Study guide
31.3 Calibrating Thermostats, Pressure Switches & Pneumatic Controls
Florida HVAC Contractor License Class A/B
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 Current Exam Facts & License Classes 1.2 Exam Format, Open-Book Rules & Pearson VUE 1.3 Eligibility, Experience Paths & Financial Responsibility
2 Establishing the Contracting Business
2.1 Business Organizational Structure 2.2 Business Plan, Marketplace & License Scope 2.3 Professionals, Fixed Assets & Bonding
3 Insurance for Florida HVAC Contractors
3.1 Obtaining Insurance (GL, Workers' Compensation & Bonds) 3.2 Coverages, Limits & Policy Language 3.3 Maintaining Insurance & CILB Certificate-Holder Rules
4 Overhead, Staffing & Markets
4.1 Developing the Business, Staffing & Markets 4.2 Determining Business Overhead (FICA, FUTA, SUTA, Workers' Comp, Rent & Utilities) 4.3 Determining Outsourced Services
5 Bids, Proposals & Estimating
5.1 Preparing Bids and Proposals 5.2 AIA Documents, Offers & Contract Components 5.3 Labor Productivity, Overhead & Project Costing
6 Purchasing, Invoices, Draws & Safety Programs
6.1 Purchasing Materials, UCC & Inventory (FIFO) 6.2 Invoices, Draw Requests & Percentage of Completion 6.3 Developing a Safety Program (OSHA, SDS & Drug Testing)
7 Managing Contracts
7.1 Contract Law, Scope & Completion Schedules 7.2 Florida Lien Law Inside Contracting 7.3 Mediation, Arbitration, Tort Law & Risk
8 Managing Trade Operations
8.1 Scheduling Trade Operations (CPM, RFI & Submittals) 8.2 OSHA Records, Document Retainage & Penalties 8.3 Takeoffs, Equipment Lease vs Purchase & Inventory
9 Accounting I: Receivables, Payables & Cash
9.1 Managing Accounts Receivable 9.2 Managing Accounts Payable & Discounts 9.3 Cash Flow, Banking & Financial Ratios
10 Accounting II: Taxes, Job Cost & Payroll
10.1 Filing Tax Forms & Returns 10.2 Tracking Job Costs 10.3 Payroll, Employment Taxes & Garnishments
11 Managing Human Resources
11.1 Hiring, I-9, Background Checks & Discrimination 11.2 HR Policies, OSHA & Drug-Test Chain of Custody 11.3 Evaluating Employees
12 Florida Contractor Law: Chapter 489 & 61G4
12.1 Chapter 489: Certified vs Registered & Qualifying Agents 12.2 61G4 Board Rules, Advertising & Discipline 12.3 Qualifying Agent Duties, Supervision & Additional Entities
13 Florida Construction Lien Law (Chapter 713)
13.1 Construction Lien Overview & Claimants 13.2 Notices to Owner, Time Limits & Perfecting Liens 13.3 Payment Bonds, Waivers & Claims of Lien
14 Financial Responsibility, CE & Federal Rules
14.1 Financial Responsibility & the 660 FICO Rule 14.2 Continuing Education & Biennial Renewal 14.3 Federal Employment, Immigration, OSHA & Environmental Rules
15 Plans, Specs & Equipment Selection
15.1 Reading Plans, Specifications, Symbols & Scales 15.2 Recommending Plan Changes & Equipment Types 15.3 EER, SEER, ARI Listings & Cost Effectiveness
16 Energy Codes, Loads & Thermal Resistance
16.1 Florida Energy Codes, R-Values & U-Factors 16.2 Determining HVAC Heating & Cooling Loads 16.3 Applying Energy Conservation, Fan Curves & Pump Curves
17 HVAC System & Duct Design
17.1 Designing HVAC Systems (Psychrometrics, Enthalpy & Airflow) 17.2 Designing Duct Systems & Insulation 17.3 Selecting Equipment, Location & Codes
