Study guide

7.2 Florida Lien Law Inside Contracting

Florida HVAC Contractor License Class A/B

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Exam Overview

1.1 Current Exam Facts & License Classes 1.2 Exam Format, Open-Book Rules & Pearson VUE 1.3 Eligibility, Experience Paths & Financial Responsibility

2 Establishing the Contracting Business

2.1 Business Organizational Structure 2.2 Business Plan, Marketplace & License Scope 2.3 Professionals, Fixed Assets & Bonding

3 Insurance for Florida HVAC Contractors

3.1 Obtaining Insurance (GL, Workers' Compensation & Bonds) 3.2 Coverages, Limits & Policy Language 3.3 Maintaining Insurance & CILB Certificate-Holder Rules

4 Overhead, Staffing & Markets

4.1 Developing the Business, Staffing & Markets 4.2 Determining Business Overhead (FICA, FUTA, SUTA, Workers' Comp, Rent & Utilities) 4.3 Determining Outsourced Services

5 Bids, Proposals & Estimating

5.1 Preparing Bids and Proposals 5.2 AIA Documents, Offers & Contract Components 5.3 Labor Productivity, Overhead & Project Costing

6 Purchasing, Invoices, Draws & Safety Programs

6.1 Purchasing Materials, UCC & Inventory (FIFO) 6.2 Invoices, Draw Requests & Percentage of Completion 6.3 Developing a Safety Program (OSHA, SDS & Drug Testing)

7 Managing Contracts

7.1 Contract Law, Scope & Completion Schedules 7.2 Florida Lien Law Inside Contracting 7.3 Mediation, Arbitration, Tort Law & Risk

8 Managing Trade Operations

8.1 Scheduling Trade Operations (CPM, RFI & Submittals) 8.2 OSHA Records, Document Retainage & Penalties 8.3 Takeoffs, Equipment Lease vs Purchase & Inventory

9 Accounting I: Receivables, Payables & Cash

9.1 Managing Accounts Receivable 9.2 Managing Accounts Payable & Discounts 9.3 Cash Flow, Banking & Financial Ratios

10 Accounting II: Taxes, Job Cost & Payroll

10.1 Filing Tax Forms & Returns 10.2 Tracking Job Costs 10.3 Payroll, Employment Taxes & Garnishments

11 Managing Human Resources

11.1 Hiring, I-9, Background Checks & Discrimination 11.2 HR Policies, OSHA & Drug-Test Chain of Custody 11.3 Evaluating Employees

12 Florida Contractor Law: Chapter 489 & 61G4

12.1 Chapter 489: Certified vs Registered & Qualifying Agents 12.2 61G4 Board Rules, Advertising & Discipline 12.3 Qualifying Agent Duties, Supervision & Additional Entities

13 Florida Construction Lien Law (Chapter 713)

13.1 Construction Lien Overview & Claimants 13.2 Notices to Owner, Time Limits & Perfecting Liens 13.3 Payment Bonds, Waivers & Claims of Lien

14 Financial Responsibility, CE & Federal Rules

14.1 Financial Responsibility & the 660 FICO Rule 14.2 Continuing Education & Biennial Renewal 14.3 Federal Employment, Immigration, OSHA & Environmental Rules

15 Plans, Specs & Equipment Selection

15.1 Reading Plans, Specifications, Symbols & Scales 15.2 Recommending Plan Changes & Equipment Types 15.3 EER, SEER, ARI Listings & Cost Effectiveness

16 Energy Codes, Loads & Thermal Resistance

16.1 Florida Energy Codes, R-Values & U-Factors 16.2 Determining HVAC Heating & Cooling Loads 16.3 Applying Energy Conservation, Fan Curves & Pump Curves

17 HVAC System & Duct Design

17.1 Designing HVAC Systems (Psychrometrics, Enthalpy & Airflow) 17.2 Designing Duct Systems & Insulation 17.3 Selecting Equipment, Location & Codes

18 Piping, Pumps, Boilers, Controls & Rigging Design

18.1 Pipe Sizing, Valves, Fittings, Sealants & Layout 18.2 Control Requirements, Fan Motors, CFM & Compressor Capacity 18.3 Pumps, Boilers, Steam, Fuel & Pipe Insulation 18.4 Grease Ducts, Live Loads, Rigging & Mechanical Equipment

19 Sheet Metal Duct Fabrication

19.1 Fabricating Rectangular & Round Ducts 19.2 Seams, Locks, Taping, Mastics & Liners 19.3 Fittings, Outlets & Grilles 19.4 Kitchen Hoods, Exhausts & Drain Pans

