Study guide
18.3 Pumps, Boilers, Steam, Fuel & Pipe Insulation
Florida HVAC Contractor License Class A/B
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 Current Exam Facts & License Classes 1.2 Exam Format, Open-Book Rules & Pearson VUE 1.3 Eligibility, Experience Paths & Financial Responsibility
2 Establishing the Contracting Business
2.1 Business Organizational Structure 2.2 Business Plan, Marketplace & License Scope 2.3 Professionals, Fixed Assets & Bonding
3 Insurance for Florida HVAC Contractors
3.1 Obtaining Insurance (GL, Workers' Compensation & Bonds) 3.2 Coverages, Limits & Policy Language 3.3 Maintaining Insurance & CILB Certificate-Holder Rules
4 Overhead, Staffing & Markets
4.1 Developing the Business, Staffing & Markets 4.2 Determining Business Overhead (FICA, FUTA, SUTA, Workers' Comp, Rent & Utilities) 4.3 Determining Outsourced Services
5 Bids, Proposals & Estimating
5.1 Preparing Bids and Proposals 5.2 AIA Documents, Offers & Contract Components 5.3 Labor Productivity, Overhead & Project Costing
6 Purchasing, Invoices, Draws & Safety Programs
6.1 Purchasing Materials, UCC & Inventory (FIFO) 6.2 Invoices, Draw Requests & Percentage of Completion 6.3 Developing a Safety Program (OSHA, SDS & Drug Testing)
7 Managing Contracts
7.1 Contract Law, Scope & Completion Schedules 7.2 Florida Lien Law Inside Contracting 7.3 Mediation, Arbitration, Tort Law & Risk
8 Managing Trade Operations
8.1 Scheduling Trade Operations (CPM, RFI & Submittals) 8.2 OSHA Records, Document Retainage & Penalties 8.3 Takeoffs, Equipment Lease vs Purchase & Inventory
9 Accounting I: Receivables, Payables & Cash
9.1 Managing Accounts Receivable 9.2 Managing Accounts Payable & Discounts 9.3 Cash Flow, Banking & Financial Ratios
10 Accounting II: Taxes, Job Cost & Payroll
10.1 Filing Tax Forms & Returns 10.2 Tracking Job Costs 10.3 Payroll, Employment Taxes & Garnishments
11 Managing Human Resources
11.1 Hiring, I-9, Background Checks & Discrimination 11.2 HR Policies, OSHA & Drug-Test Chain of Custody 11.3 Evaluating Employees
12 Florida Contractor Law: Chapter 489 & 61G4
12.1 Chapter 489: Certified vs Registered & Qualifying Agents 12.2 61G4 Board Rules, Advertising & Discipline 12.3 Qualifying Agent Duties, Supervision & Additional Entities
13 Florida Construction Lien Law (Chapter 713)
13.1 Construction Lien Overview & Claimants 13.2 Notices to Owner, Time Limits & Perfecting Liens 13.3 Payment Bonds, Waivers & Claims of Lien
14 Financial Responsibility, CE & Federal Rules
14.1 Financial Responsibility & the 660 FICO Rule 14.2 Continuing Education & Biennial Renewal 14.3 Federal Employment, Immigration, OSHA & Environmental Rules
15 Plans, Specs & Equipment Selection
15.1 Reading Plans, Specifications, Symbols & Scales 15.2 Recommending Plan Changes & Equipment Types 15.3 EER, SEER, ARI Listings & Cost Effectiveness
16 Energy Codes, Loads & Thermal Resistance
16.1 Florida Energy Codes, R-Values & U-Factors 16.2 Determining HVAC Heating & Cooling Loads 16.3 Applying Energy Conservation, Fan Curves & Pump Curves
17 HVAC System & Duct Design
17.1 Designing HVAC Systems (Psychrometrics, Enthalpy & Airflow) 17.2 Designing Duct Systems & Insulation 17.3 Selecting Equipment, Location & Codes
18 Piping, Pumps, Boilers, Controls & Rigging Design
18.1 Pipe Sizing, Valves, Fittings, Sealants & Layout 18.2 Control Requirements, Fan Motors, CFM & Compressor Capacity 18.3 Pumps, Boilers, Steam, Fuel & Pipe Insulation 18.4 Grease Ducts, Live Loads, Rigging & Mechanical Equipment
19 Sheet Metal Duct Fabrication
19.1 Fabricating Rectangular & Round Ducts 19.2 Seams, Locks, Taping, Mastics & Liners 19.3 Fittings, Outlets & Grilles 19.4 Kitchen Hoods, Exhausts & Drain Pans
20 Split, Package & Heat Pump Installation
20.1 Installing Split & Package Air Conditioners 20.2 Installing Split & Package Heat Pumps 20.3 Air-Cooled vs Water-Cooled Systems