18 Piping, Pumps, Boilers, Controls & Rigging Design
18.1 Pipe Sizing, Valves, Fittings, Sealants & Layout 18.2 Control Requirements, Fan Motors, CFM & Compressor Capacity 18.3 Pumps, Boilers, Steam, Fuel & Pipe Insulation 18.4 Grease Ducts, Live Loads, Rigging & Mechanical Equipment
19 Sheet Metal Duct Fabrication
19.1 Fabricating Rectangular & Round Ducts 19.2 Seams, Locks, Taping, Mastics & Liners 19.3 Fittings, Outlets & Grilles 19.4 Kitchen Hoods, Exhausts & Drain Pans
20 Split, Package & Heat Pump Installation
20.1 Installing Split & Package Air Conditioners 20.2 Installing Split & Package Heat Pumps 20.3 Air-Cooled vs Water-Cooled Systems
21 Large Systems, Chillers & Towers
21.1 Installing by Tonnage & Class A vs Class B Limits 21.2 Chilled Water, Water Towers & Secondary Coolant 21.3 Centrifugal, Absorption & Ammonia Systems
22 Refrigeration, Coolers, Ventilation & Controls Install
22.1 Low, Medium & Ultra-Low Temperature Systems & EPA Rules 22.2 Walk-In & Reach-In Coolers 22.3 Ventilation, Exhaust, Makeup Air, Grease Ducts & Kitchen Exhaust 22.4 Geothermal, Pneumatic & DDC Controls, TAB & Smoke Tests
23 Condensers, Compressors & Air Handlers
23.1 Installing Air-Cooled & Water-Cooled Condensers 23.2 Hermetic, Semi-Hermetic & Centrifugal Compressors 23.3 Air Handlers, Evaporators, Heat Exchangers, Receivers & Heat Strips
24 Duct, Fans, Filters & Terminals
24.1 Installing Sheet Metal, Fiberglass & Flexible Duct 24.2 Fans, Blowers, Motors, Grilles, Registers & Fire Dampers 24.3 Filters, Flues, Warm-Air, Gas & Fuel-Oil Appliances
25 Refrigerant Piping & Joining
25.1 Refrigerant Piping, Copper Tubing & Pipe Sizing 25.2 Brazing, Welding, Flaring, Swaging & Soldering 25.3 Steel Pipe, Plastic Pipe, Threading & Oxy-Acetylene 25.4 Hangers, Supports, Horizontally Supported Piping & Pressure Testing
26 Metering Devices & Line Components
26.1 TXVs, Capillary Tubes, Reversing Valves & Metering Devices 26.2 Liquid, Suction & Heat-Pump Dryers, Filters & Oil Traps 26.3 Receivers, Heat Strips, Gas/Oil Appliances & Related Accessories
27 Controls Installation
27.1 Pressure, Temperature, Humidity & Bellows Controls 27.2 Thermostats, Humidistats, Pneumatic & Solid-State Controls 27.3 Transformers, Capacitors, Contactors, Relays & Safety Disconnects 27.4 Defrost Components, Starters, Solenoids & Limit Switches
28 Motors, Wiring & Electrical Installation
28.1 Wiring Single-Phase & Three-Phase Equipment 28.2 Motor Types, Protection, Controllers, Belts & Pulleys 28.3 Geothermal Loops, Surge Protectors, Phase Monitors & Plastic Pipe
29 Diagnostic Analysis: Refrigeration
29.1 Pressure-Enthalpy Diagrams & Operating Pressures 29.2 Air Volumes, Enthalpy, Wet-Bulb & Dry-Bulb 29.3 Leak Detection & Refrigeration Test Instruments
30 Diagnostic Analysis: Electrical & Instruments
30.1 Current Draw, Voltage, Power & Motor Terminals 30.2 Testing Relays, Capacitors, Starters, Transformers & Defrost Stats 30.3 Using Amprobes, Velometers, Pitot Tubes, Manometers & Gauges
31 Recovery, Repair & Calibration
31.1 Nitrogen & Gas Regulators, Recovery & Retrofit 31.2 Repairing Hermetic, Semi-Hermetic, Centrifugal Compressors & Blowers 31.3 Calibrating Thermostats, Pressure Switches & Pneumatic Controls 31.4 Superheat, Safety Cutouts, Defrost Clocks & Freezer Controls