20 Split, Package & Heat Pump Installation

20.1 Installing Split & Package Air Conditioners 20.2 Installing Split & Package Heat Pumps 20.3 Air-Cooled vs Water-Cooled Systems

21 Large Systems, Chillers & Towers

21.1 Installing by Tonnage & Class A vs Class B Limits 21.2 Chilled Water, Water Towers & Secondary Coolant 21.3 Centrifugal, Absorption & Ammonia Systems

22 Refrigeration, Coolers, Ventilation & Controls Install

22.1 Low, Medium & Ultra-Low Temperature Systems & EPA Rules 22.2 Walk-In & Reach-In Coolers 22.3 Ventilation, Exhaust, Makeup Air, Grease Ducts & Kitchen Exhaust 22.4 Geothermal, Pneumatic & DDC Controls, TAB & Smoke Tests

23 Condensers, Compressors & Air Handlers

23.1 Installing Air-Cooled & Water-Cooled Condensers 23.2 Hermetic, Semi-Hermetic & Centrifugal Compressors 23.3 Air Handlers, Evaporators, Heat Exchangers, Receivers & Heat Strips

24 Duct, Fans, Filters & Terminals

24.1 Installing Sheet Metal, Fiberglass & Flexible Duct 24.2 Fans, Blowers, Motors, Grilles, Registers & Fire Dampers 24.3 Filters, Flues, Warm-Air, Gas & Fuel-Oil Appliances

25 Refrigerant Piping & Joining

25.1 Refrigerant Piping, Copper Tubing & Pipe Sizing 25.2 Brazing, Welding, Flaring, Swaging & Soldering 25.3 Steel Pipe, Plastic Pipe, Threading & Oxy-Acetylene 25.4 Hangers, Supports, Horizontally Supported Piping & Pressure Testing

26 Metering Devices & Line Components

26.1 TXVs, Capillary Tubes, Reversing Valves & Metering Devices 26.2 Liquid, Suction & Heat-Pump Dryers, Filters & Oil Traps 26.3 Receivers, Heat Strips, Gas/Oil Appliances & Related Accessories

27 Controls Installation

27.1 Pressure, Temperature, Humidity & Bellows Controls 27.2 Thermostats, Humidistats, Pneumatic & Solid-State Controls 27.3 Transformers, Capacitors, Contactors, Relays & Safety Disconnects 27.4 Defrost Components, Starters, Solenoids & Limit Switches

28 Motors, Wiring & Electrical Installation

28.1 Wiring Single-Phase & Three-Phase Equipment 28.2 Motor Types, Protection, Controllers, Belts & Pulleys 28.3 Geothermal Loops, Surge Protectors, Phase Monitors & Plastic Pipe

29 Diagnostic Analysis: Refrigeration

29.1 Pressure-Enthalpy Diagrams & Operating Pressures 29.2 Air Volumes, Enthalpy, Wet-Bulb & Dry-Bulb 29.3 Leak Detection & Refrigeration Test Instruments

30 Diagnostic Analysis: Electrical & Instruments

30.1 Current Draw, Voltage, Power & Motor Terminals 30.2 Testing Relays, Capacitors, Starters, Transformers & Defrost Stats 30.3 Using Amprobes, Velometers, Pitot Tubes, Manometers & Gauges

31 Recovery, Repair & Calibration

31.1 Nitrogen & Gas Regulators, Recovery & Retrofit 31.2 Repairing Hermetic, Semi-Hermetic, Centrifugal Compressors & Blowers 31.3 Calibrating Thermostats, Pressure Switches & Pneumatic Controls 31.4 Superheat, Safety Cutouts, Defrost Clocks & Freezer Controls

32 Mechanical Service & Cleaning

32.1 Belts, Pulleys, Motor Rotation & Seized Compressors 32.2 Crankcase & Evaporator Pressure Regulators & Unloaders 32.3 Cleaning Towers, Condensers, Foreign Matter & Condensate Drains

33 Jobsite Safety & Equipment

33.1 PPE: Hearing, Head, Eye, Face & Respiratory Protection 33.2 Lockout/Tagout, Warning Signs, Toxic Materials & Ventilation 33.3 Rigging, Hoists, Cranes, Forklifts, Backhoes & Excavation 33.4 Ladders, Scaffolds, Tools & Air Compressors