21 Large Systems, Chillers & Towers
21.1 Installing by Tonnage & Class A vs Class B Limits 21.2 Chilled Water, Water Towers & Secondary Coolant 21.3 Centrifugal, Absorption & Ammonia Systems
22 Refrigeration, Coolers, Ventilation & Controls Install
22.1 Low, Medium & Ultra-Low Temperature Systems & EPA Rules 22.2 Walk-In & Reach-In Coolers 22.3 Ventilation, Exhaust, Makeup Air, Grease Ducts & Kitchen Exhaust 22.4 Geothermal, Pneumatic & DDC Controls, TAB & Smoke Tests
23 Condensers, Compressors & Air Handlers
23.1 Installing Air-Cooled & Water-Cooled Condensers 23.2 Hermetic, Semi-Hermetic & Centrifugal Compressors 23.3 Air Handlers, Evaporators, Heat Exchangers, Receivers & Heat Strips
24 Duct, Fans, Filters & Terminals
24.1 Installing Sheet Metal, Fiberglass & Flexible Duct 24.2 Fans, Blowers, Motors, Grilles, Registers & Fire Dampers 24.3 Filters, Flues, Warm-Air, Gas & Fuel-Oil Appliances
25 Refrigerant Piping & Joining
25.1 Refrigerant Piping, Copper Tubing & Pipe Sizing 25.2 Brazing, Welding, Flaring, Swaging & Soldering 25.3 Steel Pipe, Plastic Pipe, Threading & Oxy-Acetylene 25.4 Hangers, Supports, Horizontally Supported Piping & Pressure Testing
26 Metering Devices & Line Components
26.1 TXVs, Capillary Tubes, Reversing Valves & Metering Devices 26.2 Liquid, Suction & Heat-Pump Dryers, Filters & Oil Traps 26.3 Receivers, Heat Strips, Gas/Oil Appliances & Related Accessories
27 Controls Installation
27.1 Pressure, Temperature, Humidity & Bellows Controls 27.2 Thermostats, Humidistats, Pneumatic & Solid-State Controls 27.3 Transformers, Capacitors, Contactors, Relays & Safety Disconnects 27.4 Defrost Components, Starters, Solenoids & Limit Switches
28 Motors, Wiring & Electrical Installation
28.1 Wiring Single-Phase & Three-Phase Equipment 28.2 Motor Types, Protection, Controllers, Belts & Pulleys 28.3 Geothermal Loops, Surge Protectors, Phase Monitors & Plastic Pipe
29 Diagnostic Analysis: Refrigeration
29.1 Pressure-Enthalpy Diagrams & Operating Pressures 29.2 Air Volumes, Enthalpy, Wet-Bulb & Dry-Bulb 29.3 Leak Detection & Refrigeration Test Instruments
30 Diagnostic Analysis: Electrical & Instruments
30.1 Current Draw, Voltage, Power & Motor Terminals 30.2 Testing Relays, Capacitors, Starters, Transformers & Defrost Stats 30.3 Using Amprobes, Velometers, Pitot Tubes, Manometers & Gauges
31 Recovery, Repair & Calibration
31.1 Nitrogen & Gas Regulators, Recovery & Retrofit 31.2 Repairing Hermetic, Semi-Hermetic, Centrifugal Compressors & Blowers 31.3 Calibrating Thermostats, Pressure Switches & Pneumatic Controls 31.4 Superheat, Safety Cutouts, Defrost Clocks & Freezer Controls
32 Mechanical Service & Cleaning
32.1 Belts, Pulleys, Motor Rotation & Seized Compressors 32.2 Crankcase & Evaporator Pressure Regulators & Unloaders 32.3 Cleaning Towers, Condensers, Foreign Matter & Condensate Drains
33 Jobsite Safety & Equipment
33.1 PPE: Hearing, Head, Eye, Face & Respiratory Protection 33.2 Lockout/Tagout, Warning Signs, Toxic Materials & Ventilation 33.3 Rigging, Hoists, Cranes, Forklifts, Backhoes & Excavation 33.4 Ladders, Scaffolds, Tools & Air Compressors
34 Energy Management
34.1 Envelope, Duct Pressure & Blower-Door Testing 34.2 Efficient Equipment, Zoning, ERVs, Wi-Fi Thermostats & Green Buildings 34.3 Energy Forms, R/U Factors, Window Heat Gain & Florida Load Calcs
35 Indoor Air Quality
35.1 Ventilation, Filtration, Humidity, UV & Air Cleaners 35.2 Contaminants, Source Control, TAB & Human Health Effects
18.3 Pumps, Boilers, Steam, Fuel & Pipe Insulation
Key Takeaways Explain This Topic AI
Pump selection is gpm at total head: friction from equivalent length plus coil, valve, and (open-system) elevation; a 24 gpm circuit with 8 feet of pipe friction, 12 feet of coil, and 5 feet of valve is about 25 feet of head.
