes pumps cavitate.

Device Where it lives Job

Air separator Typically on the pump suction , at a point of low pressure and (when possible) a high point of the piping Removes entrained air and often dirt; this is the loop’s air collector

Automatic air vent / release vent High points of coils, risers, and the separator Releases collected air; not a substitute for the separator

Manual vent Coil headers and high points Startup and service bleed

Expansion tank On the low-pressure side of the pump, piped to the separator or pump suction Absorbs expansion; an unfired pressure vessel on a large tank is Class A statutory territory

Makeup / PRV Into the loop at the tank/separator Fills the system; not a license to run potable building water lines

Chemical pot feeder On the closed loop Corrosion and biological control

FBC Mechanical still wants access , listed vessels, and relief where the listing requires it. Release vents on the outline are those automatic air vents — they are not refrigerant relief valves. Refrigerant relief is a different device on the chiller , piped per the listing and Chapter 11, not dumped into a return-air plenum.

Water towers — evaporative cooling, draft, range, and approach

A cooling tower rejects condenser heat by evaporative cooling : a small fraction of the water evaporates, and that latent heat cools the rest. The leaving water cannot be colder than the entering wet-bulb of the air. That is why a Miami afternoon at 78°F wet-bulb will not produce 70°F condenser water no matter how many extra fan horsepower you buy.

Range = tower inlet water temperature minus tower outlet water temperature. It is the condenser-water ΔT. A classic design is 95°F in / 85°F out — a 10°F range .

Approach = tower outlet (leaving) water temperature minus entering wet-bulb . A common catalog point is 85°F leaving at 78°F WB — a 7°F approach . Tighter approach means more fill, more air, more money. Approach of zero is a perpetual-motion answer.

Condenser heat rejection is cooling load plus compressor heat , roughly 15,000 Btu/h per ton on a typical electric chiller (a COP near 4: 12,000 of cooling plus about 3,000 of work). At a 10°F range:

gpm/ton ≈ 15,000 ÷ ( 500 × 10 ) = 3.0 \text{gpm/ton} \approx 15{,}000 \div (500 \times 10) = 3.0 gpm/ton ≈ 15 , 000 ÷ ( 500 × 10 ) = 3.0

About 3 gpm per ton of condenser/tower water at 10°F range, versus 2.4 gpm per ton of chilled water at 10°F ΔT. Mixing those two numbers is the exam’s hydronic banana peel. An 80-ton plant: 192 gpm chilled water, about 240 gpm condenser water.

Forced-draft towers have the fan on the inlet : they push air through the fill. Induced-draft towers have the fan on the discharge : they pull air through the fill and are the usual factory-assembled HVAC tower (less recirculation of discharge into the intake). Crossflow air moves horizontally across falling water; counterflow air moves up against falling water. Secondary-coolant condensers on this outline are the water-cooled (or glycol-cooled) condenser barrels and the tower or closed-circuit fluid cooler that serves them. A closed-circuit cooler keeps the condenser water in a coil and sprays over the coil — still evaporative cooling, still range and approach against wet-bulb.

Florida wet-bulb is high . A tower selected for 78°F WB at 85°F leaving will not make 85°F leaving if the site 1% wet-bulb is 80°F; leaving water sits at wet-bulb plus approach . Undersized towers raise SDT, cut chiller tons, and trip high-pressure. Drift eliminators, basin screens, and water treatment are maintenance (Chapter 32) but they start as install accessories: equalizing lines, make-up, overflow, and a dead-leg-free condenser loop.

Florida scenario

A Tampa (Hillsborough, Climate Zone 2A ) six-story office is issued with a 100-ton water-cooled chiller, 44/54 chilled water, 95/85 condenser water, induced-draft tower, primary-secondary pumps, air separator on the primary pump suction, and automatic vents at the penthouse coil high points. Chilled-water flow is 100 × 2.4 = 240 100 \times 2.4 = 240 100 × 2.4 = 240 gpm . Condenser flow is about 100 × 3 = 300 100 \times 3 = 300 100 × 3 = 300 gpm . Range is 10°F . If the design wet-bulb is 78°F and leaving condenser water is 85°F , approach is 7°F . A Class B qualifier who “helps” by bidding this plant as two 50-ton “halves” of the same loop is still looking at 100 tons in one system — Class A. What Class B must still know is why the 240 gpm and the 300 gpm are different, why an air vent on the fifth-floor coil does not replace the separator in the basement, and why a salesman who promises 80°F condenser water on a 78°F wet-bulb day has promised a 2°F approach the tower catalog may not own. The expansion tank on that primary loop, if it is an unfired pressure vessel in Class A’s statutory list, is another reason the ticket is Class A even before you count tons.

Traps: (1) Using 3 gpm/ton on the evaporator . (2) Using 2.4 gpm/ton on the tower . (3) Calling approach the same thing as range. (4) Selecting a tower to leave below wet-bulb. (5) Omitting the air separator because “we have automatic vents.” (6) Treating glycol like water in the 500 formula.

Chilled-water gpm at 10°F ΔT (2.4 gpm/ton)

Loading diagram... Primary-secondary chilled water and condenser/tower loops