32 Mechanical Service & Cleaning
32.1 Belts, Pulleys, Motor Rotation & Seized Compressors 32.2 Crankcase & Evaporator Pressure Regulators & Unloaders 32.3 Cleaning Towers, Condensers, Foreign Matter & Condensate Drains
33 Jobsite Safety & Equipment
33.1 PPE: Hearing, Head, Eye, Face & Respiratory Protection 33.2 Lockout/Tagout, Warning Signs, Toxic Materials & Ventilation 33.3 Rigging, Hoists, Cranes, Forklifts, Backhoes & Excavation 33.4 Ladders, Scaffolds, Tools & Air Compressors
34 Energy Management
34.1 Envelope, Duct Pressure & Blower-Door Testing 34.2 Efficient Equipment, Zoning, ERVs, Wi-Fi Thermostats & Green Buildings 34.3 Energy Forms, R/U Factors, Window Heat Gain & Florida Load Calcs
35 Indoor Air Quality
35.1 Ventilation, Filtration, Humidity, UV & Air Cleaners 35.2 Contaminants, Source Control, TAB & Human Health Effects
31.3 Calibrating Thermostats, Pressure Switches & Pneumatic Controls
Key Takeaways Explain This Topic AI
Calibrate air-sensitive thermostats against an accurate thermometer at the sensing element, not against supply-chase air. Set an electromechanical heat anticipator to the measured heating-circuit current. FBC Energy Conservation 2023 R403.1.1 wants an interior-wall, representative-air location.
A chilled-water low-temperature (freeze) cutout is typically set just above freezing, about 35–38°F, and is often manual-reset. It is not a space thermostat and is not a 20°F ice-maker.
A dual high/low pressure control is calibrated against accurate gauges: the high-side cutout is usually manual-reset and sits below the relief valve; the low side uses a cut-out/cut-in differential. Never leave a jumper on either bellows.
Pneumatic main air is about 18–25 psig; the analog branch is 3–15 psig (3 one end, 9 mid-scale, 15 the other). Direct-acting versus reverse-acting and throttling range are the calibration. Pneumatic control piping is Class A; Class B still owes 3–15 theory.
Proportional thermostats modulate across a throttling range; summer-winter changeover needs a deadband. Thermostatic motors (damper/valve actuators) are sequenced by spring range or 0–10 V / 4–20 mA. Bellows-type devices are adjusted at the spring, not by kinking the capillary.
Last updated: August 2026
31.3 Calibrating Thermostats, Pressure Switches & Pneumatic Controls
Trade F next calibrates the controls Chapter 27 installed . The outline cluster is air-sensitive thermostats , chilled-water low-temperature cutouts, dual / low-pressure switches, pneumatic controls, proportional thermostats, summer-winter changeover, thermostatic temperature controls, thermostatic motors , and bellows-type devices. Installation was “where it goes.” Calibration is “ what temperature or pressure it actually makes ,” compared to a thermometer or a gauge , not to the faceplate art. Refrigeration & Air Conditioning Technology , 9th Edition (2021) is the book. FBC Energy Conservation 2023 R403.1.1 still wants the comfort thermostat on an interior wall sensing representative air . Pneumatic control piping remains Class A statutory scope ( F.S. 489.105(3)(f) ); Class B still owes 3–15 psig theory. Class B still stops at 25 tons / 500,000 Btu for the connected system.