34 Energy Management

34.1 Envelope, Duct Pressure & Blower-Door Testing 34.2 Efficient Equipment, Zoning, ERVs, Wi-Fi Thermostats & Green Buildings 34.3 Energy Forms, R/U Factors, Window Heat Gain & Florida Load Calcs

35 Indoor Air Quality

35.1 Ventilation, Filtration, Humidity, UV & Air Cleaners 35.2 Contaminants, Source Control, TAB & Human Health Effects

7.2 Florida Lien Law Inside Contracting

Key Takeaways Explain This Topic AI

A lienor not in privity (subcontractor or supplier, not a laborer) must serve a Notice to Owner before commencing or not later than 45 days after commencing to furnish; failure is a complete defense under F.S. 713.06(2)(a).

A Claim of Lien must be recorded not later than 90 days after final furnishing (F.S. 713.08(5)); final furnishing is not measured by a certificate of occupancy and does not include punch-list correction of previously performed work.

Serve a copy of the Claim of Lien on the owner before recording or within 15 days after recording (F.S. 713.08(4)); a contractor in privity must deliver the contractor's final payment affidavit at least 5 days before suit (F.S. 713.06(3)(d)).

Suit to enforce is 1 year from recording (F.S. 713.22), shortened to 60 days after a Notice of Contest of Lien or 20 days after a summons to show cause (F.S. 713.21(4)).

Public jobs cannot be liened; claimants look to a F.S. 255.05 payment bond. A Notice of Commencement under F.S. 713.13 must be recorded and posted before the first inspection and is generally effective for 1 year unless a longer period is stated.

Last updated: August 2026

7.2 Florida Lien Law Inside Contracting

B&F Area B item 9 lists lien laws next to contract scope because draws, extras, and final payment only work if the qualifier knows who can encumber the owner's property. Chapter 13 of this guide is the dedicated Construction Lien Law chapter. This section is lien law inside contracting : which notices your HVAC contract administration must generate, which clocks start when a sub or supply house furnishes, and why a public school job is a bond claim rather than a lien.

Who is in privity, and who needs a Notice to Owner

Privity means a direct contract with the owner. The direct contractor — the HVAC company that signed with the owner — claims under F.S. 713.05 and generally does not serve a Notice to Owner (NTO) . Lienors not in privity (subcontractors, sub-subcontractors, and materialmen who contracted with someone other than the owner) claim under F.S. 713.06 . Except for laborers , they must serve an NTO on the owner before commencing, or not later than 45 days after commencing , to furnish labor, services, or materials. A sub-subcontractor or a materialman to a subcontractor must also serve a copy on the contractor. Failure to serve the NTO, or to serve it on time, is a complete defense to the lien. Substantial compliance can save a defective form; it cannot save a late one. Laborers are excepted from the NTO prerequisite because they personally perform labor on site and do not furnish materials or the labor of others.

The NTO is not a lien. It is a warning that lets the owner make proper payments . Once the owner has an NTO, progress payments must account for that lienor; paying the HVAC contractor in full while ignoring a timely NTO from the copper house is how an owner pays twice. Direct contracts greater than $2,500 on one- to four-family dwellings must contain the F.S. 713.015 statutory warning in at least 12-point, capitalized, boldfaced type. Improvements whose direct contract price is $2,500 or less are exempt from most of Part I except F.S. 713.05 . Unlicensed contractors, subcontractors, and sub-subcontractors have no lien under F.S. 713.02(7) (and F.S. 489.128 still blocks the contractor from enforcing the contract).

Notice of Commencement is a contract-start document

F.S. 713.13 requires the owner (or the owner's authorized agent) to record a Notice of Commencement (NOC) and post a certified copy or a notarized statement that it has been filed, before actually commencing the improvement — and the statutory form warns that it must be recorded and posted before the first inspection . If the work does not actually start within 90 days after recording, the NOC is void. Unless a longer period is stated, the NOC is effective 1 year after recording; payments the owner makes after expiration are improper payments . The NOC names the owner, contractor, lender, and any designated notice recipient. It is not itself a lien. Construction liens under F.S. 713.05 and 713.06 attach and take priority as of the NOC recording (or, if none was filed, as of the Claim of Lien). That is why lenders insist on a recorded NOC before disbursing construction funds.