F.S. 489.105(3)(f) gives Class A boilers and unfired pressure vessels; 489.105(3)(g) does not — Class B’s 25-ton / 500,000 Btu cap is a separate limit and does not unlock a 400,000 Btu boiler.
Class A and Class B may not install new interior LP or natural-gas fuel lines; the statutory exception is disconnecting or reconnecting changeouts of those appliances.
R-value is thermal resistance and U-factor is 1/R; FBC Energy Conservation 2023 Table C403.2.10 sets commercial pipe-insulation thickness by fluid temperature and pipe size.
Chilled-water insulation needs a continuous vapor retarder; outdoor insulation needs a weather jacket; compressing insulation at a hanger lowers R-value.
Last updated: August 2026
18.3 Pumps, Boilers, Steam, Fuel & Pipe Insulation
Trade Area A finishes the hydronic plant with pumps , boilers , steam , fuel , and pipe insulation (R-values, U-factors, and techniques). FBC Mechanical 2023 Chapter 10 (boilers, water heaters, and pressure vessels) and Chapter 12 (hydronic piping), FBC Energy Conservation 2023 pipe-insulation tables, and Pipefitters Handbook 3rd Edition (1967) are the books. F.S. 489.105 is the fence: Class A may install boiler and unfired pressure vessel systems ; Class B may not, even when the heating rating is under 500,000 Btu .
Quick Answer: Select the pump at design gpm and total head , not at “a 1-horsepower circulator we have on the truck.” Boilers, safety reliefs, low-water cutoffs, and expansion tanks are Class A . Do not run new interior gas fuel lines on an HVAC ticket. Insulate to the energy-code thickness table; R = 1/U ; keep a vapor retarder on chilled water.
Pumps — gpm, head, and the curve
A centrifugal pump is selected at an operating point : flow in gpm and head in feet of water . Head is the pressure the pump must add to push design flow around the loop:
Closed loop (typical chilled or hot water): pipe-and-fitting friction + coil or heat-exchanger drop + control-valve drop + strainer. Elevation between penthouse and basement does not add to circulating head once the loop is filled; it does add to static fill pressure.
Open loop (cooling tower basin to condenser): add the lift from the basin water line up to the tower inlet, plus nozzle pressure if the manufacturer states it.
Reuse the Section 18.1 add-up. 24 gpm , 200 equivalent feet at 4 feet per 100 feet → 8 feet of pipe friction. Coil 12 feet , valve 5 feet → select about 25 feet of head at 24 gpm . Read the manufacturer’s pump curve : flow on the horizontal axis, head on the vertical. The system curve starts at zero (closed loop) or at the static lift (open loop) and rises with flow squared. The intersection is where the pump will actually run. Trimming the impeller or adding a VFD moves you to a different curve; closing a balancing valve just rides up the system curve and wastes brake horsepower.
Net positive suction head (NPSH). The pump inlet needs enough absolute pressure to keep the water from flashing. NPSH available (from fill pressure, atmospheric pressure, and suction-pipe losses) must exceed NPSH required on the curve. A cooling-tower pump that cavitates is often a suction-pipe or basin-level problem, not a “bigger impeller” problem.
Primary-secondary (or primary-variable) plants are Class A large-system territory: a primary pump through the chiller, a secondary pump to the building, a decoupler sized so the two flows can differ. Parallel pumps add flow at roughly the same head; series pumps add head at roughly the same flow. Do not parallel two different pumps and hope the weaker one shares load.
Boilers, unfired pressure vessels, steam, and fuel — Class A versus Class B
- Item Class A — F.S. 489.105(3)(f) Class B — F.S. 489.105(3)(g)
- Cooling / heating cap Unlimited 25 tons cooling and 500,000 Btu heating in any one system
- Boiler systems Included (“boiler and unfired pressure vessel systems”) Not included
- Unfired pressure vessels (expansion tanks, receivers, some converters) Included Not included
- Pneumatic control piping Included Not included
- Piping and insulation of pipes, vessels, ducts Included Included
- New interior LP / natural-gas fuel lines No (changeout disconnect/reconnect only) No (same exception)
- Potable, sanitary, pool piping No No
The Class B 500,000 Btu heating cap is not a boiler license. A 400,000 Btu/h hot-water boiler is under 500,000 Btu and still outside Class B because the statute never put boilers in (3)(g). Class B candidates must still know the theory — relief valves, low-water cutoff, combustion air, steam traps — because the exam can test knowledge the outline did not give you as an install item.