Quick Answer: Calibrate against a real thermometer or a real gauge at the sensing element . Heat anticipator = heating-circuit amps . Freeze stat ≈ 35–38°F , often manual-reset . Dual pressure: high usually manual-reset , low has a differential . Pneumatic main 18–25 psig , branch 3–15 (9 mid-scale). Proportional means a throttling range , not a click. Never jumper a pressure switch as a calibration.
Why calibration is a maintenance item
A thermostat that is 3°F off will short-cycle or never satisfy. A dual pressure switch that was “set by ear” will either nuisance-trip or fail to protect . The exam’s move is: what do you measure, where do you measure it, and which screw is range vs differential. Jumping a bellows “until the gauges look right” is how a high-pressure machine runs without a cutout.
Air-sensitive thermostats
An air-sensitive thermostat senses room or duct air — bi-metal, remote-bulb in the airstream, averaging element, or electronic thermistor. Calibration rules:
Compare to an accurate thermometer at the element , not to a probe in the sun on the west wall and not to supply-air temperature.
FBC Energy R403.1.1 : at least one thermostat per separate heating and cooling system, interior wall , representative air — not a supply chase, not an uninsulated exterior wall.
Electromechanical heat anticipator : set to the measured current of the heating circuit (ammeter in series with W ). Typical gas-valve circuits are a fraction of an amp (often about 0.2–0.8 A — measure , do not guess). Too low an anticipator setting short-cycles . Too high makes long overshoot . Cooling anticipators are often fixed .
Electronic stats: offset / calibration in the installer menu; deadband so heat and cool do not fight. Do not use a heat-pump O/B mismatch as a “calibration.”
Old mercury bulbs (mostly gone) had to be level . A tilted mercury stat is a calibration error , not a new subbase.
Worked anticipator. A gas RTU’s W circuit draws 0.45 A with the valve energized. Set the anticipator to 0.45 , not to the highest number “so it never shuts off” and not to the lowest number “so it responds faster.” Then compare the element to a calibrated thermometer at setpoint .
Chilled-water low-temperature (freeze) controls
A chilled-water low-temperature cutout (freeze stat) protects a water coil from freezing when outdoor air is cold, when a chiller overshoots, or when flow is lost . It is not a space thermostat.
Sensing bulb or capillary in the leaving water or strapped in the coldest coil circuit , metal-to-metal, insulated from false ambient.
Setpoint typically just above freezing — teaching band about 35–38°F . 20°F is how you split a coil .
Often manual-reset so the operator finds the flow or damper problem instead of cycling ice.
Do not substitute a space stat or a low-pressure refrigerant switch for freeze protection on a hydronic coil.
Class B still sees freeze stats on legal ≤ 25-ton chilled-water air handlers. A 30-ton AHU with the same freeze stat is Class A tons. North Florida (Jacksonville, Panhandle) sees freeze-stat work on economizer AHUs; South Florida still uses the same setpoint because a lost-flow chiller can ice a coil in July.
Dual and low-pressure switches
A dual high/low pressure control puts two bellows in one housing (Chapter 27.1). Calibration:
Side Taps Typical action Calibration
High pressure Discharge Opens on high head ; usually manual-reset Set below the relief valve , above expected head. R-22 teaching neighborhood often ~ 375–400 psig ; R-410A often ~ 600–650 psig — use the listing .
Low pressure Suction Opens on loss of charge / freeze / pump-down ; often auto-reset with a differential Set cut-out and cut-in to the OEM. Pump-down cut-out is often a few psig, not 40 psig on 410A.
Oil-pressure safety Oil pump vs crankcase Section 31.4 Net oil pressure; not this dual switch.
Calibrate with accurate gauges (or a pressure pump / deadweight on the bench). Range screw moves both cut-out and cut-in; differential screw spreads them. Never leave a jumper on either bellows as a “repair.” Raising a high-pressure cutout to hide a dirty condenser is a Section 31.4 fail.
A low-pressure control used alone is the same suction bellows without the high-side. On pump-down, the thermostat drops the liquid-line solenoid ; the LP stops the compressor. Calibrating LP as if it were a box thermostat is how you short-cycle a freezer.