Perfecting the Claim of Lien

Every lienor, including those in privity, perfects by recording a Claim of Lien that states the lienor, the person contracted with, a description of the labor or materials, a property description, the owner, first and last furnishing dates, and the unpaid amount. Record not later than 90 days after the final furnishing of labor, services, or materials (F.S. 713.08(5) ). Final furnishing is the last date the lienor actually furnished. F.S. 713.01(12) says that date is not measured by a certificate of occupancy or a certificate of final completion, and it does not include correction of deficiencies in previously performed work. A punch-list damper adjustment on day 100 does not restart a 90-day clock that already expired. Serve a copy on the owner before recording or within 15 days after recording (F.S. 713.08(4) ); failure makes the claim voidable to the extent prejudicial to someone entitled to rely on service.

A contractor in privity who wants to sue must give the owner a contractor's final payment affidavit under F.S. 713.06(3)(d) listing unpaid lienors who timely served NTOs, and must deliver that affidavit at least 5 days before instituting an action , even if the job was terminated short of completion and even if no lower-tier lienors exist. The owner should hold final payment until that affidavit arrives. Priority among lienors sharing one direct contract is: laborers first , then all persons other than the contractor, then the contractor (F.S. 713.06(4) ).

Enforcement clocks the owner can shorten

A recorded Claim of Lien does not collect itself. F.S. 713.22 : the lien does not continue longer than 1 year after recording unless an action to enforce is commenced (and a lis pendens is needed to bind later purchasers). The owner can shorten that year. A recorded Notice of Contest of Lien limits the lienor to 60 days after service to file suit, or the lien is extinguished automatically. Independently, any interested party can have the clerk issue a summons to show cause ; the lienor has 20 days after service to show cause why the lien should not be enforced or vacated (F.S. 713.21(4) ). Miss either shortened clock and the lien is gone. F.S. 713.20 statutory waiver and release forms are how draws actually close these rights; a progress-payment waiver does not release retainage or later work if the statutory form is used.

Public jobs: bond, not dirt

F.S. 713.01 defines owner to exclude the state, a county, a municipality, and other governmental entities, and real property excludes publicly owned property. You cannot lien a school board chiller plant. The substitute is a payment and performance bond under F.S. 255.05 . The contractor must execute and record the bond before commencing, and give the public entity a certified copy; the public entity may not pay the contractor until that copy is provided. No bond is required when the work is done for the state and the contract is $100,000 or less ; counties, cities, and other public authorities may exempt contracts of $200,000 or less . Claimants not in privity with the contractor serve a written notice to the contractor before commencing or within 45 days after commencing, then a sworn notice of nonpayment not earlier than 45 days after first furnishing and not later than 90 days after final furnishing, and generally sue within 1 year . Those 255.05 clocks are bond administration, not a back-door lien on the courthouse.

Clock Private Chapter 713 Typical public F.S. 255.05

Preliminary notice (non-privity, not a laborer) NTO within 45 days of commencing Notice to contractor within 45 days of commencing

Claim document Claim of Lien within 90 days of final furnishing Notice of nonpayment no later than 90 days after final furnishing (and not earlier than 45 days after first furnishing)

Service on owner / surety Serve Claim of Lien before recording or within 15 days Serve notice of nonpayment on contractor and copy the surety

Lawsuit 1 year from recording; 60 days after contest; 20 days after show-cause Generally 1 year after last furnishing (retainage has extra gates)

Contractor in privity extra Final payment affidavit at least 5 days before suit Direct contractor looks to the public contract, not a 713 lien

Worked example. An HVAC supply house first delivers copper to a private Naples residence on March 1 and last delivers on May 1. It is not in privity with the owner. The NTO is due not later than 45 days after March 1 (April 15). The Claim of Lien is due not later than 90 days after May 1 (July 30). Punch-list warranty work in August does not move July 30. Serve the owner by the recording date or within 15 days after. If the same deliveries were to a county clinic, there is no Claim of Lien against the county; the supply house uses 255.05 notices against the recorded payment bond.

Florida HVAC scenario. You are the Class A prime on a $180,000 condominium condenser replacement. Your sheet-metal sub started April 2 and never served an NTO. On July 20 — more than 45 days later — the sub records a Claim of Lien for unpaid duct. The owner raises the complete defense in F.S. 713.06(2)(a). Your administration failure was not catching the missing NTO at the first pay application. Going forward you require a copy of every NTO with the first sub draw, you collect statutory 713.20 waivers through the date of each draw, and you do not sign a contractor's final payment affidavit that omits a lienor who actually served notice. That is managing the contract, not practicing law after the lien hits the official records.

Loading diagram... Florida HVAC lien and bond clocks inside the contract

Florida Chapter 713 clocks used in contract administration (days)