FBC Mechanical Chapter 10 points boilers and pressure vessels at ASME construction (heating boilers typically Section IV ; power boilers Section I ) and at listed installation: safety relief sized and piped to a safe discharge, low-water cutoff on steam and on hot-water boilers that require it, operating and high-limit temperature or pressure controls, expansion tanks (closed systems), makeup with backflow protection (makeup water itself is plumbing), and combustion air plus venting per the fuel-gas or oil listing. Capping a relief valve because it weeps is a failure mode the exam likes.
Steam. Low-pressure heating steam (not more than 15 psig) is still a boiler system. Mains pitch to drip legs; steam traps (float-and-thermostatic, inverted bucket, thermostatic) dump condensate without passing live steam. Water hammer is a pitch, trap, or startup-load problem. Condensate return is piping; the vessel it returns to can be an unfired receiver . Dry steam to a coil; wet steam wrecks control valves.
Fuel. Class A and Class B may not install liquefied petroleum or natural gas fuel lines within buildings , except disconnecting or reconnecting changeouts of those appliances. New gas pipe, new sediment traps, new regulators, and new interior fuel-oil lines that are not part of that exception belong to a mechanical , plumbing , or licensed gas contractor as the statute assigns them. You still must know that a listed gas appliance needs the correct fuel pressure, a shutoff, and combustion air — and you still reconnect the existing gas union on a changeout. Do not design a new rooftop gas main on an HVAC A/B ticket.
Unfired pressure vessels in the HVAC plant include compression/expansion tanks, flash tanks, and some heat-recovery receivers. They carry ASME stamps and reliefs. Class A installs them; Class B does not “just hang the expansion tank” as a piping accessory if it is an unfired pressure vessel in the statutory sense.
Pipe insulation — R, U, and techniques
R-value is thermal resistance . U-factor is thermal transmittance . They are reciprocals:
U = 1 / R R = 1 / U U = 1 / R \qquad R = 1 / U U = 1/ R R = 1/ U
Doubling R halves heat flow through that layer. FBC Energy Conservation 2023 commercial mechanical piping is insulated to Table C403.2.10 (minimum thickness in inches by fluid operating temperature and nominal pipe size , at a stated insulation conductivity). Hot piping needs enough thickness to cut losses and keep surface temperatures safe; cold piping needs enough thickness and a continuous vapor retarder so Florida indoor humidity does not condense in the insulation and drip on a ceiling. Thickness is not “whatever fits the hanger.”
Techniques the exam expects:
Butt joints firmly together ; seal the jacket. Gaps are thermal bridges.
Do not compress fibrous insulation at hangers — compression lowers R . Use saddles or insulation inserts.
Vapor retarder on the outside of chilled-water and refrigerant suction insulation, sealed at longitudinal and butt joints. A jacket that is only decorative is not a retarder.
Outdoor piping: UV- and weather-resistant jacketing, sealed to keep rain out of the insulation (wet insulation is a low-R sponge).
Refrigerant suction (and sometimes liquid) insulation is both an energy item and a condensation item; follow the spec and the energy table, not bare copper in a closet.
Fittings, valves, and flanges get insulating covers or mitered fittings so the energy table is not only on the straight pipe.
Residential energy rules (R-chapter) still want hot-water piping insulated in the situations the residential table lists; do not skip pipe insulation because “it is only a 3-ton air handler condensate” — condensate is drain, not hydronic insulation, but the suction line still gets insulation.
Florida HVAC scenario
A Class A firm in Tampa permits a two-pipe hydronic renovation: 20-ton chilled water (inside what a Class B tonnage cap would allow) plus a 350,000 Btu/h hot-water boiler for morning warmup. Pump P-1 is selected at 48 gpm (20 tons × 2.4 gpm/ton at 10°F) and 32 feet of head from the handbook add-up. Pipe insulation is 1-inch cellular glass or elastomeric as Table C403.2.10 requires for that chilled-water temperature and pipe size, vapor-retarder sealed, saddles at hangers. The boiler gets an ASME relief, a low-water cutoff, and a closed expansion tank. A Class B qualifier who wanted the job could have run the chilled-water piping and insulation and the low-voltage controls, but could not contract the boiler, the unfired expansion tank as pressure-vessel work, or a new interior gas supply. Fuel on this job is an existing mechanical-contractor gas main; the HVAC Class A ticket reconnects the boiler gas union on a changeout and does not extend a new fuel line across the mechanical room.