Pneumatic, proportional, summer-winter, thermostatic motors
Pneumatic main air is about 18–25 psig after the dryer and filter . The analog branch signal is 3–15 psig : 3 psi one end of travel, 15 psi the other, 9 psi mid-scale . Plenum tubing is UL 1820 (FBC Mechanical 602.2.1.3 ).
Calibration of a pneumatic thermostat :
Tee a 0–30 psi test gauge in the branch .
With the space at setpoint , a proportional stat should sit near 9 psig .
Direct-acting (DA) : temperature up → branch pressure up (typical cooling ). Reverse-acting (RA) : temperature up → branch pressure down (typical heating ).
Throttling range (proportional band) is the degrees that swing the branch 3 to 15 . A 2°F band hunts ; a 20°F band never satisfies . Comfort often lands around 4–8°F — use the sequence.
One-pipe stats bleed through a restrictor ; a clogged restrictor looks like a bad thermostat. Two-pipe stats have a dedicated supply and branch.
Proportional electric/electronic thermostats are the same idea in 0–10 V or 4–20 mA : output is modulating , not a click. Calibration is zero, span, and throttling range , plus direct vs reverse .
Summer-winter changeover (two-pipe hydronic, some heat pumps, some pneumatics) must have a deadband . Changeover on water temperature (hot water vs chilled water) or outdoor air , not on a random toggle that lets the same coil heat and cool in the same hour. A summer calibration that is perfect will be wrong in winter if the stat is DA when it should be RA .
Thermostatic motors (damper and valve actuators ):
Pneumatic spring ranges are often 3–7 and 8–13 psig so valves sequence (one starts after the other).
Stroke: 90° on many dampers, linear on globe valves. A stopped linkage is a calibration miss.
Electric floating (open/close/stop) vs proportional (0–10 V) vs spring-return fail-safe. End switches must actually make .
Thermostatic (wax/bellows) radiator valves are self-powered; you set the head , you do not feed them 24 V.
Class A owns pneumatic control piping . Class B still has to read 3–15 psig and DA/RA on the exam, including on a 20-ton (legal Class B) AHU that happens to have leftover pneumatic stats from a renovation.
Thermostatic temperature controls and bellows-type devices
A thermostatic temperature control is a remote-bulb or bi-metal switch with a range and a differential (cut-out vs cut-in). Examples: box stats, coil stats, fan-limit combinations, defrost termination (Section 31.4). Calibration:
Bulb metal-to-metal in the medium you actually care about (air, water, product). A box stat with the bulb in the discharge of the coil reads coil , not product .
Differential too tight short-cycles the compressor; too wide swings the product .
Bellows-type controls (temperature or pressure) use a volatile fill and a capillary . Do not kink the capillary. Do not flatten the bellows to “make it trip sooner.” Adjust the spring (range) and differential screws. A bellows that has lost charge will not calibrate — replace the control.
Florida HVAC scenario
A Class A crew in Hillsborough County commissions a two-pipe AHU with a pneumatic proportional stat, a chilled-water freeze bulb, and a dual pressure switch on a 20-ton DX backup (Class B tons, but the pneumatic mains are Class A ). They set the freeze stat to 20°F “so it will not nuisance,” jumper the dual pressure switch “until gauges look right,” and leave the pneumatic stat DA in winter with a 2°F throttling range. Result: a frozen coil , a compressor without high-pressure protection , and a hunting damper. Correct: freeze 35–38°F manual-reset , dual pressure calibrated to gauges with high-side manual-reset , branch 9 psi at setpoint , RA for heat , deadband on summer-winter.
Traps: (1) Calibrating a wall stat against supply air. (2) Anticipator at either stop. (3) Freeze stat at 20°F. (4) Jumpered dual pressure. (5) Mixing main 20 psi with branch 3–15. (6) Class B bidding pneumatic mains. (7) Flattening a bellows instead of turning the range screw.